Loading...
5.3. PRSR 06-10-2015 l Request for Action River To Item Number Parks and Recreation Commission 5.3 Agenda Section Meeting Date Prepared by Action Item June 10, 2015 Michael Hecker,Parks and Recreation Director Item Description Reviewed by Incorporating and renaming Big Tooth Ridge Park Cal Portner,City Administrator to Woodland Trails Park. Reviewed by Action Requested Discussion of incorporating Big Tooth Ridge Park and the Great Northern Trail into Woodland Trails Park as recommended in the Parks and Recreation Master Plan Recommend,by motion,incorporating and renaming Big Tooth Ridge Park to Woodland Trails Park. Background/Discussion The Parks Master Plan (pg. 49) recommends formally incorporating Big Tooth Ridge Park as an extension of Woodland Trails Park. It also recommends incorporating the Great Northern Trail into Woodland Trails Park. The Commission discussed these concepts during a work session on the concept plan for Woodland Trails. The Great Northern Trail will continue to keep its name and will formally be included as part of Woodland Trails. With Woodland Trail's unique recreation offerings, significant size,regional trail access,and habitat as part of a bigger unique ecosystem,it is a strong candidate for regional park status through the state. After the Commission recommends this action,staff plans to include this in the application to request that the park be formally designated as being regionally significant. Regional designation by the Greater Minnesota Regional Parks and Trails Commission is required prior to recommendation for Legacy Parks &Trail funding by the Commission. The next step following the city policy on renaming requires that staff post a public notice at least 10- days prior to the July Commission meeting. It will be the same type of notice that was posted for the Houlton Farm property. Staff is still in need of this action for renaming this month,so that it can be included in the application that is due June 30. Financial Impact None at this time. Attachments • Park and Recreation Master Plan Woodland Trails Concept [ mein II NATURE Fi:ure 5.3 Si:nature Park Concept Woodland Trails • - S i �i F 9P .4evebp tra Iheads w•th ,., TPr- s Y mg areas,wayTnAing n M(ormat on along to r rE•. -r, ..�4 vi JA! 3 A 1CrE..!.'. tf* ' 5Y�'' t e .,,,� •� ' ./'. n ny evamton on Koadtand Trails '.' . �,+ r k k .; 4 �3. � 2x s.. -t.r _ .♦ t �S v,M1F w�si.- L• • 5 - ! oorate the Rio Toth Ridge• i t a C Glee".o•them i p 4=4, 4 Develop iradheadS x: �, � x usingareas,� !ntormat on along the ..- .•;. '.fir 415t.: ` a Great Northern Dail r . Woodland Trails Improvements to Woodland Trails will include construction of a small building that will act as a warming house and a location for environmental programs,and a maintenance and storage facility for park equipment.Improved wayfinding at the entrance will welcome regional users arriving from Elk Lake Road or the Great Northern Trail.The park will formally incorporate Big Tooth Ridge,a park that has functioned as an extension of Woodland Trails.As mining gets closer to the park,invasive species removal and prevention continues,and tree diseases are combated,the park needs an in-depth natural resources and forestry plan.After mining concludes,consider integrating additional parkland,a lake feature at the southern end of the mining district,and greenways connecting from future neighborhoods to the park. With Woodland Trails'unique recreation offerings,significant size,regional trail access,and habitat as part of a bigger unique ecosystem,it is a strong candidate for regional park status through the state. atra•sexra++r.a+err.r•,aa4++r4+aa•+aee•ax+♦ar+.+a+44 Y+r+r•+•aa•aas4 4+r ar+xr•r++,ax 44.++ra+a••rara+ax4++444••s••a O+a r+•er♦•+.rras srrr 49 City of Elk River-Parks and Recreation Master Plan