Loading...
7.4. SR 07-20-2015 Request for Action To Item Number Mayor and City Council 7.4 Agenda Section Meeting Date Prepared by Planning ItemsJuly 20, 2015Chris Leeseberg, Senior Planner Item Description Reviewed by Sportech Zack Carlton, Planning Manager 1.Ordinance Amending Zoning Map to Reviewed by Rezone Certain Property from Highway Cal Portner, City Administrator Commercial to Business Park 2.Resolution to Vacate a Drainage and Utility Easement Action Requested 1.Adopt, by motion, an ordinance amending the City of Elk River zoning map to rezone Lot 1, Block 2, Natures Edge Business Center Second Addition, from C-3 (Highway Commercial) to BP (Business Park). 2.Adopt, by motion, a resolution, to vacate a drainage and utility easement as proposed. Overview Zone Change The property is currently zoned Highway Commercial (C-3) and requires a zoning change to Business Park (BP) to allow the applicant to operate a proposed light manufacturing business. They intend to construct a new 105,000 sf manufacturing facility with a possible 73,500 sf expansion. The project is a permitted use in the BP district and has been reviewed by staff. Easement Vacation The proposed project will utilize two adjacent parcels in the Nature Center Business Center Second Addition. The shared property line has 30-foot easements on each side of the property line, 60 feet total width and would be located beneath the proposed building. In order for the building to be constructed, the easement needs to be vacated. Staff has no concerns or issues with the easement vacation. Planning Commission The Planning Commission did not have any concerns with the zone change request and unanimously recommended approval. The Planning Commission does not review easement vacations. No one spoke at the public hearing and no comments have been received for or against the requests. Financial Impact None Attachments  Planning Commission Memo dated June 23, 2015  Ordinance  Resolution City of Elk River Request for Action To Item Number Planning Commission 5.3 Agenda Section Meeting Date Prepared by Planning Items June 23, 2015 Chris Leeseber , Park Planner - Planner Item Description Reviewed by Request by Sportech for Zone Change to amend Zack Carlton, Planner I Reviewed bythezoningofLot1, Block 2, Natures Edge Business Park from C3 Highway Commercial to BP Business Park, Case No. ZC 15 -05 - Public Hearin Action Requested Recommend, by motion, approval of the Zone Change as proposed. Overview The property is currently zoned Highway Commercial (C -3) and requires a zoning change to Business Park (BP) to allow the applicant to operate a proposed light manufacturing business. They intend to construct a new 105,000 square foot manufacturing facility with a possible 73,500 square foot future expansion. The project is a permitted use in the BP district and has been reviewed by staff. A site plan /landscape plan has been attached for your reference. Background /Discussion Comprehensive Plan The purpose of the Comprehensive Plan is to establish a framework and expectations as to the future use of land. Applicable Regulations In revieaving a proposed amendment, consideration shall be given to existing conditions within the area directly and indirecty affected by the proposal, the conservation ofproperly values, the use to wbicb the properly affected is being devoted at the time, and relevant provisions, if any, in the land use plan. In the review of the standards for a Zone Change as outlined, it appears the request is consistent with this standard and is consistent with the City Council approved Comprehensive Plan and the Focused Area Study. The Focused Area Study identifies the subject property area as East Elk River Gateway. Financial Impact None Attachments Location Map Applicants Narrative Site Plan /Landscape Plan P a w E A E U s r NaA f RE] Sportech Case No: ZC 15 -05 Zone Change, Easement Vacation EV 15 -06 i ll`Y._. l iv rT Fjk4 R Ryan Construction, Inc. 1100 Mendota Heights Road 9 Mendota Heights, MN 55120 a (651) 681 -0200 0 Fax (651) 681 -0235 SPORTECH NATURES EDGE BUSINESS CENTER ELK RIVER, MN ZONECHANGE Lot Legal Descriptions: LOT 1 & LOT 2 BILK 2, NATURES EDGE BUSINESS CENTER SECOND ADDITION PID's #: 75- 828 -0205 & 75- 828 -0210 Project Narrative: SPORTECH, Inc. plans on expanding their production into a new 105,000 sf facility in the Nature's Edge Business Center Park, with a possible 73,500 sf expansion. These two land parcels will be combined by the City of Elk River. We are requesting a Zone Change so that both land parcels will Zoned B -3 and allow the lot combination. A single user of the 2 different Zoned land parcels has warranted the Zone change. It is our belief the type of building and end user is consistent in the Elk River comprehensive plan for this development. We feel a 105,000 sf manufacturing facility will fit in nicely with the surrounding properties and compliment the 100,000 sf manufacturing already in the Natures Edge Business Center. We see job creation and increased tax base both benefits for the City, but keeping a long term business in the city probably the best benefit for the City of Elk River. Sportech Zone Change Narrative for City 5.26.15.docx x 0 0 0 LZ LANDSCAPE NOTES: 1. SITE IS VOID OF SIGNIFICANT EXISTING VEGETATION. 2. SEPARATE ROCK MULCH FROM SOD /SEED WITH BLACK VINYL EDGER 3. ALL PLANTING AREAS TO BE IRRIGATED BY A HIGH - EFFICIENCY IRRIGATION SYSTEM. IRRIGATION SYSTEM DESIGN BY CONTRACTOR 4. SOD OR SEED DISTURBED AREAS ONLY ACCORDING TO SITE PLAN. 5. REQUIRED LANDSCAPING BASED ON 3,218 L.F. OF LOT PERIMETER TREES - 3,218 L.F. AT 3 + 1/40 = 83 TREES REQUIRED 83 TOTAL TREES PROVIDED NO'* y4 C° II I I I II I CD . W J II rTl I II 75' -0. NATUR EASEMENT PIPELINE II I I PLANTING SCHEDULE QTY. KEY COMMON NAME BOTANICAL NAME SIZE ACCESS EASEMENT REMARKS 8 AB AUTUMN BLAZE MAPLE ACER FREEMANII JEFFERSRED 2" BB LINEPOLE 14 SO SWAMP WHITE OAK OUERCUS BICOLOR 2" BB II II 7 HL HONEYLOCUST GLEDITSIA TRICANTHOS INERMIS So 88 N 89 °55'32" W 21 300.57' PLANTING SCHEDULE QTY. KEY COMMON NAME BOTANICAL NAME SIZE MTHD REMARKS 8 AB AUTUMN BLAZE MAPLE ACER FREEMANII JEFFERSRED 2" BB LINEPOLE 14 SO SWAMP WHITE OAK OUERCUS BICOLOR 2" BB II II 7 HL HONEYLOCUST GLEDITSIA TRICANTHOS INERMIS 2" 88 T o 21 RB RIVER BIRCH BETULA NIGRA 1.5" BB CLUMP 11 WP WHITE PINE PINUS STROBUS 6' 88 22 BH BLACK HILL SPRUCE PICEA GLAUCA DENSATA 6' BB 6 BC BLUE CHIP JUNIPER JUNIPERUS BLUECHIP p5 CONT. 12 PA PYRAMIDAL ARBORVITAE THUJA OCCIDENTALIS p5 CONT. I 5 JB JAPANESE BARBERRY BERBERIS THUNBERGII p5 CONT. SEED --- 9 GS GOLDMOUND SPIREA SPIREA BUMALDA GOLDMOUND p5 CONT. 16 BB COMPACT BURNING BUSH EUONYMUS ALATUS p5 CONT. I I I N89 °47'13" W 521.78' 168th `, N 87°23'05" w v E N U E 180.19' N 89 °47'13" W 212.14' GROUND COVER OR MULCH AS SPEC. TURN BACK BURLAP REMOVE POLY AND WIRE SET BALL ON UNDISTURBED GROUND BACKFILL WITH EXISTING SOIL r3-'\SHRUB PLANTING DETAIL L1 SCALE: NOT TO SCALE 2) TREE PLANTING DETAIL L1 SCALE: NOT TO SCALE RETAIN TREES NATURAL FORM. REMOVE ONLY DEAD OR DAMAGED BRANCHES DO NOT CUT LEADERS ROOT COLLAR 1 -2" ABOVE GRADE WOOD CHIP MULCH REMOVE WIRE BASKETS AND POLY TIES. CUT BURLAP FROM UPPER 1/2 OF BALL EXISTING GRADE BACKFILL WITH EXISTING SOIL WATER THOROUGHLY TO ELIMINATE AIR POCKETS BREAK DOWN SIDES OF HOLE UNDISTURBED SOIL BENEATH BALL III I II I p \ EXISTINGTRANS. ILINEPOLE II VERIFYLOCATION UTUREEXPANSION II II II II II T o II IIJ I ICI I o III II I I I. N SEED --- I I . I I II I. TRANSMSSION LINEEASEMENT I. I I I N89 °47'13" W 521.78' p.RN 0MNN PRN401 F`pN C0 .. 10% 451 RYw nnetrnetlnn, lne. Commercial Design and Construction qms aoee 2 U ru 0 Vf L`U C 1A' I..L M Y W Drawn By: JRB Checked By: LL Revisions 5/4/15 PRELIMINRY 5/26/15 CITY SUBMITTAL LANDSCAPE PLAN Sheet Number L 1 Project No. 150126 -1 Last Updated March 2014 Ordinance 15 - ____ An Ordinance Amending the City of Elk River Zoning Map to Rezone Certain Property from Highway Commercial to Business Park Case No. ZC 15-05 The City Council of the City of Elk River does hereby ordain as follows: SECTION 1. That the duly adopted Zoning Map of the City of Elk River is hereby amended to rezone the property described on attached Exhibit A from Highway Commercial (C-3) to Business Park (BP). SECTION 2. That the rezoning approved by this Ordinance is based on the following findings: 1. The rezoning is consistent with the City of Elk River Land Use Plan adopted as part of the City of Elk River Comprehensive Plan. SECTION 3. That this Ordinance shall take effect and be in full force from and after the date of its publication. Passed and adopted by the City Council of the City of Elk River this 20th day of July, 2015. ______________________________ John J. Dietz, Mayor ATTEST: _______________________________ Tina Allard, City Clerk Last Updated March 2014 Exhibit A Lot 1, Block 2, NATURES EDGE BUSINESS CENTER SECOND ADDITION, according to the recorded plat thereof, Sherburne County, Minnesota Resolution 15-____ A Resolution of the City of Elk River to Vacate a Drainage and Utility Easement WHEREAS, application has been made by the property owner to vacate the drainage and utility easements described in Exhibit A attached hereto; and, WHEREAS, vacation of the easement is appropriate as the adjacent properties are being combined and the rights provided by the easement are no longer necessary; and WHEREAS, a public hearing was held on July 20, 2015, before the City Council of the City of Elk River on such request after published and posted notice had been given, and all persons interested were given an opportunity to be heard at the public hearing. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota, as follows: 1. The petition to vacate the drainage and utility easements described in Exhibit A is hereby granted; and, 2. Vacation of the easements described in Exhibit A shall be effective at the time of recording of the document. Passed and adopted this 20th day of July 2015. John J. Dietz, Mayor ATTEST: Tina Allard, City Clerk Exhibit A