Loading...
5.3 PCSR 06-23-2015City of Elk River Request for Action To Item Number Planning Commission 5.3 Agenda Section Meeting Date Prepared by Planning Items June 23, 2015 Chris Leeseber , Park Planner - Planner Item Description Reviewed by Request by Sportech for Zone Change to amend Zack Carlton, Planner I Reviewed by the zoning of Lot 1, Block 2, Natures Edge Business Park from C3 Highway Commercial to BP Business Park, Case No. ZC 15 -05 - Public Hearin Action Requested Recommend, by motion, approval of the Zone Change as proposed. Overview The property is currently zoned Highway Commercial (C -3) and requires a zoning change to Business Park (BP) to allow the applicant to operate a proposed light manufacturing business. They intend to construct a new 105,000 square foot manufacturing facility with a possible 73,500 square foot future expansion. The project is a permitted use in the BP district and has been reviewed by staff. A site plan /landscape plan has been attached for your reference. Background /Discussion Comprehensive Plan The purpose of the Comprehensive Plan is to establish a framework and expectations as to the future use of land. Applicable Regulations In revieaving a proposed amendment, consideration shall be given to existing conditions within the area directly and indirecty affected by the proposal, the conservation of properly values, the use to wbicb the properly affected is being devoted at the time, and relevant provisions, if any, in the land use plan. In the review of the standards for a Zone Change as outlined, it appears the request is consistent with this standard and is consistent with the City Council approved Comprehensive Plan and the Focused Area Study. The Focused Area Study identifies the subject property area as East Elk River Gateway. Financial Impact None Attachments • Location Map • Applicants Narrative • Site Plan /Landscape Plan P a w E A E U s r NaA f RE] Sportech Case No: ZC 15 -05 Zone Change, Easement Vacation EV 15 -06 i ll`Y._. l iv rT Fjk4� R Ryan Construction, Inc. 1100 Mendota Heights Road 9 Mendota Heights, MN 55120 a (651) 681 -0200 0 Fax (651) 681 -0235 SPORTECH NATURES EDGE BUSINESS CENTER ELK RIVER, MN ZONECHANGE Lot Legal Descriptions: LOT 1 & LOT 2 BILK 2, NATURES EDGE BUSINESS CENTER SECOND ADDITION PID's #: 75- 828 -0205 & 75- 828 -0210 Project Narrative: SPORTECH, Inc. plans on expanding their production into a new 105,000 sf facility in the Nature's Edge Business Center Park, with a possible 73,500 sf expansion. These two land parcels will be combined by the City of Elk River. We are requesting a Zone Change so that both land parcels will Zoned B -3 and allow the lot combination. A single user of the 2 different Zoned land parcels has warranted the Zone change. It is our belief the type of building and end user is consistent in the Elk River comprehensive plan for this development. We feel a 105,000 sf manufacturing facility will fit in nicely with the surrounding properties and compliment the 100,000 sf manufacturing already in the Natures Edge Business Center. We see job creation and increased tax base both benefits for the City, but keeping a long term business in the city probably the best benefit for the City of Elk River. Sportech Zone Change Narrative for City 5.26.15.docx x 0 0 0 LZ LANDSCAPE NOTES: 1. SITE IS VOID OF SIGNIFICANT EXISTING VEGETATION. 2. SEPARATE ROCK MULCH FROM SOD /SEED WITH BLACK VINYL EDGER 3. ALL PLANTING AREAS TO BE IRRIGATED BY A HIGH - EFFICIENCY IRRIGATION SYSTEM. IRRIGATION SYSTEM DESIGN BY CONTRACTOR 4. SOD OR SEED DISTURBED AREAS ONLY ACCORDING TO SITE PLAN. 5. REQUIRED LANDSCAPING BASED ON 3,218 L.F. OF LOT PERIMETER TREES - 3,218 L.F. AT 3 + 1/40 = 83 TREES REQUIRED 83 TOTAL TREES PROVIDED 'NO'* `y4� C° II I �I I II I CD . W J II � rTl I II 75' -0. NATUR EASEMENT PIPELINE II �I �I PLANTING SCHEDULE QTY. KEY COMMON NAME BOTANICAL NAME SIZE ® ACCESS EASEMENT REMARKS 8 AB AUTUMN BLAZE MAPLE ACER FREEMANII JEFFERSRED 2" BB LINE POLE 14 SO SWAMP WHITE OAK OUERCUS BICOLOR 2" BB II II 7 HL HONEYLOCUST GLEDITSIA TRICANTHOS INERMIS So 88 N 89 °55'32" W 21 300.57' PLANTING SCHEDULE QTY. KEY COMMON NAME BOTANICAL NAME SIZE MTHD REMARKS 8 AB AUTUMN BLAZE MAPLE ACER FREEMANII JEFFERSRED 2" BB LINE POLE 14 SO SWAMP WHITE OAK OUERCUS BICOLOR 2" BB II II 7 HL HONEYLOCUST GLEDITSIA TRICANTHOS INERMIS 2" 88 T o 21 RB RIVER BIRCH BETULA NIGRA 1.5" BB CLUMP 11 WP WHITE PINE PINUS STROBUS 6' 88 22 BH BLACK HILL SPRUCE PICEA GLAUCA DENSATA 6' BB 6 BC BLUE CHIP JUNIPER JUNIPERUS BLUECHIP p5 CONT. 12 PA PYRAMIDAL ARBORVITAE THUJA OCCIDENTALIS p5 CONT. I 5 JB JAPANESE BARBERRY BERBERIS THUNBERGII p5 CONT. � SEED --- 9 GS GOLDMOUND SPIREA SPIREA BUMALDA GOLDMOUND p5 CONT. 16 BB COMPACT BURNING BUSH EUONYMUS ALATUS p5 CONT. I I I N 89 °47'13" W 521.78' 168th `, N 87°23'05" w v E N U E 180.19' N 89 °47'13" W 212.14' GROUND COVER OR MULCH AS SPEC. TURN BACK BURLAP REMOVE POLY AND WIRE SET BALL ON UNDISTURBED GROUND BACKFILL WITH EXISTING SOIL r3-'\SHRUB PLANTING DETAIL L1 SCALE: NOT TO SCALE (2) TREE PLANTING DETAIL L1 SCALE: NOT TO SCALE RETAIN TREES NATURAL FORM. REMOVE ONLY DEAD OR DAMAGED BRANCHES DO NOT CUT LEADERS ROOT COLLAR 1 -2" ABOVE GRADE WOOD CHIP MULCH REMOVE WIRE BASKETS AND POLY TIES. CUT BURLAP FROM UPPER 1/2 OF BALL EXISTING GRADE BACKFILL WITH EXISTING SOIL WATER THOROUGHLY TO ELIMINATE AIR POCKETS BREAK DOWN SIDES OF HOLE UNDISTURBED SOIL BENEATH BALL — — — — — — — — — — — — — — — — — — — — — -------------------------- — — — — — — — — — - - - - -, I I I -------------- I II I� p \ -- EXISTING TRANS. I LINE POLE II VERIFY LOCATION UTURE EXPANSION II II II II II T o II� II J I ICI � I o� III II I I I. N � SEED --- I I . I I II I. ® TRANSM SSION ® ® LINE EASEMENT I. I I I N 89 °47'13" W 521.78' p.RN 0MNN PRN401 F��`pN C 0 .. 10%451 RYw �nnetrnetlnn, lne. Commercial Design and Construction qms aoee 2 U ru 0 Vf L`U C 1A' I..L M Y W Drawn By: JRB Checked By: LL Revisions 5/4/15 PRELIMINRY 5/26/15 CITY SUBMITTAL LANDSCAPE PLAN Sheet Number L 1 Project No. 150126 -1