5.14. SR 06-07-2004Item ~ 5.14.
City/County Engineering Meeting
Tuesday, May 11, 2004
Elk River City Hall
Attendees:
(Unable to
attend):
Arnie Engstrom, Sherburne County Commissioner
Rachel Leonard, Sherburne County Commissioner
Brian Bensen, Sherburne County Administrator
Dave Schwarting, Sherburne County Engineer
Louise Kuester, Elk River Council Member
Pat Klaers, Elk River City Adminstrator
Terry Maurer, Elk River City Engineer
Dan Tveite, Elk River Council Member
County Road 33 Memorandum of Understanding (MOU)
Dave Schwarting handed out a copy of a MOU between MnDOT and Anoka
County. This MOU deals with studying the potential of the turnback of Anoka
County Road (CR) 22 to MnDOT for conversion to a highway across northern
Anoka County. There is no timing for this study listed in the MOU. Dave has met
with MnDOT Metro District personnel and Anoka County to discuss whether or
not a MOU would be appropriate with MnDOT District 3 for the portion of
roadway from the Anoka County border to Trunk Highway (TH) 169 in Elk River.
Dave is working with Craig Robinson of MnDOT District 3. Dave will try to set up
a meet!ng with Craig to discuss adding to the TH 169 study that MnDOT will be
going with a Requests for Proposals later this year.
Louise Kuester asked what Elk River had requested of Sherburne County
previously. Terry Maurer indicated that the City Council had asked Sherburne
County to study a corridor alignment to connect CR 33 at TH 169 with the Anoka
County 22 (CR 65) at the Sherburne/Anoka County line. The Elk River Council
also asked Sherburne County to look at interim solutions to the sharp curves on
CR 33, anticipating that traffic volumes will be increasing as the CR 33
interchange with TH 169 attracts more traffic.
Arnie Engstrom asked if the City/County had established a corridor for this route
officially yet. The answer was that a conceptual alignment had been shown on
the City and County's transportation plan, but no work had been done in the field
to determine the exact route, and no official mapping had been completed. Arnie
indicated the City and County may want to begin work on that.
Louise Kuester asked about the connection of the TH 169 study and CR 22 issue
with the TH 10 study. The answer was that they are not technically connected,
but certainly traffic in a regional fashion is all interconnected. The TH 10 study
and the Dayton River Crossing would certainly have an effect on traffic patterns
on CR 22 and TH 169.
Pat Klaers indicated that the Elk River City Council would likely be willing to
support any type of resolution requesting the MOU with MnDOT or some kind of
scoping study. Brian Bensen indicated he thinks the County would do likewise.
C:\Documents and Settings\pklaers\Local Settings\Temporary Internet Files\OLKB\CCEM - 051404-minutes.doc
Dave Schwarting will take the lead in setting up the meeting with Craig Robinson
of MnDOT. He will inform Terry Maurer when the meeting is scheduled. After
the meeting is held, Dave and Terry will report back.
County State Aid Mileage Request
Dave Schwarting indicated that CR 33 has been requested to be added to the
County's State Aid Highway (CSAH) system. He also indicated that in reviewing
the request, District 3 State Aid Engineer Kelvin Howieson was okay with adding
CR 33 but wanted CR 21 taken off of the CSAH system. Terry Maurer asked
whether the CR 33 addition to the CSAH system would include both east and
west and TH 169. Dave indicated that it did include the realignment through the
gravel mining area west of TH 169 and the alignment just recently discussed east
of TH 169 going to the County's east border.
Dave Schwarting indicated that CR 40 between CSAH 12 and CSAH 13 was
requested for addition to the CSAH system. Kelvin Howieson turned that request
down and indicated to Dave that he felt CR 40 belonged on the Municipal State
Aid system.
Dave Schwarting indicated that the County has asked for 60 miles of additional
County State Aid highways. In reviewing the request, Kelvin Howieson
suggested that 43 miles were more appropriate. The County State Aid Mileage
Subcommittee has toured all of the requests and has supported 16 miles of
additional CSAH. Dave gave a brief discussion of the process of adding CSAH
mileage and indicated that Sherburne County would be going back to the
County's Screening Committee in the fall of 2004 to discuss this request further
and try to increase the additional mileage above the 16 miles recommended by
the Mileage Subcommittee. Dave also indicated in response to questions that
the additional 16 miles would add approximately $170,000 a year to the County's
annual allotment. Forty percent of that goes to maintenance, sixty percent to
construction. Dave indicated that currently the County gets approximately 1.2
million dollars of construction dollars, which is 60 percent of their annual
allotment.
County Highway 40 Project Status
Dave Schwarting indicated again that in reviewing the request to put CR 40 on
the CSAH system, District 3 State Aid Engineer Kelvin Howieson indicated he felt
CR 40 was better on the City's Municipal State Aid system. Dave reaffirmed that
the County does have a federal grant of approximately $900,000 for the
reconstruction of CR 40. That money has been moved from fiscal year 2005 to
fiscal year 2006.
Discussion continued regarding the potential of a turnback of CR 40 from
Sherburne County to the City of Elk River. There are benefits to the City in
taking back a County Road through additional mileage they would receive
through the Municipal State Aid system. The negative, of course, is that there
would then be additional mileage for the City to own and maintain.
Terry Maurer asked Dave Schwarting if the federal grant could be passed to the
City along with the roadway. Dave indicated that he felt that it could be. Terry
reaffirmed the County's turnback policy and that the project money would go with
2
C:\Documents and Settings\pklaers\Local Settings\Temporary I nternet Files\OLKB\CCEM - 051404-minutes.doc
the road. The County would pay their fair share of the reconstruction of the road
above and beyond the federal grant based on the County's Cost Participation
Policy, and then include two years of gravel road maintenance. Terry indicated
that he will bring an item forward to the Elk River City Council to determine
whether or not the City Council is interested in pursuing discussions with
Sherburne County regarding a potential turnback with CR 40 between CSAH 12
and CSAH 13 with the City of Elk River.
County Road 44 Project Status
Dave Schwarting indicated that CR 44 was programmed as part of the County's
three-year bonding road construction project. However, due to overruns and
unforeseen costs, the total bond proceeds have been spent, and CR 44, along
with other road projects, has not been completed. Brian Bensen indicated that
the County Board will be discussing later this summer, probably by the end of
August, whether or not to pursue another bonding project or to go back to using
general property tax levy to fund road projects. Brian and Dave also indicated
that because of budget cutbacks, the County Board would likely discuss whether
or not to pursue as aggressively in the future reconstruction of roads like CR 44
or look at alternative means such as mill and overlay or recycling of the surface
as a means to cut costs but maintain a drivable surface.
Brian Bensen went on to talk about a potential $1.6 million budget cut that
Sherburne County is concerned about from the State in the next bi-ennium. In
answer to a question, Dave Schwarting indicated that CSAH designation could
not be put on CR 44 and indicated that CR 44 may also be a candidate for
discussion of turnback potential.
County Cost Participation Policy
Before this item's discussion began, Brian Bensen and Rachel Leonard had to
leave the meeting.
There was general discussion regarding the County's Cost Participation Policy.
Terry Maurer indicated that he had researched several metro and St. Cloud area
Counties and had constructed a matrix of County Cost Participation Policies. He
also indicated that he had prepared an example utilizing CR 40 and CR 44 to
determine the City's share of project costs under the various County Cost
Participation Policies. The difference between the CR 40 and CR 44 hypothetical
examples is that there is substantial right-of-way acquisition in the CR 40 project.
Terry indicated that Sherburne County's policy is least favorite of the County
policies looked at for urban designs with land acquisition needed. The three
main areas where Terry indicated Sherburne County's policy seems to be the
most restrictive of all the County policies looked at is right-of-way, storm sewer,
and concrete curb and gutter.
There was general discussion regarding the County's policy relative to urban
versus rural design roadways. There was general consensus that the County
and City would continue to work together and discuss these issues on the next
urban design project undertaken within the City. This will likely be the CR 40
and/or CR 44 project.
3
C:\Documents and Settings\pklaers\Local Settings\Temporary Internet Files\OLKB\CCEM - 051404-minutes.doc
Miscellaneous Items
A few items on the agenda did not receive discussion due to limited time. These
will be discussed at the next meeting. These items are Access Management
Policies, CR 30/CR 77 Realignment Status, and Old CR 33 West of TH 169
Maintenance Issues.
Next Meeting
The next meeting between the City and the County with the administrators and
the elected officials invited was set for Tuesday, July 27, 2004, at 3:30 p.m. The
location is yet to be determined.