Loading...
3.3. SR 08-16-2004tkiver TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and Council Lori Johnson, Finance Director August 16, 2004 Pay Estimates *Item 3.3.* Attached are pay estimates for the Public Safety and City Hall building projects, ice arena floor improvements, and a public improvement project. The building project pay estimates have been reviewed and approved by K_raus-Anderson and Tushie Montgomery. Scott Ward of Stevens Engineers has reviewed and approved the ice arena pay estimates and the improvement project pay estimate has been reviewed and approved by the city engineer. The payment to W.B. Miller is a final payment that will be held until all required paperwork has been submitted. Pay Est. Project No. Contractor Amount Public Safety Facility 24 Various $ 45,605.04 City Hall Expansion 24 Various 23,014.95 Boston & Concord 6 W.B. Miller 20,334.90 WWTP Digester Cover 2 Municipal Builders, Inc. 24,462.50 Ice Arena Floor 6 Commercial Refrigeration 88,578.00 Action Requested The City Council is asked to approve the pay estimates as stated above. APPLICATION AND CERTIFICATE FOR PAYMENT Page l of 2 TO (OWNER): City of Elk River - Pat Klaers PROJECT: Elk River Public Safety Facility CONSTRUCTION ARCHITECT MANAGER: Kraus-Anderson Construction Tushie Montgomery 200 Grand Avenue Saint Paul, MN 55102 SECTION CONTRACTOR/SUPPLIER CURRENT PAYMENT DUE 3 Omann Brothers~ Inc. 9~604.10 7, North Metro Landscaping~ Inc. 6~764.69 14 George F. Cook Construction Co. 'Z~, 42 Northern Air Corporation 1 ~431.00 ;TOTAL: - APPLICATION #: PERIOD FROM: PERIOD TO: CONTRACTOR'S PROJECT #771 3 CONTRACT DATE 24 7/1/04 7/31/04 ARCHITECT'S CERTIFICATE FOR PAYMENT accordance with the Contract Documents, based on ~n-site observations and the data comprising the ~bove situation, the Architect certifies to the Owner ~at to the best of the Architect's knowledge, formation and belief the Work is in accordance with the Contract Documents, and the Contractors are ntitled to payment of the AMOUNT INDICATED. ~mount Certified'~-~'~ Tu~hie~ry And Associates Const ruction Manager: Address: Owner: City of Elk River - Pat Klaers Kraus-Anderson Construction Co 200 Grand Avenue St. Paul, MN 55102 Fences Precast Concrete Plank Concrete&Masonry___ Erection of Structural Steel Omann Bros Duncan Concrete Western Steel Membrane Roof&Sheetmetal Carciofini Caulk Hollow Metal&Wood Doers Overhead Doors Alum Entrances&Windows Ceramic Tile Steinbrecher Fabricated Stainless Window Treatments Elevators Schindler Elev HVAC&Ouctwork Electrical e installation Northern Air Th-State Fire Northern Air Sentra-Sola Collins Electnc Kraus-Anderson C Kraus-Anderson C Kraus-Anderson C Kraus-Anderson £ Kraus-Anderson TOTAL Revised Contract Project: Elk River Public Safety Facility Applioat~on Number: 24 Application Date: August I, 2004 Period to: July 31, ZOO4 Project Number: 77 ! 3 Total Value Total of of Work j This Batarme To Complete 0.00 0.00 0.00 0 O0 0 O0 0.00 0.00 000 0.00 0.00 0.00 0.00: 0.00 0.00 0.00 0.00 000 0.00: 875.00 0.00 00C 0 O0 000 0.00 0.00 0 O0 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 504.00 O.OC 000 O.OO Page 2 of 2 APPLICATION AND CERTIFICATE FOR PAYMENT Page1 of Z TO (OWNER): City of Elk River - Pat Klaers PROJECT: Elk River Public City Hall APPLICATION ~¢: 24 CONSTRUCTION MANAGER: Kraus-Anderson Construction 200 Grand Avenue Saint Paul, MN 55102 ARCHITECT Tushie Montgomery PERIOD FROM: 7/1/04 PERIOD TO: 7/31/04 CONTRACTOR' S PROJECT #7751 CONTRACT DATE SECTION CONTRACTOR/SUPPLIER CURRENT PAYMENT DUE 8 ;Western Steel Erection~ Inc. 2,575.00 ,~ 1 0George F. Cook Construction Co. 1 2,611.35 / 1 2Olympic Wall Systems~ Inc. ~,OO0.00 1 7Garage Door Store 610.00 / 23 ~larsden Building Maintenance LLC 5t873.40 ~,' 39 Systems Management & Balancing 1,345.20 ~,' Al In a[ t~ in t? el A TOTAL: :HITECT'S CERTIFICATE FOR PAYMENT accordance with the Contract Documents, based on ,n-site observations and the data comprising the ,ve situation, the Architect certifies to the Owner hat to the best of the Architect's knowledge, 'mation and belief the Work is in accordance with Contract Documents, and the Contractors are ;ntitled to payment of the AMOUNT INDICATED. ~ount ('~-~Nfied ~_ __'~__.__~4__~~'_ _?_._~_C. ~shie~omery And Associates Construction Manager: Kraus-Anderson Construction Co. Project: Elk River City Ha# Address: 200 Grand Avenue St. Paul, MN 55102 Application Number: 24 Application Date: August 1, 2004 Owner: City of Elk River - Pat Klaers Period to: July 31, 2004 Project Number: 7751 Total Value Total Value Total of Net Due Balance To Revised of Work of Work Previous This Complete Percent Bid Pkg# Description of Work Contractor Contract AdjustmentsContract Completed Retaina~e Earned Applications Request Plus 8etainage Complete General Field Conditions Kraus-Anderson 188~360.00 0.00 188,360.00 188,360.00 0.0(] 188,360.00 188,360.00 0.000 O0 l 00 ISelective Bldg Demo George F Cook 144,000.00 5~44B.00 149~448.00 1491448.00 0.00: 149~448.00 149,448.00 000 000 100 2Earthwork/Found Drainage Dryden Excavati 26~450.00 SrO00.OO 31,450.00 31,450.0(] 0.0031,450.0(] 31,450.00 0.000.O0 10(] SConcrete-Formwk~reinforc RHC Constructn 149,506.0(] 176.50 149,682.50 149,682.5C 0.00149,682.5(] 149,682.50 0.000 O0 1 0(] 4Precast Concrete Plank Molin Concrete 40,555.00i 0.OO 40,555.00 40,555.OC 0.0040,555.0(] 40~555.00 0.O00 O0 1OC 5 Concrete&Masons' Oakwood/US Fi( 208~600.00 0.O0 ?08,600.00 184,052.00 9~202.60 174~849.40' 174t849.40 0.00 33,750.6(] 88 7 Structural 5teeI,Joist~Deck Minnetonka iron 76,074.00 -1 ~830.00 74,244.00 76,074.00 3~803.70 72~270.30 72,270.30 0.00 1~973 70' 1 0? E Erection of Structural Steel Western 5teet 78~275.00 3,293.00 81 ~56§.00 81,568.00 0.00 81 ~568.00 78~993.00 Z,575.00 000 1 O0 9,Gypsum Drywall Regal Contract 266,812.00 4~890.OO 271,702.00 271,702.00 0.O0 271,702.OO 271,702.00 000 0.OO 1 O0 10Rough&Finish Carpentry George F Cook 304,700.00 22,332.00 327,032.00 327,032.00 8~17'5.80 318,856.20 306,244.85 12,611.35 8,175.80 1 00 11Waterproofing Kremer&Davis 12,750.00 500.00 13,250.0~3 13,250.00 663.00 1Z~587.00 12,587.00 O.OG 663.00 100 12Ext tnsul&Finish System Olympic Wall 48~650.00 0.0(2 48~650.O0 48,650.O0 2~433.00 46~217.00 42,217.O(] 4,000.00 Z,433.OO 100 13Membrane Roof&Sheetmetal RoofTech 180,600.00 3,471.66 184,071.66 184,071.66 9,203.58 1741868.08 174,868.08 0.00 9,Z03.58 100 14Metal Roof&Prefab Specialty Systm 59,372.00 0.O01 59,37Z.00 59,372.00 0.00 59,372.00 59,372.0C 0.00 0.00 1 O0 15Caulking Carciofini Caulk12,080.00 126.34 I 2,206.34 12~206.34 0.00 t 2,206.34 12,Z06.34 0.00 0 O0 1 O0 16Jollow Metal&Wood Doors Glewwe Doors 43,400.00 332.00 43,732.00 43,732.00 0.00 43,732.00 43,732.00 .0.00 0 O0 10U 17Coiling Doors&Secur Grille Garage Dr Store 12,555.O0 610.00 13,165.O0 13,165.00 0.0(3 13,165.00 12,555.00 610.00 000 100 18Alum Entrances&Windows Empirehouse 111,905.00 696.00 112,601.00 111,727.00 5,586.35 106,140.65 106,140.65 0.00 6,460 35 99 19Ceramic Tile Twin City Tile 98,860.00 330.00 99,190 O0 99,190.00 0.00 99,190.00 99,190.00 0.00 0 O0 100 20Acoustical Treatments Ceilings&Floors 48~485.00 700.00 49,185 O0 48,885.00 2~444.25 46,440.75 46,440.75 000 2~744 25 99 21Resil Floor&Carpeting Spectra Contrac 74,GO0.00 7,307.27 81,907 27 81,907.27 4,095.36 77,811.91 77,811.91 000 4,095 36 1 O0 22Wallcovering&Painting Steinbrecher Pa,76,800.O(] 3,357.00 80,157 O0 79,198.0(] 3,959.90 75,238.1(] 75,238.10 000 4,91890 99 23Final Cleaning Marsden Maint 8,685.00i 0.00 8,685 O0 8,685.0(3 0.00 8,685.0(] 2,811.60 5,87340 0 O0 1 24Exterior Bldg Si,qnage Bardey Sales 4,541.00: 7,987.00 12,528.00 12,528.0(] 0.00 12,528.0(] 12,528.00 0.00 0.00 1 0(] 25Awnings Hoigaard's 15,950.00 0.00 15,950 O0 15,950.0¢ 797.50 15~152.50~ 15~152.50 000 797 5(] 1 28Loading Dock Equipment V Anderson 5~300.00 0.00 5,300.00 5,300.00' 265.00 5,035.00 5,O35.00 0.00 265 O(] 10C 33Hydraulic Elevators Schindler Elev 44,760.00 1~600.00 46~360.00 46,360.00 0.00 46~360.00 46,360.00 0.00 0 0(] 10(] 34Plumbing&Hydr&PipingAlbers Mechan Z87,045.00 40,469.82 327,514.82 322,153.82 16,107.69 306,046.13 306,O46.13 0.00 21,468 69 35Fire Protection Systems Tri-State Fire 27,200.00 0.00 27,200.00 16,320.00 816.00 15,504.00 15,504.00 0.00 11,696.0(] 60 36HVAC&Ductwork Systems Weidner Plumb 224,000.00 27,420.O0 251,420.00 251,715.00 12,585.75 239,129.25 239,129.25 0.00 12,29075; 1 O0 37HVAC Control SystemsDirect Digitat 102,793.00 7,102.00 109,895.00 109,895.00 0.00 109,895.00 109,895.00 0.00 0 00 100 38Electrical Reliance Electr 384,672.00 17,350.00 402,022.00 40Z,OZZ.O0 0.00 402~022.00 402,022.00 000 0~_O0 100 3~Test&Adjust&Balancing Systems Mgmt 14,700.00 0.00 14,700.0(~ 14~700.00 735.00 13,965.00 12,619.80 1,345.2(] 735.00 100 Cost To Finish Masonry Gresser Compar 18,300.00 11,185.00 29,485.0C 29,485.00 1,474.00 ZB,011.00 28,011.00 0.00 1 ~474 O0 1 00 Additional Work Gresser Compan 603.00 0.O0 603.00: 603.00 0.00 603.00 603.00 0.001 0 O0 100 Fire Exting. & Cabinets Nardini Fire Equi 362.10 0.00 362.10 362.10 0.00 362.10 362.10 000 000 1 00 Fiber Optic Observation of W GME Consultant.'767.50 0.0(] 767.50 767.50 0.00 767.50 767.5(] 0.00 0.00 100 Constr Management Fee Kraus Anderson 62,956.00 O.OC 82,956.00 62,956.00 3,148.00 59,808.00 59,808.0(] 0.00 3,148 O0 1 O0 Rupp Industries, Inc.-Temp Ht Kraus -Anderson 2,140.17 0.00 2 ~ 140 17 2,140.17 0.0(~ 2 ~ 140.17 2 ~ 140.17: 0 00 0 O0 1 O0 JME-Dumpsters Kraus-Anderson 14~956.13 0.00 14,956.13 14~956.13 0.0(] 14,956.13 14~956.13 0.00 0.00 1 00 599TOTAL 314831119.90 1691853.59 3,65~?,973.4931612,176.49 85~496.48 3,526,680.01 3,499,665.06 27~014.95 126,293.48 99 Page 2 of 2 FINAL PAYMENT ESTIMATE NO. 6 FROM: May 14, 2004 TO: July 9, 2004 CONTRACTOR: ADDRESS: OWNER: PROJECT: W.B. MILLER 6701 NORRIS LAKE ROAD, NW. ELK RIVER, MN 55330 CITY OF ELK RIVER, MINNESOTA CONCORD STREET AND BOSTON STREET, STREET AND UTILITY IMPROVEMENTS COMPLETION DATE ORIGINAL: REVISED: June 25, 2004 AMOUNT OF CONTRACT: ORIGINAL: $353,613.90 REVISED: ~.MOU NT EARNED AM~O~-' E~T~iNE~ .................. MATERIAL ON SITE MATERIAL DEDUCT. PREVIOUS PAYMENTS AMOUNT DUE $20,334.90 $0.00 $0.00 .... $0.o° $0.00 $316,750.85 $20,334.90 PARTIAL PAYMENT ESTIMATE NO. 2 FROM: June 16,2004 TO: JuJy 30, 2004 CONTRACTOR: MUr~cipal Builders, Inc. ADDRESS: 17125 Roanoke St. NW, Anoka, MN 55304 OWNER: City of E~ River PROJECT: VVVVTP Prima,mi Digester Improvements COMPLETION DATE AMOUNT OF CONTRACT ORIGINAL: May31, 2005 ORIGINAL: $609,750.00 REVISED: REVISED: SCHEDULE 1.0 -VORTEX MIXING SYSTEM 1 Mixer LS 1 30,000.00 2 Pump, misc items LS 1 30,000.00 T43TAL -SCHEDULE t.0 -VORTEX MIXING SYSTEM SCHEDULE 2,0 - FIXED DIGESTER COVER 1 Digester Cover LS I 107,000.00 2 Welding LS 1 67,000.00 3 Sludge Removal LS 1 26,000.00 TOTAL - SCHEDULE 2.0 - FIXED DIGESTER COVER SCHEDULE 3.0 - COMPLETE PROJECT 1 Mobiff, Zalion LS 1 25,750.00 2 Bond & insurances LS 1 22,000.00 3 Cencrete LS 1 14,000.00 4 Handrail LS 1 23,000.00 5 Demoi~o~ & Remo~ls LS 1 40,000.00 6 Process Ptpe~d( LS I 61,100.00 7 Process Pump LS 1 12,000.00 8 Heat Exchanger LS I 26,000.00 9 Spray !nsuL (~ Dig Roof LS 1 16,000.00 10 Paining LS I 38,100.00 11 Eleclrical LS I 64,300.00 12 Conc. Crack Repair LF 150 50.00 TOTAL - SCHEDULE $.0 - COMPLETE PROJECT SCHEDULE 4.0 - CHANGE ORDERS 1 Change Order No.1 TOTAL ~ SCHEDULE 4.0 - CHANGE ORDERS BID SUMMARY SCHEDULE 1.0 - VORTEX MIXING SYSTEM SCHEDULE 2.0 - FIXED DIGESTER COVER SCHEDULE 3.0 - COMPLETE PROJECT SCHEDULE 4.0 - CHANGE ORDERS TOTAL BID SUMMARY THIS PERIOD TOTAL BID SUMMARY TO DATE PERCENT' COMPLETE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.2 5,150.00 0.2 5,150.00 0.00 1 22,000.00 0.5 7,000.00 0.5 7,000.00 0.00 0.09 3,600.00 0.093,600.00 0.09 5,499.00 0.095,499.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 4,501.00 0.07 4,501.00 0.00 0.00 25,750.00 47,750.00 TOTAL THIS PERIOD 0.00 TOTAL TO DATE 0.00 0.00 0.00 25,750.00 47,750.00 0.00 0.00 25,750.00 47,750.00 7.83 AMOUNT EARNED $25,750.00 $47,750.00 :.: .............. ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: :.:.:.:.:.:.:.:.:. ::::::::::::::::::::::::::::: : :::::: :::: : :: : ::::: :::::::::::::::::::::: AMOUNT RETAINED $1,287.50 $2,387,50 MATERIAL ON SITE $0.00 $0.00 MATERIAL DEDUCT. $0.00 $0.00 AMOUNT DUE S24,462.50 $24,462.50 o:~pro1~822550 J~Construcfion~PR#2-072704-M BI.xJs PACE 1 PARTIAL PAYMENT ESTIMATE NUMBER: PROJECT: DATE: PERIOD: FILE NO: Ice Rink Floor Replacement Elk River, Minnesota July 9, 2004 July 7, 2004 through July 7, 2004 6009 S TEV E N S PERCENT COMPLETED AFTER THIS ESTIMATE: ORIGINAL CONTRACT PRICE: Change Order Numbers: Net Contract Price Change: CURRENT CONTRACT PRICE: Total Completed to Date: Materials Stored: Total Completed and Materials Stored: Less Retainage (10% of Total Contract Amount): REDUCED TO 5% TOTAL EARNED LESS RETAINER: Less Previous Payments: TOTAL DUE THIS ESTIMATE: $ $ $ $ $ $ $ $ $ $ 96.5% 384,696.00 1 18,264.00 402,960.00 303,176.00 85,784.00 388,960.00 19,448.00 369,512.00 280,934.00 88,578.00 Recommended for Approval by: STEVENS ENGINEERS, INC. Scott A. Ward, P.E. - See attached signature Approved by Contractor: COMMERCIAL REFRIGERATION SYSTEMS, INC. See attachment for approval Approved by Owner: CITY OF ELK RIVER, MN Signature: Printed Name: Date: 1 of 2