Loading...
2.5. SR 08-25-2004Elk p, dver Municipal Utilities 13069 Orono Parkway Elk River, MN 55330 Item { 2.5. phone: 763.441.2020 Fax: 763.441.8099 August 16, 2004 To: Elk River City Council Elk River Municipal Utilities From: Bryan Adams Subject: Future Sites for Water Facilities Pat Klaers asked if I would update the City Council on future sites for Water facilities. Attached is a marked-up city map reflecting the location of our existing and future water facilities. These facilities are as follows. Well & Treatment Plant #2 ... 505 Great River Energy Drive Well & Treatment Plant #3 ... 741 Quinn Avenue Well & Treatment Plant #4 & Water Tower ... 18586 Gary Street Well & Treatment Plant #5 & Water Tower ... 19533 Gary Street Well & Treatment Plant #6 ... 19506 Old Railroad City Trail Well & Treatment Plant #7 ... 18561 Tyler Street Well #8 (piped to facility #7 for treatment) ... 11001 190th Avenue NW Water Tower ... 19119 Freeport Street Water Tower & possible future well site ... 17721 Johnson Street Future Well 9 & 10 (piped to facility #5 for treatment) ... 198th Avenue NW Future Well # 11 (piped to facility #7 for treatment) ... Trout Brook Estates Future Well #12 & Treatment Facility ... Orrin Thompson Homes Development Each Well at 1000 gallons per minute or 1.4 million gallons per day, can serve approximately 750 homes at current usage. Lawn water sprinkling usage is the driving factor for our water system capacity. See the attached graph. Peak day winter consumption is approximately 1.2 million gallons per day, which is approximately what the Waste Water System handles. Peak day summer consumption is approximately 5.3 million gallons per day. The difference is lawn sprinkling. The timing and extent of the water system expansion from the intersection of 171 st Avenue and Highway 10 heading southeast along Highway 10 to Ramsey is unknown at this time. This expansion will probably necessitate a water tower and addition wells. As a final note, the water system continues to struggle to deliver enough water to the west business park area. This is the reason the booster/pressure reducing station was constructed at Meadowvale Road at the railroad tracks along with upsizing the water mains at 4th and 5th Street in the Rush/Morton area. If a significant water user locates in the west industrial park or the fairground is relocated and this area becomes residential, another peaking well may be required with the water being treated at Treatment Plant #4. We are looking at a small piece of the vacant land east of the City Hall complex for a possible location. Elk River Municipal Utilities Monthly Water Pumpage 120 · -~ 100 ~ 8O ~ 4O E ~. 20 Month Elk River Municipal Utilities Peak Day Pumpage ~m mm m% Month ~78TH 177TH 174TH ~75RD 172ND WF. LL/, ) WELL 198PH 180TH 179TH 177TH 176TH 175TH 174TH ]/3RD 172ND