Loading...
5.9. SR 06-21-2004MEMORANDUM Item ~5.9. TO: FROM: DATE: Mayor and City Council Chris Leeseberg, Planner June 21, 2004 SUBJECT: Case No. CU 04-14 Request by BMS Investments for a Conditional Use Permit for Truck Terminal Request Consider a request by BMS Investments for a Conditional Use Permit for Truck Terminal. Location Lot 1, Block 1, Cascade Industrial Park Zoning/Land Use 12 (Medium Industrial) / MI (Medium Industrial) 60 Day Rule In order to comply with Minnesota Statute 15.99 (60 - Day Requirement), action must be taken on this request by June 25, 2004 Attachments · Location Map · Memo from the City Engineer · Site Layout and Utility Plan · Grading, Drainage & Erosion Control Plan · Landscape Plan · Building Elevations City Council]CU 04-14 April 21, 2OO4 Page 2 Overview The applicant is proposing to construct a 6,000 square foot building in conjunction with a truck terminal. The truck terminal component of the use requires a conditional use permit. The property is located on Jarvis Street, north of the railroad tracks, in the Cascade Industrial Park The property is currently undeveloped. The lot to the south will be a masonry business; the property to the west is a pipe yard, and single family residences are on the east side of Jarvis Street in Ramsey. The surrounding properties, on the west side of Jarvis, have a zoning of I2 (Medium Industrial) and a land use designation of MI (Medium Industrial). The building will be used to store two trucks and up to five trailers could be parked in the outdoor storage area. There is an area in the building for a small office space, but currently the office activities happen off site. The hours of operation vary from job to job and from day to day as well as season to season. The applicant stated that trucks could leave as early as 4:30 a.m. on rare occasions. Analysis Site Plan Parking and ~tccess The site plan indicates two driveways onto Jarvis Street. The Planning Commission felt that the second access was needed for the circulation of the trucks and that it will only be used 2- 3 times a week. Staff continues to recommend that the site be limited to one access point with an internal connection of the driveway from the building and the parking area. In the future, Jarvis Street will be a major north-south corridor with an access management plan that will regulate conflict points. A 14 stall parking lot is proposed south of the building, with 15 additional stalls marked "future". There is no specific parking requirement in the zoning code for a truck terminal business. The applicant is providing parking at a ratio of 1 space for every 315 square feet of floor area. For comparison, the parking requirement for a warehouse is 1 space per 2000 square feet of floor area and for office it is 1 space for every 300 square feet. Parking should be sufficient for the proposed use. Access to the area behind the building is provided via a drive isle through the parking lot. The driveways and parking area will be paved and have concrete curb and gutter. Truck Terminal The outdoor trailer parking area will be located at the rear of the building and will have a reclaimed or recycled bituminous or bit-con surface. The drain field for the septic system will be located between the building and the north property line. The trailer parking area will S:\PLANNING\Case Files\2004\CU 04-14 BMS Investments\CU 04-14_CC.doc City Council/CU 04-14 April 21, 2004 Page 3 have a fence along the eastern edge and along both the north and south property line with it terminating in the drainage and utility easement. No fencing is shown along the west end. Landscaping The ordinance requires 48 trees with a mix of 50% (24) overstory, 25% (12) evergreen and 25% (12) ornamental trees. The landscape plan meets the total number of trees required and the specific quantity of each. Although the plan meets the requirements, the size of the trees indicated on the plan does not meet the ordinance requirements. Overstory trees shall be 1 V2 inches in diameter and coniferous trees shall be balled and burlapped six feet in height. Grading Drainage and Utilities Grading, drainage and utility issues are addressed in the City Engineer's memo Signage There is no indication of any signage on the building or any freestanding signs. The ordinance allows: One on-premises freestanding business sign perpremises, not to exceed tmo square feet in sign area for each linear foot of street frontage up to a maximum of 64 square feet. Such signs shall not exceed a height of 2Ofeet. One on-premises business mall sign per occupancy, not to exceed tmo square feet in sign area for each linear foot of building frontage, up to a maximum of 128 square feetper occupancy. Building Ekvations The building will be 6,000 square feet in size and the exterior will have a metal panel finish. The front entrance will be covered with a metal canopy. The elevation facing Jarvis will have a four foot high rock wainscoting. Planning Commission Action The Planning Commission did not have any issues with the two driveways and recommended that the outdoor storage area be at a minimum Class-V surface. The Planning Commission unanimously recommended approval of the request. Recommendation Staff recommends that the Planning Commission recommend approval of the Conditional Use Permit for a truck terminal with the following conditions: 1. ALL COMMENTS OF THE CITY ENGINEER SHALL BE ADDRESSED. S:\PLANNING\Case Files\2004\CU 04-14 BMS Investments\CU 04-14_CC.doc City Council/CU 04-14 April 21, 2004 Page 4 2. THE SIZE OF TREES SHALL COMPLY WITH THE REQUIREMENTS IN THE ORDINANCE. 3. ALL SIGNAGE SHALL COMPLY WITH THE SIGN ORDINANCE. 4. ALL LANDSCAPED AREAS SHALL BE IRRIGATED. 5. THE EDGES OF THE TRUCK TERMINAL AREA SHALL BE PERMANENTLY DEFINED WITH SOME FORM OF LANDSCAPE PRODUCT THAT WILL NOT ALLOW FINE GRAVEL MATERIAL TO WASH INTO THE PONDING AREA. 6. THE EXTERIOR BUILDING MATERIALS SHALL COMPLY WITH THE ORDINANCE REQUIREMENTS. 7. IF MORE THAN 5 TRUCKS AND/OR 10 TRAILERS ARE TO BE ON SITE, THE APPLICANT SHALL APPLY FOR AN AMENDMENT TO THE CONDITIONAL USE PERMIT. 8. OUTDOOR STORAGE AREA SHALL BE A CLASS-V SURFACE. S:\PLANNING\Case Files\2004\CU 04-14 BMS Investments\CU 04-14_CC.doc SITE AVE 165RD 162ND 161ST 160TH 159TH 158TH 157TH 156TH 155TH IKiver Case Number. Location Map CU 04-14 BMS INVESTMENTS N Howard R, Green Company May 10, 2004 File: 823650J-0240 Mr. Chris Leeseberg City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: POWELL PETERSON, INC. BMS INVESTMENTS, LLC. Dear Mr. Leeseberg: As requested, we have reviewed the site plan information submitted for the proposed Powell Peterson truck terminal to be located on Lot 1, Cascade Industrial Park off of Jarvis Street. Hakanson Anderson Associates, Inc., of Anoka, Minnesota, prepared the information we reviewed. Based on our review, we would offer the following comments: The site is proposing two access points onto Jarvis Street: one that leads directly into the 6,000 square foot building, and the second that leads into the parking lot to the south of the building. We would recommend that this site be limited to one driveway access off of Jarvis and have an internal connection to the parking lot. The primary and secondary drain field sites are shown just north of the building near the front of the lot. It will be important that this area be well-protected during the grading of the site, since the majority of the remain'lng site is to have grading accomplished on it. The parking area and the drive to the proposed building appeared to have curb and gutter around them and appear to be hard-surfaced, although it is not called out what type of material. The material type should be noted along with the type of concrete curb and gutter. The remaining portion of the site, again, is not noted as to the type of surfacing. At this point, we can only assume that it will be some sort of gravel surfacing. There are proposed yard bumpers around the perimeter. The site is graded to drain from east to west into the large ponding area located on the rear of the lot. A major concern would be what will.keep the fine gravel material from washing into the ponding area under heavy rainfalls, and essentially plugging the pond bottom, eliminating infiltration? Some means of protecting against the gravel material ending up in the pond needs to be provided on this site. It appears that a portion of the north part of the gravel yard area will actually drain off to the north onto the adjacent property. Some adjustments to the proposed grading plan need to take place to ensure that the drainage will stay on the site and/or follow the drainage and utility easements along the perimeter to the ponding area. Ltr-051004-Leeseberg.doc 2550 University Avenue West · Suite 400N · St. Paul, MN 55114 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Mr. Leeseberg May 10, 2004 Page Two There is an existing storm sewer line, which runs along the frontage of the lot and then the north property line into the ponding area. This takes drainage from the lots further to the south. We would suggest that this lot tap into that existing storm sewer, a catch basin be put in the proposed parking area, and the flow be picked up internally from the parking area, rather than allowing to run into the ditch along Jarvis Street. If you have any questions regarding any of these comments, please call. Sincerely, Howard R. Green Company TJM:sw Lt~051004-Leesebe~.doc I-In\^/~qrcl ~ ('~'~r~an Pnmnan~ / 250.02 / / / / / / / / 2~0.02 INTAK~ E~612 CONCRETE CURB &: GUTTER HEAVY DUtY PAVEMENT DRIVEWAY TYPICAL SECTION PROPOSED FENCE PROPOSED TURF AREA Imm PROPOSED YARD AREA PERIMETER BUMPER PROPOSED BUILDING PROPOSED CONCRETE SUREAClNG  PROPOSED BITUMINOUS PAVEMENT PROPOSED SETBACK LINE PROPOSED RECLAIMED OR RECYCLED BITUMINOUS OR BIT-DON SURFACE 50 0 SCALE PROPOSED B612 CONCRETE CURB &: GUTTER DATE RECEIVED PED. STORM MANHOLE RIM=SD5,90 tNV~RT WEST - 877.75 INVERT SOUTH ~ STT.7o 33~ 40 . '/ 30 6O I FEET 4O EXISTING ~c PROPOSED ZONING: [-2 - MEDIUM INDUSTRIAL BUILDING SETBACK REQUIREMENTS: *FRONT - $0' *SIDES - 25' *BACK - 20' PARKING SETBACK REQUIREMENTS: *ALL SLOES - t0' PARKING STALL REQUIREMENTS: 1 STALL PER 2000 SF OF' FLOOR AREA *No. REQUIRED .3 STALLS *No. PROVIDED - 29 STALLS INCLUDING 2 HANDICAP STALLS 14 STALLS IMMEDIATELY 15 FUTURE STALLS (IF NEEDED) Ass0c.,Inc. POWELL PgERSON, INC. o.e Lo.e S.~.yo~ ELK R~ER, SHERBURNE COUNt, MINNESOTA 3 ./ LEGEND ~) = SANITARY SEWER MANHOLE ~ - HYDRANT (~ - ST0~M SEWER MANHOLE i - CATCH ~ = ELEC~IC BOX ~ = LI~T o . F~ND IRON W~UMENT ~ UCEN~ NO. ~G~ = UNDERhaND ~LEPH~E LINE -u~ = UNDERhaND ELEC~IC LINE - [-~ O~RHEAD E~C~IC LINE - T-= 0~RH[AD ~LEPH~E LINE -~= GAS MAIN ~ ~LEPHONE ~DESTAL = ELEC~IC TRAN~MER - CA~ ~ BOX = U~LI~ P~E = S~L B~ING = GA~ VAL~ ~= [XlS~NG SANITARY ~R UNE ~- [XIS~NG STeM ~R LINE --I--- ~OSED WA~R LINE ~= PRiDeD 5~ITARY SE~R LINE ~ PR~OSED ST~M ~R LINE ~85 PR0~SED C~TOU~ --5~-- ~NG CO.OURS x 855.62 ~IS~NG S~T EL~ X 855.62 PROPOSED G~ER LINE ~T EL~ (UNLESS OTHE~ISE NOTED) 1.2~ ~ PROPOSED D~E ~OW PROPOSED TI~ CURS ~ PROPOSED ~LT FENCE PROPOSED TEMPORA~ ROCK CONSTRU~ON x PROPOSED FENCE ~ ~ PROPOSED Y~D ~ PERIM~R BUMPER PRO--ED BUILDING PRaiSED 4' CONCR~E SIO~ALK (6' WIDE) PRaiSED B~MINO~ PAVEME~ PRaiSED S~CK LINE 250.02 / / / / / / / ? i I i / i i i ~ST = 875.57 I 50 0 30 50 LOT 1 77,7 I SITE SETBACK LINE -~STORM MANHOLE R~IM~.BSS. 90 tNV[RT-y/[ST INVEST SO~TH BUILDING FINISHED FLOOR ELEVATION = 889.! FOR BOTH SE WAREHOUSE) 4O ROCK CDNSTRUCTIDN DRIVE -PROPDSEI] FEh~SE (TYP.) i 4O DATE RECEIVED WASHED ROCK SILT FENCE DETAIL NO SC~L£ ROCK CONSTRUCTION ENTRANCE I hereby certify that this plan, DATE REVtSION ~ ~ I-- SHED specificoti ....... ~rt w.$ pre.redhil Hakanson GRADING, DRAINAGE, & o..,.o, .... ~.~. .... . ~. Anderson EROSION CONTROL PLAN of '~.~. State o~__n~sot~. MLH Assoc.,Inc. POWELL PETERSON, INC. oF ~ - o~a~m c;~il £.g;.e.~ ~.~ L~.d S.,~,~o~ ELK RlVER. SHERBURNE COUNt, MINNESOTA 3 Jam. . ~ns~. P.E. JEJ ~165-427-~ F~ 763-427-0520~ 4/25/0A RI[ ~. SHE~S Da /23/ L~, No. ~2651 5256.03 / / 230.02 / / / / / / / / --x x ~---~- x ~.x~,-- 250.02 X--X-- --X--X--X--X-- REFUGE LOT 1 - ;~ .... ,. - --,~-- - _ ------.------.------.----.------.------.------.----.------., Note: 1. All Landscaped areas except Operational Septic sites, shall be irrigated. --r .... m F- -- ._~-~'-F r I PRIMARY I .... _ - -- -~uTu.'E' - 20 BUILDING EXPANSION AREA FUllJRE 20 BUILDING EXPANSION AREA STORM MANHOLE RIM=885.90 INVERT WEST = 877.75 INVERT SOUTH = 87T.70 33 40 ~AR~TNI~ I DATE RECEIVED I 4O 12' MIN~ ~ PLANTING DETAIL FOR DECIDUOUS TREES NO SCALE TRIPOD METHOD NO SCALE PLANT MATERIAL SCHEDULE TREE SYMBOL KEY COMMON NAME QUANTITY SIZE ROOT ~ SA Frazinus Pennsylvanico lanceolalata 'Summit' 24 z~ 2-1/2" B&B ' (i:'~ f,~ Summit Ash ~j~ CS COLORADO SPRUCE PICEA PUNGENS 5-4" B&B 12 PSFC PINK SPIRE FLOWERING CRAB MALUS 'PINK SPIRE' 1-1/4" B&B 12A ,pe¢ifico(i ......m1 -1 Hakanson LANDSCAPING PLAN 3 , ~m a duly Lic.$. --': Anderson Prolesmnal Ewi .... und~ the ~ws POWELL P~ERSON, INC. OF ,~, o~,0. .L. Assoc.,inc, ~ ~ m~im E~g~.~ o.d L~-a s.~.~o~ ELK R~ER. 5HERBURNE COUNt, MINNESOTA 3 Jom~E. ~ .... ~.E. JEJ ~;3-4Z7-58~ r~ 763-427-0520 ~TE 4/23/04 ) ~ ~. SHE~ FRONT ELEVATION - SCALE = 3/16 REAR ELEVATION -SCALE = 3/16 DATF. R~=CEIVE. D 2 0~0 LEFT ELEVATION - SCALE -- 1/8" RIGHT ELEVATION - SCALE = 1/8" 3 o O~z ~Z ~Z--~ mzz& 0 ~oo,,, ~Z ~ao uJ<O