Loading...
4.2.A. SR 07-10-2000Item~4.2.A Howard R, Green Company CONSULTING ENGINEERS July 5, 2000 File: 808200-0060 The Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: MAIN STREET IMPROVEMENT PROJECT CONSTRUCTION BIDS CITY OF ELK RIVER, MINNESOTA Dear Council Members: We will be opening construction bids for the Main Street Improvements from CSAH 13 west to the railroad tracks on Friday, July 7th, 2000. AS you are aware, this is the project that improves Main Street near the Elk River Crossing development, along with some water main construction and an overlay from Carson Avenue to the railroad tracks. We will have the bids tabulated and ready to present to the City Council at your meeting on July 10th, 2000. Sincerely, Howard R. Green Company Terry J.'Maurer, P.E. TJM/mjw Ltr-070500-MayorCouncil--Bids.doc 1326 Energy Park Drive · St. Paul, MN 55108 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Howard R. Green Oompany QQNSULTING ENGINEERS July 10, 2000 File: 808200J-0060 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: MAIN STREET CONSTRUCTION BIDS Dear Council Members: Last Friday, July 7, 2000, we opened bids for the improvements on Main Street between CSAH 13 and the railroad tracks. As you are aware, this project includes road improvements necessary for Elk River Crossing, watermain improvements requested by the Elk River Municipal Utilities, and an overlay of Main Street between Carson Street and the railroad tracks. There were a total of four bidders. The following list provides the bidders' names and total bids: Hardrives, Inc. Bauerly Bros., Inc. North Valley Inc. Forest Lake Contracting, Inc. $847,023.37 859,859.66 882,214.62 954,057.95 Further analysis of the Iow bid submitted by Hardrives, Inc., indicates that of the total bid, approximately $312,250 is attributable to the watermain requested by the Elk River Municipal Utilities. Approximately $62,100 is attributable to the overlay of Main Street between Carson Street and the railroad tracks, and approximately $28,750 is attributable to a left turn lane into the Earl Hohlen property on the west side of TH 169. That leaves approximately $444,000 associated with the improvements necessary for Elk River Crossing. One additional note regarding the improvements necessary for Elk River Crossing, the signal work at the Main Street and TH 169 and Main Street and CSAH 13 intersections will be bid as a separate contract. This project will be entirely the responsibility of the developers of Elk River Crossing. We would recommend award to Hardrives, Inc., as the lowest responsible bidder. The award should be conditioned on two items. First is approval by Elk River Municipal Utilities of the watermain component of the project and agreement to pay for their share. The second condition should be that the developers of Elk River Crossing place with the City an amount equal to their construction costs plus field engineering overhead. Field engineering overhead should be approximately 10% of the total construction cost. Ltr 7-10-00 bid results 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toil free 888/368-4389