Loading...
6.1.c. ERMUSR 08-11-2015 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent John Dietz—Chair Al Nadeau—Vice Chair Daryl Thompson—Trustee MEETING DATE: AGENDA ITEM NUMBER: August 11, 2015 6.Ic SUBJECT: Staff Update DISCUSSION: • Had eleven new services. • Continue working on collecting data with the GPS for our ArcView maps as time permits. • Continue working on changing out some of the rusty junction boxes or removing ones that are no longer necessary. • Continue working on changing out fuse pads. This has been an ongoing project that had to be done due to our high fault current. • Continue rebuilding River Ranch in Otsego. We are replacing the rear lot line overhead with front lot line underground. • Received the rest of the junction box lids we were waiting for. We're now working on finishing up the replacement project. • Finished moving the transformer off the loading dock at Vandenberg Middle School and changed out the transformer feeding the football field with a different voltage transformer. We also installed a primary loop to the ice arena and removed two junction boxes. • Finished installing a three phase loop for Central Lutheran Church and a single phase loop for Dove Tree Apartments. We also removed a three phase junction box, moved another, and changed out a rusty one. • Installed the primary wire and transformer for the waste water treatment plant. We have to hook up the secondaries when they are ready. • Started working on the installation of a new feeder out of the Waco substation to the court house area. As the boring machine uses more water and bentonite mix when installing this big wire, the City Parks Department is letting us use a water tank on their truck so we don't have to come back to the shop as often to get water. • There is a new office building going in next to Cowboy Jacks in Otsego. We had to move some underground primary so they could install their storm water pond. • ktiIPage 1 of 2 RF R eliable Public Power Provider P 0 WE 0.E U T O S ERNE 191 • Had to change out a three phase primary pole that got hit by lightning. • Had two primary faults on our single phase wire in two different areas of town. One was caused by a gopher and the other one was a bad splice. Connexus came out and located the faults with their equipment. IPOWERED BY Page 2 of 2 NATURE Reliable Public Power Provider P 0 WE 0.E D T O S r 192