Loading...
3.8. SR 04-24-2000Tity of M£MORANDUM Item #3.8. TO: FROM: DATE: SUBJECT: Mayor & City Council Pat Klaers, City Adm~~f/ April 24, 2000 Consider Resolution Amending Western Area Phase IV Feasibility Study Attached is a memo and resolution from the city engineer regarding amending the Feasibility Study for the Western Area Phase IV project. This project is the trunk sewer and water extension along with the Business Center Drive improvement. Staff believes, but will not know until the situation is more thoroughly evaluated, that the overall project is more feasible with the trunk water system being looped through the Wilson property. With this proposal will come additional trunk assessments to the balance of the Hoyt Partners property. After the addendum is completed and evaluated, we hopefully will be recommending the deletion of the lateral water, street and storm sewer components of the project in the north Highway 10 frontage road area. However, this area still is likely to receive trunk sewer and water assessments and the frontage road intersection with Highway 10 will be realigned at the new Waco Street location. In this addendum, analysis will take place of the sewer and water trunk system going through the Wilson property and across Waco for the Ziegler property that is proposed to be residentially developed. This property will also then receive trunk assessments. Finally, it is also possible that the Chuba/Kincannon property will be petitioning the city to get back into the urban service district. Recommendation It is recommended that the City Council approve this resolution authorizing the addendum to be completed. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Howard R, Green Oompany QQNSULTING ENGINEERS April 19, 2000 File: 807650-0030 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-1900 RE: AMENDMENT TO WESTERN AREA PHASE IV FEASIBILITY STUDY Dear Council Members: At a recent City Council meeting, the Council discussed the appropriateness of the water and street improvements proposed north of TH 10 in the Western Area Feasibility Study. At that time, the discussion was that it may be more appropriate to loop the watermain through the Stewart Wilson property and not do the proposed improvements to the north frontage road including watermain looping. Since that time, City staff has had several discussions regarding this, some of which included Mr. Wilson. At this time, we would suggest that, if the Council wants to proceed with this approach, the Council consider adopting the attached resolution which would authorize an amendment to the Western Area Feasibility Study involving the deletion of the proposed water looping and street improvements of the north frontage road and the addition of trunk sanitary sewer and watermain across the Stewart Wilson property. These improvements will, of course, change the total project cost and also the properties proposed to be assessed. As you are aware, this project includes cooperative agreement monies from the Minnesota Department of Transportation. We are proceeding with the review of that portion of the plans by Mn/DOT and the preparation of the cooperative agreement. This amendment to the feasibility study will require additional public hearings followed by assessment hearings. We believe that it will be possible for these additional hearings to be held once the feasibility is amended and while the new improvements "catch up" with the Mn/DOT funded portion of the project due to the length of time that Mn/DOT will require for preparing the cooperative agreement. If you have any questions regarding this information, please call. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. TJM:tw Enc. O:\PROJ\807650\0030\ltr 4-19-00 Council.doc 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 RESOLUTION 00 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION OF THE CITY OF ELK RIVER ORDERING AN AMENDMENT TO THE PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE WESTERN AREA PHASE IV IMPROVEMENT OF 2000 WHEREAS the Council has previously ordered a feasibility study for the Western Area Phase IV improvements; and WHEREAS the Council has accepted the report for the Western Area Phase IV Improvements on February 22, 2000; and WHEREAS the Council has determined that an amendment to the Western Area Phase IV Improvement, deleting the water loop and street construction north of TH 10 and considering a trunk sanitary sewer and trunk watermain extension from the Sherburne County Government Center to Waco Street, should be considered; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to Howard R. Green Company who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 24th day of April, 2000. ATTEST: Stephanie A. Klinzing, Mayor Sandra A. Peine, City Clerk O:\PROJ\807650\0030\res 4-19-00.doc