Loading...
6.5. SR 08-21-2000~ity of River MEMORANDUM Item # 6.5. TO: FROM: DATE: SUBJECT: Mayor and City Council Michele McPherso(~rector of Planning August 2'1, 2000 Case No. CU 00-24 Request by River of Life Church to Construct a Church in the A1 District; Public Hearing Request The River of Life Church requests that a Conditional Use Permit be approved to allow construction of a 23,550 square foot church in the A1 (Agricultural) District. Loca~on Southeast corner of the intersection of County Road 1 and 217th Avenue NW. Zoning/Land Use A1 (Agricultural Conservation) / LR (Low Density Residential) Attachments · Location Map · Site Plan Phase 1 · Phase 1 Staff Suggestions · Site Plan Phase 2 · Floor Plan · Exterior Elevations · Grading Plan Landscape Plan with Staff Amendments · Memo from the City Engineer dated 7/13/00 · Letter from Sherburne County Regarding County Road 1 Access 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Memoto Mayorand Ci~ Council/CU 00-24 August21,2000 Page 2 Overview In 1996, the City Council approved an administrative subdivision to subdivide a 53 acre parcel into three individual parcels. One of the three parcels totaling 28 acres was retained by the church for their development. The other two 10-acre parcels were sold for residential development. The church proposes two phases of construction, with Phase 1 including a multi- purpose facility and a building with space for classrooms, offices, storage and nursery space. Phase 2 of the church has not been detailed, however, a conditional use permit will need to be reviewed and approved prior to commencement of Phase 2 construction. Analysis Existing Conditions The subject property is currently vacant and is composed of rolling topography and oak savannah-type vegetation. A portion of the site appears to have been farmed and is currently an open meadow. A barrier of coniferous trees have been planted along the west edge of the property adjacent to County Road 1. The topography increases from west to east, with a steep slope adjacent to the north property line along 217th Avenue NW. Proposed Site Plan The initial construction is comprised of a multi-purpose facility measuring 64' x 96' and general purpose space comprised of offices, classrooms, storage and restrooms, measuring approximately 149' x 140. This entire space is not taken up by building, as there is a main entry courtyard and a small open space adjacent to the multi-purpose room. Also proposed with phase 1 are two parking areas, which contain 335 parking spaces. As this property is not within the urban service district, they have identified on the property primary and secondary septic system sites. Use of the church for daycare or a school will require a separate conditional use permit. Compliance with Ordinance Requirements The proposed building is set back substantially from both the County Road 1 and 217th Avenue rights-of-way, preserving the trees along the west property line and minimizing impacts to existing trees along the east side of the site. The building exceeds the setback requirements for the A1 zoning district. The proposed parking area also exceeds the minimum setback requirements of the A1 district, being set back a minimum of 60 feet from both the County Road 1 and 217th Avenue rights-of-way. The proposed lot coverage is approximately S:\PLANNING~vllCHMC\CCREPRTS\CU00-24.DOC Memo to Mayor and City Council/CU 00-24 August 21,2000 Page 3 1.8 percent, with the combined parking and building hard surface coverage totaling 9.8 percent. The plan indicates 335 parking spaces. The code requires the following: Worship hall: 182 spaces Classrooms/nursery: 26 spaces Offices: 5 spaces TOTAL 213 spaces The plan indicates adequate parking. Building Elevations and Materials The building will be constructed of differing materials. That portion of the building housing the classrooms, office and nursery will be frame construction with vinyl siding and asphalt shingles. The multi-purpose building will be constructed of pre-cast concrete panels with a wide rake finish. A wide stripe painted white will be formed toward the top of the panels. Access and Parking The City Engineer reviewed the access proposed for Phase 1 which is one driveway onto 217th Avenue. In Phase 2, a second access onto County Road 1 is proposed. Any access onto County Road 1 will require a Sherburne County access permit. The City Engineer recommends that the driveway onto 217th Avenue be moved farther to the east in order to provide adequate stacking space on 217th Avenue for cars leaving the church and exiting onto County Road 1. The engineer also indicated that the access onto County Road 1 will more than likely necessitate a turn lane and a bypass lane, however, no written comments from the County have been received. In order to alleviate internal traffic conflicts, it may be appropriate for the access onto County Road 1 to be installed as part of Phase 1, instead of waiting for construction of Phase 2. The site plan also indicates overflow stalls of approximately 156 spaces. The ordinance requires parking to occur on approved hard surface which would require removal of topsoil and vegetation in the installation of Class 5 or some other suitable material to create these overflow parking areas. Grading Plan The City Engineer has reviewed the preliminary grading plan submitted by the applicant and the following summarizes staff concerns: S:\PLANNING~vllCHMC\CCREPRTS\CU00-24.DOC Memo to Mayor and City Council/CU 00-24 August 21, 2000 Page 4 a. The steep slope along 217th Avenue should be removed to allow a gradual slope to the church parking facility. This will necessitate the removal of a number of trees along this slope. bo The drainage calculations have been received but were not reviewed. There are a number of questions the engineer has in regard to the overall grading plan and direction of flow for storm water from the hard surface areas. The engineer is recommending that the plan be redefined to contain drainage on the site of the church and not to rely on the county ditch system for storm water conveyance. c. The single proposed drainage pond is within the county right-of-way and needs to be relocated outside of the right-of-way. d. The phasing of the proposed grading is unclear from the submittal. Landscape Plan For this proposal, the ordinance requires 53 total trees, 26 overstory, 13 coniferous and 13 ornamental trees. The proposed plan indicates 12 trees, three of which are overstory. The ordinance also allows credit for maintenance of existing trees. A specific tree inventory was not submitted, however, so an analysis of trees available for credit was not completed. The parking lot needs additional landscaped islands in order to eliminate the mass of parking and blacktop and to define the aisles more clearly (see attached amended landscape plan). With the additional landscaped islands, staff feels that the new trees required and the existing trees to be saved would meet the intent of the ordinance. Miscellaneous Site Details Staff has the suggested the following improvements to the miscellaneous site details to improve the overall functionality of the proposed plan: The proposed five-foot sidewalk along the east side of the parking lot should be widened to seven feet. Once cars overhang the five-foot sidewalk, the sidewalk becomes very narrow for pedestrian movement. b. A similar sidewalk should be constructed along the south side of the northerly parking lot for ease of pedestrian movement in an east-west direction. Co The dumpster is located in the far easterly edge of the north parking lot. It appears that this location would be inconvenient for office users or those using the multi-purpose room for elimination of trash and perhaps needs to be relocated closer to the main structure. S:\PLANNING\MICHMC\CCREPRTS\CU00-24.DOC Memoto Mayorand City Council/CU 00-24 August21,2000 Page 5 S~Tna~le One monument sign 42 square feet in area is proposed to be located at the intersection of County Road 1 and 217th Avenue. It will need to be 10 feet from the property lines. A small wall sign of individual letters is also proposed. All signs will require permits. Planning Commission Action The Planning Commission conducted a public hearing regarding this request at its July 25, 2000 meeting. Neighbors that spoke were concerned about the levels of traffic on 217th Avenue during peak exit times of the church. The neighbors also inquired if 217th Avenue would be paved in the future. The Planning Commission voted unanimously to recommend approval of the request. They also recommended additional landscape islands for the parking area and that the County Road 1 access be constructed first. The applicant indicated that they had no concerns with the staff recommendations. Recommendation Staff recommends that the City Council concur with the Planning Commission recommendation and approve the request to construct a church with the following conditions: 1. ALL COMMENTS OF THE CITY ENGINEER BE ADDRESSED. THE LANDSCAPE PLAN SHALL BE REVISED AS INDICATED ON THE ATTACHED AMENDED LANDSCAPE PLAN INCLUDING ADDITIONAL LANDSCAPE ISLANDS IN THE PARKING LOT. THE PLAN SHALL INCLUDE AN INVENTORY OF TREES ELIGIBLE FOR CREDIT. 3. THE SITE PLAN SHALL BE AMENDED TO INCLUDE WIDER SIDEWALKS AND A NEW SIDEWALK ALONG THE NORTHERLY PARKING AREA. THE ACCESS TO COUNTY ROAD 1 SHALL BE CONSTRUCTED IN PHASE 1, AND THE APPLICANT SHALL OBTAIN A SHERBURNE COUNTY ACCESS PERMIT AND COMPLY WITH ALL CONDITIONS REQUIRED BY THAT PERMIT. 5. THE DRIVEWAY ON 21~H AVENUE SHALL BE RELOCATED AS FAR EAST AS POSSIBLE AND CONSTRUCTED IN PHASE 2. 6. THE CURB AND GuI'rER AROUND THE PERIMETER OF THE PARKING LOT SHALL BE CONCRETE EXCEPT IN AREAS PROPOSED TO BE EXPANDED. S:\PLANNING~11CHMC\CCREPRTS\CU00-24.DOC City of · r lve 13065 Orono Parkway · P.O. Box 490 Elk River, MN 55330 LOCATION MAP CASE: C'U 0 O- 2 4 Howard R, Green Qompany QONSULTING ENGINEERS July 13, 2000 File: 811200J-0240 Mr. Steve Wensman City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: RIVER OF LIFE CHURCH SUBMITTAL REVIEW CITY OF ELK RIVER, MINNESOTA Dear Mr. Wensman: As requested, we have reviewed the River of Life Church submittal package. The package consisted of a topographic survey prepared by Taylor Land Surveyors, Inc., site plan and building drawings prepared by W.C.L. Associates, Inc., and a preliminary grading plan, landscape plan, and preliminary sewage collection and disposal plan prepared by John Oliver and Associates. Based on our review and comments received at the staff review meeting, we would offer the following comments: A. Topographic Survey 1. The site is approximately 30 acres in size. It is not clear if the site will be platted. If it is to be platted, there are Iow areas in the site that should be covered by drainage and utility easements because these areas will receive and hold runoff. The other question we would have is: Are there any wetlands on the site? With the rolling terrain and the size of the site, it is reasonable to expect that there may be wetlands on the site. If there are wetlands, they should be delineated. B. Site Plan Phase I and II The driveway onto 217th Avenue should be moved further to the east. It is too close to the intersection of CSAH 1 for the large amount of cars that will be attempting to exit the parking lot in a short period of time. 217th Avenue should be paved from CSAH 1 past the driveway access. The second phase shows an access onto CSAH 1. We assume that the County will want a right turn lane and bypass lane for this access point to be permitted. It is unclear from the drawings what the sight distances would be each direction at this location. As the traffic comes into the site from the 217th Avenue access point, an additional island should be placed on the parking lane to direct traffic. Ltr-071200-Wensman.doc 1326 Energy Park Drive · St, Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Mr. Steve Wensman July 13, 2000 Page Two The temporary drop-off spot shown in front of the church building with Phase I is in a poor location. This is the only spot for circular traffic around the large parking island. If this is a drop-off location, there will be conflicts between vehicles stopping to drop people off and vehicles wanting to circulate around the parking stalls. Perhaps a couple of parking stalls in front of the church could be deleted in Phase I and that area used for the drop-off site. C. Preliminary Grading Plan There is a relatively steep slope on the south side of 217th Avenue. The grading plan shows leaving that in place. Phil Hals, Street Superintendent, has indicated that he would like to see that slope removed with a gradual grade into the church site. We have just received drainage calculations and have not had time to review them. However, the concept of the drainage of the site is questionable. Basically, the drainage is being picked up in the northern parking lot and conveyed to the County ditch. Then the County ditch is being used as a portion of the storm drainage conveyance system to the southwest corner of the site where a culvert directs drainage from the County ditch into a holding pond. We question whether or not the County would even allow this type of drainage pattern. Here are the other questions we have: Are there any culverts under CSAH I that would outlet this drainage? What will happen if CSAH 1 is rebuilt and the drainage ditch adjacent to it redefined? We believe that the drainage for the church should be contained totally within its site and not rely on the County ditch system. The drainage pond in the southwest corner is partially within the County right-of- way. This pond should be moved to the east to eliminate the encroachment into the right-of-way. Also, the slopes of this pond are a 3:1. This is a pond that will hold water and has no outlet. We would suggest that the pond's slopes be 4:1 or flatter. Certainly with a thirty-acre site, there is enough room to move the area to the east and allow a larger area with a flatter pond slope. It is unclear whether the entire site will be graded at once or will be graded in phases with the building. If it is to be graded in phases, there should be a phase line shown on the grading plan. If it is to be graded in phases, the storm drainage pond needs to be included with Phase I. The grading plan shows concrete curb and gutter along the front of the church and around the parking lot islands. The remaining perimeter of the parking area is proposed to be bituminous berm. We question whether this is acceptable. The site should be graded to eliminate the need for the catch basin immediately to the east of the Phase I building. At a minimum, an emergency overflow elevation needs to be shown here so that drainage beyond the catch basin capacity will get into the parking lot area and not into the building. With the access point onto CSAH 1, the grade is downhill to the road. The road appears to be at a 967 elevation, and the lowest contour shown on the access is 966. It is unclear how drainage will be taken from the Iow point off of the road Ltr-071200-Wensman.doc Howard R. Green Company CONSULTING ENGINEERS Mr. Steve Wensman July 13, 2000 Page Three into the pond. We would suggest that catch basins be placed on the culvert under the road as a method to convey drainage from the access road to the pond. Bruce West, Fire Chief, indicated at the staff review meeting that the size of the Phase II building will require a fire lane around its perimeter. This fire lane should be planned for in the development and grading of the site. No septic system calculations have been submitted at this time. These calculations need to be submitted, reviewed, and approved prior to construction. If you have any questions regarding any of these comments, please call. Sincerely, Howard R. Green Company TJM/mjw Ltr-071200-Wensman.doc Howard R. Green Company CONSULTING ENGINEERS 08/11/00 13:36 FAX 612 541 9554 07/18/2008 08:53 ~12441~975 July 11,2000 River of Life Attn: Gary Dcmclc 544 3'd Street NW Box 674 Elk River, MN 55330 WCL ASSOCIATES, INC. RIVER OM LIFE EFC ~ 002 PAgE 82 Sherburne County PUBLIC WORKS DEPARTMENT 425 Jackson Avem Elk River, MN 553." (763) 24'1-7034. 800-594-52, FAX (763) 441-22t Re: Access To CSAH 1 Dear Mr. Demele; The access permit you recently appl:i, ed for has been field checked and created a lot of discussion in our office. The access point on your drawing is acceptable as far as spacing requin:ment and sight distance is concerned. The biggest problem we face is the curve just north of217~ avenue and the pine t~¢¢s that limit sight distance. Another problem is limited sight distance created by the hill on CSAH 1 to the south. Before I can issue aa access permit I feel a sight visit would be beneficial, but not a necessity. I will grant the permit trader the following conditions. 1. Right turn lanes must be constructed at both the proposed entrance and at 217t~ Avenue. 2. A bypass lane must be constmct.~:i at the proposed entrance. 3. No part of the retention pond ca~l be located within the right of way. 4. Slopcs on turn laaes and bypass lane must be 4:1. This will require tree cutting and possible slope cascracnt from The Jeniors for thc construction of thc bypass lane. 5. You are responsible for the strip:ir~g removal and thc restriping of CSAH lin the constlaaction area, 6. Pay for the signage changes required to make this segment safe for the traveling public. We suggest moving the access on tc: 217m Avenue to thc east for greater stacking distance, We also suggest a Stop Sign be placed a.t the main entrance. It may be purchased and installed by us. If you have any questions, plea~:e call me at 241-7034. Silly, Richard D, Corbin Sherbume County Public Works SIGN - SEE ELEVATION 7/A5 g:\2000\2000-16_rl\rl_sp2sp.dgn Aug. 12, PHASE, ROOFTOP PAVED : OVERFLOW : TOTAL PARKING : 505 STALLS 100 STALLS 605 STALLS 2000 ~5:31:3~ DOE] f PLAY AREA 217 TH A VENUE ~ ...... :.. ..... .. N 89°27'17'' ~ 128J. J NW. / SYSTEM FIELD // SE~/SIT~ ENOIN.EERING ! ~ ! L ~ !! ~ ~ ~// \ \ 89°25'22`` W~ River of Life Church Elk River, Minnesota WCL soc TEs, INC. ARCHITECTS INTERIORS SITE / BUILDING DATA SITE COVERAGE: SITE AREA: PROPOSED BUILDING AREA PHASE ~E: BUILDING SITE COVERAGE: TOTAL PARKING AND BUILDING SITE COVERAGE: PARKING: REQUIRED : WORSHIP HALL = 182 STALLS CLASSROOMS = 26 STALLS OFFICES= 5 STALLS TOTAL : 213 STALLS PROVIDED : PAVED : 297 STALLS OVERFLOW : 56 STALLS TOTAL : ~5~ STALLS SIGNAGE : MAXIMUM ALLOWABLE : 96S.F, PROVIDED : iWONU~NT : 84S,F.( 2 FACES) WALL : 12S.F. 1,2gL*G54 S.F,/ 28.84 ACRES 23,550 GSF WCL ASSOCIATES, INC. ARCHITECTS INTERIORS 1433 UTICA AVENUE SOUTH ~INNEAPOLI$. MN 55416 FAX: 612 541-9554 612 541-9969 RIVER OF LIFE EVANGELICAL FREE CHURCH COUNTY HIGHWAY & 217th AVE. N.W. ELKRIVER, MN55330 PHASE ONE DATE RECEIVED GENERAL CONTRACTOR: DONLAR CONSTRUCTION 480 CEDAR ST, SUITE 500 ST. PAUL, MN 55101 IHEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY PRfNT HISTORY DATE REVISED 8.12.00 SITE PLAN PHASE 1 SCALE: r' - 60'-0" ...... SP1 CHECKED MONUMENT SIGN - A VENUE ELEVATION 7 DND /SEE SiTE ENGINEERIN~ 21?TH \\OVER PHASE t / / / VE~" 56. STI~LS, ~ TRASH g'IQ. OSU~E / /..,,'P RIM AR ,'f' ,,--------------~ SECONOAR/T / SYSTEM DRAIN FIELD / SEE-/SIT8 ENGINEERING ! ./-' ! / ~' 1 / , x~' ~ / '% 17" E~ '~ NW. WCL ASSOCIATES, INC. ARCHITECt'S IND~RIOR$ RIVER OF LIFE EVANGELICAL FREE CHURCH COUNTY HICHWAY 1 & 217t~ AVE. N.W EL}< RIVER. N~N 55J JO PHASE; ONE ,/ SITE / BUILDING DATA SITE COVERAGE: SIT[ ~qEA: PARK [NG: S IGNAGE : GENERAL CONTRACTOR: DONI.~R CONSTRUCTION 480 CEDAR ST. SUITE 500 ST. PAUL. MN 55101 PRINT M~STORY DATE SITE PLAN PHASE 1 SP1 MONUM SIGN - SEE ELEVATION 7 SITE 217TH N 89°27'17'' A VENUE ROCK FACE CM~ ' ~sul~ / : PAVED : OVERFLOW : TOTAL PARKING : 503 STALLS 100 STALLS 603 STALLS PHASE II SITE PLAN SEC0t / SYSTEM // ~8/5, T/D' / ~-' / ~/ \ \ FIELD ENGINEERING 89 ° 25'22" %_., NW. WCL ASSOCIATES, INC. ARCHITECTS IN'I~RIORS RIVER OF LIFE EVANGELICAL FREE CHURCH COUNTY HIGHWAY 1 & 217th AVE. N.W. ELK RIVER, MN 55550 PHASE ONE GENERAL CONTRACTOR: DONLAR CONSTRUCTION 480 CEDAR ST. SUITE 500 ST. PAUL, MN 55101 IHERESY CERTIFY THAT THIS PLAN WAS PREPAREO BY ME OR UNDER MY DIRECT SUPERVISION AND THAT lAM A DULY REGISTERED ARCHITECT UNDER THE LAWS OF: STATE: REGISTRATION: NAME: PRINTHISTORY DATE g: \2000\2000- ~, 6._n 1 \r ] _si:) :tsp. dgn Jun. 23, 2000 SITE PLAN PHASE 2 ...... SP2 CHECKED DROP OFF - NURSERY 60 CRAWLERS ~ 20' X 30' 15 I I I ~ I NURSERY -- ~o WALKERS STOR. 24-'X 26' -- RECEPTION . Sink NURSERY / I [] 25'x 13' ~r'--~ _i_u YOUTH · ~- CLASSROOM ,~, 25'X 30' 7'x I VEST. COl TYPICAL EXTERIOR WINDOW OFFICE ONLY - THERMOTECH CLAD OPERABLE CASEMENT -- WITH FIXED TRANSOM AND 1" INSUL - ~ ~ CLEAR GLASS .~ERY SLEEPING X t8' LOB8Y 140'-0" CLASSROOM 20' X 15' YOUTH CLASSROOM 20' X 35' 22' X STORAGE CLASSROOM CLASSROOM 8' WIDE CLASSR(~OM 20'XtT CLASSROOM 20'X 20' TYPICAL INTERIOR WALL %" GYP. BOARD OVER 2X4 STUD WALL CLASSROOM 20'X 20' ~ VEST.---'l ~Txzu COURTYARD 10' X 12' STOR: OFFICE 12' RECEPTION WORK OFFICE 16' X 12' SINK 15' X 20' SERVING BAR SKYLIGHTS 2 - 4'X8' I- -ir I I L__JL_J LOBBY 48' X 36' COATS i 33' X 12' /' 'x jO000 / 10' WIDE / WOMEN'S IN HALLWAY u"- __~ D.F. ~~ '--11 TOILET ( ::[I Io co o/ CLASSROOM 15' X 20' CLASSROOM 15' X 20' 21'X 9' REC.& EQUIP. STORAGE 38'-0" 10'-0" 35'-0" 85'-0" 37'X 63' MULTI-PURPOSE CHILDREN'S LINE OF-~ PRECAST ABOVE 21'X 9' CHAIR STORAGE MECH./ ELECTR. ROOM 21'-4" 178'-4" OVERALL TYPICAL EXTERIOR WINDOW - CLEAR ANODIZED ALUM. FRAME AND 1" FIXED INSUL. CLEAR GLASS, U.N.O. PRELIMINARY FLOOR PLAN V." = 1'- O" FULL REVISED PROGRAM TOTAL AREA: 23,550 GROSS SQUARE FEET River of Life Church Elk River, Minnesota ]<_____~TYPICAL EXTERIOR WALL - U.N.O. VINYL SIDING OVER TYVEK OVER OSB OVER 2X6 STUD WALL OVER %" GYP. BOARD F WCL ASSOCiATeS, INC. ARCHITECTS INTERIORS June~1~21' 2000 ~ TOTAL SEATING: 546 OL J C.A,R COURT 84' X 50' 1:12 12" PRECAST CONC. PANELS- TYP.~ MULTI- PURPOSE 95'-4" ...\revO519\r]_6-Ifp.dgn Jun. 23, 2000 10:~.0:59 WEST (,F. oRONT) E[EVATION SC~.E ~m"' .... (~NORTH (COURT YARD) ELEVATION $C.N.F ',/8" ' 1'-0" (~EAS,T, (REAR) ELEVATION SCALE ~e" ' 1'-o" (~SOUTH (COURT YARD) ELEVATION SCALE ~e" · 1'-o" (~) NORTH ELEVATION $C~.E ~/8" ' r-o" (~ SOUTH ELEVATION SCALE ~/~" · r-o" ·.. \2000- ~6_r ] \rev05 ~§\r 1._e 12. dgn ! I~[VE~ OF LIFE (~ SIGN ELEVATION WCL ASSOCIATES, INC. ARCHITECTS INTERIORS RIVER OF LIFE EVANGELICAL FREE CHURCH COUNTY HIGHWAY ~ & 217th AVE. N.W. ELK RIVER, MN 553.30 PHASE ONE GENERAL CONTRACTOR: DONLAR CONSTRUCTION 480 CEDAR ST. SUITE 500 ST. PAUL, MN 55101 IHEREBY CEF~TIFY THAT THIS PLAN WAS PREPA~E[~ BY ME OR tJNDER MY DIRECT SUPERVISION ANO THAT I,e,M REGISTRATION: PRINT HISTORY DATE EXTERIOR ELEVATIONS sc,14-£: l/l" · t'-o- Jun. 23, 2000 10:~4:31 0 0 ,\ 217TH AVENUE NW o 50 I00 150 SCAL[ iN z o ...D> SHEET CI 0 l! / / / / / ,/ /i/ I / / GENERAL NOTES MATE:RIA~ ~ · ~m (~). ~ NI ~tol ~ un~t~ V~ ~all ~ a m~um c~ 4. O~s ~b~ ~ ~ ~e f~lo~9 m~um b. M~ -- 5 ~, ~tt~ ~t -- ~5 to ¢ f~ ~11~ ~ Tall - 2~ ~o ~ ~. b~ u~ in ~ ~ ~ n~ p~ts thr~g~ R~ ~s ~e not ~ to ha~ r~ mul~. ~of~N~ pl~t~g~ Ni ~ ~s of ~te not ~i~ by ~lding, co~. Ex~U~ to ~ i~ ~d~ ~ ~t~m9 ~u~t ~ ~ of ~e ~ M~a ~ ~ St~ lat~ .~. The ~ f~ ~t ~ ~ ~ o~ t~l (~ of lu~, ~t mat~ m~ ~ ~t~ ~ p~ the Nanting man o ~b~t~ w~ be ~e a~te (~e to I~t~), ~e ~g~ md ~ m~l ~ ~t~t~ ~ to ~t~ce of ~e & 9. 5D 60 90 ~N FEE" LANDSCAPE LEGEND KEY QIJANTITy COMJdON/t~OT ANICAL SIZE ROOT IHL 5 IMPD~AL HONEY LOCUST/ 2--1/2" CAL Bad) OI.~DITISiA TRICANTHOS 'INERMIS IIdP~RIAL' SSCA 7 ~°RING SNOW CRABAPPLE/ I-l/2" MALUS 'SPfltNG S~OW' JT'L 2 ,/APANESE TRI:"F MI.AC/ I-I/2" SYRINGA A,~A. IREN~IS ~APONICA BHJ 40 BAR HARBOR ,~,JqlPER/ I GALLOt, I POTTED JUNIP£RUS HOR~Z0~TA/J$ 'BAR HARBOR' BH 15 ~ HONEY SUCKLE/ I GALLON POTTED AWP 12 AB~OTSWOOD POTEN~LLA/ I ~LLON POTTED POTENTILLA FRt.rTICOSA 'ABSOTSWCOD' aRW 3 JAVA RED WE]GELA/ I GALLON POTlLl~ WEIG~_A FI.0RIDA PURPt. IREA 'JAVA RED' JWS 7 JAPANES~ I~HIT£ ~IRF_.A/ I GALLON POTTED S~RACA JAPONICA 'JAPANF_.S[ SS 12. SHI~ORI SPIREA/ I GALLON POTTED S~RACA JAPONICA 'SHIR(~ANA' BEIC 4 BURNING ~ COMPACT/ .3 GALLON POTTED EUONYMUS ALATUS 'COMPACTA' COMMENTS PARK