10.1. SR 09-08-2015 EOty1� ,.,�� Request for Action
River
To Item Number
Mayor and City Council 10.1
Agenda Section Meeting Date Prepared by
Worksession September 8, 2015 Michael Hecker, Parks and Recreation Director
Item Description Reviewed by
Rivers Edge Commons Park Expansion Proposed Cal Portner, City Administrator
Dock and Related Access Reviewed by
Action Requested
Discuss and provide staff direction regarding a proposed dock as an addendum to the Rivers Edge
Commons Park Expansion Project.
Background/Discussion
Members of the community approached City Council with the idea to construct a dock on the Mississippi
River at Rivers Edge Commons Park. The City Council directed staff to review options for a possible
dock.
Staff found, through the DNR, that a seasonal dock,which could be removed during the winter months,
was a possibility.
The Park Concept Plan was approved by Council earlier this year. Preliminary design to accurately
determine the cost and feasibility of the dock and related access is estimated to cost approximately
$8,700. The actual construction documents and construction administration will be an additional cost.
Paul Paige from HKGi will attend City Council meeting to discuss the proposal of adding a dock to the
current park project.
Financial Impact
N/A
Attachments
■ Rivers Edge Commons Park Concept Plan
■ Dock Proposal
POWERED 6T
Template Updoted 4/14 INAWRE1
----------------- �---_-----
1
GFI
V
r i I
NO CHANGE
—sem Yom. REMOVE/REGRADE
ALLEYWAY T P
UTILITIES
. relocate light control box/cable box
consolidate electrical
i
UPPER PLAZA
add plaza /
shelter
open for bleachers �' EXPANDED SEATING
'��� f WITH LIMESTONE a i
CURVED RETAINING WALLS shelter
decorative railing
' ` S IAGE AREA J/
• i yrs • <l Enlarge stage
STEPS'
STORMWATER
WATERFALL
long t r
term _
-
park BRIDGE ` NO
expansion CHANGE TO -' f
area PERMEABLE `
PAVERS GAZEBO 1. .
qr
CREATE STRONGER EDGE
- restore slope with prairie plantings
STORMWATER
Yr STEPS WATERFALL
TO RIVER
LANDING
ADA ramp as future option r W =
• landing set
above ordinary ACCESS RIVER
high water level formal stairs to landing
informal stone steppers into water
ADA ramp-future option
�. � � floating seasonal dock(DNR review required)
Elk River River's Edge Expansion 2016 — HKGi Aug242015
Additional task: Dock and related access design
Task 1-Background Review
Review River water elevation records and flood events to establish average and historical high and low
water levels as a basis for dock and gangway design.
Review with other communities on river that have docks and there experience with products/design,
maintenance, storage approaches. Likely candidate cities include Monticello and Anoka.
Review with MNCOR the parameters of custom dock and gangway options available.
Update survey base map for elevations and grading at shoreline and field verify specific rock and tree
situations in the area of the future dock.
Task 2—Access and Dock Feasibility Study
Based on discussions with area cities regarding best practices for their docking systems,the HKGi team
will create a preliminary layout for stair/step access and gangway/dock(ADA ramp not in scope),
including the following:
• Concrete step with hand rails—material and foundation to be verified
• Concrete landing with small overlook with seating area above average high water line
• Explore concrete or stone steps to dock ramp/gangway
• Dock ramp/gangway with railings hinged for adjustment to water levels
• Dock with railing suitable for fishing, and boat access area without railing for boat tie up
• Explore integration of kayak docking options
• Landscape/shoreline restoration plan as required
• Consider how access fits in with future park improvements—future trail/ADA ramp
• Structural and Civil schematic approach (not detailed engineering) of planned improvements to
accommodate high water events—pilings, slab on grade, anchoring system, etc.
• Update the project construction estimate based on the schematic design approach for the
stair/gangway/dock
Task 3-Develop Maintenance Plan
Assist City in developing plan for removal and storage. Including time of year, additional resources
needed, location for storage, and routine maintenance.
Assist City in developing plan for mitigating potential damage due to strong currents and damaging river
debris.
Task 4-Related Permitting
Permits required are anticipated to be:
a. City of Elk River
i. Conditional Use Permit for the stair/gangway/dock
ii. Shoreland Permit
iii. Floodplain Permit
iv. Excavation and Filling Permit
v. Certification of No Rise (recommended as otherwise additional requirements
will apply)
b. MnDNR—no permit is needed as long as the MnDNR is in agreement that the project
does not obstruct navigation or create a water safety hazard and that the project meets
the following seven conditions identified in Mn Rules 6115.0210 Subp. 4:
i. The structure or mooring facility will not constitute a hazard to navigation or
public health, safety, and welfare, as determined by the commissioner.
ii. The structure will allow the free flow of water beneath it
iii. The structure or mooring facility is not used or intended to be used as a marina
iv. The structure of mooring facility is consistent with or allowed under local land
use controls, as determined by the local government land use authority.
v. The structure, other than a watercraft lift or watercraft canopy, is not more
than eight feet in width and is not combined with other similar structures so as
to create a larger structure
vi. Docks placed on rock filled cribs are located only on waters where the bed is
predominantly bedrock,which is incapable of accepting pilings
c. USACE—a Section 10 permit may be required as the project may be in a navigable water
of the US. If required,the USACE permitting process may take 4 to 6 months to
complete. Further communication with the USACE District staff will need to occur to
verify the applicability of this permit relative to the stair access/dock project.
Task 5—Civil/Structural Engineering and Site related Construction Documents
a. Once a final design has been established,the HKGi team will incorporate the supported
access/gangway/dock configuration into the CD package. Civil and structural engineering
tasks will be required to ensure that the public investment will be able to sustain high
water events. The exact scope of engineering will be determined once an agreed upon
design and maintenance approach are refined through Tasks 1 through 4.
b. Required documentation is anticipated to be; enlarged layout plans, site sections, and
details related to the stair,gangway, and dock will be included. Supporting specification
sections will also be developed to incorporate the design into the upcoming 2016 park
improvement project.
Task 6—Construction Administration
c. Review and approval of shop drawing submittals for dock,gangway, and achorage
system
d. Construction observation of the proposed stairway/gangway/dock installation and
related site work
e. Review and administer pay requests and forward to City for payment as part of the phase
one project
f. Coordinate as-builts with selected contractor as part of project closeout
This proposal is based on the following assumptions:
1. Dock system is provided by MINNCOR Industries (a DNR approved vendor). Other vendors may
need additional review time/tasks
2. The dock system is intended to be seasonal with removal in the late fall
3. Structural engineering of any required foundations or anchor systems is not included in the
basic tasks (detailed engineering is proposed as future task 5). This service, if required,will be
estimated once a design has been established
4. A USACE Section 10 Permit is assumed to not be required. If required,this may be a time
consuming task. See description above for additional information
5. A DNR permit is not required.
6. Legal review of potential liability exposure is not in this scope, and is assumed to be done
concurrently by City staff
7. Coordination with FEMA, if required, is not part of this scope
Proposed Design and Engineering Fees:
Due to the undetermined nature of the final design of the access stair/gangway/dock,the HKGi team
proposes to include tasks 1 through 4 as an initial step in determining the viability/feasibility of the dock
design and as a means of providing a more realistic design prior to determining the scope for tasks 5 and
6.
Tasks 1 through 4 will provide enough background and preliminary design to accurately determine the
cost and feasibility of the dock and related access.
The HKGi team proposes to accomplish Tasks 1 through 4 of the above described scope for a fee of
$8,700.