4.2. SR 06-19-2000~ity of
ver
MEMORANDUM
Item # 4.2
TO:
FROM:
DATE:
SUBJECT:
Mayor and City Council
Scott Harlicker, Senior Plann~
June 19, g000
Northstar Corridor Update
At the Northstar Corridor Development Authority meeting held on June Ist,
the Authority received an update on the legislative session, a conceptual
design report on equipment and the maintenance facility, and an update on
station area planning. The state legislature approved $100,000 for commuter
rail and approved funding for the Hiawatha Corridor. At the federal level the
appropriation request is still proceeding through the FTA. There is federal
dollars available through June 2001. Elk River is still being looked at as a
possible site for a maintenance facility. The facility will require about 20
acres of land. The area receiving the most attention is south of the proposed
station. On Wednesday June 7th City staff met with the consultants hired to
assist communities with station area planning. The purpose of the meeting
was to introduce the consultants to the communities and allow time for some
initial discussion regarding land development around the stations. On July
12th , there will be a follow up meeting at which the consultants will address
the issues raised at the first meeting. There will also be opportunities for
several public meetings during this planning process. There has also been a
second commuter rail demonstration scheduled for August 10th with a stop at
the proposed Elk River station site.
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
Northstar Corridor Development Authority
Thursday, June 1, 2000
4:30 p.m.
Sherburne County Government Center
Elk River, MN
Action Requested
Minutes of May 4, 2000 Meeting*
Approval
2. Exec.9.utive Committee Report
,~. Terminus Station Selection/'
Resolution 2000-4*
.,,~b~. Shandwick Contract Amendment*
c. Appointment to Central Corridor
Coordinating Committee*
.~....~~Legislative Wrap-up
Approval.
Approval
Information
Information
Conceptual Design Report
a. Overview
b. Vehicles
c. Maintenance facility
d. Fare collection
Information
Station Area Planning: Upcoming Activities
Updates
a. FTA Approval of PE
b. Mn/DOT Agreement
c. Multi-modal Stations
d. Public Information Demonstration Project
7. Other
Information
Next Meeting: July 6, 2000
*Attached
DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT
NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY
'Regular Meeting Minutes
May 4, 2000
The Northstar Corridor Development Authority met in regular session on May 4, 2000, in the Board Room at
the Sherburne County Government Center, Elk River, Minnesota.
Present were: Mark Stenglein, Paul Ostrow, Steve Billings, Paul McCarron, Lynn George, Ken Paulson,
Dave Saunders, Peter Beberg, John Weaver, Lewis Stark, Walt Fehst, John Hunter, Patrick Cairns, Duane
Cekalla, Carl Yilek, Art Daniels, Jerry Leese, Jerry Goebel, Duane Grandy, John Norgren, Terry Nagorski,
Paul Goenner, Tom Cruikshank, Tom Gamec, Jean Keely, Dick Wolsfeld, Biz Colburn, Dan Meyers, Rick
Nau, Gabe Guevara, Rick Speak, Jim Barton, Jim Dickinson, Cartrell Lipscomb, Elliott Perovich, Scott
Harlicker, Vic Oviatt, John Blaha, Barb Winfield, Robert Kirchner, David Loch, Yvonne Chaillet, Anita
Rasmuson, Jim Norman, Tim Houle, Terry Hendrickson, Susan Anderson, Ken Stevens, Gary Hammer, Bob
Erdich, Paul Nieman, Dan Erhart, Noel Shughart
1. The meeting was called to order at 4:35 p.m.
A motion was made by Mark Stenglein, seconded by Bob Erdrich and carried unanimously to
approve the agenda of April 6, 2000, with the addition of discussion on recent correspondence and
the minutes of April 6, 2000, as presented.
3. Paul McCarron presented an update on current legislative issues.
Tom Gamec, Mayor, and Jim Norman, Administrator, City of Ramsey, reviewed the Ramsey station
rationale in support of a commuter rail station in Ramsey and requested that the NCDA include the
City of Ramsey on its list of proposed stations for further development.
Peter Beberg, Mayor, City of Anoka, reviewed the Anoka 4th Avenue station rationale requesting that
the proposed Anoka 4th Avenue station be kept on the list of proposed stations for further
development.
A motion was made by Steve Billings, Seconded by John Norgren and carried (Steve Billings
abstained) to include the City of Ramsey as a future station site in the Northstar Corridor commuter
rail system.
A motion was made by Steve Billings, seconded by Peter Beberg and carried (Tom Gamec voting
nay) to include the Anoka 44 Avenue station site in the proposed station sites for further
development.
o
Noel Shughart, Mn/DOT, and Dan Meyers, BRW, Inc., presented a summary of findings of the north
and west extension studies (from the City of Rice to Camp Ripley and from downtown St. Cloud to
the City of St. Joseph ). Both studies were conducted by BRW pursuant to a contract with Mn/DOT.
The recommendation of the West Extension Study participants and a preliminary evaluation of the
characteristics of the projected service moderately suggest that a west extension commuter rail
service is a feasible transportation solution.
The recommendation of the North Extension Study participants and a preliminary evaluation of the
characteristics of the projected service strongly suggest that the North Extension commuter rail service is a
feasible transportation solution. Given the strong support for an extension to the North by the study
Page 1
o
o
10.
11.
12.
13.
participants, Mn/DOT will be recommending continuing further study of the North Extension of the Northstar
Corridor commuter rail system.
Summaries of the findings and the results of the respective Advisory Committee meetings were
distributed to the NCDA members. No action taken.
A motion was made by Paul Nieman and seconded by Duane Grandy to approve Resolution #2000-4
requesting MnDOT and NCDA staff and contractors to continue planning efforts for only the North
Extension of the Northstar Corridor commuter rail line from St. Cloud to Camp Ripley. The
Resolution was introduced by Morrison County.
A motion was made by Steve Billings, seconded by John Ellenbacher and carried
unanimously to refer Resolution #2000-4 to the Northstar Corridor Executive Committee.
The Authority reviewed the Second and Third Quarter 2000 Schedule for the NCDA dated May 4,
2000. No action taken.
Tim Yantos updated the Authority on the proposed commuter rail demonstration, which is
tentatively set for Tuesday, August 15, 2000. More information to follow.
Tim Yantos updated the Authority on the application to the Federal Transit Administration (FTA)
to enter preliminary engineering and the Memorandum of Understanding with Mn/DOT.
The Chicago office of the FTA has said the Northstar Corridor project is looking favorable and will
be forwarding their recommendations next week to the Washington, D.C. office. The FTA expects
to complete its review of the preliminary engineering application by the end of May.
Per the Minnesota Attorney General's Office, the Memorandum of Understanding is now an
Agreement and should be referred to as such.
Mn/DOT has been reviewing the Agreement and is currently working out the details regarding
administrative oversight. The NCDA can expect to receive the latest draft of the Agreement within
the next month.
The Conceptual Design Report will be discussed at the June 1, 2000, meeting.
A motion was made by Duane Grandy, seconded by John Norgren, and carried
unanimously to appoint Tim Yantos to serve on the Project Management Team of the Red Rock
Corridor.
The next meeting of the Northstar Corridor Development Authority is scheduled
for Thursday, June 1, 2000, at 4:30 p.m. at the Sherbume County Government Center.
The meeting was adjourned at 6:40 p.m.
Betsy Wergin Chairperson
Date
Page 2
NORTH TAR
Agenda Item #2a
MEMORANDUM
May 25, 2000
To:
From:
Subject:
NCDA
Executive Committee
Terminus Station Selection/Resolution 2000-4
As requested by the NCDA at its last meeting, the Executive Committee considered
proposed Resolution #2000-4 relating to the north extension of the Northstar Corridor.
The Committee determined that the decision on the extension should be made in light of
the criteria set forth in the NCDA's Policy on Extensi.ons of the Northstar Corridor,
adopted September 27, 1999. This policy also applies to the decision on the terminus
station (downtown St. Cloud or Rice). Thus, the Executive Committee directed the
Project Management Team to prepare a technical analysis evaluating both the terminus
station and the potential extension of the Northstar Corridor. The PMT will present its
analysis and a draft resolution based on the findings of the evaluation at the June 1
NCDA meeting. Also attached please find correspondence from Stearns County
regarding the downtown St. Cloud station.
Action Requested: Consideration of terminus station and future extension of the
Northstar Corridor.
Attachment A.
Attachment B.
Attachment C.
Draft Resolution #2000-4
Policy on Extension
Stearns County Correspondence
Northstar Corridor Development Authority
2100 3® Avenue, Anoka, Minnesota 55303-2265 (612) 323-5700 Fax: (612) 323-5682
RESOLUTION ~
TO CONTINUE PLANNING EFFORTS FOR A NORTH EXTENSION
OF THE NORTHSTAR CORRIDOR
WHEREAS,
WHEREAS,
WHERF. AS,
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
WHEI~AS,
the Minnesota Legislature authorized MnDOT to conduct two studies to
determine the feasibility of extending the Northstar commuter rail service. The
first study, referred to as the North Extension study, studied extending the
Northstar Corridor from its originally planned terminus in Rice/East St. Cloud to
Camp Riptey. '['he second study, referred to as the West Extension study, studied
extendhag the Northstar Corridor through St. Cloud to St. Joseph; and,
the Northstar Corridor hits received and reviewed the feasibility reports, prepared
by MnDOT, for both the North Extension and the West Extension to the Northstar
Corridor; and,
the feasibility reports indicate that ridership forecasts are higher for the North
Extension; and,
the feasibility reports indicate that capital cost estimates are lower for the North
Extension; and,
a screening level analysis of environmental and social factors shows that there
would be no major impacts within the North Extension Study area; and,
the projected per-mile capital and operating costs, ridership Ievels, and per
passenger operating costs which have been calculated to date indicate that the
North Extension commuter rail service would fall well within the cost and
pertbrmance range of other, comparable new commuter rail services nationwide;
and,
preliminary evaluation of these characteristics of the projected service by BRW
"strongly suggests that the North Extension commuter rail service is a feasible
transportation solution" while the West Extension is determined by BRW to be
only "moderately feasible;" and,
Community support for the extension of the Northstar Corridor within the North
Extension service area is substantially higher than within the West Extension
service area as evidenced by vastly different levels of community participation in
the Public Involvement portion of the feasibility study in the two Extension areas;
and,
funding to begin an Alternatives Analysis for the North Extension continues to
move tot-ward at both the state mad federal level, while there is no legislation even
proposed to continue studying the West Extension, indicating legislative intent to
MAY-
8-00 M0N 1'36
PM SHERBURNE COUNTY
FAX NO. 6122412707
Po
continue studying the North Extension, but not the West Extension; and,
WIIEREA$,
in order for the Northstar Corridor Development Authority. to continue the
engineering process for the originally designated corridor from Minneapolis to St.
Cloud, a decision needs to be made soon as to in which direction the terminus
must be planned; and,
~3fI--IE~AS,
Mordson and Benton County, along with the Morrison County Regional Rail
Authority have consistently shown their determined support for extending the
Northstar Corridor along the North Extension not only by their membership in the
Norfl-mtar Corridor Development Authority, but also by their tireless efforts
publicly and legislatively in support of the entire project; and,
WtlEREAS,
Congressman Oberstar has indicated his support for extending the service to
Camp Ripley and while the current feasibility report indicates the capital and
operating costs of doing ~o, the ridership estimates do not yet include any
estimates of potential riders due to military or civilian training activities which
routinely take place at Camp Ripley and, which when properly accounted for,
could substantially incre~e the ridership and revenue within the North Extension
area, especially on weekends when the entire line is underutilized; and,
NOW THEREFORE, BE IT RESOLVED:
The Northstar Corridor Development Authority hereby requests MnDOT continue
pl~hming efforts for ~ the North Extension of the Northstar Corridor commuter
rail line from St. Cloud to Camp Ripley.
BE IT FURTHER RESOLVED:
Staff and contractors to the Northstar Corridor Development Authorit,j are hereby
instructed to continue planning efforts ~ on ~e North Extension of the
Northstar Corridor commuter rail line from' St. Cloud to Camp Ripley.
Adopted this _..~ dayof .~c~ ,2000:
NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY
Betsy Wergin. Chair
Date:
To:
From:
Subject:
Agenda Item #3a
September 24, 1998
Northstar Corridor Development Authority Executive Committee
Executive Committee
Policy on Extensions of the Northstar Corridor
Backqround
The Northstar Corridor is defined in State and federal legislation as linking downtown
Minneapolis to the St. Cloud area. In response to a request from Benton County, the NCDA
agreed to include the City of Rice as a part of the study area for the Major Investment Study.
The NCDA further agreed, at its last meeting, to include in its current study the assessment
of the feasibility of commuter rail in St. Cloud. Mn/DOT has offered to pay for the additional
costs associated with the western extension of the Corridor. Morrison County has submitted
a resolution requesting a station in Little Falls and supporting the station in Rice if such an
extension is not feasible. At its meeting on September 17, the Executive Committee discussed
elements of a draft policy on extensions of the Northstar Corridor and recommends that the
NCDA adopt the following policy.
Proposed Policy
The NCDA will evaluate the initial terminus and future extensions of the Northstar Corridor
using the following criteria:
· Estimated Ridership
· Capital Cost
· Operating Cost
· Environmental Impact
· Station Site Availability
· Station Area Access
· Economic Development Potential
· Railway Operating Impact
· Community and Governmental Support
· Future Expansion Potential
Given the limited resources of the NCDA, the governmental unit requesting the evaluation
should secure the funding needed to conduct the evaluation. The NCDA will conduct the
evaluation of the extension as soon as the NCDA deems it feasible and appropriate in light of
its work on the initial segment of the Corridor.
Action Requested: ApprOval.
STEARNS COU'NTY ADMIN./HUMAN RES, NO. 572 P. 2
COUNTY OF STEARNS
Administration Center Rm 121 · 7135 Courthouse Square St. Cloud, MN 56303
320-656-3601-Fax 320-656-6393
May 18, 2000
Mr. David Loch
6834 Majesta Lane
Lake Shore, MN 56468
Dear Dave:
At their most recent Board meeting on May 16, Stearns Conmy Commi~ioncrs discussed
published reports of polL~wfial St. Cloud train station sites for the Northstar Corridor Project.
Although our Board took no form_al action, several key members expressed the/.r concern
regarding a proposed downtown site un_'_l!~ng property currendy owned by Stearns County. The
follovoxg is a mrmmary of a few of these concerns.
The location sited on the map published in the St. Cloud Times is configured iu a way that is
not conducive to locating both a station and a parking facflLry. Alternatively, locating a station
on the site and a parking facility across the street conflicts with the. City aM county's future
ma.qter plans for Law Enforcemeat Center building expansion.
Several comssioners questioned the wisdom of locating a parking facility so far north and
west of the heart of downtown. Such a facility would be almost useless to downtown
customers as well as County customers. Downtown employees would also likely find the site
to be less than d~sirable.
The location of a downtown station with adjacent downtown ramp parking appears to be less
des[table to Stearns Connty residents th, g the east side alternative. Given a choice between
fighting downtown traffic or crossing the Mississippi bridge to a surface lot adjacent to the
train station, our commissioners sense that its constituents would prefer r_he latmr.
Given Board members comments, I suspect the Steams County Board would be a more active
supporter of the entire Northstar Corridor Project should a suitable stat/on site be locamd on
the east side of the river. They would likely become active opponents should a station be
loca~d downtown.
"Affirmative Action / Equal Opportunity Employer"
,,,ay ,~, ~.~ ~ ~ :;,.o ~a:: ,rom: ..;ave a ~o ,,ocn I-ax ~: 21~:~bt~/U Page 3 of 3
MAY. 19. 2000 7:56AM STEARNS COUNTY ADM[N,/HUMAN RES.
N0.572
P, 3
Mr. David Loch
May 18, 2000
Page 2
It should be noted that Steams County Board members agree with those who recogni?e the major
problems associated with a lack of customer artrl employee parking downtown. They coxxeur wi~
· e view tlmt intergovernmental cooperation is needed to address the problem. However, they do
not agree that ble~d~ng a train station with an additional parkiJag ramp, suitably addresses either the
location or parldng issue. The location of a train station should emourage citizens to ride the
Northstar commuter trairt, not create obstacles to its use.
Sincerely,
George M. Rindelaub
Connty Admflfislxator
NO T TAR
Agenda Item 2b
MEMORANDUM
May 25, 2000
To:
From:
Subject:
Northstar Corridor Development Authority
Executive Committee
Amendment No. 2 to the Shandwick Contract
At the May 18, 2000 Executive Committee meeting, the Administrative Team requested
a contract amendment for Shandwick, the public information/public involvement
contractor to the NCDA, in the amount of $131,128.65.
The purpose of the amendment is two-fold. First, $31,128.65 will be used to cover the
excess costs relating to the direct mailing. Of this amount, the 2000 budget provides for
$15,000. Consequently, the Administrative Team is requesting a budget amendment of
$16,128.65, the difference between the budgeted amount ($85,000) and the a(}tual cost
($101,128.65).
Direct Mail
Budget
85,000
Actual Cost
101,128.65
IBudgetAmendment
$16,128.65
Second, $100,000 will be used to provide additional services as described below. Of
this amount, the 2000 budget provides for $75,000. Consequently, the Administrative
Team is also requesting a budget amendment of $25,000 in addition to the approved
budget of $75,000. The additional services to be provided by Shandwick include:
Public Information Activities:
Maintain Image Library
Project Updates
Newsletters (2)
Web site Coordination/Maintenance
Monitor News Coverage
Information Kit
Media Alerts/News Releases
Media Relations
Northstar Corridor Development Authority
2100 3'd Avenue, Anoka, Minnesota 55303-2265 (612) 323-5700 Fax: (612) 323-5682
Public Involvement Activities: ;> Coordinate Business Plan
> Promotion for Public Meetings
2000 Budget Budget Amendment Contract
Amendment
Direct Mail $85,000.00 $16,128.65 $ 31,128.65
Shandwick $75,000.00 $25,000.00 $100,000.00
Contract
Amendment #2
Total $37,931.64 $131,128.65
Note: There are sufficient funds in the NCDA contingency fund to cover the proposed
budget amendment.
At its May 18, 2000 meeting, the Executive Committee voted to recommend to the
NCDA that it approve the budget amendment of $16,128.65 and the contract
amendment of $31,128.65 to cover the additional costs related to the direct mailing in
February. The Executive Committee referred the decision on the $25,000 budget
amendment and the $100,000 contract amendment to the NCDA. The Executive
Committee also appointed a task force, comprising Steve Billings, Rick Speak, and Paul
McCarron, to meet with Shandwick to discuss Committee concerns.
Action Requested: That the NCDA approve a budget amendment of $16,128.65 and a
contract amendment in the amount of $31,128.65 to cover excess costs related to the
direct mailing in February 2000.
The Executive Committee requests, with no recommendation, that the NCDA consider a
budget amendment in the amount of $25,000 and an amendment to the Shandwick
contract in the amount of $100,000 for the above described services.
NORTH TAR
Agenda Item 2b
MEMORANDUM
May 30, 2000
To:
From:
Subject:
Northstar Corridor Development Authority
Executive Committee, public information task force
Amendment to the Shandwick Contract
In consideration of the proposed contract amendment for Shandwick professional services for
the remainder of 2000, the Executive Committee established a task force comprised of Paul
McCarron, Steve Billings and Rick Speak to address performance issues with the Shandwick
contract. The task force identified three areas of concern with regard to performance, including
1 ) project management, 2) quality assurance, 3) political sensitivity. The task force has directed
staff to work with Shandwick to address its performance in these problem areas. The task force
will review Shandwick's performance in early August, and recommend at the September
meeting of the NCDA to either extend Shandwick's contract for the remainder of the year, or to
procure a new public information/public involvement firm.
Given these conditions, the task force recommends a contract amendment for Shandwick in the
amount of $57,000 for additional services for the period of June through September, as
described below.
Public
Information Activities:
Maintain Image Library
Project Updates
Newsletter
Website Coordination/Maintenance
Monitor News Coverage
Information Kit
Media Alerts/News Releases
Media Relations
Public
Involvement Activities:
Coordinate Business Plan
Promotion for Public Meetings
Action Reo_uested: That the NCDA authorize the chair to execute the amendment to the
Shandwick contract in the amount of $57,000 for the services described above.
Northstar Corridor Development Authority
2100 3'~' Avenue, Anoka, Minnesota 55303-2265 (612) 323-5700 Fax: (612) 323-5682
Agenda Item 2c
MEMORANDUM
May 25, 2000
To:
Northstar Corridor Development Authority
From:
Executive Committee
Subject:
Appointments to the Central Corridor Coordinating Committee
(information item)
The Ramsey County Regional Railroad Authority invited the NCDA to appoint a non-
voting representative and an alternate to attend Central Corridor Coordinating
Committee meetings of the Central Corridor Transit Study. The Coordinating
Committee will be discussing and making recommendations on commuter rail and will
serve as a policy group on light rail and bus decisions for the corridor work.
The Executive Committee approved the appointments of Mark Stenglein to serve as the
NCDA non-voting representative on the Coordinating Committee and Paul Ostrow to
serve as the alternate.
Northstar Corridor Development Authority
2100 3'd Avenue, Anoka, Minnesota 55303-2265 (612) 323-5700 Fax: (612) 323-5682
Ramsey County Regional Railroad Authority
665 Ramsey County Government Center-West, 50 West Kellogg Boulevard
St. Paul, Minnesota 55102 (651) 266-2760 / FAX (651) 266-2761
April 25, 2000
Commissioner Betsy Wergin, Chair
Northstar Corridor Development Authority
Sherbume County Government Center
13880 Highway 10
Elk Kiver, M2q 55330
,; ,APR27 20o0
ADi¥';ii,~.L ,'RATOR'S OFFIC[
Dear Chair Wergin:
Ramsey County Regional Railroad Authority is beginning work on the Central Corridor Transit
Study. As part of that project, we will be considering commuter rail, buses and light rail transit
for the corridor.
Legislation enacted in 1999 requires establishment of a Commuter Rail Coordinating Committee
to advise the Commissioner of Transportation on issues relating to alternatives analysis,
environmental review, advanced corridor planning, preliminary engineering, final design,
implementation method, construction of commuter rail, public involvement, land use, service and
safety. The membership for the Central Corridor Coordinating Committee includes each
significant funding panner, each county and city in the area where the line or lines are located,
Metropolitan Council and the University of Minnesota. This group will be discussing and
making recommendations on commuter rail and als6 will be a policy group on light rail and bus
decisions for the corridor work. We invite the Northstar Corridor Development Authority to
appoint a nonvoting representative and an alternate to attend Central Corridor Coordinating
Committee meetings of the Central Corridor Transit .Study: We expect that appointments to this
group will be elected and appointed officials. Tim Yantos has been invited to serve on the Project
Management Team, a staffgroup that will assist with the study.
We anticipate beginning meetings of the Cent-al Corridor Cc~rdinating Committee in May.
Please let Kathy DeSpiegelaere know your choices. She can be reaChed at 651-266-2762.
Sincerely,
CC:
Commissioner Paul McCarron
Tim Yantos
Primed on Recycled Paper
Executive Committee:
Betsy Wergin, NCDA Chaiz
Sherburne County
Paul Os[row, NCDA Vice Chair
City of Mi~meapolis
Paul NlcCarron
Anoka County
Mark Stenglein
Hennepin County Regional
Railroad Authority
Steve Billings
City of Fndley
Lewis Staxk
t laven Townslup
June 1,2000
MEMO TO: Northstar Corridor Development Authority Board
FROM:
Northstar Corridor Development Authority Project Management Team
SUBJECT: Northstar Northerly Terminus Evaluation
Staff has reviewed the optional westerly (downtown St. Cloud) and northerly (Rice)
terminus station locations. The evaluation used criteria adopted by the Northstar
Corridor Development Authority on September 24, 1998.
The attached evaluation matrix strongly supports a northerly terminus at Rice. The
Project Management Team therefore, recommends continued evaluation of a northerly
terminus at the City of Rice and elimination of further consideration of a westerly
extension to downtown St. Cloud. Further staff recommends that the NCDA support
Morrison County and MnDOT's continued planning efforts for the north extension of the
Northstar Corridor commuter rail service from Rice to Camp Ripley.
Action Requested: Consideration of Resolution 2000-4.
TY:sc
Attachments
Northstar Corridor Development Authority
2100 3~d Avenue. Anoka, Minnesota 55303-2265 (612) 323-5700
Website: northstartrain.org
Fax: (612) 323-5682
NORTH TAR
MEMORANDUM
May 25, 2000
To:
From:
Subject:
Interested Parties
Northstar Corridor Development Authority
Station Area Planning
The Northstar Corridor Development Authority (NCDA), in anticipation of its proposed
commuter rail service between Minneapolis and Rice, Minnesota, recently solicited the
services of a consulting team to look at station area planning opportunities, in particular,
those regarding Transit-oriented Development (TOD), at the station stops along the
corridor. The selected consulting team consists of IBI Group, Irvine, California
(Transportation Planners and TOD specialists), Hoisington Koegler Group Inc.,
Minneapolis, Minnesota (Land Use Planners and Landscape Architects), and ZHA Inc.,
Annapolis, Maryland (Economic Feasibility and Market Analysts).
Consistent with their submitted work program, the consultants have requested the first
of two Corridor Workshops, regarding TOD initiatives, to be held at the Anoka County
Government Center, on June 7, 2000, from 1:30 p'.m. to 4:30 p.m. We request your
attendance to share TOD opportunities with you as they relate to your planning
jurisdiction and to gain your knowledge and perspective regarding 'Issues and
Opportunities' for this very exciting project.
Please invite other staff members you feel would benefit from the discussion or may
provide information to the consulting team, and please RSVP to Yvonne Chaillet,
Richardson Richter & Associates, 651-222-7227.
We look forward to seeing you on June 7, 2000.
Northstar Corridor Development Authority
2100 3'" Avenue, Anoka. Minnesota 55303-2265 (612) 323-5700 Fax: (612) 323-5682
NORTHSTAR
MEMORANDUM
June 8,2000
To:
From:
Subject:
Northstar Corridor Development·Authority
Administrative Team
Star Tdbune Editorial - Sunday, June 4, 2000
Enclosed for your information and reading pleasure is a copy of the editorial
"Northstar commuter rail still on track," which appeared in the June 4, 2000
Sunday edition of the Star Tribune. The editorial portrays the Northstar Corridor
commuter rail project as a worthy project that is proceeding as planned, despite
the recent funding setback in the Legislature. "[It] holds the promise of
expanding transportation and lifestyle choices for thousands of Min .nes. otans."
Read and enjoy!
Northstar Corridor Development Authority
2100 3'" Avenue. Anoka, Minnesota 55303-2265 (612) 323-5700 Fax: (612) 323-5682
Northstar
.Commuter rail still on track
"Weary commuters who frequent the
metro area's northwestern reaches
won't b~ surprised to learn that traffic
has doubled since the early '90s along
Interstate Hwy. 94 and Hwy. 10.
... Indeed, the number of trips, miles
ariven and cars-per-household have
far outpaced even the rapid popula-
tion growth of Sherburne, Wright and
Anoka counties-- a commentary, per-
haps, 'on the behind-the-wheel life-
style of modern suburbia People are
driving more and enjoying it less.
.. That's why it's good news that the
Northstar commuter-rail project con-
tinues to glide quietly toward its inau-
gural run in late 2003. While the Hia,'
watha light-rail line drew ferocious op-
. position, Northstar has enjoyed a rela-
· tively low profile.
During the final days of the legisla-
tive session, House Republicans did
succeed in restricting the transporta-
tion commissioner's flexibility to fur-
ther advance Northstar without the
~.egislature's specific consent. State
and local officials are still examining
the implications of this change, but
'don't think it necessarily means a de-
lay or an increase in the project's $223
million cost."
:. Generally, Northstar has succeeded
~ building a broad constituency of gov-
ernment and business leaders.
Medtronic Inc., for. example, in a letter
'to the governor, cited the "tremendous
benefit" of both Northstar and Hiawa-
tha in its decision to stay in the region
· and build a new headquarters in Fridley.
The public, too, seems eager to give
the rails a try -- or hope their neigh-
bors do. A telephone survey by the
Northstar Corridor Development Au-
thority found three-quarters of those
living within five miles of the Minne-
~.polis-St. Cloud corridor favoring the
proposed Commuter trains.
0~ Such trains already operate on more
'/hah 6,000 miles of [rack in 10 states.
The most extensive systems are in and
around New York, Boston, Philadel-
phia, Washington-Baltimore, Chicago,
San Francisco-San lose and Los Ange-
les-San Diego. Ridership nationwide
has risen by a third since 1980.
These trains are substantially differ-
ent [rom the light-rail version. Think
of IRT as a souped-up electric street-
car nmning every seven, minutes in an
urban setting, stopping every six
blocks. Think of commuter rail as a
diesel-powered string of double-deck-
er cars running only during rush hour,
but extending 70 or 80 miles into the
countryside on existing freight tracks
-and stopping every five miles.
Both versions have the potential to
arrest sprawl by encouraging a mix of
compact residential and commercial
development around stations. Indeed,
over the next decade, Northstar may
considerably influence the flavor of
towns like Clear Lake, Becket, Big Lake
and Ramsey as they become gathering
points for commuters.
Initially, 9,300 riders are expected
on eight morning and eight evening
Northstar trains equipped with work
tables and power outlets.
Obviously, every new train rider
takes another car off the freeways.
While motorists may not notice the
extra space, Northstar holds the po-
tential of restraining the enormous de-
mands [or expanding Hwys. 94, 10 and
101 in the coming decades. The cost o£
adding lanes on those roadways plus
building 14 proposed new interchanges
on 1-94 could run into the billions.
"The great'advantage of commuter
rail is that it uses existing irdrastruc-
ture that's not being fully used," said
Anoka County Commissioner Paul
McCarron. He referred to the sharing
of tracks owned by the freight-hauling
Burlington Northern Santa Fe.
Northstar is a worthy project. With
similar lines planned to reach Has-
tings and Northfield, commuter rail
holds the promise of expanding trans-
portation and lifes~le choices for
thousands of Minnesotans.