Loading...
5.1. ERMUSR 07-14-2015 Jackson Street Water Tower City of Elk River Condition Assessment ." , . �r , q .,Eik i, 47, .' Ill '; 1 ":„...„4„„ f , . Ai YY..: \ „...44. 7:1',,::,,,';Irv.:,::..li;.- -----„-_, __,:.., ii, .4.-- J5 . I r ,. .� +' .a «4 5 -. Prepared By C4COLLABORATIVE I)esignGroup,inc. 100 PORTLAND AVENUE SOUTH, SUITE 100 MINNEAPOLIS, MINNESOTA 55401 PHONE: 61 2.332.3654 FAX: 61 2.332.3626 Project Number 15010.00 July 1,2015 COLLABORATIVE DesignGroup,in,. Architecture Engineering Interiors Planning July 1, 2015 Zack Carlton City of Elk River 13065 Orono Parkway Elk River, MN 55330 Re:City of Elk River Jackson Street Water Tower Condition Assessment CDG Project #15010 Dear Zack, We have completed the Condition Assessment for the Jackson Street Water Tower as proposed. This report summarizes our evaluation procedures, along with our observations, conclusions regarding the current condition of the water tower, and recommendations for repairs. The services performed in evaluating this assessment and in preparing this report have been in accordance with the level of skill and care normally used for this type of project. The conclusions and recommendations discussed in this report are our best professional opinions based on our knowledge of current design and repair of this type of building. No warranties are expressed or implied. It has been a pleasure to perform this service for you. If you have any questions, or if we can be of further assistance, please feel free to call. Very truly yours, Collaborative Design Group C rig Milkert, PE Principal 100 Portland Avenue SoulP,. SuLn 100 Minneapolis. Minnesota 55401 t 612 332/3654 1 332 3626 nliirrr,ol ve Action. Equal Opportunity Employer www collaboiativedesig,ngroup.corn City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project #15010.00 TABLE OF CONTENTS EXECUTIVE SUMMARY 1 INTRODUCTION 2 SCOPE OF REPORT 2 Review of Documents 2 Discussions with City of Elk River Personnel 2 Observations 3 DISCUSSION AND CONCLUSIONS 28 Introduction 28 General Discussion 28 RECOMMENDATIONS 30 PRIORITIES AND ESTIMATE OF PROBABLE COSTS 30 Ci COLLABORATIVE DesignGroup,. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDC Project#15010.00 EXECUTIVE SUMMARY From a structural standpoint,all components of the Water Tower appear to be performing well. Besides some more superficial issues, such as the presence of chipped paint,rust, and lichen, all steel components are in average condition,especially for their age. The legs are securely bolted to the concrete footings. There are no noticeable problems with any of the tie rods, horizontal girders,or lattice work on the legs. Two issues were observed, both located on the legs,which will need further maintenance beyond the obvious painting. The first issue relates to some corrosion of the steel at the base of the legs. This condition is hidden by the concrete that was installed to drain water from the legs. It would be important to investigate the condition of the steel behind the concrete further during the painting project by removing a portion of the concrete mall and inspecting the steel. If the corrosion is worse than what is observed presently, some remedial action may need to be done to strengthen the base, such as the addition of steel plates to replace the loss of cross sectional area due to corrosion. The second potential concern involves the steel splice plates connecting the leg sections. Some of the plates are bowing as result of rust jacking,which occurs when the backside of the metal rusts and expands,causing the front of the panel to move outward. Further investigation and testing is recommended to confirm the severity of the corrosion and determine the proper remedial action. Paint is chipping on the Water Tower's legs, tie rods, and horizontal girders; the surface of much of the exposed steel is covered in rust. The condition of the underside of the tank and its surrounding walkway platform was observed to be similar to that of the legs, tie rods,and girders,with a significant amount of weathered paint and rust. The sides of the tank appeared to be in good condition relative to the rest of the Tower, but the roof and cap are weathered with rust stains present from seams in the roof panels. Considering that the Water Tower structure is no longer supporting the weight of water in a full tank, maintenance and periodic observation will be all that is required in the future, and no major structural modifications will be necessary. Some minor modifications may be necessary as identified above. All of the Tower's surfaces should be painted, including areas that may not be easily visible from the ground, such as any exposed areas of steel angles,the inside of legs, and the walkway platform. A new coat of paint will not only return it to its original appearance, but it will also protect the steel from further rusting and deterioration. The two potential structural issues should be further investigated with a more in depth study of the areas in question. We recommend that a portion of concrete from one of the leg bases be removed to get a better understanding of the condition of the steel. The bowing steel splice panels should also be closely observed and tested to determine the extent of damage. CCOLLABORATIVE DesignGroup.. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 INTRODUCTION The Jackson Street Water Tower was built in 1920 by the Minneapolis Steel &Machinery Company as part of a water works project that developed a fire protection program for the City of Elk River. The Water Tower consists of a 100,000 gallon tank on a four leg, lattice-girder trestle tower and stands approximately 129 feet tall. The Tower is currently coated with paint that is assumed to be lead-based, and displays a non-historic City of Elk River logo,which differs from the original silver tank and red conical roof. The structure was added to the National Register of Historic Places on May 23, 2012. The City of Elk River and the Elk River Heritage Preservation Commission have plans to restore this structure. The intent of this Condition Assessment is to provide an understanding of the required restoration work, along with the associated costs. SCOPE OF REP•�RT Review of Documents Available documents regarding the Jackson Street Water Tower were limited, but the National Register of Historic Places Registration Form was reviewed to gain an understanding of the structure's construction and history. This paperwork informed us that, "« n r[: besides cleaning and painting of the Water Tower, no alterations had been made to the structure since its construction. Discussions with City of Elk River Personnel ¢„The Jackson Street Water Tower is an iconic , $d " r landmark, and provides an important piece identity and heritage o fi the City of Elk of the de y g Y -41 River. The historic paint colors were silver for the main structure and tank, and red for the sloped roof. Simple black lettering spelled .- out "Elk River' on the side of the tank. t �s " '. The water tank structure was constructed in 1920 by the Minneapolis Steel and Machinery 7*' Company. The tank was constructed initially as a response to the many fires that occurred in the downtown area. These fires were difficult to fight since the railroad line created a barrier between the downtown and the river. After the construction of newer water tanks in other locations, the Jackson Street , _ Water Tower was de-commissioned in 1960. 2 COLLABORATIVE DesignGroup,ffic. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 Observations Initial, ground-level observations were made on January 30, 2015. A more thorough site visit was made on March 12,2015 to further document the structure from both the ground and the top of the Tower. The following rating system was used in assessing the condition of the structure components: e Good: The component is new,with no apparent defects, e Average: The component is able to perform its originally intended function in its current condition. Any defects are minor and do not affect the performance of the component, • Poor: The component is unable to perform its originally intended function in its current condition. The component has major defects, but is repairable. e Unacceptable: The component is unable to perform its originally intended function in its current condition, and cannot be economically repaired. Replacement of the component is required. Visual observations of the building are recorded below. OBSERVATIONS REFERENCE PHOTO 1. Each of the Water :$ Tower's legs consists of two parallel steel channels,which are bracketed on the outside with a flat steel plate,and on the inside with small k latticed bars. 3 COLLABORATIVE DesignGroup,,nc City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 2. The Water Tower was constructed in 1920. t ;.` , d 4 `4 , rs jjf tyj 1 µ;..ms "* - `A'Ni "? ,, 4 y V°{a "4 i jam. W w i . , , _ _ ' --''' Jai.. ' - , . 3. The Water Tower has four concrete `.: ° ' footings with9 �'ii varying amounts of ' , exposure due to the 1 M. '` ■ surrounding , landscape. All ° i A footings appear to be in average 1 ,� ''fi a condition,with no s t' ` `' significant deficiencies noted. 4 000i_LABORATIVE Designt;roiip,n,<. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 4. The legs are connected onto a '` � steel base plate at each footing with steel angles,all of °' -4.. °._°„,i ' ,.. , „, which appear to be + in average ' . li. ' condition. . ',1, ' 47 ' lb li.vilgr` '. ,1,11P . -Lit ----, AIL IF k ' 4 - -44.- »a ,N> mgr '� 4; 5, The steel base plate at the bottom of each leg is bolted , ..,. ... 00,,,t.'l -‘144i''' ..1: into the concrete footings. These t. bolts show no significant ” '° �� i deterioration,and ,1,, are in average " condition. fr 40 r i S 5 &COLLABORATIVE Desig IGr«up,,,,. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 6. The inside of the base of each leg t has been filled with -44 4111Pr 7. The sloped surface of the concrete allows water to drain from the base of the legs,but water that flows to '> sides of the legs has begun to rust and deteriorate the steel 6 COLLABORATIVE Designt.,roup,�� City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 8. Water flows out of the legs along the steel at the edge of concrete,which has caused the steel to corrode. ' Loss of cross sectional area of the steel is . occurring on the steel channels due to corrosion. ".f Ito ft* • 9. Loss of cross- sectional area of the steel is occurring on the steel channels due to corrosion. 7 COLLABORATIVE I)esignGraup,,,,, City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 10. Steel tie rods are ;.. connected to the ' 1 ', base of each leg. { ,, Steel legs and tie , , rods are covered with a significant 4 ,. Y amount of rust and chipped paint. i s is 11. Rust and chipped paint are prevalent ' ` on all steel tie rods ..ivr 4. '- and legs. :4,... * i 8 `COLLABORATIVE llesignGroup,,.r. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#1-1" 10.00 OBSERVATIONS REFERENCE PHOTO 12. Diagonal tie rods »° are in overall . ;" average condition ° and are performing M •: well,but are . ° .xi showing a ` .. significant amount ` 4,14 of chipped paint r �" and rust. a .,. t w'> C•'''' ,.:i':;-'h e:',,,,t ittl:it Att .. ., .....T' it � � Y } y Y 13. Diagonal tie rods A,,, .k.,, 61, ,,,,, 4t ,,,,,„.. 10 are in overall '"' average co nods t 1 and are performing ```' well,but are el showing a # ` significant amount of chipped paint �� 's ■ and rust. 1 .1'IW ' it xk } 9 COLLABORATIVE 1)esignGroup,„t. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 14. Tie rods are connected with steel turnbuckles. Like the tie rods, these turnbuckles are covered with rust and chipping paint,but their performance is unaffected. 15. A ladder extends up the northwest leg of the Water Tower. Surface rust and peeling paint are visible in some areas,but no 1 functional concerns regarding the ladder were observed. 10 . COLLABORATIVE DesignGroHp,,n, City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 16. Lichen (organic ` , ' 1 , ` .40+, growth) is growing ' • # •. s i.< *.:.'v ! • + 1 on the legs in some lit*� r4 . r, , areas. + .. ` 4 . . ,c , ,* * . X K4 ,w '8 .',s i. . i a * a ` 4•r Fs a 1 17. The lattice girder 1 appear s a ear to be in average condition, with no structural deficiencies observed. Lattice J surfaces generally 4 seem to be in better '% r ` . condition than the it` !*- flat sides of the legs, 't Si- 1 with considerably " "_ less chipped paint, - ._ 4¢ rust,and lichen. '. �. / 11 C COLLABORATIVE DesigrnGroup,m.. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 18. The paint on the flat sides of the legs is le weathered;lichen m`' and corrosion was observed in some areas. 1 ("s , 19. Each of the Water Tower's legs is essentially made up of three sections, with the longest at VPI the bottom and the shortest at the top. •� The leg sections are ,- 4 connected with � ° 3 w ; , steel splice plates „., on all four sides, , -� with some plates .: . a r ti x 0. inside the legs and / ' �, some outside. Note h .. the two exterior `� plates indicated in . Kw "� the photo. , , 12 ko [)esign(:,roup,n,< City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 20. The presence of 7 k bolts and rivets within the leg I. channels indicates .' , , " ,* r that there is a steel inside the leg, d the condition of , I which could not be i fi ascertained from ' ground level. The of * steel bracket b,' `� connecting the horizontal girder is a t rusting and the ' bottom of the 1.. exterior plate is expanding outward ,, t IN slightly. — , t‘,_ 21. A steel plate is ,� ; attached to the � R .° � legs just above the connection to the _ 7" horizontal girders. Each of these plates r'f (eight total) appear ' J. > K to be in average , condition. '°" ' f . 4. . k '. 13 (4 DesignGrOOup,,”. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 22. The plates on the � ` outside of the Water "s Tower are in average to poor condition,with some showing eif )11 significant rust and '' expansion. ft 23. Close up of one of the outside steel plates. It appears E µ as though water has corroded the .$ backside of the plate,causing the steel to expand and bow outward,a condition known as rust jacking. 14 COLLABORATIVE DesignGrOup,,nt City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 24. Another instance of . rust jacking. While A• this plate is in better . condition than others,it can be expected to _' continue to degrade. 2 * 4111i A Atilliiiii * 44 25. A horn sits on a , ...w+ platform perched ...w� _ atop two horizontal _ steel girders, - i"sir ri,requiring an 0 1 ; electrical conduit ''. - .,u,'*41' running up the northwest leg from ` „_. the ground. The horn and platform ' contain surface rust .n and weathered paint,but no major „ deficiencies. It is "" unknown if the horn is functional. 15 COLLABORATIVE l)esignt::r()ttp,,,,, City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 26. Horizontal girders # are connected to co.„ the legs with steel angles and rivets. There are eight total ' t girders,connected just below the "A seams between leg sections. All girders * , r} appear to be in , average condition, _ with just some rust, ` ''' weathered paint, r • and lichen noted on their surfaces. �, -x: . 4 27. Lichen is growing on horizontal girders. 0. 16 COLLABORATIVE DesignGrc>upo„.. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 28. Rust and chipped paint is evident on the surface of horizontal girders. 29. At the epicenter of the four Tower legs is vertical steel tube that encloses an eight inch stand pipe connecting the tank to the water system. Eight tie rods connect the center tube to the Tower's legs. 17 COLLABORATIVE Design(;raup,,„, City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 30. An access hatch leads underground underneath the Water Tower. „ ' .-- - fillik ',: a f 31. A small hatch allows access to the ' ,<,,', . 4 ° o enclosed stand pipe. , . v a ; Ey "gym »1' i*, *.*'..4. ' '''''q**`:<.i., 2 r I '}14a :,,,'1',., `2'#, '$4 18 4 COLLABORATIVE I esign(; )up,gym, City of Elk River Jackson Street WMter Tower Condition Assessment July 1.2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 32. Some minor rusting and weathered c paint were II observed on the vertical tube. Mm:. r iii■ } pw r t §gam S f a'� a 4.4104' • v � � �,'r ? ,�mss '' { t "'t`. r(( e w �1,-w ., >8 .` ..: ; ' .r. �' $'' * �. r;..< " i `"` }.}} 33. The vertical tube is bolted into a concrete pad. The `"" surfaces of the bolts are covered with - ' rust and dirt,but are ' :.; y .. .. performing well. �: :.ii*' - „ . r° '44-i,.< °�• . ...,,,,, , r / °, 5` , 1 19 4 COLLABORATIVF DesignG roup,„ City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 34. The standpipe �� enclosure extends . ' from the ground to '° ` the underside of the . _ tank. '','..`1`.. .. . i 1 t r r 35. The underside of the '*� 44, tank is in average 14 r condition,with `* �` . some rusting and weathered paint. w v. 20 COLLABORATIVE 1)esignGrotip,,.5. City of Elk River Jackson CDG Stect reet Water 15010.0 Tower 0 Condition Assessment July 1,2015 Proj OBSERVATIONS REFERENCE PHOTO 36. The walkway ° .. `„ ' platform , _' surrounding the 1 ` tank is in average ;� condition,with ' i °' V 0 weathered paint. rr, � s } .itg,,... 4..,,,0:: a� b' . 1�, '7-::'. F. t }K' !,. (+' ayyY t .}I_a - j P ' .: ,..... 2- to .{{ 37. Sections of the steel _ •€ m�� plate walkway are :** riveted to steel -'444"174:108;::4:11.' _� `w.• 1; splice plates beneath the ;." la platform. ., . s as {.. _. _g'` 21 COLLABORATIVE I)eStgnGr()up,;,,r City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 38. Steel plates and rivets beneath the -`- walkway platform � „ connect the sections of steel walkway plates. The walkway has a latticed steel "`,_, guardrail,which- .0,0..0' -„"' .. ` like the platform-is ''" a weathered but in 'r `, * .. V average condition. .;,, . 39. The latticed handrail around the .. tank is in average k. ,_ _+__ 1 ., ,, .,. 1 condition overall, but features many .. areas of chipped paint and rust. \,, Iti‘,\1 \h4. .li \\\\ ,, 41 il, \ °.y 4 , , , ,, . \ , - v 22 0 COLLABORATIVE DesigtIca 0up, City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 40. The latticed ! handrail around the ? tank is in average : . . . - t 4 ., condition overall, Y ' *- t t ' but features many _ e , areas of chipped ,, -: paint and rust. y N ..., ,1 .4",:' -/ {p$ r w f ' ' A.b ' /14 / ' ' '400 4' *' ' it ' 4 A 41. The four legs extend inside the walkway platform and are ,fl+ connected with 1 % steel angles and 1/4. rivets to the vertical surface of the tank. J 7 r : .: i' 4Y4 , • < r . ii r. 23 COLLABORATIVE I)esignuroizp,,Y,,. City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 42. View looking down the inside of one of ,, -° the Water Tower's ., legs. r # e"^ r 14 , t a • 43. The side of the tank is in average condition, 7 24 0 COLLABORATIVE I)esignGlotip,,n,. City of Elk River Jacks CDG oPro n jStreet ect#1 Water 5010.00 Tower Condition Assessment _ July 1,2015 OBSERVATIONS REFERENCE PHOTO 44. The side of the tank is in average condition. s 40 f t isiv i . .... , . ,. ., , , r 4. 4,- 4 ., , ., . :,:„ - ... , - i rmt 45. A second ladder rises along the side I i',i_Ik lL of the tank. Like the ladder along the northwest leg,this L I \, ladder features ` lIk.surface rust and i chipped paint,but i is performing well I and has a good "I connection to the Water Tower. 16 A = te, 25 6 COLLABORATIVE i esign(ruup,, City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 46. A third ladder allows access to the conical roof of the tank and the cap on the very top of the Water Tower. This ladder can dis- connect from the <.,t ' second ladder,and pivot around the ,i. cap at the top to provide access around the entire circumference of the roof. ,{+weds ., . 47. Some minor rusting and water staining was observed at seams and the edge of the tank on the underside of the roof eave. 26 COLLABORATIVE 1.)esigri(;1oup,m, City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 48. The conical roof is \� rusting at panel seams. I w ..A "w 49. The conical roof is s 1 rusting at panel seams. `� k I 27 4 COLLABORATIVE 1)esigncroUp,,»< City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 OBSERVATIONS REFERENCE PHOTO 50. The cap atop the roof appears to be in average :,, condition. e- 441140404 1114 r7t, DISCUSSION AND CONCLUSIONS Introduction This condition assessment focuses oin two main points concerning the Jackson Street Water Tower: the overall structural condition of the Tower, and the requirements to preserve the Tower to maintain its integrity and value. Part of the preservation plan i to restore the water tower to its original appearance,which will require extensive work to clean and remove old paint, rust, and growing lichen. A few rusting areas, such as at connecting splice plates on the outside of the legs and deteriorating areas within leg bases also present a concern from a structural standpoint. General Discussion From a structural standpoint, all components of the Water Tower appear to be performing well. Besides some more superficial issues, such as the presence of chipped paint,rust, and lichen,all steel components are in average condition, especially for their age. The legs are securely bolted to the concrete footings. There are no noticeable problems with any of the tie rods, horizontal girders, or lattice work on the legs. The Water Tower's legs consist of two steel channels sitting parallel to each other and riveted to a long, flat steel plate on the edges on the outside perimeter of the Tower and small 28 COLLABORATIVE Design(,rattp,,�< City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 latticed bars on the inside edges. Put together, these pieces form a square leg that rises to the tank in three sections. Each section is connected with four steel splice plates, two of which are bolted and riveted inside the legs, and two that are bolted on the legs'exterior surfaces. Two issues were observed, both located on the legs, which will need further maintenance beyond the obvious painting. First, the base of each leg is filled with concrete that promotes the drainage of water out of the leg assembly. It appears that water naturally flows to the sides of this concrete and along the edge of the inside of the legs,which has resulted in some deterioration and loss of cross sectional area of the steel. The thickness of the steel channels is important, as this is what transfers the load of the water tower to the foundation. At this time, the condition of the steel is behind the concrete is unknown. It would be important to investigate the condition of the steel behind the concrete further during the painting project by removing a portion of the concrete infill and inspecting the steel. If the corrosion is worse than what is observed presently, some remedial action may need to be done to strengthen the base,such as the addition of steel plates to replace the loss of cross sectional area due to corrosion. If it is determined that additional steel needs to be added, a sample of the steel should be taken and tested to determine its physical properties. Steel produced during the time of the construction of this water tower did not have the same physical properties of modern day steel, and may not be able to be welded. This testing information will inform the design of the connection of any additional steel members, if needed. The second potential concern involves the steel splice plates connecting the leg sections. Some of the plates are bowing as result of rust jacking,which occurs when the backside of the metal rusts and expands, causing the front of the panel to move outward. This appears to be happening exclusively on the eight plates on the outside perimeter of the Tower,which is not surprising since the slope of these surfaces allows water to travel down the legs and flow behind the connection plates. Since these plates hold the legs together, they are integral to the structural integrity of the Tower. If the plates continue to corrode, the connection between each section will weaken and the structural capacity of the legs will diminish. Paint is chipping on the Water Tower's legs,tie rods, and horizontal girders;the surface of much of the exposed steel is covered in rust. A significant amount of lichen is also growing on some of these surfaces. The condition of the underside of the tank and its surrounding walkway platform was observed to be similar to that of the legs, tie rods, and girders, with a significant amount of weathered paint and rust. The sides of the tank appeared to be in good condition relative to the rest of the Tower,but the roof and cap are weathered with rust stains present from seams in the roof panels. Considering that the Water Tower structure is no longer supporting the weight of water in a full tank, maintenance and periodic observation will be all that is required, and no major structural modifications will be necessary. Some minor modifications may be necessary as identified above. 29 `COLLABORATIVE IwsignC;roup,„„ City of Elk River Jackson Street Water Tower Condition Assessment July 1,2015 CDG Project#15010.00 RECOMMENDATIONS It is the City of Elk River's intent to restore the Water Tower to its original appearance,which consisted of mostly silver painted steel except for black lettering and a red roof. In order to do so, chipped paint, lichen, and rust will need to be removed to provide for the adhesion of the new paint. Because the paint is likely to contain lead, all removed paint will need to be captured by qualified workers and properly disposed of. It will not be necessary to strip all of the paint off of the water tower down to bare steel. Any lead based paint that is adhered well can be encapsulated with the new paint. Proper cleaning and preparation of all surfaces will need to be performed prior to cleaning. All of the Tower's surfaces should be painted,including areas that may not be easily visible from the ground, such as any exposed areas of steel angles, the inside of legs, and the walkway platform. A new coat of paint will not only return it to its original appearance, but it will also protect the steel from further rusting and deterioration. The two potential structural issues should be further investigated with a more in depth study of the areas in question. We recommend that a portion of concrete from one of the leg bases be removed to get a better understanding of the condition of the steel. Areas of rust and deterioration are present on the exposed steel just above the concrete, and the possibility exists that water has been able to seep between the metal and concrete and cause unseen damage to the steel. The bowing steel splice panels should also be tested to determine the extent of damage. PRIORITIES AND ESTIMATE OF PROBABLE COSTS Description Estimated Cost Additional Testing $ 4,000 Steel repair (if required) $ 5,000 Painting $60,000 Sub Total $69,000 Contingency, 15% $10,350 Design Fees, 8% $ 5,525 Total $84,875 30 COLLABORATIVE DesignGroup,,n<