Loading...
3.4. SR 09-25-2000City of River MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor & City Council Lori Johnson, Finance Director September 25, 2000 Pay Estimates Item//3.4. Attached are pay estimates for both the street and storm sewer and water and sewer eastern area public improvement projects. The city engineer has reviewed the pay estimates and recommends approval. CONTRACTOR PAYMENT REQUEST RETAINAGE Pay Estimate #6 - Eastern Area Tyler Street Improvements LaTour Construction, Inc. $176,908.92 $109,339.00 Pay Estimate # 16 - Eastern Area Water and Sewer Improvements S. R. Weidema $104,806.82 $160,898.75 Partial Pay Estimate #1 - Eastern Area Phase III Street & Utility Improvements Hardrives, Inc. $197,786.23 $ 10,409.80 Action Requested The City Council is asked to approve the pay estimates as listed above. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone (763) 441-7420 · Fax (763) 441-7425 SPEC. REF. DESCRIPTION CONTRACT ITEMS I UNIT QTY. UNIT QTY. PRICE THIS PERIOD AMOUNT TOTAL TO DATE AMOUNT 0 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 2564.603 2564.603 2564.603 2564.604 2565.602 2565.603 2573.501 2573.502 2573.602 2575.501 2575.502 2575.502 2575.505 2575.511 2575.519 2575~523 2575.531 2580.501 100 mm DOUBLE SOLID LINE YELLOW - EPOXY 600 mm STOP LINE WHITE - POLY PREFORMED 600 mm SOLID LINE YELLOW - EPOXY CROSSWALK MARKING - EPOXY PVC HANDHOLE (METAL FRAME AND COVER) 103 mm RIGID STEEL CONDUIT BALE CHECK SILT FENCE TYPE HEAVY DUTY MAINTAINED TEMPROARY ROCK CONSTUCTION ENTRANCE SEEDING SEED MIXTURE 50A SEED MIXTURE 65A SODDING MULCH MATERIAL TYPE 1 DISK ANCHORING EROSION CONTROL BLANKET, CATEGORY 3 COMMERCIAL FERT ANALYSIS 10-20-20 TEMPORARY LANE MARKING m I 192 $2.20 0.00 $0.00 0.00 $0.00 m 85 $38.00 0.00 $0.00 0.00 $0.00 m 40 $15.00 0.00 $0.00 0.00 $0.00 m2 32 $52.00 0.00 $0.00 0.00 $0.00 EA 4 $519.00 1.00 $519.00 1.00 $519.00 m 150 $50.00 0.00 $0.00 0.00 $0.00 EA 100 $7.00 0.00 $0.00 0.00 $0.00 m I 500 $6.10 0.00 $0.00 0.00 $0.00 EA 1 $650.00 0.00 $0.00 0.00 $0.00 ha 22 $490.00 0.00 $0,00 0.00 $0.00 kg 900 $8.80 0.00 $0.00 0.00 $0.00 kg 400 $5.50 0.00 $0.00 0.00 $0.00 m2 21 100 $2.05 0.00 $0.00 0.00 $0.00 t 105 $165.00 0.00 $0.00 0,00 $0.00 ha 22 $122.00 0.00 $0.00 0.00 $0.00 m2 700 $1.80 Q00 $0.00 0,00 $0.00 t 11 100 $0.30 0.00 $0.00 0.00 $0.00 m 6 900 $0.80 0.00 $0.00 0.00 $0.00 TOTAL BID SUMMARY THIS PERIOD TOTAL BID SUMMARY TO DATE AMOUNT EARNED AMOUNT RETAINED MATERIAL ON SITE MATERIAL DEDUCT. PREVIOUS PAYMENTS AMOUNT DUE TOTAL THIS PERIOD $186,219.92 $186,219.92 $9,311.00 $0.00 $0.00 $176.908.92 TOTAL TO DATE $2,187,979.75 $109.399.00 $0,00 $0.00 $1,901,671.83 $176,908.92 $2,187,979.75 o:\proj\~O110.1~0081~Tylcr Payest #6 PAGE 3 32 33 34 35 36 37 38 39 40 41 42 43 44 SPEC, REF.  CONTRACT ITEMS DESCRIPTION UNIT QTY, UNIT PRICE 2531.501 2531.602 2531.602 2531.604 2575.501 2575.502 2575.505 SPEC SPEC SPEC SPEC SPEC SPEC SPEC SPEC SPEC SPEC SPEC SPEC CONCRETE CURB & GU']-rER, B618 PEDESTRIAN RAMP CONCRETE VALLEY GUTTER TRAING. SECTIONS CONCRETE VALLEY GU'II'ER SEEDING SEED, MIXTURE 50A SODDING, LAWN SUBGRADE DENSITY TEST, INPLACE CLASS 5 GRADATION TEST CLASS 5 PROCTOR TEST CLASS 5 DENSITY TEST, INPLACE PROCTOR TEST, INPLACE DENSITY TEST, INPLACE BITUMINOUS CORE DENSITY TESTING CONCRETE TESTING SCHEDULE C8 ELK RIVER BUSINESS PARK--TOTAL SCHEDULE C9 EXTRA WORK COVER WATERMAIN IN INDUSTRIAL PARK OFFROAD TRUCK DOWNTIME JIB CRANE AND HOIST GAS MAIN JACKING SCHEDULE C9 EXTRA WORK--TOTAL THIS PERIOD AMOUNT, TOTALTO DATE QTY. AMOUNT rn 1280 $22.00 1093.32 $24,053.04 1093.32 $24,053.04 EA 10 $150.00 0.00 $0.00 0.00 $0.00 EA 16 $300.00 16.00 $4,800.00 16.00 $4,800.00 m2 190 $37.00 78.46 $2,903.02 78.46 $2,903.02 ha 0.2 $325.00 0.00 $0.00 0.00 $0.00 kg 10 $9.90 0.00 $0.00 0.00 $0.00 m2 3000 $2.05 0.00 $0.00 0.00 $0.00 EA 6 $25.00 0.00 $0.00 0.00 $0.00 EA 2 $65.00 0.00 $0.00 0.00 $0.00 EA 1 $45.00 0.00 $0.00 0.00 $0.00 EA 6 $25.00 0.00 $0.00 0.00 $0.00 EA 5 $45.00 0.00 $0.00 0.00 $0.00 EA 20 $25.00 0.00 $0.00 0.00 $0.00 EA 12 $64.00 0.00 $0.00 0.00 $0.00 EA 8 $100.00 0.00 $0.00 0.00 $0.00 LS 1 $4,200.OO LS 1 $30,305.00 LS 1 $14,490.00 LS 1 $91,180.00 $53,499.20 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 $0.00 $265,131.40 1.00 $4,200.00 1.00 $30,305.00 1.00 $14,490.00 1.00 $91,180.00 $140,175.00 TOTAL BID SUMMARY THIS PERIOD TOTAL BID SUMMARY TO DATE .BID SUMMARY SCHEDULE C1A TYLER STREET -- TOTAL SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE SCHEDULE C1 B TYLER STREET-- TOTAL C2 NORTHWEST AREA -- TOTAL C3 UPA FORCEMAIN AND WATERMAIN -- TOTAL C4A TH 10 AND TH 169 WATERMAIN -- TOTAL C4B TH 10 AND TH 169 WATERMAIN -- TOTAL C5 RAIL 10 AREA--TOTAL C6 TYLER ST EARTHWORK & EROSION CONTROL -- TOTAL C7 LIFT STATION -- TOTAL C8 ELK RIVER BUSINESS PARK -- TOTAL C9 EXTRA WORK -- TOTAL $110,322.96 TOTAL THIS PERIOD $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $56,823.76 $0.00 $0.00 $53,499.20 $0.00 $5,505,327.28 TOTAL TO DATE $908 968.96 $878 889.43 $724 887.78 $742 129.75 $122 373.54 $256 648.41 $721 529,56 $332 392.44 $412 201.00 $265 131.40 $140 175.00 ~,MOU NT EARNED ~MOUNT RETAINED MATERIAL ON SITE MATERIAL DEDUCT. PREVIOUS PAYMENTS ~MOUNT DUE o:\proj\800110J~0071\Payest~16 PAGE 7 SEP-21-~ 10:~4 HONARD R. GREEN CO. 6516~9~6 e. L~Ub ECI4EDULE %0 MAiN ~TR£ET f.A~T OF ~ 1~i - TOTAL ~IEDULE 20 MAIN ~rR~ET ~T ~ llq ~. TOTAL SCHEDULE 4.0 CAR~ON STREk"T TO RAg. ROAD TRACKS .. TOTAL TOTAL IIg ~IUBMARY ?HII PIRIO0 TOTAL laid 8UMM~RY 1'O DA'Il ..... -,~,,d. ~m RER~ Ga.,ns. orB ! To=~ TO ~'ri .... I