Loading...
6.1.e. ERMUSR 07-14-2015 Elk River . Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Eric Volk-Water Superintendent John Dietz—Chair Al Nadeau—Vice Chair Daryl Thompson—Trustee MEETING DATE: AGENDA ITEM NUMBER: July 14, 2015 6.1e SUBJECT: Staff Update DISCUSSION: • Delivered six new residential water meters. • Sealed the water meter and took curb stop ties from six water services. • Turned on four water services, and four electric services. • Turned off four water services. • Went on ten service calls. • Completed 25 BACTI/Total Chlorine Residual Samples o All confirmed negative for Coliform Bacteria. • Completed 20 routine fluoride samples o All samples met MDH standards. This was the first month we had to meet the lower standard of.7 ppm. • We have determined that Well#8 is not pumping sand at this time. After reviewing the video,we have made an early determination that roughly 15 feet of cavity has collapsed. The open hole at the bottom of the well will have to be redeveloped and the fill will need to be removed when the well is pulled for maintenance in the future. • We have completed the first round of treatment optimization with John Thom from SEH. We have made quite a few changes to our treatment process resulting in many procedural changes for treatment and testing. The biggest change that effects the water department is that we now have more tests that need to be completed. In the past there were only eight tests being completed every month for each well. We now have 85 tests that will need to be completed at a minimum. There is daily effluent testing of iron, manganese, and free chlorine. Monthly tests will include 20 filter bed tests, raw water samples,pH, and temperature. • Well#5 failed on June 5. After troubleshooting the problem, it was determined the motor had blown a seal and needed to be sent back to the manufacturer. Fortunately, the motor was still under warranty. E.H. Renner pulled the well and sent it out for repair. We are still waiting for the well to be returned for reinstallation. _ Elq P O / E K E D I Y Page 1 of 2 NATURE Reliable Public Power Provider P OW ER ED T O S ERVE 64 • The water operators have started with the scheduled annual hydrant maintenance. This year the total number that will be receiving preventative maintenance will be 363 hydrants; this includes 163 private hydrants and 200 utility owned hydrants. • The water operators exercised and performed preventative maintenance on all of the gate valves that were located in the 2015 street improvement areas. This helps to ensure that the valves are in working order before the street project begins. If there were to be any gate valves requiring replacement, we would be able to complete that before the road is replaced. We did locate one valve on County Road One/Proctor Ave that will be repaired during the county's reconstruction project. During this inspection,we take gate valve ties, which help us relocate valves should they be paved over. • We had our ERMU Field Services Space Needs Study Kickoff meeting with Kodet Architectural Group on July 8. As we get further into the study, we will continue to keep the commission updated on our progress. ATTACHMENT: • June Pumping By Well 11' 011E11E0 BY Page 2 of 2 NATURE 0 Reliable Public Power Provider P O W E R E D T O S E R V E 65 f! "Flo- c a_ m E N z a o r-1 p Q1 LA ,W t� W a N ro Q1 N N o v 00 _,. M u J L l-1 a m = Ni Q b13 a, NI E T-4 a E o — �a a oo ,_a, - - N C �' c o O — 0 0 4 r-I N O 1 in 1.11 M 0 W 1 0 N . c N c C k N '; LA -a _ >. CU = `s ONi a n o M El-..) c-I LD Q v, v MEN It CU