Loading...
6.8. SR 07-17-2000'ity of Item # 6.8. MEMORANDUM Mayor and City Council Michele McPherso irector of Planning TO: FROM: DATE: July 12, 2000 SUBJECT: Case Number: P 00-1 Request by Floyd Kruse and Les Lundquist for Preliminary and Final Plat, K & L Addition; Public Hearing Request The applicants request approval of a preliminary plat for 17 lots (Ultimate Plan) with nine lots in Phase 1 final plat. Location Northeast Corner of Highway 10 and 173ra Avenue Zoning/Land Use C3 (Highway Commercial)/HB (Highway Business) Attachments · Location Map · Preliminary Plat (Phase 1) · Preliminary Plat (Ultimate) · Final Plat · Memo from the City Engineer · Resolution No 00- Overview Staff has been working with the applicants since the first of the year on this project. Mr. Lundquist is the owner of proposed Lots 9-13, Block 1, and Mr. Kruse is the owner of the area encompassed by proposed Lots 1-8, Block I as well as the Vance Street right of way and a portion of proposed Lot 1, Block 2. The purpose of the proposed plat is to prepare lots for sale now that utilities are available to the area. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Memotothe Planning Commission/P 00-1 June 22,2000 Page 2 The preliminary plat also includes Back to the 50's, Deano's, and Dehn's All Season. As these properties are unplatted, platting would have been required if expansion, redevelopment, or connection to utilities would have occurred. The only property owner not participating at this time is the owner of Atlas Pet Foods (Mr. Szurek). He is not in a position financially to participate and sees no benefit to him to participate at this time. Analysis Existing Conditions The area to be platted includes seven buildings and vacant land. The vacant land totals approximately 50% of the area to be platted. The land is bounded by Highway 10 on the west, 173rd Avenue on the south, the railroad tracks on the east, and additional land on the north. In general, the land is flat, but slopes from northwest to southeast. Proposed Plat Configuration The Ultimate Plan consists of 17 lots ranging from one acre (minimum lot area in C3, Highway Commercial) to 2.58 acres in size (Deano's). Deano's desires to expand, so they are acquiring approximately one acre from Mr. Kruse and that is reflected in the size of Lot 1, Block 2, K & L Addition. Also included in the Ultimate Plan is right of way dedicated for Vance Street/174th Avenue. Additional right of way will be needed from Atlas Pet Food to complete this connection in the future. It is unknown at this time when that might occur. Phase 1 consists of eight lots and approximately 600 feet of Vance Street right of way. All of the proposed lots meet, on paper, the minimum lot area of one acre, with 100 feet of lot width. Upon closer examination, however, some of the lots have less than an acre of buildable area due to slope constraints or easement encroachments. These lots include Lot 1 and 4, Block 1. It is possible that in the future some lots will be combined. All of the vacant lots will meet the setback requirements. However, due to the location of existing buildings on existing unplatted lots, not all buildings meet the setback requirements. Wherever possible, however, the setbacks for existing buildings are met. Access Vance Street and 173rd Avenue will provide access to the new lots. Existing buildings like Back to the 50's and Deano's will continue to have their current access points. Vance Street will end in a cul-de-sac complying with the City requirements. Grading and Drainage The City Engineer has addressed these issues in his memo (attached). Phase 1 provides adequate ponding, however, the Ultimate Plan needs additional work to properly address the grading and drainage requirements of the City. A common drainage pond is proposed that would service all lots. Drainage calculations are also required to be submitted. Memotothe Planning Commission/P 00-1 June 22,2000 Page 3 Utilities The City Engineer addresses utilities in his memo. extended as part of this development. Utilities are proposed to be Park Dedication As this is a commercial plat, the Park and Recreation Commission recommended cash dedication for this plat. Park dedication will be determined by the number of lots platted in the final plat. As no park dedication has been collected previously, all platted lots will be required to pay park dedication at the rate required at the time of final plat (currently $3,000 per acre). Zoning Currently, the entire parcel is zoned C3, Highway Commercial. It may be more appropriate, due to the lack of visibility from Highway 10, to rezone Lots 1-10, Block 1, to Light Industrial. The City lacks an inventory of small industrial lots for small industrial users. A rezoning is not required nor is it being requested, however. As lots are developed, they will be evaluated either through Site Plan Review (permitted uses) or as conditional uses. Planning Commission Action The Planning Commission conducted a public hearing at its June 27, 2000 meeting. Mr. Tom Price, adjacent property owner to the north, inquired as to any impacts this plat may have on his property. There are no impacts to the property to the north; access will be provided by the service road along Highway 10, and utilities are available for the property. No one spoke for or against the proposal. Recommendation Staff recommends that the City Council approve the request for preliminary plat of K & L Addition with the following conditions: A DEVELOPERS AGREEMENT BE PREPARED AND EXECUTED OUTLINING THE TERMS AND CONDITIONS OF THE DEVELOPMENT PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. 2. ALL OF THE CITY ENGINEER'S COMMENTS BE ADDRESSED. PARK DEDICATION FEES IN THE AMOUNT REQUIRED BY THE CITY BE PAID PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. Memo to the Planning Commission/P 00-1 June 22, 2000 Page 4 STORMWATER MANAGEMENT FEES IN THE AMOUNT REQUIRED BY THE CITY BE PAID PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. STREET LIGHTS AS REQUIRED BY ELK RIVER UTILITIES BE INSTALLED. A SEALCOAT FEE IN THE AMOUNT DETERMINED BY THE CITY BE PAID PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. Final Plat The applicant requests final plat approval for Lots 1-4, Block 1, and Lots 1-4, Block 2, and Outlot A, K & L Addition. The final plat also provides right of way for both 173rd Avenue and Vance Street. The proposed lots meet the minimum lot area for the C3, Highway Commercial zoning district. Staff recommends that the City Council approve final plat of K & L addition with the following conditions: A DEVELOPERS AGREEMENT BE PREPARED AND EXECUTED OUTLINING THE TERMS AND CONDITIONS OF THE DEVELOPMENT PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. 2. ALL OF THE CITY ENGINEER'S COMMENTS BE ADDRESSED. 3. PARK DEDICATION FEES IN THE AMOUNT REQUIRED BY THE CITY BE PAID PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. 4. STORMWATER MANAGEMENT FEES IN THE AMOUNT REQUIRED BY THE CITY BE PAID PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. 5. STREET LIGHTS AS REQUIRED BY ELK RIVER UTILITIES BE INSTALLED. 6. A SEALCOAT FEE IN THE AMOUNT DETERMINED BY THE CITY BE PAID PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. O~ p~K LOCATION 174.'~H 173RD 172N0 1715T 17o~-J. City of :0 13065 Orono Parkway · P.O. Box 490 Elk River, MN 55330 LOCATION ~ MAP ~, CASE: P 00-1 " Howard R, Green Company QONSULTING ENGINEERS June 19, 2000 File: 809020J-0240 Ms. Michele McPherson Director of Planning City of Elk River 13065 Orono Parkway Elk River, Minnesota 55330 RE: K&L ADDITION CITY OF ELK RIVER Dear Ms. McPherson: We have reviewed the submittal package for the K&L Addition. As you are aware, this is a proposed plat just north of 173r~ Avenue between Trunk Highway (TH) 10 and the Burlington Northern Railway. The submittal package was prepared by John Oliver and Associates and consisted of a Phase I three-page plan set and an Ultimate 3-page plan set. The three pages in each set plan consisted of a preliminary plat, preliminary grading plan, and preliminary utility plan. Based on our review, we would offer the following comments: Preliminary Plat 1. The Phase I preliminary plat consists of platting the Back to the 50's Restaurant, Dean's Four Seasons, and Deano's Collision Center, along with Vance Street and four lots between Vance Street and the railroad tracks. The Ultimate preliminary plat includes an additional nine lots along Vance Street/174th Avenue, including the Riverview Sports Area. The APS property is excluded from both the Phase I and Ultimate preliminary plats. It will be necessary, however, in the Ultimate scenario to acquire a small piece of property to extend the street out to TH 10. 2. Both preliminary plats should provide drainage and utility easements along the created lot lines of the existing businesses. 3. There are two gas lines which cross Lot 1 in the southeast corner. The gas line company easement should be shown on both plats. 4. Lot 4 Block 1 in the Phase I scenario is exactly one acre in size; however, the grading plan shows that approximately 15% of the lot is used for a retention pond. 5. In the Phase I scenario, there are sanitary sewer and water main, a temporary cul-de-sac, and the retention pond outside of the platted area. There will need to be an easement provided for the construction of these improvements. O:\PROJ\809020J\Ltr-061900-McPherson.doc 1326 Energy Park Drive · St. Paul, MN 55108 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389 o ADDITION I ~ ~ ~ ~¢~ ~. pi ....... po~ wos prepored by me DATE; 4//24Z00 NO. DATE DESCRIPTION thor I om ~ duly Licensed Lond ~¢ ~o~e ~e~e Su~eyor under the tows of the DRAWN BY; BJC DWO: 1PP~? D~te: 4/24/00 Reg, No, 21729 N. LiNE OF THE g. I/2 OF THE SW I/4 OF SEC. 2 --~ ..... ~. E C E P I 0 N k.. "' [] 1 41 \ , LINE O~ THE SW V4 OF SEC. 2 I"OVCO mUC~ ~1 T. w. ~ azcmc ~ LEGAL DESCRIPTION THAT PART OF THE SOUTH HALF OF THE SOUTHWEST QUARTER THAT LIES NORTHEASTERLY OF THE NORTHEASTERLY ~GHT-OF-WAY OF U.S. HIGHWAY NO. lO ANO SOUTHWESTERLY OF THE RAILROAD RIGHT-OF-WAY BEING IN SECTION 2, TOWNSHIP 32, RANGE 26, SHERBURNE COONTY, MINNESOTA- EXCEPT THE NORTH t00 FEET THEREOF. SL~JECT TO THE TOWN ROAD (173RD AVENUE N.W.) 0 SCALE lO0 200 30O Drainage and Utility Easements shown thus: Being I0 feet In width and ad~oining right- of-way Ii~es, unless otherwise ~ndlcated, also being 5 feet in width and ad~olning lot lines. TOTAL PLAT AREA: 24.14 Ac.% HUMBER OF LOTS : 18 EXISTING ZONING: C-3 PROPOSED ZONING: MINIMUM LOT SIZE: 1.0 Ac. MIN, LOT WIDTH : 100 FT BE3~ICHMARK: TRIPLE SPIKE SET IN NORTH FACE OF POWER POLE. SECOND POWER POLE EAST OFHIGHWAYt0, SOUTH SIDE OF 173RD AVENUE. ELEVATION = 886.42 SETBACKS Front: 25 FT. Side: 20 FT. Rear: 40 FT. 0 Denotea I/2 inch x 14 inch iron pipe with plastic plug stamped R.L.S. 21729 · Denotes a found iron pipe. MAJOROWNERS & DEVELOPERS Les Lundquist FToyd Kruse cio RIver~ew Sparf$ ~ MarineP.O. Box 3l~,~ 17445 Highway /0 Monticello, MN 55362 ETk River, MN 55J30 612-878-4449 ~H) 612-441-t799 612-Z71-3025 (W) 5URVEYOt?$ & ENGINEERS John Oliver & Asaociate$, /nc. 580 Dodge A~enue Elk River, Mn. 55330 612-441--2072 SHEET NO. K AND L ADDITION N. LINE OF THE 5. I/2 ~ THE SW ~t c, X C E P T ! ~ .... N8,9'4~'2'6'£ 717.59 \ \ JJ5.77 173RD A VENUE NW. 245,00 ~ .... N~9*$7'2,5"E 1252.56 .... \ \ ~ s. UNE OF THE SW I/4 OF SEC. 2 265.08 N89°J7'2J'E 50~.08 59L4J City Of Elk River Sherburne County, MN 0 I00 200 500 SCALE IN FEET lINCH = 100 FEET Drainage and Utility Easements shown thus: 13eing I0 feet in width and adjoining right- of-way lines, un~e@s otherwise indicated, also being 5 feet in width and adjoining lot lines, unless otherwise indicated, as shown on the plat. For the purposes of this plat, the South line of the Southwest I/4 of Section 2. Township 32, Range 26 is assumed to bear NBg°57'25"E. 0 Denotes iron pipe set. Denotes t/2 inch x 14 inch iron pipe with plastic plug stomped R,L.S. 21729 to be set within I year of recording this plot. · Denotes a found iron pipe. DATE RECEIVED ll.c o. _ Ms. McPherson June 19, 2000 Page 2 Preliminary Grading Plan 1. Lot I Block 1 has relatively steep access off 173rd Avenue, is only one acre in size, and a portion of the southeast corner of the lot is occupied by an existing gas line easement. We question whether or not this lot is buildable. 2. In the Phase I condition, a large retention pond is proposed to hold the storm water runoff. This pond has no outlet and will operate through infiltration. No drainage calculations have been provided at this time. The side slopes on this pond must be 4:1 or flatter or the pond needs to be fenced. o In the Ultimate scenario, the pond is reduced substantially in size and an outlet is shown under the railroad tracks to the City ditch on the east side of the tracks. It is acceptable to provide an outlet under the tracks; however, a pond must be provided prior to outletting that handles both the sediment control for the entire area plus restricts the discharge under the railroad tracks to the pre-existing conditions for the property. The City ditch on the east side of the railroad tracks flows ultimately to a large pond constructed with the East Elk River improvements. This pond has not been sized to accept unrestricted flow from the K&L Addition. Storm drainage calculations will be needed also for the Ultimate condition. We would recommend that these calculations be done with Phase I so an adequately-sized area can be set aside for ponding in the future. An emergency overflow location and elevation should be shown near the catch basins in Vance Street, such that in a case where the catch basins are plugged, water will overtop the curb and flow into the pond. The typical street section on the preliminary grading plan should have B618 concrete curb and gutter instead of B612. The bituminous base course should be two inches in thickness rather than an inch and a half. In most other commercial/industrial areas, concrete sidewalk is a part of the street section. We question whether or not concrete sidewalk should be included in this addition. Preliminary utility plan 1. The Phase I preliminary utility plan shows water main looped through from 173rd Avenue to the frontage of road of TH 10. Easement will be needed for this looping outside of the proposed Phase I plat. The water main should be a minimum eight inches in diameter with six-inch pipe used for hydrant leads. 2. Hydrant spacing in commercial/industrial areas is required to not exceed three hundred feet. There will be additional hydrants needed to maintain this three hundred-foot maximum spacing. 3. The sanitary sewer is shown in the Phase I preliminary plat to be extended from 173r~ Avenue up Vance Street just beyond the plat boundary. In the Ultimate scenario it continues around Vance Street to the TH 10 frontage road. In the Phase I scenario, sanitary sewer should be added to provide service to Lot 3 Block 2. In the Ultimate scenario, sanitary sewer needs to be added to provide service to Lots 12 and 13, Block 1. O:\PROJ\809020J\Ltr-061900-McPherson.doc Howard R, Green Company CONSULTING ENGINEERS Ms. McPherson June 19, 2000 Page 3 If you have any questions regarding any of these comments, please call. Sincerely, Howard R. Green Company Cc: Jim Klein, John Oliver and Associates O:\PROJ\809020J\Ltr-061900-McPherson.doc Howard R, Green Company OONSULTING ENGINEER8 RESOLUTION NO. 00 - CITY OF ELK RIVER A RESOLUTION GRANTING FINAL PLAT APPROVAL FOR: K & L Addition Case No. P 00-1 WHEREAS, application has been made for final plat approval, pursuant to Section 1008.08 (1)(c) of the Elk River City Code of Ordinances, of the property legally described on attached Exhibit A and hereinafter referred to as "the Property"; and WHEREAS, the application for preliminary plat approval has been referred to the Planning Commission which has given its advice and recommendation to the City Council; and WHEREAS, a preliminary plat of the Property was approved by the City Council July 17, 2000; and WHEREAS, the proposed final plat is consistent with the preliminary plat as approved by the City Council; and WHEREAS, the proposed final plat complies with each of the conditions set forth by the City Council in its approval of the preliminary plat of the Property; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELK RIVER, as follows: It is hereby determined by the City Council for the City of Elk River as follows: The proposed subdivision is consistent with the Zoning Ordinance and conforms with all of its requirements. Bo The proposed subdivision is consistent with all applicable general and specialized city, county, and regional plans including, but not limited to, the City's Comprehensive Development Plan. The physical characteristics of the site, including , but not limited to, topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and drainage are suitable for the type and density of development and uses contemplated. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage transportation, erosion control and all other services, facilities and improvements otherwise required herein. Eo The proposed subdivision will not cause substantial environmental damage. F° The proposed subdivision will not conflict with easements of record or with easements established by judgment of a court. The proposed subdivision will not have an undue or adverse impact on the reasonable development of neighboring land. Final plat approval is hereby granted for the Property, subject to the conditions set forth in attached Exhibit B. The officers of the City are hereby authorized, once the conditions set forth in Exhibit B are met and complied with, to sign the final plat for the Property and to issue a certified copy of this Resolution giving final approval of the plat. The owner of the Property is authorized to record the final plat as required by law and shall file proof of said recording with the City. No building permits will be issued for the Property until the final plat is recorded. This final plat approval shall expire one year from the date of this resolution if the final plat is not recorded within that time. The foregoing resolution was introduced by Council Member and duly seconded by Council Member The following voted in favor of the Resolution. The following voted against the Resolution: The following were absent: S:\DOCUMENT~RESOLUTI\p00-1 .doc Page 2 WHEREUPON the resolution is adopted. Passed and adopted this __ day of ,2000. Stephanie Klinzing, Mayor CERTIFICATE STATE OF MINNESOTA COUNTY OF SHERBURNE CITY OF ELK RIVER I, the undersigned, being the duly qualified and acting Clerk of the City of Elk River, Minnesota, hereby certify that the above resolution is a true and correct copy of the resolution as adopted by the City Council of the City of Elk River on ,2000. WITNESS my hand officially as such Clerk and the corporate seal of the City this ~ day of ,2000. Sandra Peine, City Clerk STATE OF MINNESOTA SS. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this __ , 2000, by Stephanie Klinzing, Mayor, City of Minnesota. Elk day of River, Notary Public S:\DOCUMEN'I~RESOLUTI~p00-1 ,doc Page 3 STATE OF MINNESOTA SS. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this __ day of ,2000, by Sandra Peine, City Clerk, City of Elk River, Minnesota. Notary Public THIS INSTRUMENT WAS DRAFTED BY: DOHERTY RUMBLE & BUTLER 3500 Fifth Street Towers 150 South Fifth Street Minneapolis, MN 55402-4235 S:\DOCUMENT~RESOLUTI~p00-1 .doc Page 4 EXHIBIT A Legal Description: That part of the South Half of the Southwest Quarter that lies northeasterly of the Northeasterly right-of-way of U.S. Highway No. 10 and Southwesterly of the railroad right-of-way being in Section 2, Township 32, Range 26, Sherburne County, Minnesota. Except the North 100 feet thereof. Subject to the Town Road (173rd Avenue N.W.) S:\DOCUMENT~RESOLUTI\p00-1 .doc Page 5 EXHIBIT B 1. A DEVELOPERS AGREEMENT BE PREPARED AND EXECUTED OUTLINING THE TERMS AND CONDITIONS OF THE DEVELOPMENT PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. 2. ALL OF THE CITY ENGINEER'S COMMENTS BE ADDRESSED. 3. PARK DEDICATION FEES IN THE AMOUNT REQUIRED BY THE CITY BE PAID PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. 4. STORMWATER MANAGEMENT FEES IN THE AMOUNT REQUIRED BY THE CITY BE PAID PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. 5. STREET LIGHTS AS REQUIRED BY ELK RIVER UTILITIES BE INSTALLED. 6. A SEALCOAT FEE IN THE AMOUNT DETERMINED BY THE CITY BE PAID PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING. S:\DOCUMEN~RESOLUTI\p00-1 .doc Page 6 ~O'd ]WIOI Howard R, Green Company CONSULTING ENGINEERS July 13, 2000 File: 809020J-0240 Ms. Michele McPherson Director of Planning City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: K&L ADDITION FINAL PLAT CITY OF ELK RIVER, MINNESOTA Dear Ms. McPherson; As requested, we have reviewed the final plat for Phase I of the K&L Addition. Based on our review, we would offer the following comments: The final plat consists of four lots around the existing buildings and four new lots on the east side of Vance Street. Lot 1, Block 1 should show the existing easement for the gas main that crosses in the southeast corner of the lot. Outlot A should show the necessary easement for the storm drainage pond and dedicate street for the cul-de-sac. Outlot A should also show an easement necessary, for the extension of the watermain loop to Trunk Highway 10. The plat should show limited access along Trunk Highway 10. If you have any questions regarding any of these comments, please call. Sincerely, Howard R. Green Company aurer, P.E. TJM/mjw Ltr-O71300-McPhe~son.do¢