Loading...
4.1. HRSR 02-04-2002 Item 4 . 1 . City of Elk -�--, River MEMORANDUM TO: Housing & Redevelopment Authority FROM: Catherine Mehelich, Director of Economic Development///�� DATE: February 4, 2002 (( SUBJECT: Downtown Riverfront Revitalization Project - Development Objectives & Design Concepts Attachments • Downtown Riverfront Revitalization, Redevelopment Process • Downtown Riverfront Revitalization,Project Goal& Objectives • Downtown Riverfront Revitalization, Chronology Issue The design concepts identify desired outcomes,potential redevelopment uses and design ideas, and designates potential areas for redevelopment. Staff recommends the HRA consider the refined development objectives and design concepts as a framework for proposal options. Background In 2001, the HRA completed the first phase in the attached redevelopment process—Need & Goal Identification. The HRA identified the Core Central Business District/downtown riverfront as the focus area for a revitalization project. The primary goal for the revitalization project was established as follows: To assure the long-term viability of downtown by making a connection to the rest of the community and by utilizing the riverfront location. The next phase of the redevelopment process includes the development and refinement of design concept options. The purpose of the design concepts is to identify general areas and potential types of development within the revitalization area. Overview In November 2001, the HRA reviewed five design concept options as prepared by staff. The initial design concepts were based on previous studies,goals of the HRA, and feedback Downtown Riverfront Revitalization Project February 4,2002—HRA Meeting Page 2 of 2 from developers. In addition, HRA Commissioners met individually with staff to share comments on the concept options. Staff has compiled the feedback from both the November meeting and individual meetings for the following development objectives. The refined design concepts will be presented at the HRA meeting. Both the design concept(s) and development objectives will be communicated to developers during the request-for-proposals process as a framework for proposal options that the HRA would be willing to consider. Development Objectives: 1) Primary area of focus—South Main St. to river from Lowell Ave. to Parrish Ave. 2) Uses should be limited to residential,retail, or office;Developers should be encouraged to use a combination of uses. 3) The Jackson Square public parking lot and the "Brick Block" located along Jackson Avenue between Hwy 10 and Main Street are not to be included in redevelopment proposals. 4) Design should include design elements of traditional downtown character and pedestrian orientation. 5) Open to proposals that include an arts facility, but not necessary. 6) Open to proposals for partial or full rehabilitation, or redevelopment of south Main Street from Jackson Avenue to King Avenue block. 7) Developments should provide adequate parking. 8) Developments should support public access to the river and utilize the river view. 9) Increased residential density. 10) Multiple types of housing products (i.e. townhomes, senior rental coops,market rate apartments). Other Issues to be communicated to developers: • Future Highway 10 construction • Historic Context Study,pending results • Arts/Family/Theater facility interests Requested Action In review of the refined objectives and concepts, the HRA should consider the following items: • Review and adopt (with any changes) the development objectives. This will provide the guidelines to be used in soliciting proposals from developers. Remember this does not bind the HRA to accept any proposals. It provides an outline of what type of proposals will be initially presented. It is expected that after developer selection the proposals will change to reflect community, staff, HRA, Council and market input. • • Identify uses or areas that should not be considered by developers when preparing proposals. • City of Elk - .-� River City of Elk River Downtown Riverfront Revitalization Redevelopment Process The phases of Redevelopment Process include: Phase I — Need Identification The HRA has identified the Core Central Business District as the focus area for redevelopment. The primary goal is to assure the long-term viability of downtown by making a connection to the rest of the community and by utilizing the riverfront location. A communications strategy is developed to keep the public informed of the project and to provide opportunities for public comment. Phase II — Concept Development Various design concepts have been developed which incorporates consistent themes from the previous 30 years of planning, current design objectives, and input from the development community. The design concepts identify desired outcomes, potential redevelopment uses and design ideas, and designates potential areas for redevelopment. Phase III — Concept Refinement In this phase the concept is tested for market and financial feasibility with the help of developers and market specialists. The redevelopment concept is then refined,based on the financial and market analysis. This phase includes an opportunity for the public to provide comments on the alternative design concepts. Phase IV— Request for Proposals/Developer Selection The City will be contacting qualified developers to discuss the redevelopment concept. Developers' experience and financial capabilities are assessed. One or more developers are selected for further analysis of the redevelopment feasibility. The City reviews general plans,including uses, design concepts, densities and financial feasibility with developers. Phase V— Development Agreement Most of the planning is completed and a developer has been selected,but the project is still months from construction. A pre-development agreement is negotiated with one or more developer,providing a period of exclusive right for development. During this period the developer must refine plans and assess market feasibility. In the development agreement, the developer secures a lease commitment and financing for the project, completes land use and other regulatory issues. The development agreement occurs when the developer completes contingencies and initiates land acquisition and building design. Phase VI — Construction fibAll development agreements are final, acquisition has begun and even some initial demolition of existing properties has occurred. �j • City of Elk - -� River City of Elk River Downtown Riverfront Revitalization Objectives Obj Project Goal & 1 Purpose: For more than 30 years,various studies and proposals have examined the need to redevelop Elk River's downtown business district. Investment in the downtown has stagnated and area businesses and residents alike are concerned about the need to revitalize downtown and attract people there. Neighborhoods age, and change will occur whether or not the City intervenes. Controlling that change through revitalization and redevelopment will ensure that the types of changes that occur in downtown Elk River are the ones people want—those that will keep our community vital and flourishing. Primary Goal: To assure the long-term viability of downtown by making a connection to the rest of the community and by utilizing the riverfront location. Redevelopment will enhance downtown Elk River's role as a residential,retail and commercial area and also revitalize investment in the downtown business district. • Development Objectives: • Mixed use (residential/retail/service) • Consideration of the historic context study results • Strengthen connection to the community • Traditional downtown design elements • Brick, stucco, stone materials with visual breaks in the building design • Increased residential density • Pedestrian orientation • Increase exposure to the riverfront • Recognize those buildings that have potential for rehabilitation • Replace market/economic obsolete buildings • Multiple types of housing products (i.e. townhomes, senior rental coops,market rate apartments) • City of Elk -�-� River City of Elk River Downtown Riverfront Redevelopment Planning & Project History 1970 Elk River Central Business District Report (Nason,Wehrman, Knight& Chapman Inc.,Mpls) is developed and provides general guidelines for physical appearance,movement patterns, and development potentials of the CBD for years 1970-1990. • Unify existing and new buildings for distinct unique character • Remove traffic conflicts (eg overpass between North& South Hwy 10) • Provide adequate parking (eg parking ramp) • Utilize natural setting of Mississippi River (eg restaurant) 1982 Elk River Downtown Redevelopment Plan (Zack Johnson&Associates Inc.) establishes a long-range guide for evaluating physical improvements, developing zoning policies, establish priorities in capital improvements and identifying • redevelopment opportunities. • Rehab buildings that City fords architecturally&historically significant (eg establish design standards) • Concentrate retail/office south of Hwy 10 • Concentrate service business north of Hwy 10 • Concentrate high-density residential west of Lowell • Priority Redevelopment Areas: -Town Square—for retail/office space and municipal parking - King&Main—for office space - Star News buildings to cinema building—for 2-story retail/office 1986 The City and Chamber work with the Governor's Design Team to develop an overall plan for the CBD. The river is stressed as an amenity to focus on. • Promote downtown as "unique historic river town" • Link with open space& trail system • Utilize river with restaurant/hotel/community center • Consider parking ramp for heavy traffic areas 1988 The Central Business District Redevelopment Project results in a theme for CDB fixtures, trees, and sidewalks in the downtown area. The project is paid for via assessments and City, HRA, and Utility funds. I Downtown Riverfront Revitalization Planning and Project History Page 2 of 2 1988 Elk River Riverwalk Project (Brauer&Associates Ltd, Eden Prairie) creates riverwalk design and financial feasibility for new building proposed for Hardware store site. • Create more retail/service traffic via restaurant • Generate interest in Mississippi River via boardwalk trail • Develop design standards 1989 Following the purchase of the Hardware store site, the EDA improves the site for use as public green space. In 2000, the EDA turns the property over the City for parkland. 1990 Riprap is installed along the riverbank in the CBD for erosion control in 1990 and again in 1995. The project is funded by a grant from the Sherburne County Soil and Water Conservation District and matched by the City and HRA. 1990 The EDA and Dr. Tony Jarmoluk redevelop the NE corner of Main St. and Lowell Ave as a new dental clinic. 1992 The city demolishes the old creamery building and then assists The chamber in 1994 in relocating their building to the site. 1992 Parking lot at Jackson Square is improved by the HRA. In 1993 the city purchases the • BNRR parking lots for CBD patrons and the HRA improves one of the lots in 1994. In 1995,improvements are made to the parking lot behind Kemper Drug. 1994 A Riverwalk Corridor Committee is formed to spearhead riverwalk effort. A Riverwalk Plan (Hoisington-Koegler Group Inc.) is developed for the CBD, and is envisioned for the beginning of a trail system along the river. • Interpretive walk/bike trail depicting early transportation history of region 1996 The city applies for an ISTEA grant to fund the Riverwalk Project,but the application is rejected. Phasing of the project is considered but no action is taken. 1997 HRA acquires the King and Main site and removes the existing structures. The proposal to immediately redevelop the site with a 12,000 commercial building falls though. A number of other concepts for the site are later proposed, but none materialize. 1998 The HRA hires Theresa Washburn to lay the foundation for developing a downtown plan master plan. Ms. Washburn submits the Central Business District Action Plan in January of 1999. Implementation of the Action Plan begins but participation levels from citizens drop. a. Public Improvement Goals: plan to utilize river, art center,pedestrian pathway, beautification plan b. Private Improvement Goals: sign ordinance, fascade improvements to highlight • historic character,interior standards, new construction to compliment historic character Downtown Riverfront Revitalisation Planning and Project History Page 3 of 3 • c. Activities &Events Goals: Heritage Festival, develop winter festival, develop mural event d. Business Activity Goal: complete market analysis 1999 The EDA, Council, and HRA review the Strategic Plan for Economic Development and lower downtown's priority. Summer 2000 King and Main is sold to the First National Bank of Elk River,which plans to construct an office building on the site. Downtown is listed as a top priority at Operation ER's October meeting. Fall 2000 HRA authorizes staff to complete Downtown Redevelopment Plan to identify priority redevelopment sites and guide desired development. Plan to include inventory of properties, conditions,vision and implementation. 2001 March HRA directs staff to research details of two Main Street properties for sale (ECM Publishers) April HRA considers information on property sale and directs staff to work with private developers for redevelopment proposals for the site/area. Staff sends listing agent a list of developers specializing in retail/office mixed use developments. • April Staff receives interest in redevelopment from property owner,Nadeau's, and interest from two developers: Kraus-Anderson/Best&Hempel and Marly Glines/Dynamics Design. May Joint worksession between HRA,Planning Commission&River's Edge Assoc. Staff presents results of market analysis, and assessment of building condition& historic significance for discussion of redevelopment opportunities. May Staff request preliminary development concepts from two interested developers for review and discussion by HRA. Riverfront property owners notified of developer interest. May HRA authorizes the completion of new paver brick sidewalks in the CBD in conjunction with Municipal Utilities electric line relocation project. New trash receptacles, trees, and flower pots added to beautify downtown. June Joint worksession with HRA,Planning Commission&River's Edge Assoc. Priority projects and design principles ranked. Group identifys the redevelopment of ECM Publisher/Riverfront property as a priority project. HRA considers presentation of development concept by Best&Hempel. • HRA provides feedback and requests additional information on development concept including: Downtown Riverfront Revitalization Planning and Project History Page 4 of 4 • sufficient parking • amount of housing • sufficient land area for proposed project • financial feasibility HRA directs staff to work with developer to present financial feasibility and proposal for HRA assistance. July Heritage Preservation Commission (HPC) recommends completion of historic context study prior to HRA action on development proposal for downtown Elk River. August AMCON Construction requests information on any redevelopment opportunities. HRA directs staff to request development proposals from broader group of developers. HRA authorizes completion of historic context study for year 2001, completion early 2002. Redevelopment worksession with Ehlers &Assoc. scheduled for Sept. HRA meeting. September HRA works with Ehlers &Associates to facilitate Downtown Revitalization Project. October HRA develops problem statement,identifies core CBD as focus area. HRA develops primary goal: To assure the long-term viability of downtown by making a • connection to the rest of the community and utilizing the riverfront location. December HRA reviews preliminary design concepts and discusses development strategies. 2002 February HRA revisits design objectives, concepts, and development strategies. Consistent Themes throughout last 30-years: . Utilize the Mississippi River • Capitalize on unique historic character • Safer pedestrian&vehicle movement •