HRSR WORKSESSION 01-05-2004 City of River MEMORANDUM TO: Housing & Redevelopment Authority FROM: Catherine Mehelich, Director of Economic Development/' DATE: January 5, 2004 SUBJECT: Downtown Revitalization Project—Work Session The purpose of the HRA work session is for the HRA to informally discuss issues related to the Downtown Revitalization Project. Because the meeting is a work session,the HRA must not make any formal motions or actions. Staff requests the HRA's discussion and direction regarding the following work session • issues: Project Communications The attached memo from Heidi Steinmetz,Assistant Director of Economic Development outlines staff's proposed communication and distribution methods to the public regarding the Downtown Revitalization Project. Staff requests the HRA's direction if there are any other communication tools or methods to be added to the list. Downtown Parking Options Terry Maurer,City Engineer will be present to discuss the research he's completed regarding various parking options in the downtown. Mr.Maurer's memo and background information is attached to this cover memo. Development Agreement Issues Jim Prosser and Sid Inman of Ehlers&Associates will be present at the meeting to verbally discuss development agreement issues with the HRA. Staff anticipates that the developer will not be present for this discussion. • • City of Elk -�-1 River MEMORANDUM TO: Housing & Redevelopment Authority FROM: Heidi Steinmetz, Assistant Director of Economic Development DATE: January 5, 2004 SUBJECT: Downtown Project Communications Attachment August 2003 Downtown Revitalization Q &A Newsletter Background Beginning in February of 2002, communications for the Downtown Revitalization Project have included the following tools and distribution methods: Open Houses Open houses are scheduled with the HRA's consent at critical points in the process in which the HRA requests public comment. The City has held three public open houses on the project. Q &A Newsletter Project newsletters, "Q &As" are developed during critical points in the process when formal actions are made by the HRA or when the public feels the need for new information. Five issues of the Downtown Revitalization Q &A Newsletter,which responds to some of the recent questions about the project, have been distributed in the Elk River Star News, at City Hall, the Chamber of Commerce, Municipal Utilities and at each public open house. The most recent newsletter from August 2003 is attached. City of Elk River Newsletter The Current Periodic articles on the project have appeared in The Current. The Current is distributed in the Elk River Star News every other month and is available at City Hall. Due to a long delay between publication and distribution times, the articles are more general in nature. City Web Site Project updates are available on the Downtown Revitalization page of the City web site. The • page is updated as project activities occur, typically following the most recent HRA meeting. Downtown Project Communications Page 2 of 2 Rivers Edge Downtown Business Association Staff provides verbal updates on the project to the Rivers Edge Downtown Business Association at the Rivers Edge monthly meetings. Rivers Edge meets regularly on the 2nd Wednesday of every month. Elk River Star News Staff is interviewed by the Elk River Star News as project activities occur. Direct Mail Per the direction of the City Council in July 2003, staff began sending monthly HRA meeting notices to approximately 200 downtown property owners, tenants, and citizens. Issue for Discussion In 2004, staff will continue the above listed communications, however staff requests feedback from the HRA on current and future communications activities, such as the direct mail meeting notices. O 0 • 1 i, VOøZtOLøil(eUt&4ttDIt/ City of &A Newsletter EAUGUST 2003 Ri's. e Enhancing Downtown Elk River's Role / As a Vital Retail,Commercial and Residential Area. Q.What exactly does Metro Plains have planned ment forms were made available at ArtSoup via a display for the Bluff Block and the Jackson Block? booth on the project, and on the City Web site. A.The redevelopment concept includes the following: Bluff Block Development ------.4-1, Q.What type of comments BLUFF BLOCK DEVELOPMENT were received? Southwest corner of Main St. and ' A.The majority of comments County Rd. 42(Parrish Ave. Bridge) ,Y.,,11.111..::: " . — 10,000 s.f. commercial on first ,: ii.lF`' reflected approval for the use of floor along Main Street($13/s.f. commercial and retail space in the 4 -. _ concept, the design features and avg. rent) sp , a 1 , the waterfront connection. Opinions — 52 units of for-sale housing .` �'�� rr� t� 4, i,��° . were split on the relocation of the Gazebo to the open ace — 70 80 below grade parking - i' ': : - to . • . �t p p stalls for housing and commercial ":° -=1. 1 '�� _°p 44, _ between the Cinema Building and g : „ �, the Sunshine Depot. The biggest residents �'' , Till �k ',' iii xa t :1:,11 .1.11_7.-_ �? �_ �_ � �;��������:�;�,�� �- _- concern expressed by the public Connection to City's Riverwalk e z �4 V,,,g m development gi z �'. +!,r.--4!',4<2•- • was whether there would be suffi tN cient parking downtown during Jackson Block Development _ r' ,. construction and after the develop- Northeast corner of Jackson Ave. ment was completed. and Main St. JACKSON BLOCK DEVELOPMENT — 10,000 s.f. commercial on first Q. How will the need floor along Jackson Street and at . u m for additional parking the corner of Jackson and Main .. `,. c -' _-- >' during construction be 32 units rental housing (16 1 bed �/ '„� . ; �� addressed? room units at$600 per month and wI p - ,. . , . A. Parking plans will be prepared 16 2-bedroom units at$700 per •Il i - r P, . for both the construction period month), which are slightly higher °" ,,, _ "_ . , ,. , and final development. The City than current rental rates for units '. ''lr � itcti�4 ' �j,�c�vrs� � $,,., �� and MetroPlains are currently. x41• '' 6111s\�:;►-�°;,` in downtown Elk River .. ,r.. : ,. exploring a variety of alternatives — 3 stories , ;•., 'I1I 1 1111 illfeil''�i �` ..- that include both better utilization U to 52 below grade parking _` ` - - ' ' of some existing parking, acceler- uniiits for housing residents and .7--17-,-0-:17-..-_- �� �"- '' �� ating the timing of parking con- commercial and 18 surface units struction, closing off King Avenue, and utilization of other existing Q.What happened at the space for parking. The City recognizes that since many June 18th Open House? of the businesses rely on public parking, adequate and A. Following a presentation of development concepts by well located parking spaces are key ingredients to MetroPlains, the public spoke with project representatives the continued vitality of existing and new businesses in and filled out comment forms providing specific feedback our downtown. on parking; the use of commercial and retail space; design features; relocation of the Gazebo to the open space Q.When will a final solution to the parking issue • between the Cinema Building and the Sunshine Depot; and be determined? the waterfront connection. The project would begin with A.The City and MetroPlains will resolve the parking issue and any development at the Jackson Block, which is currently a other design and planning issues before entering a final devel- parking lot, and use that project to make development on opment agreement. It is expected that the City and MetroPlains the Bluff Block more financially feasible. In addition, com- could enter a final development agreement this year. CITY OF ELK RIVER DOWNTOWN REVITALIZATION Q&A NEWSLETTER AUGUST 2003 Q. Are there any other new developments with Q.When is acquisition of properties likely the Downtown Revitalization Project? to occur? A.The Elk River Housing and Redevelopment Authority(HRA) A. It is too early to tell exactly when acquisition would occur. • reviewed the MetroPlains design concept in June and City staff However, it is likely that acquisition would not occur until after the summarized the open house activities for the HRA at a special City and MetroPlains would enter a final development agreement. meeting.The HRA has directed City staff and MetroPlains to prepare a list of development agreement issues that would be Q. Is this redevelopment a "sure thing"? brought back to the HRA in the next 30-60 days. A. No. Redevelopment is complex. A redevelopment project must meet the goals of the community and pass the test of both Q.What conditions must be met before the City market and financial feasibility. In the preliminary development would enter a final development agreement phase, the developer is still working through these issues. with MetroPlains? A.The developer must complete the refinement of the plan Q.Why is the City pursuing redevelopment based on public, staff, and HRA comments. Once that is com- revitalization of downtown? pleted they will update the project budget and market analysis A. The downtown riverfront is very important to Elk River. The to be able to demonstrate that the project is financially City has identified its long term vitality as a community goal. feasible. If the project meets those tests, the City will enter a For more than 30 years studies have emphasized the need final development agreement with MetroPlains. to better utilize the riverfront, capitalize on the traditional character of downtown, and ensure safe pedestrian and Q. How will the redevelopment be funded? vehicle movement. Investment in downtown has stagnated A. Most of the project funding will be provided by the developer. and the riverfront is underutilized. The revitalization will In addition, the developer and the City have applied for state enhance downtown Elk River's role as a retail, commercial, grants available for this type of downtown redevelopment proj- and residential area and revitalize the investment made in ect. Finally, the developer has requested assistance to close the downtown business district. the remaining gap in redevelopment costs. The assistance requested includes a write down in the cost of the City-owned Q. How can I stay informed? property and tax increment that would be generated from the A. Copies of this and future newsletters will be provided at Elk River new development. The City has retained financial consultants City Hall,the Elk River Area Chamber of Commerce, Elk River to review this request to be assured that the amount requested Municipal Utilities,and the Elk River Star News. In addition, proj-W from the developer is justifiable and reasonable. ect updates are provided in the Elk River Star News,on the City Web site at www.ci.elk-river.mn.us, and at the Rivers Edge Q.What is the current time frame for the project? Downtown Business Association meetings. If you have questions A. If the City and MetroPlains move to a final development agree- about the revitalization process, please contact Economic ment in October when the preliminary development agreement Development Director Cathy Mehelich at(763)635-1000. expires,the earliest construction could begin would be some- time in mid-2004. City of Elk -�-� River 13065 Orono Parkway Elk River, MN 55330 • Fr;r:;e1C- • !V:4ri Howard R. Green Company December 24, 2003 File: 813320J-0325 Ms. Cathy Mehelich Director of Economic Development City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: DOWNTOWN PARKING EXPANSION AND AUXILIARY ITEMS Dear Ms. Mehelich: As you are aware, I have been requested to do some preliminary design and cost estimating on a number of issues related to the downtown redevelopment project and the expansion of parking. This letter is intended to summarized these issues and provide some background into each of them. They • are as follows: A. Pedestrian Bridge Across Trunk Highway 10 The first issue explored was the potential of constructing a pedestrian bridge across Trunk Highway (TH) 10. The first location we looked at was immediately west of Jackson Avenue from the parking lot on the north side of TH 10 to the south side. There is virtually no area open for the landing of a bridge at this location. For this reason, we moved the location slightly to the east, as shown on the attached exhibit. The bridge could just as easily be moved slightly to the west and be located from the parking area on the north side of TH 10 to the parking lot behind Kemper's drugstore on the south side of the highway. As we looked at the style of bridge and means of accessing it, we explored the highway right-of-way relative to the railroad right-of-way. We have assumed that we will be unable to construct any portion of a pedestrian bridge within the railroad right-of-way. The highway requirements are a vertical clearance of 17 feet 5 inches, and a minimum horizontal clear zone of 11 feet from the edge of the travel lane. The other criteria we used in the preliminary design was a minimum slope on the ramps leading to the bridge of 12:1, as per the Americans With Disabilities Act. Given these design criteria and the available space, the only type of ramps accessing the pedestrian bridge would be switchback ramps—a total of three on each side to get to the vertical clearance needed. Because of the width restrictions between the horizontal clear zone and the railroad right-of-way, we believe it will only be possible to build the ramps • eight feet wide. Since only eight feet of width is possible on the ramps accessing the bridge, we have assumed that the bridge itself would be eight feet in width. As a Ltr-120903-Mehelich.doc 1326 Energy Park Drive • St. Paul, MN 55108 • 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Ms. Mehelich December 24, 2003 Page Two reference, the pedestrian bridge over TH 169 is 12 feet in width. The style of the pedestrian bridge over TH 10 that we have estimated is similar to the bridge over TH 169 in that it is a concrete through-girder design. Assuming a 15 percent contingency, and 28 percent for overhead items, we have estimated the total project cost for the pedestrian bridge at$570,000. Obviously, there are several other alternative locations and other options that could be utilized in the design. For example, extending the bridge beyond the railroad tracks and having another access point there or potentially having the pedestrian bridge providing direct access into the proposed building at the corner of Jackson Street and TH 10. B. Demolition of the Elk River Municipal Utilities Building In order to get a reasonable estimate of the cost of demolition of the Elk River Municipal Utilities building, I contacted Scott Lodico of Veit Environmental, Inc., and Steve Hosier of Veit and Company, Inc. On Monday, December 1, 2003, I met Mr. Lodico and Mr. Hosier at the Elk River Municipal Utility Building. We briefly toured the building and inspected its construction. Mr. Lodico put together the attached proposal for demolition of the building. He has estimated the demolition cost at $26,000 and $30,000. The big unknown in his cost estimate is how much asbestos abatement will need to be done prior to demolition. When the building is ready to be removed, an asbestos building survey will need to be ID accomplished. The estimated cost of this survey is $1,000. Mr. Lodico has provided a range of abatement costs, depending on what the asbestos survey would find. He has given a range of $13,000 to $28,000. Therefore, the total estimated cost of asbestos abatement and demolition of the building would be between a low of$40,000 to a high of $60,000. C. King Avenue Parking Lot Improvements As directed, we have prepared a preliminary design for the expansion of the King Avenue parking area, assuming the removal of the Elk River Municipal Utilities building. Attached is Sheet 4 of that preliminary design, which shows the final configuration of the parking area. The configuration was modeled after a layout prepared by Chris Leeseberg of the Planning Department. The design assumes that the access to TH 10 from King Avenue will be closed, and that head-in parking utilizing a portion of the school district property will be constructed on the west side of King Avenue. The shaded area on the plan sheet is the bituminous that would be replaced. The unshaded areas are existing bituminous surfaces that we believe will be able to be saved and utilized for parking in its current condition. We have assumed some new lighting in the parking area but no new landscaping. Based on this preliminary design, the construction cost is estimated at approximately$125,000. The plan provides approximately 45 to 50 additional parking stalls. D. Project Schedule One of the things that I have been asked to estimate is what would be the total • construction time frame for the Elk River Municipal Utility building asbestos abatement, demolition, and King Avenue parking lot improvements. Assuming the asbestos survey is Ltr-120903-Mehelich.doc Howard R.Green Company • Ms. Mehelich December 24, 2003 Page Three complete, I would estimate that the abatement would take one to two weeks, depending on how much material containing asbestos is determined to be within the building. The demolition could proceed immediately after abatement is complete, and would take two to three weeks to demolish the building, remove it from the site, and backfill the basement. If the contract for the parking lot improvements is ready to go immediately after the building demolition, the process would take an estimated four weeks to complete. Assuming one additional week for time lost between one operation and the other, the total project time for the removal of the Utilities' building and reconstruction of the parking lot should be accomplished within about 10 weeks time. The asbestos abatement would certainly be done early in the year while weight restrictions are still on. The removal of the building and reconstruction of the parking lot would be dependent upon the removal of weight restrictions to allow free movement of materials and equipment. If desired, I believe the entire project could be accomplished in 2004 by the first week of July. E. King Avenue Parking Ramp Attached is an exhibit that shows one option for an elevated parking ramp above the King Avenue at grade parking lot. This option has the ramp for access to the elevated parking on the southeast corner. The elevated parking extends over the "head in" parking on the school district property but keeps the corridor behind the businesses open for larger • delivery vehicles. This example provides 86 parking stalls on the upper level but would eliminate 7 to 10 stalls on the ground level to make room for the ramp. Estimated construction cost would be $1,000,000 to $1,250,000. F. Pedestrian Countdown Timers The final thing that I was asked to investigate was the potential of installing new pedestrian crossing heads at the signal on Jackson Avenue/TH 10. Around the Twin Cities, we are starting to see the pedestrian movement heads having a countdown timer included once the signal goes to a "do not walk" condition. A color photograph of one of these is attached. As of this date, MnDOT has not authorized these signal heads for installation in signals on the trunk highway system. This is simply because they are not officially accepted in the federal Manual on Uniform Traffic Control Devices. The upcoming revision to the MUTCD will recognize these timers. Therefore, I believe it would be possible to install these pedestrian crossing timers, if the City so desired. Attached is a memo from my traffic engineer to me, estimating the cost to retrofit the TH 10 and Jackson Avenue signal with these timers. He estimates the heads themselves are approximately $750 for materials. There are eight heads included in the signal. He has estimated the installation costs at $250 per head. This assumes that the existing wiring would be acceptable and there will be little if any work beyond the exchange of the pedestrian crossing heads at the signal. The total estimated cost is $8,000. • `tr_120903-Mehelich.doc Howard R. Green Company • Ms. Mehelich December 24, 2003 Page Four I will be prepared to make a brief presentation about each of these items at the January 5, 2004 Economic Development Authority meeting and then answer any questions from the EDA commissioners. Sincerely, Howard R. Green Company Terry J. ��er, P.E. TJM:sw Enclosures • • Ltr-120903-Mehelich.doc Howard R. Green Company s .0. ' , . I - . . _.. / , ... . 0 . _ :ate-... :i ry . ao .a�,� -- - . r j> • 7 K • / I • • • . ' ` �ACKSQN ,.:. . .. �r;`c1 �/. i • /� � I-9 //, ,> n ?> JJ• • '4 : - •j• ■Sy _ • • ---.--.........• •:•••:" .• -• ' /_ th V m o • .• c-) > , ..".../ ,, ., • �._, j ... ... i � C-:)-' - i' • .. • '----/...", , /---,7-/,,, _. .. % •// i/// ' till - -•f/ - , � 3.n: i • % i / • i // / O m, '• • • / / - S+ • • • • r • VEIT ENVIRONMENTAL, INC. PROPOSAL AND AGREEMENT PROPOSAL SUBMITTED TO: Mr.Terry Maurer Howard R.Green Company 1326 Energy Park Drive St.Paul,MN 55108 RE: Abestos Budget and Demolition Budget Elk River Municipalities Building 322 King Avenue Elk River,MN We hereby submit this BUDGETARY estimate proposal for the work described below: Asbestos Building Survey $1,000.00 Asbestos surveys range in costs from approx.$750 for small residential houses to several thousand dollars for larger industrial or commercial type buildings.This estimate should cover most of the costs for a building survey which would include asbestos survey and hazardous waste survey information.Lead Paint survey may cost an additional$300-$500 dollars if performed at the same time as the others. • Asbestos Abatement $13,000.00—$28,000.00 Our proposal fluctuation is based upon the ceiling tile becoming positive for asbestos containing material.This low range of estimate is includes the building linoleum flooring and the black tar paper in the lower level mechanical room to assume to contain asbestos.In the upper range of estimate we also have included some pipe insulation that may be hidden within the existing walls that may service the restrooms on the upper floors. Demolition $26,000.00—30,000.00 Our proposal includes all mobilization of necessary demolition equipment,a demolition permit,adequate supervision,complete building demolition including footing and slab removal,debris disposal,backfill of the site, and utility disconnects. (Excludes tank removal,well abandonment,testing,regulated waste removal,and removal of personal property).Upper estimate would include standard hazardous waste materials to be removed such as fluorescent bulbs,PCB ballasts,mercury switches,door closures,and exit lamps,etc.—No chemical wastes. All work to be done in compliance with State and Federal rules and regulations. Work To Include: • All Labor,Materials,Equipment,Insurance,and Disposal. Work To Exclude: • Hazardous waste disposal other than asbestos. Signature: Date: 12/3/03 Scott Lodico • Title: Project Manager/Estimator 6 1 il I 41 1 m m �? SnSmn �zy ;mm�+� >P, mN 1-}a. -n 20 fri�pp � cNuff. $ 3 ; 'RIjCN pAN f_* C = r, cmy=Cpy08 Ar- m fnOi 0 a c m� 2min mmn N�z> Drr'1N z.9 C *zD to / r y C 2i m Z m C D 2 N D Z r I ^ $ °z av2 zm v�aro 01 -1-*.>V)D>z� my x c�v�iz $ I t go Fl ; mi �� 2� pWI2 _ �G p�� �A c MI Ex 1Sn Ar p-a_-I> 222—Irrz I+�N DD f=*1.N.1 2 >z I c>:-.4.* Zm �ZZ mymm�Wtn N-0 xx �0 -' m I ± o `" z p mno� 2m� IQo Z2 r ^ C1 > S N>; Vm DN0 1''lWzzzr 0(4 PP S^= is Z - "' 'CY, / ^, '- >m Z � a cn�-+v�c�N min �� p a ±±u= z m� / rn in0�'= mD mfr �Dtro�� � py x x f�* xx IA A ~n i D r� tr tV�r7C Oo p p g I 2 N A ~14 p r C7 m rn rn pi •I - ., 'ill�; ,,y-' /,j,;����,(,�._�,._....-.-. __...._ yr.„ ,411(4 n - t -14,--- _ _ _- ____-_- i____ — _ We'fS':Q2''I+'Vl�JL`yXS7YF.7�a'IF.i77 �if: /e / i Y"9 4 ,,;'o> tzg 1�. R A ' ^ S SI N A I I Y :'.' AAA! G ".B` /,;!,.....'.:':.2 ^f` Y f�, �,`. , nsF E,P a 5� f . n - -- — - 'iY f.rr— —”". ar;' r ' y i +r. � "�•`NVS ;f1b'S NVS -f��� I . _ � �'' i e "'' 'f' :Y N zd Z M M ��M1�`. M M �M M V c �, 0• •� .— ` r n.,ummilelt , - ,•g.111,1 „--Ijj7 1 -- . 1 L M co F .t, q a� • o *ft� U w gip, I c' # " it ', 1 ;j4 �Q • ilk t;:�� 9?, 1 a �O_, '..7. . cl 4 ______ ,.,k _,....f "� Y mi , ., ,,,i „_., -- i , ,,, Q .------- r. y,'' g o ,,: ,c0 ,.. , ,,,,,,, „, , ,„.... N N '' C7 s ----•-•••••,..,-••••...'' /r '..:'' g f . •—•.:,,- . .s, . , , , , .... , ,i 1 m ...„, i...e...VJ `i r • I i 3 r2f ;• 1 N m ef• > 1? "'. B 1 ,i � � ■ ■ ...... , f' .1 T. ce, it) , _41011411,.__ , if,,,., . ‘, / ,,,,,,, L NI z, , .‘„,, ....),,t..:: l, .... ,_ , , • 4. II , 7 F.r.r .�f;iri Q `�i A ----' /I" o 2 r ago ,--- -------------/ / 1 O i i co o 0 ^ cn o cn r 1y OI ::-.1 4 N 03� \� m 8 r... ... o gN z VI luj, g y y h�ol I C i � [ny 4 tx rn 3E y ti a Ml I A7C �_ rf m icio •0 iy .E4° w.... ._ 's. I 1 il • 0 0 1 VI 0 f) > O _ 0 o v N > O m .. s m v o m o m m N N y N N � W O Q i N a F N N A p ' O W D V b m n . 3 m x A N m N o z rn ('� X 2 Z> DNm II O O m I ;O< P, ',:',`,3' r C[ S 1 72 L C mS2 III A N N 1 A 51%0;11 ° P }.: P3 ;I O >O Zmg F p u �g m O ppppp \\\ -' . ��.`s,3 a �'-��• � a•' II' me s s xc�e .aa z I KING AVENUE 4,t s r `are, 3 ''�w 1 �� .��'` '��,.> r m x , ...(• -- ► çii ± I I I 11 Ff' ' ii,k, \\ 11 . \ ��� ,x Ca l&VAS=x I. �,' , Soh l 3 'Z �'aY''$'"d xa �� � t a € a�. u CD v N 1 . si;. `" ,.' s� ', ' era c i u w D T„o z g, 1 $ 4' tin i.`,',?.. - Ii ) 3 y i n t 7C w �� 7 v D m Z f rr , , s.. ;III �. I, 7c t Z ,; II - a.. 4 1 1 i 1 11 1 I I 1 1 , I r x I T.o L I • ``■ Celebrating 90 Years MEMO Howard R.Green Company To: Terry Maurer, City Engineer From: Steve Manhart, Project Manager/Sr. Traffic Engineer Subject: Pedestrian Countdown Timers Date: November 24, 2003 You had requested information regarding pedestrian countdown timers on traffic signals. You had inquired about the application of such timers and their potential use at the intersection of TH 10 and Jackson Avenue in Elk River, Minnesota. Today, I called Steve Misgen, a Signal Design Engineer in Mn/DOT's Waters Edge Building. I asked him about Mn/DOT's latest policy regarding countdown timers. He said that Mn/DOT does not currently authorize the installation of countdown timers. This is because countdown timers are not officially accepted in the federal Manual on Uniform Traffic Control Devices. Nevertheless, the upcoming update of the MUTCD will recognize countdown timers. Therefore, Mn/DOT is not officially sanctioning the installation of countdown timers until such time as the federal MUCTD update has been adopted, which may be later this year. Steve went on to say that if the City of Elk River were intent on installing countdown timers, they should write a letter to Mn/DOT District 3 traffic personnel describing the situation and the proposed use of the timers. Steve added that the District 3 traffic personnel may not be as restrictive as the Mn/DOT Metro staff is, and may allow use of the countdown timers now. He said that the cost of the countdown timers is approximately $750 per head. Therefore, the cost of furnishing countdown timers for a complete intersection would be approximately $6000 plus labor. Steve thought that as long as the proper countdown timers were used to retrofit the existing pedestrian head, labor would not be a significant effort. As a result, a qualified technician could complete the installation for the entire intersection in a day or less. Furthermore, because the countdown timers are typically triggered by the "don't walk" phase, there is no wiring required back to the controller cabinet, thus making the installation less complicated. Therefore, assuming an installation cost of $2000 ($250 per pedestrian signal head), the total construction cost to furnish and install the countdown timers would be approximately $8000. These costs could be higher depending on type of existing pedestrian head to be retrofitted, and by actual installation costs. Cc: C:\Documents and Settings\swind\LLocaISettings\Temporary Internet Files\OLK4F\MEM 112403 timers.doc • Pedestrian Countdown Timers �.. i i 4. x '..,-'Z' t , ' ... :. . la • , ii j 1 x( i 7 qq 1 s i1 • ii.; • . '`, t.'--,, A _, ,,,, _,,,, .,.. , , Pedestrians cross Las Vegas Boulevard at Fremont Street, where a newly installed countdown clock displays the time remaining until the signal changes. Photo by Gary Thompson, Las Vegas Review-Journal. it 06 •