9.1. SR 05-18-2015 �j
Elk = - Request for Action
River
To Item Number
Mayor and City Council 9.1
Agenda Section Meeting Date Prepared by
Work Session May 18, 2015 Cal Portner, City Administrator
Item Description Reviewed by
Street Assessment—John Alfords Justin Femrite, City Engineer
Reviewed by
Action Requested
None, receive information and provide direction if necessary.
Background/Discussion
Mr.John Alfords appeared before the City Council on May 4, 2015, at Open Forum to express his
concerns for the amount of his property tax assessment following the street improvements in 2007.
The city administrator and city engineer met with Mr. Alfords on July 1, 2013, to discuss his concerns
with the franchise fee. Each has had multiple follow-up phone discussions with him on the topic since
the meeting in 2013,which tend to follow each rebate mailing sent to property owners per Council policy.
Our records concur with Mr. Alfords' statements regarding the 2007 assessment. Public hearings were
held in accordance with state law for the street improvement projects. Mr. Alfords did not appeal his
assessment at that time as prescribed by law.
The Council approved a policy for rebating the franchise fee paid by property owners who also paid or
are currently paying street improvement assessments. The Council's intent was to exempt property
owners in the identified assessment repayment period from temporarily paying the franchise fees.
The franchise fee funding program for street improvements was designed to be prospective, collecting
funds for future street improvement projects.
Apartment dwellers frequently pay their own utilities and subsequently are served by the transportation
system thus are intended to fund the street improvement program. Multi-family building owners, under
the former funding program,were required to pay the identified costs of street improvements. The new
funding program places the funding burden on the renters who utilize the streets, not the property owner,
who may have trouble recovering the assessment costs from lease rates because they are market driven;
therefore, a renter would likely not have paid a portion of the old assessment.
Financial Impact
N/A
Attachments
■ February 5, 2007, Request For Council Action (Public Hearing)
p0WIRED 0
NA UREJ
■ April 2, 2007, Request For Council Action (Assessment Hearing)
■ April 2, 2007, Meeting Minutes
■ 2014 Franchise Fee Rebate Application Form
N:APublic Bodies\Agenda Packets\05-18-2015\Final\Laserfiche\x9.1 sr Street Assessment-John Alfords.docx
City of Elk River Item
REQUEST FOR COUNCIL ACTION 5.2.
OWN
Irving Avenue Area Street Rehabilitation Improvement — Public
Introduction
The public hearing for the Irving Avenue Area Street Rehabilitation Improvement is scheduled
for this evening's Council meeting. Please bring your feasibility study which was distributed at a
December meeting.
Discussion
As with previous street reconstruction projects, an informational meeting has been held. The
minutes and presentation from that informational meeting are in the appendix of the feasibility
study. I will have a PowerPoint presentation very similar to the informational meeting which I
will go through at the public hearing. As with previous reconstruction projects, the assessment is
proposed on a residential unit basis. The proposed assessment rate for 2007 has increased
modestly from 2006 and is proposed at $6,650 per residential unit. There are a few properties on
this project that are not typical residential units. There is a small apartment building and a small
townhouse complex. As with the 2006 reconstruction projects, these units are proposed at 0.75
residential equivalents per dwelling unit. The other property that is non - residential is the St.
Andrews Church and school property. I have met with representatives of St. Andrews Church
individually and indicated to them that the parcel they own on the west side of Irving Avenue at
4`h Street is proposed as 1 unit and their church and school frontage on the east side of Irving
Avenue is proposed at 6 units, based on the length of frontage and similar -sized residential
properties. Therefore, their total proposed assessment for this project is seven units.
The biggest issue beyond the assessment amount at the informational meeting was the issue of
whether or not sidewalks are needed in the Irving Avenue area. As directed by the City Council
at the public hearing I will have a recommendation for sidewalk routes throughout the
development. At the end of my presentation I will be available to answer questions from the City
Council and/or public.
The feasibility study analyzes the potential for paving the alleys between Jackson Avenue and
Irving Avenue, 8`h Street on the north and 5`h Street on the south. At the public hearing it will be
my recommendation that this work be excluded from the improvement project. The reason I am
making this recommendation is the cost to pave the alleys far exceeds the ability for the adjacent
properties to be assessed for the improvement. Because the alleys carry heavy loads with garbage
trucks in the spring of the year, the alleys would need to be built as strong as a city street. This
would require some grading of the alleys, a thick gravel base, and two lifts of bituminous
surfacing. Otherwise, the alleys will be subject to breakup every time a heavy truck travels down
them. Many of the properties that abut the alley, especially on the Irving Avenue side, do not
actually utilize the alley for their driveway access. I believe it would be a better approach to
simply re-grade the alleys and re- gravel them as a maintenance -type project without any
assessment to the abutting property owners. If the Council would like, this work could be
accomplished by the contractor for the street reconstruction project.
At the close of the public hearing, it would be appropriate for the Council to consider four
resolutions: The first orders the improvement and the preparation of plans and specifications, the
second approves the plans and specifications and orders the advertisement for bids. This will
allow the project to bid prior to the assessment hearing. The third determines the amount to be
assessed and orders the preparation of the assessment roll, and the last resolution sets the
assessment hearing for April 4, 2007.
Financial Impact
Based on the feasibility study which includes the cost of the alley construction, the amount to be
funded by the City is approximately $2.1 million out of a $3.4 million project.
Attachments
• Resolution Ordering the Improvement and Preparation of Plans and Specifications
• Resolution Approving the Plan/Specifications and Ordering the Advertisement for Bids
• Resolution Determining the Assessment Cost and Ordering the Preparation of the
Assessment Roll
• Resolution Establishing the Date for the Assessment Hearing
Action Requested
At the close of the public hearing, the Council is requested to take action on the four resolutions
included in the packet.
Council Action Motion by Second by vote _
Follow Up
5: \Engineer1mpmvPmj \2007 Improvement Pmje s \Irving Ave Area \02 05 07 CC memo.doc
City of Elk River Itei
REQUEST FOR COUNCIL ACTION 5.1.
Administration I Anril2. 2007
Irving Avenue Area Street Rehabilitation Project — Lori Johnson, City Administrator
Assessment Hearing
Introduction
The Irving Avenue Area Street Rehabilitation Project Assessment Hearing is scheduled for this
evening's City Council meeting. I will be prepared with a brief PowerPoint presentation which
discusses the proposed improvements and the financing aspects of the project After my
presentation, I will be available to answers questions from the City Council and /or public.
Discussion
As you are aware, a resident of Irving Avenue appeared at the City Council Open Mike on March
12, 2007 and presented some information relative to sidewalk location. Attached is a petition the
same resident has circulated through the area, asking for the sidewalk on the east side of Irving
Avenue to be located immediately behind the concrete curb and gutter. Based on this
information and the City Council's recent discussion regarding the same issue at the Deerfield 3'
Assessment Hearing, I will be recommending that the sidewalks all be located immediately behind
the concrete curb and gutter on this project.
Part of my presentation will touch on the property owners' rights relative to an appeal of the
assessment It is important to remember that the property owners must submit a written
objection at or before the assessment hearing in order to preserve their right to appeal the
assessment. Simply speaking at the public hearing and voicing an objection is not sufficient to
preserve the right to file an objection with the District Court
Construction bids were received on Thursday, March 15, 2007. There were a total of 12 bidders.
A full bid tabulation is attached. The low bid was received from Redstone Construction Co., Inc.,
the same contractor who was low on the Deerfield 3'd Addition, in the amount of $1,468,281.78.
This is below the feasibility study estimate for the construction cost. Therefore, as with the
Deerfield 3`' project, we will be recommending a reduction in the assessment rate for the street
reconstruction from $6,650 per residential lot to $6,500 per residential lot (the 2006 assessment
rate). There is a portion of this project which will be receiving an overlay. That assessment is
proposed at $1,950 per residential lot and is recommended to stay the same.
At the close of the assessment hearing, it would be appropriate for the City Council to consider
the attached resolution. The first one adopts the final assessment roll (which is also attached).
This can be adopted with any revisions to the assessment roll that the City Council deems
appropriate after listening to testimony from the public. If the City Council concurs with staff
S: \Engineec1mprovProj \2007 Improvement Projects \Irving Ave Area \04 02 07 CC memo.doc
that the reconstruction assessment amount should be reduced to $6,500 per residential lot, a new
amortization schedule will be sent to each property after the assessment hearing, indicating the
action the Council has taken. The second resolution awards the contract. It would only be
appropriate to consider this resolution if the resolution adopting the assessment roll is passed by
the City Council. Award of the contract should be conditioned on the ERMU Commission's
agreeing to pay for the water improvements. Bryan Adams will be recommending this at their
Commission meeting on April 10" `.
Financial Impact
Based on the low bid received, the total project cost including overhead and a 5 percent
contingency is estimated at $1,952,814.77. There are a total of 136.5 street reconstruction
assessment units at $6,500 and 30 overlay assessment units at $1,950. Therefore, the total
assessment is $945,750. The remaining project cost is proposed to be funded by the City and the
Elk River Municipal Utilities, who have a small amount of watermain replacement in the project.
Attachments
• Sidewalk petition
• Assessment roll
• Bid tabulation
• Resolution adopting final assessment roll
• Resolution awarding bid and authorizing execution of the contract
Action Requested
The City Council is asked to consider adoption of the attached two resolutions at the conclusion
of the assessment hearing.
Council Action Motion by _ Second by _ Vote
Follow Up
S: \Enginea1mprovPmj \2007 Improvement Projects \Irving Ave Aces \04 02 07 CC nx mo.doc
a�
a.�
U
Q
a
a
a
2
SS88
888S88S81°
°o
°0
°0
888S88S8
8
8888888888
8
N N
o
°
0
°8888888
0
88885888
88888888888888885
ooc
oo
�m��mmm�l'q'ommm"ra
Ci
ui
ooi
o
I`Id
woo
vi
m'�wwSi
o0
0
0
0
gc;amaw
OM
99s9999999i9
WWOWW�v��w$'
m
m
m
m
m
9
_T
�p
��I�aoo�a000lo���!o
o
a
v
ymmmmm�m
pp
a
$$1$aa$$I
a
a
a
b
bIb
°aaa
a
o
°aa
b
°l$aa$$�a$
a
b
o
a
a
p
m'
wnwnn
»Inw
»wNwv
ilN
�wN
m
mlm
m
�Im
w
WI
'o.'
gig
A
m
m
@�
�I3
y
y
0
v
H!v
C C
J J
G
J
C
J
C
J
n'
c
J�
C
J
SEC
J
J
'J
........
J
J
d—
JIJ
J
J
n—
J
J
j�11
4
a
99JJ,�
4�
a'p
a
aa!b
a
a "a
t
m
m
m
m
m
m
t
m
m
[t
m
m
m
tttl
m
m
m
m
t
m
m
I
i
J
mmm
J
J
J
J j
mmIO�
m
m
m
m
m
O
JIJ
J
mmm
J
JIM
I�
"3
a
I(m�
J
1pT
1L
SZL
J
J
�R
JJ5
{yy11
JJ
JJ
8pO
Q
N
O
N
V
N,Jj.
V
Nj
N
Y
N
N
Y
N
t�Y
Y
Nj
V
Nj
OIL
P
N
PIP
N
m
Nj.
m
O
N
I(�p
Y
N
n
a
N
a
N
Ommppm
P
Nj
V
N
p�
N
t7
^
Niln
p
Id
O
Q
m
Q
O
0
b
N��
ONO
pJ
I(J�
V
p�1��alawa���
m
1d
°
m
N
N
N
O
N
N
N
I
Qop
�Q(
�Q(
4
0
0
O
O
O
O
O
O
4
O
q�
q
�
I
I
i
I
I
I
I
I
N
V
I
10
h
I
I
1
O
h
I
N
d
3
o
W
O
M
d
m
W
pC
W
N
W
m
a
I
a
zY
�m
o
>�
tll
zZwylw
C
K
z
_ >z
fq
W
K
0
wl<
��
Z
8
ryry
Z
c
CS
5
N
I�N
S
Zlz
rIqw ;1[l
�
w
f°O
0
l0t'
m
Y
N
N
a
N
r
d
mnb
6
Z
�i
K�
Krc
KKR:ii
KIYrcK
W
sY
W
W
m2�
���9
IWI
"g�.gaaa
iii
W
W
�i
��mw��
W
W
zaryN
W
�
IW
WWIIIIILILRKK�K�S`mILILWIII
22$$
WIW
ii
W
W
zing
W'
33
Z�
Z
Z
W�31W
W
W
Y
W
W
Z
Z
Z
>2
Z
Z
Y
wl>
Z
3U
Z
I
Z`LIL
>l�
`L
>
�!ZI2
Z
ZI
W
Z
Y
W
`L�
Z
mS
>
a
�>
aqs
>wlziii
Qa�i
�'yyaa
aa�`a
>31a�
I
aalaaal3Za�aaa
`�j
C
C
pia
..
v
�n
LV
Y'LCCC
wl
CC
U�'C
r.
M
IS
JR[Y�.Y
VViVUUe
Y`$lam!aaaamv
CSmMtiltYS
NNyx
�x
..CC
51N
x�{�{pp
�vJpdi
I(�Opmi
-pdi
���p-mmi
�mpt���
IZ
�O�Op
pp
1p�y
{�y
MO
IN
n
N
N1d
Nb
NNINw
N
N_N
N
ml$
v
u>NN
IMmN
I)r
Ivi
In
17)mmw
0w
9m_
La
Ix5
Q
mIE
I
N
❑�g
m
mIm
US
m
IJ
8
w
m
C
a
g
g
J
LI
O
o
u
3
J
L
JIJ
L L
>..
m
al
p
❑
al
NNI
a6lm
°a
-�
N
L
y
C
F
d
m
'0
v
mew
<tl
c
M
a_I'
m'
m
m
x
mc°
E
`v
0
w"rvv
m'
ebww
;
ti
owm
c
ep
CC7
m
'oowwysb`dZ�
etl
e
WIn
m
ro
U'
c
aIa
1 l
a
O
W
mmmEl
a
g
w
d
a
K
Jm2�
g
V
m
U
c
<
m
�z�mEl
0
c
g
0,0
m
w
�inxmx
�arrc�a3uxw¢�g
rc-,
yrn
-Li
UaoOwn
mil
om�m,m
I
I
I
i
I
l
(
I
'Ow'
E
`m
E
nlm
x.g-�
mo�EmI=W
owl
aI
E
I
mN
E
E
L
IQ
ao
°
I
ppNnIJ
j
iz
m
°J
�i
y9!
�j
j
a Ja`t
gg �oK
`
m
h
w
Oww
Z
le yLX
lW c
c
o
Y
m
Y
R
a
J
a
x
Nyd
d
M
U
m
a
g
MEETING OF THE ELK RIVER CITY COUNCIL
HELD AT THE ELK RIVER CITY HALL
MONDAY, APRIL 2, 2007
Members Present: Mayor Klinzing, Councilmembers Zerwas, Farber, Gumphrey, and Motin
Members Absent None
Staff Present: City Engineer Terry Maurer, Finance Director Tim Simon, Fire Chief Bruce
West, Ice Arena Manager Rich Czech, Police Chief Jeff Beahen, City Clerk
Tina Allard, and Deputy Clerk Jessica Miller
1. Call Meeting To Order
Pursuant to due call and notice thereof, the meeting of the Elk River City Council was called
to order at 6:30 p.m. by Mayor Klinzing.
MOVED BY COUNCILMEMBER FARBER AND SECONDED BY
COUNCILMEMBER MOTIN TO APPROVE THE AGENDA. MOTION
CARRIED 5 -0.
• 3. Consider Consent Agenda
MOVED BY COUNCILMEMBER FARBER AND SECONDED BY
COUNCILMEMBER ZERWAS TO APPROVE THE FOLLOWING CONSENT
AGENDA:
3.1. COUNCIL MINUTES
02/20/07
03/12/07
• 03/19/07
3.2. CHECK REGISTER
3.3. MASSAGE THERAPIST LICENSE TO MELISSA WALLIN TO WORK
AT SALINA SALON AND DAY SPA
3.4. SPEND $5,344 FROM FORFEITURE FUNDS TO ISSUE NEW BADGES
3.5. GENERAL PLANNING PERMIT TO HOME DEPOT FOR A GARDEN
CENTER WITH THE FOLLOWING CONDITIONS:
1. NO ELECTRICAL SERVICES SHALL BE ACROSS ANY DRIVE OR
WALKING SURFACE.
2. ALL MERCHANDISE SHALL BE INSIDE THE GREENHOUSE
UNRELATED ITEMS SHALL NOT BE DISPLAYED IN THIS
AREA.
3. IF TRAFFIC BECOMES A PROBLEM AROUND THE TEMPORARY
SITE AS DETERMINED BY THE CITY, THE SALES AREA SHALL
BE DELINEATED WITH A BARRIER TO RESTRICT TRAFFIC.
4. THE GREENHOUSE /GARDEN CENTER BE MAINTAINED
FREE OF DEBRIS AND KEPT IN AN ORDERLY CONDITION.
City Council Minutes
April 2, 2007
Page 2
5. THE LOCATION OF THE GREENHOUSE IS CONSISTENT WITH •
THE SUBMITTED SITE PLAN.
6. THE GREENHOUSE AND DISPLAY AREA BE REMOVED BY
JULY 22, 2007 (WITHIN ONE WEEK OF THE END OF THE SALES
PERIOD) AND THE SITE BE RETURNED TO ITS PREVIOUS
CONDITION.
MOTION CARRIED 5 -0.
0001�.
No one appeared for Open Mike.
5.1. Pavement Management Program 2007, Public Hearing (Irving Avenue)
Mr. Maurer reviewed the Irving Avenue Street Rehabilitation project. He stated the property
owners have a right to appeal their assessment but must submit a written objection at or
prior to this assessment hearing in order to preserve their right to appeal the assessment
with the District Court. I le stated simply voicing an objection does not protect their appeal
right.
Mr. Maurer reviewed the bids and noted that Redstone Construction Co. was the lowest
responsible bidder at $1,952,815.
Mayor Klinzing opened the public hearing. There being no one to speak to this issue, Mayor
Klinzing closed the public hearing. •
Mr. Maurer noted a written objection was received and requested the Council act on the
objection.
MOVED BY COUNCILMEMBER MOTIN AND SECONDED BY
COUNCILMEMBER FARBER TO DENY THE WRITTEN OBJECTION OF
RICHARD CAMPBELL, 614 5TH STREET, PID # 75 -412 -0160 BASED ON THE
FINDING THAT THE BENEFIT TO THE PROPERTY WILL EXCEED THE
AMOUNT OF THE ASSESSMENT. MOTION CARRIED 5 -0.
Mayor Khrizing explained to Mr. Campbell the appeal process and Mr. Campbell indicated
that he understood.
MOVED BY COUNCILMEMBER FARBER AND SECONDED BY
COUNCILMEMBER ZERWAS TO ADOPT RESOLUTION 07 -41 ADOPTING
FINAL ASSESSMENT ROLL IN THE MATTER OF THE IRVING AVENUE
AREA STREET REHABILITATION IMPROVEMENT OF 2007. MOTION
CARRIED 5 -0. ($6,500 for property owners that are part of the street reconstruction and
$1,950 for property owners being assessed for the overlay)
MOVED BY COUNCILMEMBER FARBER AND SECONDED BY •
COUNCILMEMBER MOTIN TO ADOPT RESOLUTION 07 -42 ACCEPTING
13065 Orono Parkway
Elk River, MN 55330
2014 City of Elk River
Franchise Fee Rebate Application Form
Applicant Name:
Property Address:
Mailing Address (if different):
PID # (if known):
Phone Number:
Applicant's Certification
By my signature below, and as the applicant for this franchise fee rebate, I represent and agree that:
a) I understand that franchise fee rebates are only available to properties which are currently paying
street improvement assessments; b) I understand that only one application per property is eligible;
c) I understand that I must be the owner of the property and provide proof of the franchise fee
payments; d) I certify that I have been paying the franchise fee for the property for the rebate
period; e) I understand the City of Elk River will be verifying all applications.
Property Owner
Date
Mail this application along with copies of a November or December gas bill and electric bill
showing the franchise fees to:
City of Elk River
Attn: Franchise Fee Rebate
13065 Orono Parkway
Elk River, MN 55330
* *2014 Rebate Applications are due by January 31, 2015. Checks will only be
issued once per year in March.
Phone: 763.635.1000
Fax: 763.635.1090
www.elkriverrnn.gov
P R N E R E R R 1
NATUREI