Loading...
5.2a PCSR 07-14-2015 of Request for Action River To Item Number Planning Commission 5.2a Agenda Section Meeting Date Prepared by Planning Items July 14, 2015 Chris Leeseb erg, Senior Planner Item Description Reviewed by Ordinance Amendment to add a new extreme Zack Carlton, Planning Manager commercial recreational zoning district, Case No. Reviewed by OA 15-04—Public Hearing Action Requested Recommend,by motion, approval of the ordinance amendment creating a new zoning district. Overview Elk River Extreme Motor Park (ERX) proposes to expand their current facility. ERX is a year-round complex hosting snowmobile events in the winter and car, truck,ATV and go-cart racing in the summer months. The applicant is requesting to create a new zoning district,Extreme Commercial Recreation (XCR), to accommodate their long term vision. Current zoning district standards and uses do not provide the needed flexibility that a unique business like ERX requires. In working with the applicant, the city has determined that establishing a new zoning district allowing the growth and expansion of their operation will be a benefit to the city and the applicant. The new zoning district, like any other district,will include a variety of permitted and conditional uses specific to the applicant's plans for expansion. The creation of a new zoning district also provides the applicant more flexibility than a Planned Unit Development (PUD) district would. When approving a PUD, the city reviews a specific site plan that must be followed as growth occurs, and any deviation from that plan requires an amendment and approval from both the Planning Commission and City Council. By creating a new zoning district the applicant can acquire, subdivide, and develop property within the zoning district as needed.Amendments to the zoning district are not required, and when developing a permitted use (as identified in the zoning ordinance) only an administrative site plan review is required. Any property owner within the city can apply for a zone change to their property. Creating this new zoning district would allow any property owner that has at least 10 acres to request their property to be zoned XCR. Background/Discussion ERX has historically operated under the regulations of an Interim Use Permit (IUP),which was first issued on July 21, 2008 to operate at the current location. The current IUP has expired and the proposed ordinance amendment will eliminate the need for an IUP in the future. P O W E R E D ® Y NATURE They are interested in expanding the size and scope of the existing business but also have a long term vision for the growth and development of theirs and surrounding properties. Some of these activities are short term visions with others being more long term. The immediate to short.term uses include: • Carlson Motorsports Expansion (CU 15-10) • Rental Shop Space • Off-Road Truck Racing • Training/Development/Testing The longer term uses include: • Water Sports Facility • Swap Meets • Festivals • Concerts Staff and the applicant have been discussing their plans for expansion and development of the subject property as well as the surrounding properties and felt the best approach was to create a new zoning district to allow the current uses as well as the future uses. With uses that are commercial and highway business in nature, staff is recommending the architectural standards follow subsection 30-938(2) pertaining to building finish and subsection 30-938(3)pertaining to roofs applies to this district. The attached ordinance has been drafted to try to codify all the visions of the applicant but to also maintain some of the current uses in the Commercial Reserve Transition District. Utilities The subject property is not located in the Urban Service District. Although the current project does not require city services, some of the proposed permitted and conditional uses in the XCR.district will require city services and this will have to be addressed in the future. Planning Commission The Planning Commission reviewed this application at their June 23, 2015 meeting. No concerns were raised'by the commission regarding the request. The public hearing was opened and continued to the July 14, 2015 meeting. Financial Impact None Attachments • Location Map • Draft Ordinance • Sec 30-938 Architectural Standards (partial) N:\Departments\Community Development\Planning\Case Files\OA\OA 15-04 Commercial Recreation\OA 15-04 sr PC 7-14-15.docx Sec.30-1027. -XCR extreme commercial recreation. (a) Purpose. The extreme commercial recreation district is intended to provide lodging, retail, and a variety of commercial recreation uses that are more intense in nature than traditional recreational uses. Some uses•may include,but are not limited to, off road racing, hotels, and training facilities. (b) Permitted'uses. (1) Retail shops and stores. (2) Business and professional offices. (3) Class I restaurants. (4) Class II restaurants. • (5),Public parks,playgrounds, and open space. (6) Agriculture horticulture uses(ten-acre lots or more). (7) Facilities for flood and erosion control. (c) Accessory uses. (1) Accessory structures. (2) Signs as permitted in section 30-851 et seq. (3) Public shelters and essential services. (4) Overflow event parking. (d) Interim uses. Interim uses shall be permitted for no more than five years, or when the property is platted,whichever occurs first. The city may require a[n] escrow to ensure the conditions of the interim use are adhered to. (1) Roadside sales stands. (2) Wind generators. (3) Gravel mining. (4) Asphalt and concrete plant. (5) Veterinary clinics commercial kennels. (6) Conditional home occupation. (e) Conditional uses. (1) Off road racing facilities. (2) Water sports training facility. (3) Limited Stay Lodging. (4) Active use storage. (5) Campground- for a period of no more than seven (7) consecutive days. Page 1 (6) Hotels. (7) Outdoor storage,provided the storage area: a. Is accessory to a principal permitted,interim, or conditional use; and f b. Complies with the accessory structure setback requirement applicable to the property; and c. Is no larger than 30 percent of the building area and d. Includes screening so as to provide a visual barrier. Any such barrier shall reduce visibility in a manner that restricts vision of the object being screened, but is not required to totally block the vision of any such object. 1. Screening shall consist of two or more of the following: i. A compact evergreen or deciduous hedge or evergreen, overstory and ornamental trees of sufficient width and density; or a. Hedge material must be at least three feet in height. b. Deciduous trees must be at least two inches in diameter as measured six inches above the ground. c. Coniferous trees must be at least six feet in height. ii. An earth berm of sufficient height to provide an effective screen throughout the year; or a. Earth berms shall not have a slope of more than three feet horizontal to one foot vertical or be located within any street right- of-way unless otherwise approved by the city engineer. iii. A screening fence constructed of one or more of the following materials: a. Factory finished metal or vinyl panels. b. Wood. (f) Architectural standards. No provision of section 30-938 except subsection 30-938(2) pertaining to building finish and subsection 30-938(3) pertaining to roofs applies to this district. Page 2 I r ,x I + y i \I,: . I ,, ... ■ F� Y +,,( 1:� Envision Company, LLC/ ERX Case ZC 15 CU 15 10,LU 15--00 3, Create New Zoning District OA I5-04 ERivcr Sec. 30-938. -Architectural standards. (partial) (2) Exterior building finish. a. In the C-1, C-2 and C-3 districts, the exterior building finish shall consist of at least two of the exterior building finishes, at least two shall be used per wall: 1. Face brick. 2. Natural stone. 3. Architectural glass. (i.e. curtain wall) 4. Wood. 5. Stucco. 6. Siding. (metal, fiber-cement or vinyl) 7. Integrally colored split face (rock face), bur nished or glazed concrete masonry units (excluding smooth/plain or painted). 8. Other city approved architectural materials. b. In the I-1 and I-2 districts, the exterior building finish shall consist of the following exterior building finishes: 1. ,Face brick. 2. Natural stone. 3. Architectural glass. (i.e. curtain wall) 4. Wood. 5. Stucco. 6. Integrally colored split face (rock face), burnished or glazed concrete masonry units (excluding smooth/plain or painted). 7. Integrally colored and/or exposed aggregate precast concrete panels. 8. Poured-in-place concrete walls. 9. Prefinished metal panels. 10. Other city approved architectural metal. (3) Roofing standards. Roofing shall consist of a shingled, prefinished metal panel and/or membrane roof. Page 1