Loading...
8.2. SR 07-06-2015 ��i Eof lk — - Request for Action River To Item Number Mayor and City Council 8.2 Agenda Section Meeting Date Prepared by General Business July 6, 2015 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Rivers Edge Park Expansion Proposal Tim Simon, Finance Director Reviewed by Cal Portner, City Administrator Action Requested Adopt,by motion,the Agreement for Professional Services to hire Hoisington Koegler Group,Inc. (HKGi) to complete the design and construction management of Rivers Edge Commons Park Phase One. Background/Discussion On April 20, 2015, the Council approved the concept plans for Rivers Edge Commons Park and directed staff to begin a phased approach for the improvements. A Request for Proposal (RFP) was drafted and advertised for professional design and construction administrative services to complete phase one. Three proposals were received. $37,900 TKDA $46,700 HKGi $68,955 WSB Following an internal review, HKGi received the strongest support for the project due in part to their work plan deliverables,project schedule, familiarity with the city, and the pricing. Staff did not have a good comfort level with the lowest bidder's proposed team and experience. Per state law, the city may choose the lowest responsible bidder for professional services contracts,not necessarily the lowest bid. Following approval, design development will begin in late July. Refined costs estimates are expected to be brought to Council in August before seeking construction bids. With the construction season well underway, construction costs are expected to be higher than a later bidding for spring construction. We will explore bidding this project in the winter for completion in the spring of 2016. Financial Impact This will be initially funded from the Park Improvement Fund. Once all costs are determined the professional services will be reallocated to the corresponding final funding source such as GRE reserve and Stormwater Funds. Attachments ■ Agreement of Professional Services ■ Request for Proposals Rivers Edge Commons Park Expansion Phase One ■ HKGi Proposal ■ City Council Approved Park Concept POWERED 9r UREI City of Elk - _ River 13065 Orono Parkway Elk River,MN 55330 RIVERS EDGE COMMONS PARK AGREEMENT FOR PROFESSIONAL SERVICES THIS AGREEMENT ("Agreement") is made this 6th day ofd, 2015 ,_ between the City of Elk River,Minnesota ("City"),whose business address is 13065 Orono Parkway, Elk River,MN 55330 and Hoisington Koegler Group Inc. (HKGi) ("Consultant") whose business address is 123 N. Third Street, Suite 100,Minneapolis,MN 55401 PRELIMINARY STATEMENT The City has adopted a policy regarding the selection and hiring of consultants to provide a variety of professional services for City projects. That policy requires that persons, firms, or corporations providing such services enter into written agreements with the City. The purpose of this agreement is to set forth the terms and conditions for the professional services Consultant will provide in connection with the Design and construction management of the Rivers Edge Commons Park Phase One Expansion,herein referred to as the "Work". The City and Consultant agree as follows: 1. Work. The Consultant agrees to provide the professional services described in Exhibit"A"- Request for Proposal for Rivers Edge Commons Park Phase One and Exhibit`B"- Proposal to the City of Elk River for Rivers Edge Commons Park. submitted June 22, 2015, by Hoisington Koegler Group Inc.(HKExhibit A and Exhibit B are attached and herein referred to as (the "Work"). 2. Time for Performance of Services. The Consultant shall perform the work set forth in Exhibit B according to the schedule provided. 3. Compensation for Services. City agrees to pay the Consultant up to $46,700 for the Work. Any changes in the scope of the Work which may result in additional compensation due to the Consultant shall require prior written approval by an authorized representative of the City or by the City Council. The City will not pay additional compensation for services that do not have prior written authorization. Page 1 of 9 Standard Agreement For Professional Services 4. The City agrees to provide the Consultant with the information required to complete the Work. 5. Method of Payment. The Consultant shall submit itemized bills for professional services performed under this Agreement on a monthly basis. Bills submitted shall be paid in the same manner as other claims made to the City. 6. Project Manager and Staffing. The Consultant has designated the individuals identified in Exhibit B as the Project Manager to serve on the Project. The Project Manager shall be assisted by other staff members as necessary to facilitate the completion of the Project in accordance with the terms established herein. Consultant may not remove or replace the Project Manager without the approval of the City. 7. Standard of Care. Standard of Care. Consultant shall exercise the same degree of care, skill and diligence in the performance of the Work as is ordinarily exercised by members of the profession under similar circumstances in Minnesota. Consultant shall be liable to the fullest extent permitted under applicable law,without limitation, for any injuries,loss, or damages proximately caused by Consultant's breach of this standard of care. Consultant shall put forth reasonable efforts to complete its duties in a timely manner. Consultant shall not be responsible for delays caused by factors beyond its control or that could not be reasonably foreseen at the time of execution of this Agreement. Consultant shall be responsible for costs or damages arising from unreasonable delays in the completion of the Work. 8. Audit Disclosure. The Consultant shall allow the City or its duly authorized agents reasonable access to such of the Consultant's books and records as are pertinent to the work performed under this Agreement. Any reports,information,data, etc. given to, or prepared or assembled by, the Consultant under this Agreement which the City requests to be kept confidential shall not be made available to any individual or organization without the City's prior written approval. All finished or unfinished documents, data, studies, surveys, drawings, maps,models,photographs, and reports prepared by the Consultant shall become the property of the City upon termination of this Agreement,but Consultant may retain copies of such documents as records of the services provided. 9. Term. The term of the Agreement shall be from July 6, 2015 through final punchlist completion and construction acceptance by the City. This Agreement may be extended upon the written mutual consent of the parties for such additional period as they deem appropriate, and upon the terms and conditions as herein stated. 10. Termination. This Agreement may be terminated by the Consultant effective upon sixty (60) days'written notice delivered to the City at the address written above. The City may terminate this Agreement effective immediately,upon with notice to the consultant. Upon termination under this provision,the Consultant shall be paid for services rendered and reimbursable expenses until the effective date of termination. Page 2 of 9 Standard Agreement For Professional Services If, however the City terminates this Agreement because the Consultant has failed to perform in accordance with this Agreement,no further payment shall be made to the Consultant,and the City may retain another consultant to undertake or complete the Work. 11. Independent Consultant. At all times and for all purposes herein,the Consultant is an independent contractor and not an employee of the City. No statement herein shall be construed so as to find the Consultant an employee of the City. 12. Non-Discrimination. During the performance of this Agreement,the Consultant shall not discriminate against any employee or applicant for employment because of race, color, creed,religion,national origin, sex,marital status, status with regard to public assistance, disability, or age. The Consultant shall post in places available to employees and applicants for employment,notices setting forth the provision of this non-discrimination clause and stating that all qualified applicants will receive consideration for employment. The Consultant shall incorporate the foregoing requirements of this paragraph in all of its subcontracts for program work,and will require all of its subcontractors for such work to incorporate such requirements in all subcontracts for program work. 13. Assignment. Neither party shall assign this Agreement,nor any interest arising herein,without the prior written consent of the other party. 14. Services Not Provided For. No claim for services furnished by the Consultant not within the scope of the Work shall be honored by the City. 15. Severability. The provisions of this Agreement are severable. If any portion hereof is, for any reason,held by a court of competent jurisdiction to be contrary to law, such decision shall not affect the remaining provisions of this Agreement. 16. Entire Agreement. The entire agreement of the parties is contained herein. This Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the parties relating to the subject matter hereof. Any alterations, amendments,deletions, or waivers of the provisions of this Agreement shall be valid only when expressed in writing and duly signed by the parties, unless otherwise provided herein. 17. Compliance with Laws and Regulations. In providing services hereunder,the Consultant shall abide by all statutes, ordinances,rules and regulations pertaining to the provisions of services to be provided. The Consultant and City,together with their respective agents and employees, agree to abide by the provisions of the Minnesota Data Practices Act,Minnesota Statutes Section 13, as amended, and Minnesota Rules promulgated pursuant to Chapter 13. Any violation of statutes, ordinances,rules and regulations pertaining to the services to be provided shall constitute a material breach of this Agreement and entitle the City to immediately terminate this Agreement. Page 3 of 9 Standard Agreement For Professional Services 18. Waiver. Any waiver by either party of a breach of any provision of this Agreement shall not affect,in any respect,the validity of the remainder of this Agreement. 19. Indemnification. Consultant agrees to defend,indemnify and hold harmless the City and its officials, employees and agents from any liability, claims, damages, costs, losses judgments, or expenses,including reasonable attorney's fees, resulting directly or indirectly from a negligent act or omission (including without limitation professional errors or omissions) of the Consultant,its agents, employees, or subcontractors in the performance of the services provided by this Agreement and against all losses by reason of the failure of said Consultant fully to perform,in any respect, all obligations under this Agreement. 20. Insurance. A. General Liability. Prior to starting the Work, Consultant shall procure, maintain and pay for such insurance as will protect against claims for bodily injury or death, or for damage to property,including loss of use,which may arise out of operations by Consultant or by any subcontractor or by anyone employed by any of them or by anyone for whose acts any of them may be liable. Such insurance shall include, but not be limited to,minimum coverages and limits of liability specified in this Paragraph, or required by law. The policy(ies) shall name the City as an additional insured for the services provided under this Agreement and shall provide that the Consultant's coverage shall be primary and noncontributory in the event of a loss. B. Consultant shall procure and maintain the following minimum insurance coverages and limits of liability on this Project: Workers Compensation Statutory Limits Employer's Liability $500,000 each accident $500,000 disease policy limit $500,000 disease each employee Comprehensive General Liability $1,500,000 property damage and bodily injury per occurrence $2,000,000 general aggregate $2,000,000 Products —Complete Operations Aggregate $100,000 fire legal liability each occurrence $5,000 medical expense Page 4 of 9 Standard Agreement For Professional Services Comprehensive Automobile Liability $1,000,000 combined single limit each accident (shall include coverage for all owned,hired and non-owned vehicles. Umbrella or Excess Liability $1,000,000 C. The Comprehensive General/Commercial General Liability policy(ies) shall be equivalent in coverage to ISO form CG 0001, and shall include the following: a. Premises and Operations coverage with no explosions, collapse, or underground damage exclusion (XCU). b. Products and Completed Operations coverage. Consultant agrees to maintain this coverage for a minimum of two (2) years following completion of its work. Said coverage shall apply to bodily injury and property damage arising out of the products-completed operations hazard. c. Personal injury with Employment Exclusion (if any) deleted. d. Broad Form CG 0001 0196 Contractual Liability coverage, or its equivalent. e. Broad Form Property Damage coverage,including completed operations, or its equivalent. f. Additional Insured Endorsement(s),naming the "City of Elk River" as an Additional Insured, on ISO form CG 20 10 07 04 or such other endorsement form as is approved by the City. g. If the Work to be performed is on an attached community,there shall be no exclusion for attached or condominium projects. h. "Stop gap" coverage for work in those states where Workers' Compensation Insurance is provided through a state fund if Employer's liability coverage is not available. i. Severability of Insureds provision. D. Professional Liability Insurance. The Consultant agrees to provide to the City a certificate evidencing that they have in effect,with an insurance company in good standing and authorized to do business in Minnesota, a Page 5 of 9 Standard Agreement For Professional Services professional liability insurance policy. Said policy shall insure payment of damage for legal liability arising out of the performance of professional services for the City. Said policy shall provide an aggregate limit of $2,000,000. Said policy shall not name the City as an insured. E. Consultant shall maintain in effect all insurance coverages required under this Agreement at Consultant's sole expense and with insurance companies licensed to do business in the state in Minnesota and having a current A.M. Best rating of no less than A-,unless specifically accepted by City in writing. In addition to the requirements stated above,the following applies to the insurance policies required under this Paragraph: a. All policies, except the Professional Liability Insurance policy, shall be written on an"occurrence" form ("claims made"and "modified occurrence" forms are not acceptable); b. All policies, except the Professional Liability Insurance policy, shall be applied on a "per project"basis; c. All policies, except the Professional Liability Insurance and Worker's Compensation Policies, shall contain a waiver of subrogation naming "the City of Elk River"; d. All policies, except the Professional Liability Insurance and Worker's Compensation Policies, shall name "the City of Elk River" as an additional insured; e. All policies, except the Professional Liability Insurance and Worker's Compensation Policies, shall insure the defense and indemnity obligations assumed by Consultant under this Agreement; and f. All policies shall contain a provision that coverages afforded thereunder shall not be canceled or non-renewed, nor shall coverage limits be reduced by endorsement,without thirty (30) days prior written notice to the City. A copy of the Consultant's Certificate of Insurance which evidences the compliance with this Paragraph 20, must be filed with City prior to the start of Consultant's Work. Upon request, a copy of the Consultant's insurance declaration page, Rider and/or Endorsement, as applicable shall be provided. Such documents evidencing Insurance shall be in a form acceptable to City and shall provide satisfactory evidence that Consultant has complied with all insurance requirements. Renewal certificates shall be provided to City prior to the expiration date of any of the required policies. City will not be obligated, however,to review such Certificate of Insurance, declaration page, Rider, Endorsement or certificates or other evidence of Page 6 of 9 Standard Agreement For Professional Services insurance, or to advise Consultant of any deficiencies in such documents and receipt thereof shall not relieve Consultant from,nor be deemed a waiver of, City's right to enforce the terms of Consultant's obligations hereunder. City reserves the right to examine any policy provided for under this paragraph. F. Effect of Consultant's Failure to Provide Insurance. If Consultant fails to provide the specified insurance,then Consultant will defend,indemnify and hold harmless the City,the City's officials, agents and employees from any loss, claim,liability and expense (including reasonable attorney's fees and expenses of litigation) to the extent necessary to afford the same protection as would have been provided by the specified insurance. Except to the extent prohibited by law, this indemnity applies regardless of any strict liability or negligence attributable to the City (including sole negligence) and regardless of the extent to which the underlying occurrence (i.e.,the event giving rise to a claim which would have been covered by the specified insurance) is attributable to the negligent or otherwise wrongful act or omission (including breach of contract) of Consultant,its subcontractors, agents, employees, or delegates. Consultant agrees that this indemnity shall be construed and applied in favor of indemnification. Consultant also agrees that if applicable law limits or precludes any aspect of this indemnity,then the indemnity will be considered limited only to the extent necessary to comply with that applicable law. The stated indemnity continues until all applicable statutes of limitation have run. If a claim arises within the scope of the stated indemnity,the City may require Consultant to: a. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing performance of the indemnity obligation, or b. Furnish a written acceptance of tender of defense and indemnity from Consultant's insurance company. Consultant will take the action required by the City within fifteen (15) days of receiving notice from the City. 21. Records Access. The Consultant shall provide the City access to any books, documents,papers,and records which are directly pertinent to the specific contract, for the purpose of making audit, examination, excerpts, and transcriptions, for three years after final payments and all other pending matters related to this contract are closed. 22. Ownership of Documents. All plans, diagrams, analyses, reports and information generated in connection with the performance of the Agreement ("Information") shall become the property of the City. The City may use the Information for its purposes and the Contractor also may use the Information for its purposes. Reuse Page 7 of 9 Standard Agreement For Professional Services of the Information for the purposes of the project contemplated by this Agreement ("Project") does not relieve any liability on the part of the Contractor,but any reuse of the Information by the City or the Contractor beyond the scope of the Project is without liability to the other,and the party reusing the Information agrees to defend and indemnify the other from any claims or liability resulting therefrom. 23. Subcontractor. The Consultant shall not enter into subcontracts for services provided under this Agreement except as noted in Exhibit B,without the express written consent of the City. The Consultant shall pay any subcontractor involved in the performance of this Agreement within ten (10) days of the Consultant's receipt of payment by the City for undisputed services provided by the subcontractor. If the Consultant fails within that time to pay the subcontractor any undisputed amount for which the Consultant has received payment by the City, the Consultant shall pay interest to the subcontractor on the unpaid amount at the rate of 1.5 percent per month or any part of a month. The minimum monthly interest penalty payment for an unpaid balance of$100 or more is $10. For an unpaid balance of less than$100, the Consultant shall pay the actual interest penalty due to the subcontractor. A subcontractor who prevails in a civil action to collect interest penalties from the Consultant shall be awarded its costs and disbursements,including attorney's fees, incurred in bringing the action. In addition,no subcontractor can file alien against the City. 24. Dispute Resolution/Mediation. Each dispute, claim or controversy arising from or related to this Agreement or the relationships which result from this Agreement shall be subject to mediation as a condition precedent to initiating arbitration or legal or equitable actions by either party. Unless the parties agree otherwise, the mediation shall be in accordance with the Commercial Mediation Procedures of the American Arbitration Association then currently in effect. A request for mediation shall be filed in writing with the American Arbitration Association and the other party. No arbitration or legal or equitable action may be instituted for a period of ninety (90) days from the filing of the request for mediation unless a longer period of time is provided by agreement of the parties. Cost of mediation shall be shared equally between the parties. Mediation shall be held in the City of Elk River unless another location is mutually agreed upon by the parties. The parties shall memorialize any agreement resulting from the mediation in a Mediated Settlement Agreement,which Agreement shall be enforceable as a settlement in any court having jurisdiction thereof. 25. Conflicts. No salaried officer or employee of the City and no member of the City Council of the City shall have a financial interest,direct or indirect,in this Agreement. The violation of this provision renders the Agreement void. Any federal regulations and applicable state statutes shall not be violated. 26. Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be considered an original. Page 8 of 9 Standard Agreement For Professional Services 27. Entire Agreement. This Agreement constitutes the entire agreement of the parties and supersedes all prior communications,understandings and agreements relating to the subject matter hereof,whether oral or written. 28. Governing Law. This Agreement shall be controlled by laws of the State of Minnesota. Executed as of the day and year first written above. City of Elk River Mayor City Clerk Hoisington Koegler Group Inc. HKGi By: Its: Page 9 of 9 Standard Agreement For Professional Services City of Elk T- River Request for Proposals Rivers Edge Commons Park Expansion Phase One Section I General Information All correspondence regarding this Request for Proposal (RFP) must be addressed to: Michael Hecker, CPRP Parks and Recreation Director City of Elk River 13065 Orono Parkway Elk River,MN 55330 mhecker&elkriverMN.gov All questions must be received before 4:30 p.m.,June 16,2015. Questions received after that time will not receive a response. Proposals will be accepted until 4:30 p.m. on Thursday June 22, 2015 Please submit five (5) hard copies and one (1) pdf copy of your firm's proposal. Acceptance of Proposal Contents The contents of this RFP and attached information provided to the proposer will be included as part of the contractual obligations if a contract ensues. All information in the proposal is subject to disclosure under the provisions of Minnesota Statutes Chapter 13 —Minnesota Government Data Practices Act. Proposal Timeline Final Inspection completion May 27, 2016 Submission of proposals June 22,2015 by 4:30 p.m. Consultant approved by City Council July 6,2015 The park will be available for construction beginning August 24, 2015. All construction and the final inspection of the Rivers Edge Commons Park Expansion Phase One must be completed by May 27,2016. The Rivers Edge Commons Park Riverfront Concert Series 2016 will begin in early June 2016. Request for Proposals Rivers Edge Commons Park Expansion Phase One Page 2 of 7 -------------------------- Project Overview The intent of this request is to obtain the services of a design firm,hereinafter referred to as the "Consultant" to perform consultant services for the City of Elk River,Minnesota, hereinafter referred to as the "City." Services of a multi-disciplinary team with park design,landscaping,and construction plan experience in both active and passive park components is required to assist staff preparing plans for the elements outlined in this proposal. Anticipated disciplines should include Landscape Architecture, Civil Engineering and Structural Engineering. The city is seeking proposals for a Consultant to fully design and administer the construction of expanding our Rivers Edge Commons Park. Said improvements are shown in the attached Concept Plan that was approved by the City Council on April 20,2015. Section 2 Project Description The Consultant services to be performed are for engineering and landscape design services for the following: 1. Park design and site plan for the expansion of Rivers Edge Commons Park Phase One. 2. Plans, specifications and construction documents for the Rivers Edge Commons Park Phase One. 3. Bid review, construction management and project inspection for Rivers Edge Commons Park Phase One. Rivers Edge Commons Park Description Rivers Edge Commons Park is located at 679 Main Street in downtown Elk River. The current park is 0.63 acres on the bank of the Mississippi River. This park embraces the river making it a focal point of downtown that facilities interaction and fosters community pride. It is home to the annual Riverfront Concert Series and is used on a regular basis for special events,weddings,and receptions. The park's plaza located on the street level is a community gathering place that includes a fountain water feature popular for younger children to splash during the summer months. Rivers Edge Commons Park was designed and constructed during the summer of 2006. The park was dedicated with a grand opening ceremony during the spring of 2007 and the first concert series started in the summer of 2007. The concerts, especially during the summers of 2013 and 2014 have seen crowds growing to over 1,500 people. In early 2015, staff and City Council discussed the need to expand the seating into the lower part of the adjacent alley and restore the failing retaining walls for the city's downtown parking lots. This is Phase One of the concept plan. It is stated on page 63 of the Parks and Recreation Master Plan "Evolve the Riverfront Concert Series at River's Edge Commons Park to a higher profile community event that becomes a greater economic benefit for the community." The overall concept of the park approved by City Council would make the park a stronger focal point regionally attracting people downtown and to the Mississippi River. Initiative 4 of the Parks and Recreation Master Plan is to Connect to the Rivers. It states "As opportunities arise, extend a connection from Bailey Point Nature Preserve to Rivers Edge Commons Park to Babcock Park." C:\Users\rgardner\Desktop\Park RFP\FINAL RFP Rivers Edge Commons Park Phase One.doc Request for Proposals Rivers Edge Commons Park Expansion Phase One Page 3 of 7 -------------------------- Section 3 Overall Scope of Services The services required of the Consultant are anticipated to be provided beginning in July of 2015 and ending after final acceptance of the improvements and expiration of the warranty period,whichever comes later. The selected Consultant shall be the overall project lead and manager on behalf of the City. The Consultant shall report to and take direction from city staff as directed by the City Council. The Consultant's proposal should include a detailed scope and budget estimate for all services as outlined in this RFP. Each element must be broken out as a separate item. The City stresses Consultant's innovation,uniqueness and ingenuity in proposing scope of services. Recommended changes to the scope will be considered and concerns regarding budget and time frames should also be identified. The City proposes a team approach in the development of the design utilizing the services of the Consultant in conjunction with the Parks and Recreation staff and the Parks and Recreation Commission. Management Services The Consultant will serve as assistant to the Parks and Recreation Director throughout all elements of the park design project. Services rendered shall include as a minimum: 1. Assistance in defining the maximum utilization of project resources in completing the scope of services,taking into account budget and time frame constraints. 2. Coordination,preparation and delivery of monthly reports covering the project. Meeting with the Parks and Recreation Director on a regular basis. 3. Assistance in preparing documents, CAD,graphics and mapping standards applicable to all. Parks Design and Construction Drawings The Consultant shall: 1. Include a topographic and boundary survey for the Phase One of the Rivers Edge Commons Park Project. 2. Define materials and construction systems for this project. 3. Design drainage system to incorporate storm sewers and catch basins. 4. Design and engineer retaining walls that will reinforce the upper parking lot and fit within the overall design of the park. 5. Develop outline specifications for the scope of this project. 6. Reviews draft and final design development sets with city staff and the Parks and Recreation Commission. 7. Drawings must include all details, cross section and profiles necessary to bid the project. 8. Review 60% and 90% construction document sets with city staff. C:\Users\rgardner\Desktop\Park RFP\FINAL RFP Rivers Edge Commons Park Phase One.doc Request for Proposals Rivers Edge Commons Park Expansion Phase One Page 4 of 7 -------------------------- 9. Conduct a 100%review meeting with city staff. Construction Administration The Consultant shall: 1. Prepare an ad for bid, bidding support,pre-construction meeting,assume bi-weekly construction meetings. 2. Utilize the lower parking lot as the staging area for construction equipment and materials. 3. Review pay requests and recommended action to staff. 4. Process change orders,if required. 5. Complete inspections;prepare project punch lists and coordination of close-out documentation. All permit and other regulatory review fees shall be paid by the consultant and will be reimbursed by the city. These costs shall not be included in the consultants proposed fee for the project. Section 4 Proposals The proposal shall contain the type of information summarized below. Additional information is allowable,providing it is direcdv relevant to the proposed project. Proposal Format The submittal should follow the Table of Contents listed below: 1. General Firm Introduction (include your firms expertise on the subject of this project) 2. Project Understanding 3. Project Approach 4. Proposed Project Team and Experience 5. Schedule 6. Any Additional Information as Needed 7. Consultant Cost 8. Insurance Certificate A brief description of each section is as follows: 1. General Information Give general information and a brief history of the consulting firm. State whether the Consultant is registered and licensed to perform landscape architectural work in the State of C:\Users\rgardner\Desktop\Park RFP\FINAL RFP Rivers Edge Commons Park Phase One.doc Request for Proposals Rivers Edge Commons Park Expansion Phase One Page 5 of 7 -------------------------- Minnesota. Include similar information on key subconsultants,if any,proposed for the project. 2. Project Understanding Include a summary of the Consultant's understanding of this project. 3. Project Approach Provide specific approaches, methods, and assumptions that will be utilized to accomplish each work item. 4. Proposed Project Team and Experience ■ Identify the key project team members and describe their specific roles on the project. Include key team members from subconsultant firms,if any. ■ Describe relevant experience and provide information on at least three (3) reference projects completed in the last six (6) years. Provide references and contact information. ■ Include one-page resumes or�ly for key members of the project team,including field personnel. 5. Schedule The project will begin as soon as a consultant is selected. The Consultant is to propose a schedule that shows how this project will be delivered. The schedule should include a list of key tasks within each phase, key milestones and approximate dates, and deliverables. 6. Statement Explaining Why Your Firm Should be Selected to Perform Services for This Project Several firms have been asked to respond to this Request for Proposal. Explain why your firm is the best qualified for this project. 7. Additional Information Include any other information that is believed to be pertinent, but not specifically requested elsewhere in this RFP. 8. Total Consultant Cost The Consultant cost should be separated as follows: a. Not to exceed cost. b. Hourly rates for all consultant employees expected to work on this project. These rates shall be the agreed upon costs for any additional services requested by the City, above what has been detailed in the RFP. c. Reimbursable costs including detail of service or item and applicable charge per unit. Proposals that do not include a `Not to Exceed' cost will be disregarded without further consideration. It is the responsibility of the proposing firm to accurately predict the amount of time they require for services. 9. Insurance Certificate Indicate ability to provide all necessary insurance certificates. C:\Users\rgardner\Desktop\Park RFP\FINAL RFP Rivers Edge Commons Park Phase One.doc Request for Proposals Rivers Edge Commons Park Expansion Phase One Page 6 of 7 -------------------------- Section 5 Consultant Selection Proposals will be reviewed and evaluated by City staff and based on the following criteria: 1. Consulting firm and key project staff experience. 2. Proven track record in successfully completing similar projects on time and within budget. Successful experience of both the firm itself and the individual team members will be considered. 3. Proposed approach to completing the project. 4. Consultant's familiarity with landscape architecture. 5. Proposed project schedule. 6. Proposed consultant cost. Following review of the proposals by the City, only selected Consultants will be asked to make oral presentations of their proposals to City representatives. Upon conclusion of the presentations, staff will select a Consultant to negotiate a contract as follows: 1. If for any reason,a firm is not able to commence the services in that firm's proposal within 30 days of the award, the City reserves the right to contract with another qualified firm. 2. The City shall not be liable for any expenses incurred by the Consultant prior to the signing of a contract including, but not limited to, the Proposal preparation,attendance at interviews, and/or final contract negotiations. 3. The Proposal must be signed in ink by an official authorized to bind the Consultant to its provisions that will be included as part of an eventual contract. The proposal must include a statement as to the period during which the proposal remains valid. This period must be at least 90 days from the date of the submittal. 4. The City reserves the right to reject any and all proposals or to request additional information from any or all of the proposing firms. Section 6 Contract Terms and Conditions Upon selection of a Consultant, an Agreement or Contract for Services shall be entered into by the City and the Consultant. The standard City contract is attached. It is expected that the contract will provide for compensation for actual work completed on a not to exceed basis,with the following conditions. 1. Deletions of specific components, such as individual project meetings,will be at the discretion of the City. Payment or reimbursement shall be made based on actual tasks completed on the project plus necessary subcontractor work (as applicable) and out-of- pocket expenses. Billing that exceeds the not to exceed amount will not be compensated unless a contract extension has been approved in advance by the City Council. 2. The City shall retain ownership of all documents,plans,maps,reports and data prepared under this proposal. In addition to being provided hard copies and digital documents C:\Users\rgardner\Desktop\Park RFP\FINAL RFP Rivers Edge Commons Park Phase One.doc Request for Proposals Rivers Edge Commons Park Expansion Phase One Page 7 of 7 -------------------------- throughout the project,the consultant shall supply the City with a fully-scanned (Laserfiche) project file upon completion. 3. If, for any reason,the Consultant is unable to fulfill the obligations under the contract in a timely and proper manner, the City reserves the right to terminate the contract by written notice. In this event, the firm shall be entitled to just and equitable compensation for any satisfactory work completed to that point at the discretion of the Parks and Recreation Director. 4. The Consultant shall not assign or transfer any interest in the contract without prior written consent of the City. 5. The Consultant shall maintain comprehensive general liability insurance in accordance with Section 466.04 of the Minnesota Statutes. 6. The Consultant shall defend,indemnify and hold harmless the City of Elk River,its officials, employees and agents, from any and all claims, causes of action,lawsuits, damages,losses or expenses,including attorney fees, arising out of or resulting from the Consultant's (including its officials, agents, subconsultants or employees) performance of the duties required under the contract,provided that any such claim, damages,loss or expense is attributable to bodily injury, sickness,diseases or death or injury to or destruction of property including the loss of use resulting therefrom and is caused in whole or in part by any negligent act or omission or willful misconduct of Consultant. 7. The Consultant contract shall be governed by the laws of the State of Minnesota. 8. Project summaries shall be submitted with each invoice during the course of the project. Each summary shall detail the amount billed to date, outstanding work items with costs to completion,and timelines. Invoices submitted to the City shall include a detailed breakdown of all chargeable items for that period. Section 6 Appendix Rivers Edge Commons Park Concept Plans (2) Rivers Edge Commons Park Aerials (3) Standard Professional Services Agreement C:\Users\rgardner\Desktop\Park RFP\FINAL RFP Rivers Edge Commons Park Phase One.doc ----------------- �---_----- 1 GFI V r i I NO CHANGE —sem Yom. REMOVE/REGRADE ALLEYWAY T P UTILITIES . relocate light control box/cable box consolidate electrical i UPPER PLAZA add plaza / shelter open for bleachers �' EXPANDED SEATING '��� f WITH LIMESTONE a i CURVED RETAINING WALLS shelter decorative railing ' ` S IAGE AREA J/ • i yrs • <l Enlarge stage STEPS' STORMWATER WATERFALL long t r term _ - park BRIDGE ` NO expansion CHANGE TO -' f area PERMEABLE ` PAVERS GAZEBO 1. . qr CREATE STRONGER EDGE - restore slope with prairie plantings STORMWATER Yr STEPS WATERFALL TO RIVER LANDING ADA ramp as future option r W = • landing set above ordinary ACCESS RIVER high water level formal stairs to landing informal stone steppers into water ADA ramp-future option �. � � floating seasonal dock(DNR review required) !1 tt sr d wS $ Joe nn v 5 �• # 1, ♦ ■ } m At of r■ m_o a �' v � we E Be # # ## ■ a f ■# # r ■ 1 f LU ■ f rti Y � #� #--+ Y r r` f ' + rk: r rr 1 ' t 41 I r .Si 4 I � r i J�� .�, Cott � � r �p� •'k�. c y -- cc . � r `~ •amu � + . � �_ - —� jf r qr •�, . a � i 1 t,. r,q Y 4D F a I a� ; 1 Ito . � 7 . IF 3 Y f _ 1 � � fl �. City of Elk River 13065 Orono Parkway Elk River,MN 55330 STANDARD AGREEMENT FOR PROFESSIONAL SERVICES THIS AGREEMENT ("Agreement") is made this day of July ,2015_,between the City of Elk River,Minnesota ("City"),whose business address is 13065 Orono Parkway, Elk River,MN 55330 and ("Consultant") whose business address is PRELIMINARY STATEMENT The City has adopted a policy regarding the selection and hiring of consultants to provide a variety of professional services for City projects. That policy requires that persons, firms, or corporations providing such services enter into written agreements with the City. The purpose of this agreement is to set forth the terms and conditions for the professional services Consultant will provide in connection with the Design and construction management of the Rivers Edge Commons Park Expansion Phase One,herein referred to as the "Work". The City and Consultant agree as follows: 1. Work. The Consultant agrees to provide the professional services described in Exhibit"A"-Request for Proposal and Exhibit `B"—XX Proposal attached hereto (the "Work"). 2. Time for Performance of Services. The Consultant shall perform the services described in Exhibit B according to the schedule provided,hereto. 3. Compensation for Services. City agrees to pay the Consultant up to $ for the Work. Any changes in the scope of the Work which may result in additional compensation due to the Consultant shall require prior written approval by an authorized representative of the City or by the City Council. The City will not pay additional compensation for services that do not have prior written authorization. 4. The City agrees to provide the Consultant with the information required to complete the Work. Page 1 of 9 Standard Agreement For Professional Services 5. Method of Payment. The Consultant shall submit itemized bills for professional services performed under this Agreement on a monthly basis. Bills submitted shall be paid in the same manner as other claims made to the City. 6. Project Manager and Staffing. The Consultant has designated the individuals identified in Exhibit A as the Project Manager to serve on the Project. The Project Manager shall be assisted by other staff members as necessary to facilitate the completion of the Project in accordance with the terms established herein. Consultant may not remove or replace the Project Manager without the approval of the City. 7. Standard of Care. Standard of Care. Consultant shall exercise the same degree of care, skill and diligence in the performance of the Work as is ordinarily exercised by members of the profession under similar circumstances in Minnesota. Consultant shall be liable to the fullest extent permitted under applicable law,without limitation, for any injuries,loss, or damages proximately caused by Consultant's breach of this standard of care. Consultant shall put forth reasonable efforts to complete its duties in a timely manner. Consultant shall not be responsible for delays caused by factors beyond its control or that could not be reasonably foreseen at the time of execution of this Agreement. Consultant shall be responsible for costs or damages arising from unreasonable delays in the completion of the Work. 8. Audit Disclosure. The Consultant shall allow the City or its duly authorized agents reasonable access to such of the Consultant's books and records as are pertinent to the work performed under this Agreement. Any reports,information, data, etc. given to, or prepared or assembled by,the Consultant under this Agreement which the City requests to be kept confidential shall not be made available to any individual or organization without the City's prior written approval. All finished or unfinished documents,data, studies, surveys,drawings, maps, models,photographs, and reports prepared by the Consultant shall become the property of the City upon termination of this Agreement,but Consultant may retain copies of such documents as records of the services provided. 9. Term. The term of the Agreement shall be from -June XX, 2015 through the final punchlist completion and construction acceptance by the owner the date of signature by the parties notwithstanding. This Agreement may be extended upon the written mutual consent of the parties for such additional period as they deem appropriate,and upon the terms and conditions as herein stated. 10. Termination. This Agreement may be terminated by the Consultant effective upon sixty (60) days'written notice delivered to the City at the address written above. The City may terminate this Agreement effective immediately,upon with notice to the consultant. Upon tenuination under this provision, the Consultant shall be paid for services rendered and reimbursable expenses until the effective date of termination. If,however the City terminates this Agreement because the Consultant has failed to perform in accordance with this Agreement, no further payment shall be made to the Page 2 of 9 Standard Agreement For Professional Services Consultant, and the City may retain another consultant to undertake or complete the Work. 11. Independent Consultant. At all times and for all purposes herein, the Consultant is an independent contractor and not an employee of the City. No statement herein shall be construed so as to find the Consultant an employee of the City. 12. Non-Discrimination. During the performance of this Agreement,the Consultant shall not discriminate against any employee or applicant for employment because of race, color, creed, religion,national origin, sex,marital status, status with regard to public assistance,disability, or age. The Consultant shall post in places available to employees and applicants for employment,notices setting forth the provision of this non-discrimination clause and stating that all qualified applicants will receive consideration for employment. The Consultant shall incorporate the foregoing requirements of this paragraph in all of its subcontracts for program work,and will require all of its subcontractors for such work to incorporate such requirements in all subcontracts for program work. 13. Assignment. Neither party shall assign this Agreement,nor any interest arising herein,without the prior written consent of the other party. 14. Services Not Provided For. No claim for services furnished by the Consultant not specifically provided for in Exhibit A shall be honored by the City. 15. Severability. The provisions of this Agreement are severable. If any portion hereof is, for any reason,held by a court of competent jurisdiction to be contrary to law, such decision shall not affect the remaining provisions of this Agreement. 16. Entire Agreement. The entire agreement of the parties is contained herein. This Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the parties relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the provisions of this Agreement shall be valid only when expressed in writing and duly signed by the parties, unless otherwise provided herein. 17. Compliance with Laws and Regulations. In providing services hereunder,the Consultant shall abide by all statutes, ordinances,rules and regulations pertaining to the provisions of services to be provided. The Consultant and City,together with their respective agents and employees, agree to abide by the provisions of the Minnesota Data Practices Act,Minnesota Statutes Section 13,as amended, and Minnesota Rules promulgated pursuant to Chapter 13. Any violation of statutes, ordinances, rules and regulations pertaining to the services to be provided shall constitute a material breach of this Agreement and entitle the City to immediately terminate this Agreement. 18. Waiver. Any waiver by either party of a breach of any provision of this Agreement shall not affect,in any respect, the validity of the remainder of this Agreement. Page 3 of 9 Standard Agreement For Professional Services 19. Indemnification. Consultant agrees to defend,indemnify and hold harmless the City and its officials, employees and agents from any liability, claims,damages, costs, losses judgments, or expenses,including reasonable attorney's fees, resulting directly or indirectly from a negligent act or omission (including without limitation professional errors or omissions) of the Consultant,its agents, employees, or subcontractors in the performance of the services provided by this Agreement and against all losses by reason of the failure of said Consultant fully to perform,in any respect, all obligations under this Agreement. 20. Insurance. A. General Liability. Prior to starting the Work, Consultant shall procure, maintain and pay for such insurance as will protect against claims for bodily injury or death, or for damage to property,including loss of use,which may arise out of operations by Consultant or by any subcontractor or by anyone employed by any of them or by anyone for whose acts any of them may be liable. Such insurance shall include,but not be limited to,minimum coverages and limits of liability specified in this Paragraph, or required by law. The policy(ies) shall name the City as an additional insured for the services provided under this Agreement and shall provide that the Consultant's coverage shall be primary and noncontributory in the event of a loss. B. Consultant shall procure and maintain the following minimum insurance coverages and limits of liability on this Project: Workers Compensation Statutory Limits Employer's Liability $500,000 each accident $500,000 disease policy limit $500,000 disease each employee Comprehensive General Liability $1,500,000 property damage and bodily injury per occurrence $2,000,000 general aggregate $2,000,000 Products—Complete Operations Aggregate $100,000 fire legal liability each occurrence $5,000 medical expense Page 4 of 9 Standard Agreement For Professional Services Comprehensive Automobile Liability $1,000,000 combined single limit each accident (shall include coverage for all owned,hired and non-owned vehicles. Umbrella or Excess Liability $1,000,000 C. The Comprehensive General/Commercial General Liability policy(ies) shall be equivalent in coverage to ISO form CG 0001, and shall include the following: a. Premises and Operations coverage with no explosions, collapse, or underground damage exclusion (XCU). b. Products and Completed Operations coverage. Consultant agrees to maintain this coverage for a minimum of two (2) years following completion of its work. Said coverage shall apply to bodily injury and property damage arising out of the products-completed operations hazard. c. Personal injury with Employment Exclusion (if any) deleted. d. Broad Form CG 0001 0196 Contractual Liability coverage, or its equivalent. e. Broad Form Property Damage coverage,including completed operations, or its equivalent. f. Additional Insured Endorsement(s),naming the "City of Elk River" as an Additional Insured, on ISO form CG 20 10 07 04 or such other endorsement form as is approved by the City. g. If the Work to be performed is on an attached community,there shall be no exclusion for attached or condominium projects. h. "Stop gap" coverage for work in those states where Workers' Compensation Insurance is provided through a state fund if Employer's liability coverage is not available. i. Severability of Insureds provision. D. Professional Liability Insurance. The Consultant agrees to provide to the City a certificate evidencing that they have in effect,with an insurance company in good standing and authorized to do business in Minnesota,a professional liability insurance policy. Said policy shall insure payment of Page 5 of 9 Standard Agreement For Professional Services damage for legal liability arising out of the performance of professional services for the City. Said policy shall provide an aggregate limit of $2,000,000. Said policy shall not name the City as an insured. E. Consultant shall maintain in effect all insurance coverages required under this Agreement at Consultant's sole expense and with insurance companies licensed to do business in the state in Minnesota and having a current A.M. Best rating of no less than A-,unless specifically accepted by City in writing. In addition to the requirements stated above,the following applies to the insurance policies required under this Paragraph: a. All policies, except the Professional Liability Insurance policy, shall be written on an"occurrence" form ("claims made"and "modified occurrence" forms are not acceptable); b. All policies, except the Professional Liability Insurance policy, shall be applied on a"per project" basis; c. All policies, except the Professional Liability Insurance and Worker's Compensation Policies, shall contain a waiver of subrogation naming "the City of Elk River"; d. All policies, except the Professional Liability Insurance and Worker's Compensation Policies, shall name "the City of Elk River" as an additional insured; e. All policies, except the Professional Liability Insurance and Worker's Compensation Policies, shall insure the defense and indemnity obligations assumed by Consultant under this Agreement; and f. All policies shall contain a provision that coverages afforded thereunder shall not be canceled or non-renewed,nor shall coverage limits be reduced by endorsement,without thirty (30) days prior written notice to the City. A copy of the Consultant's Certificate of Insurance which evidences the compliance with this Paragraph 20, must be filed with City prior to the start of Consultant's Work. Upon request, a copy of the Consultant's insurance declaration page,Rider and/or Endorsement,as applicable shall be provided. Such documents evidencing Insurance shall be in a form acceptable to City and shall provide satisfactory evidence that Consultant has complied with all insurance requirements. Renewal certificates shall be provided to City prior to the expiration date of any of the required policies. City will not be obligated,however,to review such Certificate of Insurance, declaration page,Rider, Endorsement or certificates or other evidence of insurance, or to advise Consultant of any deficiencies in such documents and Page 6 of 9 Standard Agreement For Professional Services receipt thereof shall not relieve Consultant from, nor be deemed a waiver of, City's right to enforce the terms of Consultant's obligations hereunder. City reserves the right to examine any policy provided for under this paragraph. F. Effect of Consultant's Failure to Provide Insurance. If Consultant fails to provide the specified insurance,then Consultant will defend,indemnify and hold harmless the City,the City's officials, agents and employees from any loss, claim,liability and expense (including reasonable attorney's fees and expenses of litigation) to the extent necessary to afford the same protection as would have been provided by the specified insurance. Except to the extent prohibited by law,this indemnity applies regardless of any strict liability or negligence attributable to the City (including sole negligence) and regardless of the extent to which the underlying occurrence (i.e., the event giving rise to a claim which would have been covered by the specified insurance) is attributable to the negligent or otherwise wrongful act or omission (including breach of contract) of Consultant,its subcontractors, agents, employees, or delegates. Consultant agrees that this indemnity shall be construed and applied in favor of indemnification. Consultant also agrees that if applicable law limits or precludes any aspect of this indemnity, then the indemnity will be considered limited only to the extent necessary to comply with that applicable law. The stated indemnity continues until all applicable statutes of limitation have run. If a claim arises within the scope of the stated indemnity,the City may require Consultant to: a. Furnish and pay for a surety bond, satisfactory to the City, guaranteeing performance of the indemnity obligation; or b. Furnish a written acceptance of tender of defense and indemnity from Consultant's insurance company. Consultant will take the action required by the City within fifteen (15) days of receiving notice from the City. 21. Records Access. The Consultant shall provide the City access to any books, documents,papers, and records which are directly pertinent to the specific contract, for the purpose of making audit, examination, excerpts, and transcriptions, for three years after final payments and all other pending matters related to this contract are closed. 22. Ownership of Documents. All plans,diagrams, analyses,reports and information generated in connection with the performance of the Agreement ("Information") shall become the property of the City. The City may use the Information for its purposes and the Contractor also may use the Information for its purposes. Reuse of the Information for the purposes of the project contemplated by this Agreement Page 7 of 9 Standard Agreement For Professional Services ("Project") does not relieve any liability on the part of the Contractor, but any reuse of the Information by the City or the Contractor beyond the scope of the Project is without liability to the other, and the party reusing the Information agrees to defend and indemnify the other from any claims or liability resulting therefrom. 23. Subcontractor. The Consultant shall not enter into subcontracts for services provided under this Agreement except as noted in Exhibit A,without the express written consent of the City. The Consultant shall pay any subcontractor involved in the performance of this Agreement within the ten (10) days of the Consultant's receipt of payment by the City for undisputed services provided by the subcontractor. If the Consultant fails within that time to pay the subcontractor any undisputed amount for which the Consultant has received payment by the City,the Consultant shall pay interest to the subcontractor on the unpaid amount at the rate of 1.5 percent per month or any part of a month. The minimum monthly interest penalty payment for an unpaid balance of$100 or more is $10. For an unpaid balance of less than$100,the Consultant shall pay the actual interest penalty due to the subcontractor. A subcontractor who prevails in a civil action to collect interest penalties from the Consultant shall be awarded its costs and disbursements, including attorney's fees,incurred in bringing the action. In addition,no subcontractor can file alien against the City. 24. Dispute Resolution/Mediation. Each dispute, claim or controversy arising from or related to this Agreement or the relationships which result from this Agreement shall be subject to mediation as a condition precedent to initiating arbitration or legal or equitable actions by either party. Unless the parties agree otherwise, the mediation shall be in accordance with the Commercial Mediation Procedures of the American Arbitration Association then currently in effect. A request for mediation shall be filed in writing with the American Arbitration Association and the other party. No arbitration or legal or equitable action may be instituted for a period of ninety (90) days from the filing of the request for mediation unless a longer period of time is provided by agreement of the parties. Cost of mediation shall be shared equally between the parties. Mediation shall be held in the City of Elk River unless another location is mutually agreed upon by the parties. The parties shall memorialize any agreement resulting from the mediation in a Mediated Settlement Agreement,which Agreement shall be enforceable as a settlement in any court having jurisdiction thereof. 25. Conflicts. No salaried officer or employee of the City and no member of the City Council of the City shall have a financial interest, direct or indirect,in this Agreement. The violation of this provision renders the Agreement void. Any federal regulations and applicable state statutes shall not be violated. 26. Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be considered an original. Page 8 of 9 Standard Agreement For Professional Services 27. Entire Agreement. This Agreement constitutes the entire agreement of the parties and supersedes all prior communications,understandings and agreements relating to the subject matter hereof,whether oral or written. 28. Governing Law. This Agreement shall be controlled by laws of the State of Minnesota. Executed as of the day and year first written above. City of Elk River Mayor City Clerk Firm Name Bv: Its: Page 9 of 9 Standard Agreement For Professional Services i q �■ _ � r k i .F , Vik b Of a e f - �i 6-,. � ° ., a � � �F• .. `� � �. Vie; 7 Rk RIVERS EDGE COMMONS EXPANSION ELK RIVER, lViINNE4� %gli% Prepared by 4 � i Hoisington . - . - HK June 22, 2015 3i t r 1 4 , 4-1 41 lap CONTENTS 1 1 FIRM PROFILE 02 PROJECT UNDERSTANDING 03 PROJECT APPROACH 04 PROPOSED ; RELEVANT 05 SCHEDULE 06 QUALIFICATION STATEMENT 07 COST SUMMARY AND INSURANCE REQUIREMENTS Pi-opo5al to The Oty I I I/i-k ma5teiplannlng 5eivlces SubmIttedJune2015by HogtonI'/ ' I I Inc MIN ©® Hoisington Koegler Group Inc. June 22,2015 Landscape Architecture Michael Hecker,CPRP Planning Parks and Recreation Director Urban Design City of Elk River 13065 Orono Parkway 123 N.3rd Street,Suite 100 Elk River,MN 55330 Minneapolis,MN 55401 612-338-0800 Re:Rivers Edge Commons Expansion Dear Michael and members of the selection team: Elk River already has a significant investment in Rivers Edge Commons Park. The park is well loved and well used. The initial project has done what was intended;bringing people to the downtown,connecting them to the riverfront,and providing a spectacular venue for the popular summer concert series. HKGi is very proud of how the original park plan has been accepted by the City and COLLABORATE specifically how well the project has brought energy to the historic downtown. Whether it is the large concert events that fill downtown on Thursdays in the summer,or the days LISTEN when the kids take over the fountain,the park has brought joy and fun to many people. Being invited to potentially participate in the next chapter of the park story is very EXPLORE gratifying and represents something we strive to do as a company: build and strengthen relationships with Cities by providing relevant and tangible design solutions to key public CREATE spaces. To supplement our team we have added BKBM for the Civil and Structural Engineering tasks and Oliver and Associates for the surveying tasks. Together we will provide all of the expertise necessary to successfully lead the implementation of the phase one expansion project. We thank you for the opportunity to compete for such an important community project. Please contact me directly at 612.940.5285 or paul@hkgi.com if you have any additional questions. HKGi believes that design,when inspired by the character of the Sincerely, people and the land,can create a unique and identifiable sense of community. Paul Paige,PLA President and Project Manager ppaige@hkgi.com 612-252-7125 RIVERS EDGE COMMONS EXPANSION PROPOSAL 1 :_�. M-liaam- -Owl Paolo C a{ + a AQ IL S � .iM -!�„�� r .`'. .• -+�� t +. i 4 .P• ..a +M1. - r 5 ,P M1 • FIRM PROFILE FIRM PROFILE Hoisington Koegler Group Inc. (HKGi) Hoisington Koegler Group Inc. 123 North Third Street Suite 100 Minneapolis,Minnesota 55401 p: 612.338.0800 f: 612.338.6838 ` e:info@hkgi.com r w: www.hkgi.com R, Est.1982 �h Principals: Mark Koegler,ASLA,CEO �.� Paul Paige,PLA,President ' Brad Scheib,AICP,Vice President Bryan Harjes,PLA,LEED AP,Vice President Associates: Lil Leatham,PLA Hoisington Koegler Group(HKGi)is a firm of talented planners,landscape architects,and Staff: urban designers who share their passion for planning and design with clients striving to » 8 Licensed Landscape create lasting places of quality.HKGi has over thirty years of experience designing high Architects quality and distinctive public and private spaces on budget and on time.Clients seek HKGi » 3 Certified Planners to lead their planning and design efforts because of our ability to creatively synthesize » 1 Graduate Planner complex program needs and planning issues within a process of consensus-building. » 4 Graduate Landscape COLLABORATE Architects We strive to integrate diverse perspectives into all of our work.We bring together teams Services: of professionals that thrive on a studio approach to design and are passionate about the Park Planning and Design continuous process of teaching and learning. Public Participation LISTEN Schematic&Site Design In order for design to reflect the unique character of any given place,the natural,cultural, Landscape Architecture and historical values need to be heard and understood.We will continually listen to Greenway Planning clients and stakeholders to ensure we build upon the inherent strengths of the land and » Bikeway and Trail Planning consistently provide direction that respects the context of the project at hand. » Urban Design EXPLORE » Streetscape Design By embracing the complexities of our projects we can create new solutions that bring » Downtown Planning obvious and measurable value to our clients.Our thirst to seek out new connections » Corridor Studies between people and the land is at the heart of our explorations and is integral to our design » Strategic Planning process. » Commercial Area Revitalization » Transit Oriented Development CREATE » Zoning Ordinance Only by understanding how a planning principle evolves into a built community asset can » Comprehensive Planning we actually begin to see how our work affects the physical character of any given place.We » Environmental Review will always strive to carry our conceptual planning ideas forward to built realities so that our plans can make a real and tangible contribution to our client communities and their culture. RIVERS EDGE COMMONS EXPANSION PROPOSAL 3 BKBM Engineers - Civil Engineering BKBM Engineers BKBM Engineers is a multi-discipline,professional engineering firm committed to 5930 Brooklyn Blvd excellence in design,on-schedule project completion and exceeding customer Minneapolis,Minnesota 55429 expectations. We've earned a national reputation for innovative design solutions and p: 763.843.0420 proactive project management.Our expertise includes civil,structural,restoration,and f: 763.843.0421 industrial engineering services. The award-winning firm was established in 1967,and is e:bkbm@bkbm.com headquartered in Minneapolis,Minnesota with a branch office in Mandan,ND. w:www.bkbm.com The civil services we offer include site engineering and conceptual planning.We have Civil Engineering Services: experience with public and private development including specialization in industrial and » LEED&MN B3 design railroad. » Site due-diligence studies BKBM is committed to high value and exceptional service. Our goal is to develop and Sidewalk&trail design maintain long-term relationships with direct clients and end users/owners. By listening Site demolition to our clients,we identify their unique needs,allowing us to present alternatives and Hydrology studies recommend solutions to achieve the design objectives. » Master planning » Utilitydesign » Railroad alignment » Conceptual planning » Project peer reviews » Grading&drainage design » Roadway/Utility plan and profile 4 RIVERS EDGE COMMONS EXPANSION PROPOSAL FIRM PROFILE Oliver Surveying & Engineering, Inc. - Surveying Our mission is to provide experienced and professional service to achieve the highest Oliver Surveying&Engineering,Inc. quality project for each client. 580 Dodge Avenue Oliver Surveying&Engineering,Inc.is centrally located in Elk River,Minnesota.Our office Elk River,Minnesota 55330 is digitally integrated and uses state of the art software and hardware to complete the p: 763.441.2072 f: 763.441.5665 projects presented. e:Icaswell@oliver-se.com With our experience and relationships with various City,County and State agencies,we w:www.oliver-se.com provide an accurate profitable product whether it is Commercial or Residential.High Land Survey Services: quality,cost effective,and fully functional design services are provided by talented and Boundary Surveys experienced teams composed of Civil Engineers,Land Surveyors and Land Planners. A.L.T.A./A.C.S.M.Surveys We work to deeply understand your business and all aspects of your project.As a result,we » H.U.D.Surveys provide comprehensive,strategic and innovative solutions that get your project approved » Topographic Surveys and built on schedule.We are committed to maintaining a rich tradition of excellence by Design Surveys providing clients with quality innovative designs and services that strive for complete G.P.S.Surveys satisfaction on every project. Torrens Surveys At Oliver Surveying&Engineering,Inc.,we are more than just engineers,surveyors and » Registered Land Surveys planners.We are a team of professionals,passionate to provide successful solutions for our » Platting clients. Condominium Platting Oliver Surveying&Engineering Inc utilizes state of the art electronics to produce survey » Construction Staking and development projects of exceptional quality.The Oliver survey team will get the » Concept and Site Planning precise information in an efficient manner resulting in the documents to fit your needs. » F.E.M.A.Flood Surveys Expert Testimony RIVERS EDGE COMMONS EXPANSION PROPOSAL 5 ;p kill �; R, . .. io if RLk ° * a do ip jp ti IT 2 6 y -� � --'•� r - � �. •ice a gill �� 4 ` m • PROJECT UNDERSTANDING - PROJECT UNDERSTANDING The City of Elk River is seeking consulting services to lead,coordinate and collaborate with staff on the phase one expansion of Rivers Edge Commons Park in downtown Elk River. The project represents the next step in the evolution of the highly successful downtown park,and is being driven in part by the desire,identified in the recent System Plan,to improve the community connection to the riverfront and the continued growth of the summer concert series. The concerts have grown in popularity over the years,with crowds commonly exceeding 1,000 people. The project intends to provide additional concert seating while simultaneously making improvements to deteriorating retaining walls and storm-water systems in the park area. The phase one improvements are being directed by a recently adopted park concept plan that explored how the expansion of the park could be implemented through a series of phases. Future phases will include additional park features including a shelter,expanded - trails along the river,and potential docking facilities at the rivers edge. This phase one project needs to carefully consider the future phases,so that the park can grow over time in the most efficient means possible,and with the least amount of disturbance to the popular .2 ; park. HKGi has a long history with the City of Elk River related to the design and implementation of Rivers Edge Commons Park,including the initial exploration of design ideas with City of staff that incorporated the amphitheater,plaza spaces and water features that have all turned out to be a huge success for Elk River residents and visitors. The expansion project represents a great opportunity for us to continue our role in making a great park even better. f _ a ,.g i r it 4. r RIVERS EDGE COMMONS EXPANSION PROPOSAL 7 . .�•, 46 HKGI PROJECT WORK: s 4r RICE MARSH LAKE PARK TRAIL CHANHASSEN,MN 't PHOTO BY KATIE RAGLAN COURTESY OF CITY OF CHANHASSEN w dr 00 Al to 1p f rF r. r .. .91 • ` i sic a r b r # ,s „ f e It w 3 � s w wr -lw Aar • = PROJECT APPROACH ' PROJECT APPROACH Our team understands the importance of"place-making"and is committed to building on the existing strengths at Rivers Edge Commons Park. We have carefully selected individuals on our team with the experience,passion and desire to create lasting public facilities and spaces within the park. Our team has personal experience in the day to day functions at the park;from attending countless concerts to more casual strolls through the park,we understand what Rivers Edge Commons Park is today,how to best protect and build upon the characteristics of the park that work well today,and how to make it even better over time. With our team's inherent knowledge of the Park,and our recent experience with staff in developing the updated Master Plan,we can bring measurable results to this phase of the project from day one. Additionally,our team's institutional knowledge of the City process and what it means to bring planned projects through the review process in Elk River will mean that we can focus on the project vs.the process. The project represents an opportunity to make the Park an even more amazing destination for Elk River residents to enjoy for generations to come.Our approach to making Rivers Edge Commons Park unique, dynamic,and enduring will rely on the following approach: Project Work Plan Working closely with City staff,and in response to the requested tasks identified in the RFP,our team will provide the following professional services to accomplish the phase one expansion project: TASK 1 -DESIGN DEVELOPMENT Collaborate with the City to review the outcomes of the recently completed Concept Master 1.1 Topographic Survey and Plan and review and confirm all of the design ideas including but not limited to: basemap of the Phase 1 project area Integrate other additional project design ideas and information that has been 1.2 Definition of materials and Construction systems based developed by staff since the completion of the previous Master Plan. on the approved Concept Finalize the phase one project limits and conduct a site survey of the existing conditions Plan to be utilized as the base map for the proposed park changes.Preparation of a 1.3 Engineer preliminary storm drainage systems topographic map and as-built map will be part of the boundary survey. Procedures for incorporating best practices measurement of both horizontal and vertical positions will include use of GPS and a 1.4 Develop outline robotic total station. Upon completion of the field measurements a CAD model of the specifications for the project 1.5 Review the draft design park will be prepared for use by the other members of the team. documents with staff(60% Evolve the existing concept plan into a draft design development set by integrating best and 90%)and the Parks and practices of sustainable site design. This plan set will provide a guide to construction Rec Commission(90%) 1.6 Prepare progress reports for systems and materials options and will be critical in establishing more refined cost staff estimates and the approach to project implementation. The review process for the design development set will include review by staff and the park commission at various stages of completion. For City staff,we propose two review meetings during the design development phase(60%and 100%). The review meetings will focus on design options and alternatives for the basic construction systems and materials being proposed for the project. This design process is critical to coordinating the project and to develop design solutions that align project goals with budgets,phasing requirements,and City expectations. RIVERS EDGE COMMONS EXPANSION PROPOSAL 9 PROJECT APPROACH TASK 2-CONSTRUCTION DOCUMENTS- PLANS AND SPECIFICATIONS Working with the continued direction of the City,our team will provide a complete draft 72.1Engineer final storm and final construction document(CD)set for the phase one expansion project. The e systems assumption is that all of the planned improvements are consolidated into one set of bid rating best practices 2.2 Finalize layout,details, documents,and that required landscape and civil tasks are to be accomplished under sections related to the site the direction of a general contractor. Specific construction timing,site availability,and features coordination with planned program events in the park(if deemed necessary)are controlled 2.3 Staff level meetings to in the plans via clear language in the special provisions of the project specifications. review progress 2.4 Develop final specifications The CD package will also include review sets for staff at interim stages of completion (50%, for the project 2.5 Present to sect the Park 90%,and 100%). The CD sets will include specifications(general conditions,technical Commission for approval specifications,and special provisions),plans(civil,landscape,sections)and all required 2.6 Initiate necessary project detailing to ensure that prospective bidders will have a clear understanding of the overall permits project design intent. The interim CD review process will utilize team meetings where 2.7 Assess bidding climate to determine the optimum all trades are represented to walk through the drawing sets and discuss potential design scenario and report to staff coordination issues. Cost analysis will also be completed at each review stage in the 2.8 Seek approval and process. authorization from the City Council to seek bids TASK 3-CONSTRUCTION ADMINISTRATION Bidding related-Our team will coordinate an advertisement for bid,respond to bidder's questions,develop and distribute any required addenda,attend bid opening,tabulate bids, and review and recommend an apparent low bidder. Schedule/Bidding Note: Given the current high pricing that is occurring during the 2015 3.1 Prepare an ad for bid and construction season,due in part to the fact that many contractors are already booked for assist in publishing Fall projects,we will also explore the potential for bidding this project in the Winter for 3.2 Support bidders completion in the Spring of 2016. We propose to review this topic with City staff once questions,attend bid opening,recommend the CD set is near completion,and discuss the positive and negative implications of the qualified bidder approach and after consultation with area contractors to better understand their capacity 3.3 Attend bi-weekly for Fall work. construction meetings (4 month construction Construction Observation-Our team will provide scheduled on site observation during assumed-Sept,Oct,Apr, May) construction of the expansion improvements to ensure that the requirements of the plans 3.4 Review pay requests and and specifications are adhered to by the selected Contractor. Ongoing bi-weekly site recommend action to meetings will be organized and thoroughly documented during all active construction staff 3.5 Process change orders if periods. required Contract Administration-HKGi has a great deal of familiarity with the existing processes 3.6 Coordinate necessary project permits related to capital improvement projects in Elk River,as well as invaluable institutional 3.7 Prepare project knowledge that is up to date with current City and other local agency standards and punchlists at substantial practices for project delivery. Our team will coordinate all contract related tasks including and l finacompletion 3.8 and al c close out initiation of Agreement with selected Contractor,interim and final pay requests,change Cordocumentation with orders and supplemental instructions,project punch lists,and all other closeout and Contractor and submit to project acceptance documents. City 10 RIVERS EDGE COMMONS EXPANSION PROPOSAL TM cF, low- A5 4p.Pk WN, _a was .a - 4 yS t _ � J! �t ��'.. -'� �, • '.`• gas. • RLEV `} ER NCE R a . t HKGI TEAM HKGI has assembled a team familiar with Elk River and that also has specific experience on the original design of Rivers Edge Commons Park and experience collaborating with one another on built projects throughout the region.More detailed roles for each of the key personnel on the HKGI team are included below,and more detailed resumes are included on the pages that follow. Paul Paige,PLA,President of HKGI,will serve as Project Manager for the Rivers Edge Commons Expansion project. He will be responsible for leading the design effort, overseeing quality control and conducting design review and construction administration meetings. Paul led the planning,design,and implementation of the previous phase of the Rivers Edge Commons project,and he has worked with the City of Elk River on numerous other planning and construction projects over the course of his career. His familiarity with the site and with the community will be an asset,ensuring that the design meets the needs of both the community and the landscape and that the project proceeds according to schedule and budget. Paul has provided similar service and expertise on design and construction projects throughout the state of Minnesota. He has won numerous awards for his planning and design work,including the Rivers Edge Commons,the Buffalo Downtown Commons,and the Bloomington Civic and Arts Center Campus. Amy Bower,PLA,with HKGI will serve as the lead landscape architect. She will lead the site planning and design effort and will provide cost estimation,construction documentation, and support to construction administration services. Amy's experience translating design concepts into built work includes earlier phases of the Rivers Edge Commons project. She has developed designs and produced construction documentation for dozens of projects throughout the region,including the Village Creek, Arbor Plaza and Shingle Creek Overlook in Brooklyn Park,Veterans Memorial Park in Mound, Minnehaha Refectory in Minneapolis,and the Bloomington City Hall and Arts Campus. Kevin Clarke,a graduate planner and landscape architect with HKGI,will provide planning and landscape architecture support. He will assist in site design,cost estimating,and construction documentation. Kevin has experience working with the City of Elk River,having provided planning and landscape architecture support for the recently approved Parks and Recreation Master Plan. His additional park planning and design experience includes work on the Buffalo Downtown Commons,the Central Park Master Plan in Greenfield,and the Downtown Streetscape in Red Wing. 12 RIVERS EDGE COMMONS EXPANSION PROPOSAL Paul Paige PLA President,Landscape Architect AREAS OF EXPERTISE: Paul possesses more than 20 years of experience completing public and private projects throughout the country.He has provided leadership as project manager on a wide range of planning and design projects,with a particular focus on planning,site design,and construction administration for park and recreation systems and facilities,downtown and s commercial corridor streetscapes,civic and corporate campuses,and other public spaces. Paul has also frequently provided consultation and advisory services to public and private land owners to help them understand their development options to achieve the highest and best use of their land. Paul's project management leadership and technical expertise have been critical ingredients in transforming paper plans and designs into built work. He p:(612)252.7125 has shepherded numerous construction projects through to completion,and the results of e:ppaige@hkgi.com his work can be seen throughout Minnesota. Years of Experience:23 RELEVANT PROJECT EXPERIENCE: EDUCATION: Blaine,MN Dakota County,MN Bachelor of Landscape Architecture, > Town Square Park » North Urban Regional Trail Design University of Minnesota Bloomington,MN » Spring Lake Park Trail REGISTRATION: p 9 » Civic Campus Site Design » Lebanon Hills Connector Evaluation Landscape Architect,Minnesota » Normandale Lake Bandshell Dayton,MN License No.23594 > Bush Lake Beach Renovation » Parks,Trails and Open Space Master n Park,MN Plankl MEMBERSHIPS/AFFILIATIONS: Brooklyn Elk River Parks and Recreation » Village Creek and Arbor Plaza Elk River,MN Commission(former) » Park and Recreation System Plan » Parks and Recreation System Master Sensible Land Use Coalition » Shingle Creek Overlook Plan AWARDS: Buffalo,MN » River's Edge Commons Downtown Park Plan and Construction Administration 2015 ACEC-MN Excellence in » Downtown Commons Engineering Honor Award-Buffalo Farmington,MN Downtown Commons Champlin,MN » Meadowview Park Master Plan 2014 MN APA Planning in Context » Veterans Memorial Park » Hill Dee Park Master Plan Award-Chaska Downtown » Andrews Park Renovation » Silver Springs Park Master Plan Streetscape Schematic Design Chanhassen,MN » Middle Creek Park Master Plan 2013 MN ASLA Merit Award-Elk » Marsh Glen Trail Extension Minneapolis Park and Recreation Board River,Rivers Edge Commons » Lake Ann Stairway and Overlook » Victory Park Master Plan and 2009 MRPA Award of Excellence-Elk » 15+Park Improvement Projects over 15 Renovation River,Rivers Edge Commons years » Keewaydin Park Renovation 2003 Mpls AIA Merit Award- Crystal,MN y » Lake Calhoun Parking expansion Bloomington Civic Plaza » Hagemeister Pond Preserve Master Plan » Cedar Field Neighborhood Park 2002 MRPA Award of Excellence- » Bassett Creek Park Extension Normandale Lake Bandshell » Levin Triangle Park Renovation 1988 ASLA Honor Award for Student » East Phillips Park Master Plan Work » Bottineau,Currie,and Stewart field improvement projects RIVERS EDGE COMMONS EXPANSION PROPOSAL 13 HKGI TEAM Amy Bower PLA Landscape Architect AREAS OF EXPERTISE: Amy has nearly two decades of experience developing plans,site designs and construction documentation for parks,public spaces,trails,recreational facilities,and streetscapes. She also designs wayfinding and monument signage for clients. Her background in industrial design,combined with her experience as a landscape architect,has enabled her to develop a particular expertise transforming planning and design concepts into built work. She provides clients with valuable cost estimation,landscape architecture,and construction administration services. Her award-winning work can be seen throughout the Twin Cities metropolitan area,including in Elk River,Osseo,and Hastings. In addition to Amy's expertise transforming project designs into built products,she is p: (612)252.7121 skilled at working with clients and stakeholders during the design process,ensuring their e: amy@hkgi.com input and needs are addressed during final design and implementation. Years of Experience:18 RELEVANT PROJECT EXPERIENCE: Education: Masters of Landscape Architecture, Alexandria,MN Edina,MN University of Minnesota » Big Ole/Central Park Master Plan » Countryside Park and Ballfield Bachelors of Science,Industrial » Lake Connie Park Master Plan Improvements Design,University of Wisconsin-Stout Blaine,MN Elk River,MN Registration: » Town Square Park Concepts » River's Edge Commons Park Plan and Landscape Architect,Minnesota » Blaine City Offices Landscape Plan Construction Administration Licence No.41472 Bloomington,MN » Gateway and Wayfinding Signage » City Hall Campus Landscape Plan Design Honors: » Riverfront Pathway along the Minnesota Department of Brooklyn Park,MN Mississippi Transportation Entry Sign > Shingle Creek Overlook Competition-1st Place-June,1996 Hastings,MN » Village Creek and Arbor Plaza » Pioneer Park Plan Works-Student publication of projects-1995 Buffalo,MN Minneapolis Park and Recreation Board » Downtown Commons Improvements Awards: » Minnehaha Refectory Design-Sea Salt 2015 ACEC-MN Excellence in Champlin,MN » Neighborhood Park and Athletic Engineering Honor Award-Buffalo » Veterans Memorial Park Field Design and Construction Downtown Commons » Andrews Park Improvements Administration(multiple parks) 2014 MN APA Planning in Context Chanhassen,MN » Calhoun South Sustainable Parking Award-Chaska Downtown Lot Design and Construction Streetscape Schematic Design » Rice Marsh Lake Trail Design and Administration Construction 2013 MN ASLA Merit Award-Elk River,River's Edge Commons » Park Plans,Designs,and Construction Mound,MN 2012 MN ASLA Merit Award-Osseo Administration(multiple parks) » Veterans Memorial Park Master Plan Central Avenue Streetscape Dakota County,MN Northfield,MN 2009 MRPA Award of Excellence-Elk » Thompson County Park Master Plan » Bridge Square Downtown Park Plan River,Rivers Edge Commons » North Urban Trail Design » Park and Trail Master Plan 14 RIVERS EDGE COMMONS EXPANSION PROPOSAL Kevin Clarke Graduate Planner and Landscape Architect AREAS OF EXPERTISE: Kevin is a community planner and landscape architect in training.At HKGi he has been especially involved with park and recreation planning,contributing to system master plans, individual park master plans,trail and bikeway plans,and athletic facilities plans. He has also participated in community comprehensive planning,neighborhood planning,land use -J analysis and planning,and site design projects. Kevin's work at HKGi has focused on GIS mapping,conditions analysis,plan writing,and public engagement,and he has provided support for concept planning,design,and visual communication. Kevin has also been involved with volunteer community planning efforts including the Minnesota Design Team and the Starling Project,an effort to enliven and sustain University p:(612)252.7133 Avenue in St.Paul,MN during the light rail construction process by supporting temporary e:kevin@hkgi.com uses in vacant storefronts.While at The Jens Jensen Center and The Clearing in Door County, Years of Experience:3 Wisconsin,Kevin preserved and restored historic landscapes.He also brings construction experience from multiple urban infill projects in Portland,Oregon. Education: Masters of Landscape Architecture, RELEVANT PROJECT EXPERIENCE: University of Minnesota Brooklyn Park,MN Hennepin County,MN Masters of Urban and Regional » Recreation and Parks System Plan » Crow Mississippi River Regional Trail Planning,University of Minnesota Buffalo,MN Hermantown,MN Bachelors of Arts,Economics, » Munger Spur Connector Plan Saint John's University » Downtown Commons Plaza g p Chanhassen,MN Hopkins,MN Memberships/Affiliations: > Aquatic Invasive Species Program » Park System Reinvestment Plan American Planning Association Analysis y Inver Grove Heights,MN American Society of Landscape » Camden Ridge Park Plan » Parks and Recreation System Plan Architects Dakota County,MN » City Center Campus Site Design The Starling Project » Rice CreekTrail Master Plan Minneapolis,MN Minnesota Design Team Douglas County,MN » MPRB-Northeast Athletic Park Master McCarthy Center for Public Policy and » parks,Trails,and Bikeways Master Plan Plan Civic Engagement Duluth,MN Prior Lake,MN Urban Land Institute-Young Leaders » Park Dedication Update » Lake Superior Zoo Vision Workshop p » Sports Corridor Mini-Master Plan » Trail and Sidewalk Study » Mission Creek and Magney Snively Trail Ramsey County,MN Planning » Rice Creek North Regional Trail Master Elk River,MN Plan » Spectrum High School Athletic Facilities Red Wing,MN » Parks and Recreation Master Plan » Downtown Streetscape Greenfield,MN River Falls,WI » Greenfield Central Park Master Plan » Hoffman and Glen Park Master Plans RIVERS EDGE COMMONS EXPANSION PROPOSAL 15 BKBM TEAM Joel W. Maier PE Civil Group Manager Education: AREAS OF EXPERTISE: Bachelors of Science,Civil Mr.Maier has engineering practice on a wide variety of civil engineering projects. His Engineering,University of Wisconsin- experience includes design of grading,paving,earthwork and drainage for highway Platteville segments;hydraulic analyses,studies and reports for bridges over rivers and streams;urban Registration: road design,utility relocations,traffic features and temporary traffic measures;extensive Registered Professional Engineer- design and field engineering for railroad trackage;and site design for a variety of projects. MN(#19181),IA,IL,MO,SD American Society of Civil Engineers RELEVANT PROJECT EXPERIENCE: Three Rivers Place,Hastings,MN Civil Project Engineer for a retail/condominium complex. Civil consists of critiquing drainage,storm water management,soils,and utilities,review compatibility of existing utilities and consider connections and service extensions to municipal and public utilities such as sanitary sewer,water mains,and storm sewer on a 4.3 acre site. Terra Springs(Historic Stillwater Territorial Prison Redevelopment),Stillwater,MN Project Engineer for the design of new utilities,water quality treatment and rate control. There were intricate stormwater quality treatment designs involved due to groundwater issues. The Historic Territorial Prison is being converted to luxury condominiums. US Bank,St.Paul,MN Project Engineer for the design and specifications for the geometric site layout,grading, drainage,erosion control,site utilities,hydraulic analysis and agency permit approvals. This project involved design of city streets and utilities,stormwater quality treatment through use of an infiltration pond,stormwater rate control as well as an intensive draintile system under proposed building. Project also included a parking ramp,parking and loading docks below the building and a pedestrian tunnel. Permits were required to be obtained from the Army Corps of Engineers,City of St.Paul,Minnesota Department of Transportation and Minnesota Pollution Control Agency. Care Development Properties,Marshall,MN Two separate parcels of land involving placement of fill within the 100 year flood plain of the Redwood River. Design included development of grading plans,City Council approval and DNR and US Army Corps permits. 16 RIVERS EDGE COMMONS EXPANSION PROPOSAL Rivers Edge Commons Park Elk River,Minnesota MOW 4- - '- � •4 1�1 � ,-,;ray � p rS P t +34., 2013 Merit AMERICAN of Rivers Edge Commons Park,located in the heart of downtown Elk River,Minnesota, Award LANDSCAPE connects Main Street to the adjacent Mississippi River,drawing thousands of visitors every MINNESOTA year for community festivals and concerts in the park. The project was initiated because 2009 Minnesota the City recognized the need to enhance the long-term viability of downtown by attracting Award of Recreation and Park people to the downtown area. Rivers Edge Commons Park is a critical piece of that plan. Excellence Association Taking advantage of the river's natural ability to attract people,the park has given the community a popular gathering space and has provided a significant economic boost to the downtown business district since opening in 2007. The design process for the park began when HKGi was commissioned by the City to develop park concepts and complete construction documents for the design,culminating in the construction of the park in the summer of 2007. The design incorporates an upper square with shade trees and a popular in-grade fountain feature at the street level,a grand staircase with a terraced stone amphitheater at the hillside,and a performance area and gazebo overlooking the River below. The project has been recognized for its outstanding planning and design by both the Minnesota Recreation and Parks Association and the Minnesota chapter of the American Society of Landscape Architects. RIVERS EDGE COMMONS EXPANSION PROPOSAL 17 HKGI EXPERIENCE Buffalo Downtown Commons Buffalo,Minnesota WAYFINDING I)f A. / KIOSK .-... a... F SAS AWN AREA&BENCH SEATING ENHANCED PEDESTRIAN CROSSING FUTURE FARMERS w -' --, MARKETSTRUCTURE SHADE TREES LINEAR INTERACTIVE I MULTI-PURPOSE PLAZA - `? FOUNTAIN , -�j' SPACE ELEMENT 1` SHADETREES, LAWNAREAa -�"-�.._, 8 BENCH SEATING SEAT WALLAND LAKE OVERLOOK TERRACEDLAWN AR EA • WITH TREES ENTRY SIGNAGE 8 LANpSGAPING RAINWATER GARDEN 8 NATURALIZED PLANTINGS y ENHANCED PEDESTRIAN CROSSING PCT NCURE —_ INTERSECTION x �� ENHAEMENT .. PROJECT REORGANIZED 1 EXISTING PARKI NGAREA In the 1990s the City of Buffalo began making improvements to its lakefront area adjacent .: to downtown,and in the past decade has established a vision for extending public space 2015 Honor improvements to its downtown district.The Downtown Commons,which HKGI designed Award �\ax�xKxs�f�" in collaboration with Bolton&Menk,extends those improvements southward,creating an inviting entry point into downtown and a new connection point to Buffalo Lake. The Downtown Commons project transformed an unattractive,undeveloped site into an inviting urban park plaza that features a rainwater garden,seating with lake overlooks, an interactive fountain/splash pad,a multi-purpose plaza,entry signage,and arbors with shade trees and terraced lawns. The Downtown Commons concept plan also anticipates potential future projects such as an intersection enhancement at Highway 25 and 1 st Street,and a potential farmers'market structure on the southern tip of the site. The final concept plan also calls for creating pedestrian connections that invite people to stroll between the Commons and the downtown area.In addition to extending pavers, lighting,and other urban design materials from the Commons onto the adjacent block, adjacent downtown alleyways have been transformed into an art walk that uses paving elements,overhead signs,and other design features to tell the story of historic downtown Buffalo. 18 RIVERS EDGE COMMONS EXPANSION PROPOSAL Rice Marsh Lake Trail Loop Chanhassen and Eden Prairie,Minnesota KRBw AV .. r. r r c � iw 5 After years of planning,the Rice Marsh Lake Trail Loop is now complete. The trail is a3.4 mile multipurpose pedestrian loop encircling Rice Marsh Lake in Chanhassen and Eden REFERENCE Prairie. Half of the Rice Marsh Lake Trail Loop is located within Chanhassen,and half Todd Hoffman is located in Eden Prairie. Initial planning for the trail loop began in the 1970s and the Parks and Recreation Director northerly segments were completed in the 1980s.Since then,the cities of Eden Prairie and City of Chanhassen Chanhassen have worked together to ensure the trail loop's completion. 952-227-1129 HKGi assisted the City of Chanhassen in the design, bidding,and construction thoffman@ci.chanhassen.mn.us administration of the last remaining section of the loop in 2013.Sensitive field locating of the trail saved many of the old oak and maple trees that make this trail so spectacular. Routing the trail alignment to work within multiple easements was an additional challenge. Ultimately,HKGi designed the trail not only to meet MNDOT standards,awarding it an easement through MNDOT land,but also negotiated the adjustment of a private landowner's easement in order to save 100 year old oaks. The trail offers spectacular views of Rice Marsh Lake and provides a nature-based trail experience featuring rolling terrain,forests,meadows and wetlands. RIVERS EDGE COMMONS EXPANSION PROPOSAL 19 HKGI EXPERIENCE Village Creek Park and Arbor Plaza Brooklyn Park,Minnesota d' qL P a "4 HKGI was retained by the City of Brooklyn Park to develop park plans for two underutilized parcels of land abutting Shingle Creek.The project evolved through schematic design into a connected greenway that integrated the two parks,improved the stream and shoreline, and features a creek side trail and crossing via a new pedestrian bridge. Fronting Zane Avenue and a key redevelopment area of the City,the eastern park space integrates a specially designed arbor to celebrate the gateway to the creek from Brooklyn Boulevard.The western section is a more passive park that invites leisurely strolling, including an entrance garden planted with native prairie plants and flowering perennial species. Connecting the parks is a meandering series of trails,located to minimize creek and tree disturbance while celebrating the natural features within the greenway. As part of the project,HKGI worked collaboratively with Barr Engineering in developing a series of improvements to Shingle Creek.The creek improvements have provided more consistent creek flow,reduced erosion issues and sedimentation buildup,stabilized the shoreline,created natural habitat,and established a preservation plan for significant trees along the creek.These improvements,combined with the greenway trail and east and west park improvements,have been instrumental in attracting redevelopment in the area. 20 RIVERS EDGE COMMONS EXPANSION PROPOSAL Veterans Memorial Park Mound,Minnesota 'f ;✓ 7" Y � N l� The Mound Veterans Memorial Park is an important public focal point of the downtown and is part of the Mound Visions downtown revitalization plan. Veterans Memorial Park,located REFERENCE prominently along County Road 15,is a pivotal point between the Mound Transit Center, Kandis Hanson a multi-modal transit hub,a regional bike and hike trail,and the Lost Lake Greenway and City Manager Canal. City of Mound 952-472-0609 HKGi's landscape architects led the design process for this park. As a result of the process, kandishanson@cityofmound.com the final park design incorporates several features desired by the Veterans community, including flags,a granite memorial,benches,circular paver walking path,lush plantings and shade trees. HKGi also produced construction documentation and provided construction administration services for the City. A construction company volunteered the installation. RIVERS EDGE COMMONS EXPANSION PROPOSAL 21 HKGI EXPERIENCE Lost Lake Canal and Greenway Mound,Minnesota The Greenway has catalyzed redevelopment along the Mound lakefront. HKGi custom designed the boardwalk and pier structure,drawing inspiration from historical structures from the early 1900s. During the early 20th Century,passenger steamers shuttled tourists from"the Big Lake;' Lake Minnetonka,through Lost Lake Canal and into Downtown Mound.These excursions REFERENCE afforded visitors the opportunity to spend a leisurely day along the shores of Lost Lake. Drawing inspiration from the Lake's resort-era history and seeking to recreate that Kandis Hanson pedestrian village experience,the City of Mound and HKGI developed Mound Visions as a City Manager plan to revitalize Downtown Mound. City of Mound 952-472-0609 Lost Lake Canal and Greenway are key elements of that revitalization vision.Lost Lake kandishanson@cityofmound.com Greenway winds through restored wetlands along the north shore of Lost Lake. Its focal is the Central Green,a historically-inspired boardwalk and pier structure specially designed by HKGI.Featuring garden plantings,engraved pavers,crosshatched brickwork and a circular boardwalk and pier structure,the Central Green will become the town plaza,a Mound landmark connecting the canal from Lake Minnetonka,wetlands and the adjacent mixed- use development in Downtown. 22 RIVERS EDGE COMMONS EXPANSION PROPOSAL HKGI EXPERIENCE Minnehaha Park Refectory Building Improvements Minneapolis,Minnesota DRAFT droPofrttlerveryrrcle 00. / 6 ♦ _. is,zois wa w' s delks along curb L, ge ed / � � t y. _ ` bl-sh regular drop ott � I 4 Sea Salt entry and Falls N d tional sgn age a1�` k y tl -on Po nts side of building to direct / \ New var able-s zetl fixetl q park entry paths Points along Paths \ outtloor d n nq - for—a'Informal I{C ' New ornamental fencing 1 e of Sea Salt rl I seat walls to direct pedestrian movement; - trench tlrains behintl .� New bike racks \ \ • _ New planter pots to dFre t foot aPtl b cycle tra arotl eat n9 areas c / 1 - •_ _—Relocatetlm culat-or 1,_ .��.�• route to Falls overlook to t atl f N fi tlizbles for i �, o i -_, outtloor d-ri nq ox 9 i I -' ® New v✓de,angular sta rs - - — _ —-� J I m a000iomotlaze-amrmal fF on^� seat eg �- �._ New seat wall along deck � 1 �I _ • • r I� expans on J New concrete pad(or 'ter- t g ti ke racks acd dd t I racks k etc ,g 0 20 1\\ ot� New fixetl New�itler st Expantl Expantl Rel to w ge tables for to ac notlate structure f� xistr outdooring tleck electrical N H tlmmg mformai seareg rectal bikes �eaeg area traesrdrm . 0 — HKGI was hired by the Minneapolis Park&Recreation Board (MPRB)to redesign the site amenities immediately adjacent to the Refectory Building at Minnehaha Park,the current home of Sea Salt restaurant. As part of a planned restaurant expansion and new lease agreement,HKGI worked closely with the MPRB,Sea Salt representatives and the project architects,Miller Dunwiddie Architecture,to create a plan that accommodates both the anticipated restaurant improvements and helps resolve the functional issues surrounding REFERENCE the Refectory. Dana Murdoch HKGi's plan called for a new bypass trail connection from the parking lot to the Minnehaha Project Manager Falls viewing area to reduce conflicts with restaurant patrons,enhanced and added Minneapolis Park and additional outdoor seating areas near the falls,and provided much needed space for Recreation Board bicycle parking. The plan also improves the drop off and circulation for tour buses and food 612-230-6446 and beverage delivery by modifying the existing circle drive on the west. dmurdoch@minneapolisparks.org HKGI worked closely with both the architect and tenant to realize the desired goals for the expanded restaurant space within the context of the MPRB's goals for a new,four season Refectory building and public component to the space. HKGI was then retained to prepare the construction documents and construction administration for the first phases of construction slated to start in the summer of 2014. RIVERS EDGE COMMONS EXPANSION PROPOSAL 23 HKGI EXPERIENCE Civic Plaza and Arts Center Site Plan Bloomington,Minnesota I - YRi'Li'ill� OWE �c e The City of Bloomington Civic Plaza combines its City Hall,Police Station and Arts Center under a single roof. As the City has expanded,its services were beginning to fragment into various locations. This 17-acre redevelopment site,across the street from the City's public works facility,offered an opportunity to create a civic campus that reunites the various services in a single location within Bloomington. Working with Ankeny Kell Architects,Hoisington Koegler Group created a site plan that responds to the disparate needs of several user groups: City employees,visitors to City Hall and visitors and users of the Arts Center.Each group uses the site differently and each user has a different set of expectations of what the site should provide.The site plan combines formal outdoor spaces with informal spaces,uses traditional garden plants as well as some less traditional native species,and provides space for several levels of passive recreation. The most prominent site feature,a storm pond,was designed to be an amenity that feels more urban and intentionally-built than traditional storm ponds. Hard edges of the pond adjacent to parking and the building are constructed of stone to create spaces where people can sit,stroll or view public art along the northern edge of the pond. 24 RIVERS EDGE COMMONS EXPANSION PROPOSAL BKBM EXPERIENCE Covington at Norman Pointe Bloomington,Minnesota BKBM provided civil and structural engineering for a six-story multi-family residential building with five-stories of wood framing on one-story of precast concrete and masonry Mr.Steve Dunbar located on an approximately 8.4 acres. The large interior plaza on the second level Dunbar Development Corporation necessitated early coordination with the precast concrete,as well as a detailed load plan. 5000 Glenwood Ave.,Suite 200 We were able to take advantage of repetitive floor layouts to efficiently design the wood Minneapolis,MN 55422 framing. We also utilized some steel framing where it was necessary to transfer loads at the lower levels. All structure was above grade due to poor soil conditions,which also required driven pile foundations. Geotechnical exploration indicated the presences of clayey organic 763-377-7090 soils on a portion of the site,with high ground water levels. The project stormwater Steve.dunbar@ivyprop.com management was governed by 9-Mile Creek Watershed District. To meet the requirements, two underground infiltration systems were designed. To reduce the size of the systems, partial treatment/rate control was achieved on the raised plaza green roof. Water from the high roofs would discharge onto the green roof,and infiltrate through the grass media,to the roof deck drains. Mississippi Gardens Entertain Center Brooklyn Park,Minnesota Mississippi Gardens was a 2.5 acre redevelopment project along West River Road in Brooklyn Park,adjacent to the Highway 610 Bridge and the Mississippi River.The existing Mr.Mark Duff ney site consists of a razed building that was a restaurant along with an asphalt paved parking Market Mechanical lot on both the east and west sides of West River Road. BKBM Proposed site redevelopment 8701 Wyoming Ave.N. that consisted of a new wedding facility and parking lot addition. The east foundation Brooklyn Park,MN 55445 line of the new building matched the east foundation line of the old building so that the structure did not encroach any closer to the Mississippi River than the previous building.Civil engineering design consisted of grading,drainage,utilities and stormwater 612-867-5904 management for the new facility.Design also included measures to minimize impact to the markduffney@msn.com Mississippi River bluff directly adjacent to the new building and parking lot. Herzl Jewish Camp Webster,Wisconsin BKBM provided civil and structural engineering for an overnight Jewish camp.The project consisted of structural design and master planning for 15 new rustic cabins for campers, Mr.John Gockel additions to the fine arts and art buildings and new bathrooms with showers. BKBM also Herzl Camp provided footing designs for some additional existing buildings that were moved and repair 7204 West 27th Street,Suite 226 of an existing deck. Civil design consisted of master planning of 13.5 acres of new trails, St.Louis Park,MN 55426 buildings,beach front and shoreline deck. Services also included routing of new water supply lines,well locations and new sanitary sewer and septic systems. BKBM also prepared both temporary construction and permanent erosion control and stormwater management 952-888-5362 plans for the facility. jrgockel@aol.com RIVERS EDGE COMMONS EXPANSION PROPOSAL 25 BKBM EXPERIENCE Thompson Park West St.Paul,Minnesota BKBM provided civil engineering design for the Thompson Park Pavilion located adjacent Mr.Craig Johnson to Thompson Lake in West St.Paul.Civil design included site grading,grading for trail Dakota County Parks and Open Space relocations and extensions,drainage,new utility services and stormwater management for 14955 Galaxie Ave. the one acre pavilion redevelopment site. AppleValley,MN 55124 952-953-2300 parks@cityofapplevalley.org Oliver Kelley Farm Elk River,Minnesota BKBM provided civil engineering design for site improvements at Oliver Kelley Farm in Ms.Ali Huss Elk River,MN.Bid Pack One design included preparation of demolition documents for Minnesota Historical Society razing of the existing Visitor Center and parking area.Bid Pack Two,is currently being bid. 345 Kellogg Blvd. Design consisted of grading,drainage,stormwater management and utilities for the 16.4 St.Paul,MN 55102 acre redevelopment project adjacent to the Mississippi River.A new Visitor Center,Multi- Purpose Building,Animal Husbandry,Maintenance Building,Guest Animal and Pavilion are building improvements for the site along with new trails and parking Iot.The stormwater 651-259-3483 management system was designed to meet MN B3 Standards. Ali.Huss@MNHS.org 26 RIVERS EDGE COMMONS EXPANSION PROPOSAL HKGI REFERENCES HKGI References Todd Hoffman Parks and Recreation Director City of Chanhassen (952)227.1129 thoffman@ci.chanhassen.mn.us Adam Arvidson Interim Director of Strategic Planning Minneapolis Park and Recreation Board (612)230.6470 aarvidson@minneapolisparks.org Danny Nadeau Chief of Staff for Commissioner Jeff Johnson Hennepin County (612)543.1274 danny.nadeau@co.hennepin.mn.us Buddy Lucero Community Development Director City of River Falls (715)426.3423 blucero@rfcity.org RIVERS EDGE COMMONS EXPANSION PROPOSAL 27 ,w!\r _ ,.+9+ ':-�� Y i.f 'j't �. E, _ P• .X � , ���`3 T ,y r f•K;"f�yl�;�" a . j�fs. �:.�g•P .if• - � I �.�r �lt''�►Ir' �- � P M,R Q" '1`�'s"� j+ ;I .. :q+ � ! •.� •1. � r A ftp yr•..i.�'��'�,.a p`- �;r'1 P��� a �'t'!}.,, StStYik; 4940 fi- .,•nr - arY^1. i y iwv ki • �: - �+ ��' + ', G � .6 M l '4.fir 1 1 t.�.�`�1..�M �v'.e .y �. _ r:r y = K: VILLAGE CREEK PARK BROOKLYN PARK,MN SCHEDULE 1.DESIGN DEVELOPMENT 2.CONSTRUCTION -fid DOCUMENTS 3.CONSTRUCTION ADMINISTRATION Meeting+Input Summary & City Staff Meeting ' Parks and Rec Commission Meeting City Council Meeting Construction Meeting RIVERS EDGE COMMONS EXPANSION PROPOSAL 29 wwi, •1i, �; i d �, � r 1dr f 1, 1 ! yJyybAL �AJKE A9a4 �f " +' }IN *, h + tri ; 1i 1 n+ i• ' •s Jill I '� Ytljl. T ° •f� +�rJ r/, ,kft� ;iq rll� 11�� - a91i i��Jr t•"��� �! ^� �. ����'�3�,��r �� �. � Yh.; ,.� + i,f. fit' i1„ til a .. � ..�� `q ,�� w+ 3 + '►[1; �� ! t' (� y�j6 �, � � ? � ���iy � �,.�• ®:'�� � +���y.4•+ J . �- I. .. ���IM,,jY�rP• "tb'; � r: 1 4 �' '��.'. ��,, F y Y 'Ir�.r .��r• �•. - 9: ,' � . 1 '. , _ -. P 1, ,�..1:'. •C .L. i Jii MJ' ". ' + � '•• a ,`, ,• r"�_.4"" :,� .�.—, ' i.,V IVH • » "-.. - • ,., 4i r., 5 • QUALITICATION STATEMENT ��, "'fills. - '0. _ Cy r ,<y_ r .�, y!w •- QUALIFICATION STATEMENT The RFP requests a statement explaining why our firm should be selected for the work. The HKGi team is best qualified to successfully complete the expansion project at River's Edge due to several facts: Our extensive experience in Elk River,specifically the Construction Documents and Contract Administration for the original Rivers Edge Park,means that we know exactly what materials,details,and construction techniques were used in the original park. Knowing this means that our time can focus on the expansion solely without spending time to review historical bid sets and deciphering how the previous park was constructed. The core staff at HKGi that worked on the project in 2006 and 2007 are the same staff identified to work on the expansion project(Paul and Amy). The project manager on the HKGi team has a strong working relationship with City staff, the Park and Recreation Commission,and the City Council. And being a 15 year resident _ a of Elk River and Big Lake Township,he uses the Park and the Mississippi River frequently and is very familiar with the role that the park plays in downtown Elk River. The Civil Engineer for the project has a great deal of experience working on other similar ti river-oriented site improvement projects,and thoroughly understands the complexities * k involved with the storm water management and the required erosion control for projects adjacent to the Mississippi River. t RIVERS EDGE COMMONS EXPANSION PROPOSAL 31 •' �"�'' 1 r l t OL P L � M f IDT_ lb 00 1_4 ow - ' ice• -t �3'li � r _,- A"?adg--� 4.! �d 'r � }��I��f��1D11� .. li�l�• F� r ♦, � ,� s A " , .r ry . HKGI PROJECT WORK: LOST LAKE CANAL,LAKE MINNETONKA - I MOUND,MN 5 COST SUMMARY & INSURANCE REQUIREMENTS COST SUMMARY AND INSURANCE REQUIREMENTS Cost Summary TASK TASK DESCRIPTION PROJECTED HOURS PROJECTED FEE 1.0 >ite Survey and Design Development 90 $10,900 2.0 ,:onstruction Documentation 250 $24,500 3.0 -onstruction Administration 80 $10,700 fours and Fee Total 420 $46,200 �:xpenses $ 500 "otal Proposed Not-to-Exceed Fee $46,700 *additional detailed staff to task and related budgeted hours information is available upon request HOURLY RATES BY KEY STAFF AND ROLE Role Staff Rate Principal Project Manager Paul Paige 180 Construction Admin Paul Paige 90 Project Landscape Architect Amy Bower 87 Landscape Designer/Draftsman Kevin Clarke 68 Civil Engineer Level X Joel Maier 165 Civil Engineer Level V TBD 95 Civil Designer TBD 75 Insurance Requirements Regarding the required insurance types and minimum coverages as identified in the Elk River Standard Agreement for Professional Services Paragraph 20 including Sections A-F: HKGi will supply the City with the described Insurance Certificates after project award and before beginning any work on the project. RIVERS EDGE COMMONS EXPANSION PROPOSAL 33 n � - 1' ,, j '�"Kra— �•'� _ — ti - � c � " Hoisington Koegler Group Inc. ----------------- �---_----- 1 GFI V r i I NO CHANGE —sem Yom. REMOVE/REGRADE ALLEYWAY T P UTILITIES . relocate light control box/cable box consolidate electrical i UPPER PLAZA add plaza / shelter open for bleachers �' EXPANDED SEATING '��� f WITH LIMESTONE a i CURVED RETAINING WALLS shelter decorative railing ' ` S IAGE AREA J/ • i yrs • <l Enlarge stage STEPS' STORMWATER WATERFALL long t r term _ - park BRIDGE ` NO expansion CHANGE TO -' f area PERMEABLE ` PAVERS GAZEBO 1. . qr CREATE STRONGER EDGE - restore slope with prairie plantings STORMWATER Yr STEPS WATERFALL TO RIVER LANDING ADA ramp as future option r W = • landing set above ordinary ACCESS RIVER high water level formal stairs to landing informal stone steppers into water ADA ramp-future option �. � � floating seasonal dock(DNR review required) i' a auk IL r ♦a m sAhk 1 ■ ' i ■ ■ un m 1 �' ■I ■ Uo p ■ � n ol ■ � 1 ■ ■ ■ ■ 1 r o ■ ■■ ■ ■ ■ un ■■ ■ j (QD ■ ■ ♦♦ 77 ♦ v v v ID 0 - - - - O• o „� ° a 0 D - � � rho �■`�'■�T, uo � � rn � I � � _- pp