Loading...
11-14-2000 BA MIN • MEETING OF THE ELK RIVER BOARD OF ADJUSTMENTS HELD AT ELK RIVER CITY HALL TUESDAY, NOVEMBER 14, 2000 Members Present: Chair Mesich, Commissioners Baker and Kuester. Commissioner Chambers arrived at 6:45 p.m. Commissioner Schuster arrived at 7:10 p.m. Members Absent: Commissioner Pederson Staff Present: Steve Wensman, Planner; Debbie Huebner, Recording Secretary 1. Call Meeting To Order Pursuant to due call and notice thereof, the meeting of the Elk River Board of Adjustments was called to order at 6:45 p.m. by Chair Mesich. 2. Consider 11/14/00 Board of Adjustments Agenda COMMISSIONER KUESTER MOVED TO APPROVE THE NOVEMBER 14,2000, BOARD • OF ADJUSTMENTS AGENDA. COMMISSIONER CHAMBERS SECONDED THE MOTION. THE MOTION CARRIED 4-0. 3.1. Request by Paul & Michelle Welinski for Setback Variance, Public Hearing-Case No. V 00-4 Staff report by Steve Wensman. Paul and Michelle Welinski request an 18 foot variance to the 150 foot shoreline setback from West Twin Lake in order to construct a deck. Mr. Wensman explained that the original house on the property was constructed prior to the shoreline ordinance in 1973. That house was destroyed by fire in 1996. A building permit was issued in 1997 to rebuild the house in its original location, and included sliding glass doors and a deck on the rear of the house facing the lake. The deck was not constructed at that time, however, and when the applicant applied for a deck permit this summer, they were informed that they would need a shoreline setback variance. Staff feels that the five findings necessary for granting a variance can be met and recommends approval based on the findings listed in the staff report. Chair Mesich opened the public hearing. There being no comments from the public, Chair Mesich closed the public hearing. Chair Mesich asked if the DNR has reviewed the variance request. Steve Wensman stated that staff will verify DNR approval of the variance. COMMISSIONER KUESTER MOVED APPROVAL OF THE REQUEST BY PAUL AND • MICHELE WELINSKI FOR A SHORELINE SETBACK VARIANCE, CASE NO. V 00-4, BASED ON THE FOLLOWING FINDINGS: Board of Adjustments November 14,2000 Page 2 • 1. THE APPLICANT'S HARDSHIP IS THAT THE CITY ALLOWED THEM TO REBUILD ON THE ORIGINAL FOUNDATION AND THE BUILDING PERMIT ISSUED IN 1997 INCLUDED A DECK IN THE SAME LOCATION THAT IS CURRENTLY BEING PROPOSED.THE APPLICANT FEELS THEY HAD A REASONABLE EXPECTATION THAT, EVEN THOUGH THE DECK WAS NOT CONSTRUCTED AT THE SAME TIME AS THE HOUSE,THEY COULD BUILD A DECK AT A FUTURE DATE AS SHOWN ON THE APPROVED BUILDING PERMIT. IF THEY WOULD HAVE CONSTRUCTED THE DECK AT THE SAME TIME AS THE HOUSE,THEY WOULD NOT BE BEFORE THE BOARD OF ADJUSTMENT WITH THIS VARIANCE REQUEST. 2. THE HARDSHIP IS PECULIAR TO THIS PROPERTY IN THAT NO OTHER PROPERTIES IN THIS AREA ARE IN THE SAME SITUATION AS THIS ONE, IN THAT THE HOUSE WAS DESTROYED AND THEY WERE ALLOWED TO REBUILD ON THE ORIGINAL FOUNDATION. 3. THE LITERAL APPLICATION OF THE PROVISIONS OF THIS ORDINANCE WOULD DEPRIVE THE PETITIONER OF RIGHTS ENJOYED BY OTHER PROPERTIES IN THE SAME DISTRICT UNDER THE TERMS OF THIS ORDINANCE. IT IS NOT UNUSUAL, IN FACT IT IS QUITE COMMON, FOR LAKESHORE HOMES TO HAVE DECKS FACING THE LAKE. 4. THE SPECIAL CONDITIONS AND CIRCUMSTANCES ARE NOT A CONSEQUENCE OF THE PETITIONER'S OWN ACTION OR INACTION. IT IS A CONSEQUENCE OF RELYING ON A PREVIOUS BUILDING PERMIT ISSUED BY THE CITY. 5. THE VARIANCE WILL NOT BE INJURIOUS TO OR ADVERSELY AFFECT THE HEALTH, SAFETY OR WELFARE OF THE RESIDENTS OF THE CITY OR THE NEIGHBORHOOD WHERE THE PROPERTY IS LOCATED AND WILL IN KEEPING WITH SPIRIT AND INTENT OF THE ORDINANCE. 6. THE GRANTING OF THE VARIANCE IS NEEDED FOR REASONABLE USE OF THE PROPERTY. 7. THE VARIANCE IS NOT BEING REQUESTED SOLELY ON THE BASIS OF ECONOMIC CONSIDERATIONS. 8. THE PROPOSED HOUSE WOULD BE IN CHARACTER WITH THE SURROUNDING PROPERTIES. AND, WITH THE FOLLOWING CONDITION: 1. THE PROPERTY OWNER SHALL BE RESTRICTED FROM ENCLOSING THE DECK OR CONVERSION OF THE DECK TO A THREE OR FOUR-SEASON PORCH. COMMISSIONER CHAMBERS SECONDED THE MOTION. THE MOTION CARRIED 4-0. 6. Adjournment There being no further business, COMMISSIONER KUESTER MOVED TO ADJOURN THE MEETING. COMMISSIONER CHAMBERS SECONDED THE MOTION. THE MOTION CARRIED 4-0. • Board of Adjustments November 14,2000 Page 3 • The meeting of the Elk River Board of Adjustments adjourned at 6:56 p.m. Respectfully submitted, Debbie Huebner Recording Secretary • •