4.2. SR 09-21-2015Request for Action To Item Number Mayor and City Council 4.2 Agenda Section Meeting Date Prepared by Consent September 21, 2015 Justin Femrite P.E., City Engineer Item Description Reviewed by Pay Estimates Tim Simon, Finance Director Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, the pay estimates as detailed below Background/Discussion The following pay estimates have been reviewed and found to be accurate and in accordance with the approved contracts. Financial Impact PROJECT WWTF Improvements 2015 Street Improvements Attachments ■ Pay Estimates PAY EST. # CONTRACTOR 10 Rice Lake Construction Group 4 North Valley, Inc. AMOUNT $1,323,544.27 $476,868.72 POWERED 6T AR Application for Payment Contractor's Certification The undersigned Contractor cortifles that: (1) all previous pnlgh payments reralved from Owner on account of Work done under Contract have been applied on account to discharge Contrecl legitimate obligations Incurred in connection with Work covered by I Applications for Payment; (2) title or as Work, materials and equipn incorporated In said Work or otherwise listed in or covered by Application for Payment will pees to Owner at time of payment free dear of all Liens, security interests and encumbrances (except such as covered by a Band acceptable to Owner indemnifying Owns against such Liens, security interest or encumbrances); and (3) all Work cove by this Application for Payment is In accordance with the Cont Documents and is not defective. Contractor's Application For Payment No. 10 ORIGINAL CONTRACT PRICE Net change by Change Orders CURRENT CONTRACT PRICE (Line 1 t 2) TOTAL COMPLETED AND STORED TO DATE (Column F on Progress Estimate) RETAINAGE: 5% x $6,340,994.99 Work Completed . 5% x $0.00 Stored Materials Total Retalnage (Line 5a+ Line fib) AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c) LESS PREVIOUS PAYMENTS (Line 6 from prior Application) AMOUNT DUE THIS APPLICATION BALANCE TO FINISH, PLUS RETAINAGE (Column G on Progress Estimate+ Line 6 above) $16,525,200.00 $259,991.59 $16,785,191.59 $8,340,994.99 $417,049.75 $417,049.75 $7,923,945.24 $6,600,400.97 $1,323,544.27 $8,861,246.35 Payment of: $1,323,544.27 (Line B or other-F�Rtlon of other amount) Is recommended by: O" A • 11 Sept. 2015 (Engineer) (Date) Payment of: $1,323,544.27 (Line 8 or other - attach explanation of other amount) is approved by: Approved by: (Finance Director) (Date) Funding Agency (if applicable) (Date) VJCW Na. C420 (2002 Mr..) Pnpaal by Ibe Enh{i.-dolor O."d eummane Ceamied and mderrM by the Adaeiaad nenerd Cwindnn of A.H. wd dr Cemrnldan SaMf deem Imtiloe. Project Owner: City of Elk River Applicalion Number 10 Date of application 9/4/2015 Work completed Ihrough: 91412015 Wastewater Treatment Facility Improvements 2014 Contractor: Rice Lake Construction Group Engineer: Bolton & Monk, Inc. Item Pay Item Number Description B Scheduled Value C From Previous Application (C+D) D E This Period Materials Presently Stored (not in Col D) Total Completed and Stored to Date (C + D + E) % U Balance to Finish 01001 Performance Bond $230,186.00 $230,186-00 $230,186.00 100.00 $0.00 01002 Insurance $161,171.00 $161,171.00 $161,171.00 100.00 $0.00 01003 Mobilimtion $635,418.00 $635,418.00 $635,418.00 100.00 $0.00 01004 Demobilization $30,000.00 $0.00 $0.00 0.00 $30,000.00 01005 Project Allowances $748,380.03 $0.00 1 $0.00 0.00 $746,380.03 01005.1 Submittal Exchange $9,795.00 $9,795.00 $9,795.00 100.00 $0.00 01005.2 Building Permit $29,530.04 $29,530.04 $29,530.04 100.00 $0.00 01005.3 Lift Station SCADA System Allowance $230,000.00 $242,268.59 $242,268.59 105.33 ($12,268.59) 01005.4 COP#01-Automatic Door Operators $5,963.20 $5,963.20 $5,963.20 100.00 $0.00 01005,5 COPk02- Overflow for Biosolids Holding Tank $2,787.42 $2,787.42 $2,787.42 100.00 $0.00 01005.6 COP#03 -Additional Window in Door 112B $323.84 $323.04 $323.84 100.00 $0.00 01005.7 COPH04 - Delay Casts IN COI BELOW 01005.8 JCOP#05 - Revised Plans $0.00 $0.001 #DIV/01 $0.00 01005.9 COP#06-Black Material $106,703.90 $106,703.90 $106,703.90 100.00 $0.00 01005.10 COP#07-Side Gate 16 $5,36191 $5,361.91 $5,361.91 100.00 $0.00 01005.11 COP#08 - Aeration Basin Sumps $10,693.54 $10,693.54 $10,693.54 100.00 $0.00 01005.12 COP#09- Biosolids OH Doors $37,350.46 $37,350.46 $37,350.46 100.00 $0.00 01005.13 COP#10-Aeration Pipe Drop Legs ($3,500.80) ($3,500.80) ($3,500.80) 100.00 $0.00 01005.14 COP#11 - Vitan Gaskets $11,424.54 $11,424.54 $11,424.54 100.00 $0.00 01005.15 COP#12- Supernatant MH Vent $3,686.92 $3,686.921 $3,686.92 100.001 50.00 02060 Demolition of Existing FacilitleelPavement 02060.1 -Main Building $40,000.00 $15,000.00 $15,000.00 37,501 $25,000.00 02060.2 -Blower Building $15,000.00 $0.00 $0.00 0.00 $15,000.00 02060.3 -Aeration Tank $20,000.00 $0.00 $0.00 0.00 $20,000.00 02060.4 - Trickling Fillers & Pump Station $45,000.00 $0.00 $0.00 0.00 $45,000.00 02060.5 - Final Clarifier Sludge Wel Well $10,000.00 $0.00 $0.00 0.00 $10,000.00 02060.6 -Pavement $10,510.00 $8,500.00 $8,500.00 80.88 $2,010.00 02140 Bypass Pumping $75,000.00 $0.00 $0.00 0.00 $75,000.00 02220 Earthwork 02220.1 - New Aeration Basins $355,815.00 $355,815.00 $355,815.00 100.001 $0.00 02220.2 - New Proposed Aerated Biosolids Control Bldg 2 $65,000.00 $65,000.00 $65,000.00 100.00 $0.00 02220.3 - New R4SANAS Building $58,000.00 $45,000.00 $13,000.00 $58,000.00 100.001 $0.00 02220.4 - New Operations Building $85,000.00 $0.00 $0.00 0.00 $85,000.00 Page 2 of 7 Project Owner: City of Elk River Application Number 10 Date of application 9/4/2015 Work completed through: 9/4/2015 Wastewater Treatment Facility Improvements 2014 Contractor'. Rice Lake Construction Group Engineer: Bolton & Monk, Inc. Pay Item Number Item Description B Scheduled Value C From Previous Application (C+D) D This Period E Materials Presently Stored (not in Col D) Total Completed and Stored to Data (C + D + E) % (J Balance to Finish 02550 Site Piping 02550.1 -Purchase $690,000.00 $409,500.00 $175,000.00 $584,500.00 84.71 $105,500.00 02550.2 -Install $426,947.00 $67,500.00 $60,000.00 $127,500.00 29.86 $299,447.00 02600 Bituminous PavemenUClass S/Sidewelks $149,490.00 $0.00 $0.00 0.00 $149.490.00 02030 Chain Link Fence & Gates $18,690.00 $10,000.00 $10,000.00 52.94 $8,890.00 02835 Retaining Walls $25,000.00 $0.00 $0.00 0,001 $25,000.00 02920 Seeding/Landscaping $16,000.00 Sent) $0.00 0.00 $16,000.00 03200 Concrete Reinforcement 03200.1 -Purchase $661,997.00 $620,000.00 $10,000.00 $630,000,00 95.17 $31,997.00 03200.2 -Install $312,165.00 $287,988.00 $7,500.00 $295,488.00 94.66 $16,677.00 03300 Concrete Work 03300.1 -Aeration Basin $1,190,000.00 $1,138,000.00 $52,000.00 $1,190,000.00 100.00 $0.00 03300.2 -RASNJAS Bulking $215,000.00 $100,000.00 $25,000.00 $125,000.00 58.14 $90,000.00 03300.3 -Aerated Biosolids Control Bldg Na 2 $110,000.00 $110,000.00 $110,000.00 100.00 $0.00 03300.4 -Operations Building $148,000.00 $0.00 $0.00 0.00 $148,000.00 033005 -Gsneralor 8 Transformer Pads $20,000.00 $20,000.00 $20,000.00 100.00 $0.00 03400 Precast Walls & Plank $1,062,500.00 $388,237.50 $388,237,50 36.54 $674,262.50 04810 Masonry $75,000.00 $0.00 $0.00 0.00 $75,00000 05500 Misc. Metals 05500.1 -Purchase $200,000.00 $28,000.00 $28,000.00 14.00 $172,000.00 05500.2 -Install 595,000.00 $10,000.00 $10,000.00 10.53 $85,000.00 06100 Carpentry 06100.1 -Purchase $18,000.00 $2,500.00 $2,500,00 13.89 $15,500.00 06100.2 -Install $22,000.00 $2,500.00 $2,500.00 11.36 $19,500.00 07150 Dampproofing $31,638.00 $5,00000 $5000.00 15.60 $26,638.00 07535 Roofing $235,078.00 $68,000.00 $68,000,00 28.93 $167,078.00 07900 Caulking $26,870.00 $7,500.00 $7,500.00 27.91 $19,370.00 08110 Doors & Frames 08110.1 -Purchase $57,780.00 $25,000.00 $25,000.00 43.27 $32,780,00 08110.2 -Install $35,00000 $0.00 $aoo 0.00 $35,000.00 08360 Upward Acting Sectional Doors $36,600.00 $0.00 $0.00 0.00 $36,600.00 08500 Windows $25,000.00 $0.00 $0.00 0.00 $25,000.00 08800 Steel Studs/Gypsum $22,869.00 $0.00 $0.00 0.00 $22,869.00 Page 3 of 7 Project: Owner: Cityof Elk River Application Number 10 Date of application 91412015 Work completed through: 91412015 Wastewater Treatment Facility Improvements 2014 Contractor: Rice Lake Construction Group Engineer: Bolton & Monk, Inc. Pay Item Number Item Description B Scheduled Value C From Previous Application (C+D) D E This Period Materials Presently Stored (not in Col O) Total Completed and Stored to Date (C+D+ E) % U Balance to Finish 09310 CoramlcRtesillant Tile $30,000.00 $0.00 $0.00 0.00 $30,000.00 09510 Acoustical Calling $6,500.00 $0.00 $0.00 0.00 $6,500.00 09900 Painting $373,921.00 $84,000.00 $43,500.00 $127,500.00 34.10 $246,421.00 10110 Marker BoarderTollet CompartmentsiToilet Accessories 10110.1 -Purchase $8,000.00 $0.00 1 30.00 0,00 $8,000.00 10110.2 -Install $3,000.00 $0.00 $0.00 0.00 $3,000.00 10250 Safely Devices 10250.1 -Purchase $10,000.00 $0.00 $0.00 0.00 $10,000.00 10250.2 -Install $3,500.00 $0.00 $0.00 0.00 $3,500.00 10505 Metal Lockers 10505.1 -Purchase $10,000.00 $0.00 $0.00 0.00 $10,000.00 10505.2 -Install $4,000.00 $0.00 $0.00 0.00 $4,000.00 11280 Hydraulic Gates 11280.1 -Purchase $50,000.00 $50,000.00 $50,000.00 100.00 $0.00 11280.2 -Install $20,000.00 $0.00 $0.00 0.00 $20,000.00 11311 Submersible Centrifugal Pumps 11311.1 -Purchase $278,858.00 $264,924.60 $264,924.60 95.00 $13,943,40 11311.2 -Install $25,000.00 $0.00 $0.00 0.00 $25,000.00 11345 Chlorination & Dechlorina0on Eq. 11345.1 -Purchase $330,000.00 $0.00 $0.00 0.00 $330,000.00 11345.2 -Install $20,000.00 $0.00 $0.00 0.001 $20,000.00 11351 Clarifier Equipment 11351.1 -Purchase $15,000.00 $13,507.74 $13,507.74 90.05 $1,492.26 11351.2 -Install $12,000.00 $0.00 $0.00 0.00 $12,000.00 11359 Screw Press 11356.1 -Purchase $575,000.00 $0.00 $0.00 0.00 $575,000.00 11356.2 -Install $25,000.00 $0.00 $0.00 0.00 $25,000,00 11374 IFIne Pore Aeration Equipment 11374.1 -Purchase $100,000.00 $84,000.00 $11,000.00 $95.000.00 95.00 $5,000.00 11374.2 -Install $75,000.00 $15,000.00 $15,000.00 $30,000.00 40.00 $45,000.00 11375 Blower System (PD w/Enclosure) 11375.1 -Purchase $180,000.00 $0.00 $0.00 0.00 $180,000.00 11375.2 -Install $30,000.00 $0.00 $0.00 0.00 $30,000.00 Page 4 of 7 Project: Owner: City of Elk River Application Number 10 Date of application 91412015 Work completed through: 9/412015 Wastewater Treatment Facility Improvements 2014 Contractor: Rice Lake Construction Group Engineer Bolton & Monk, Inc. Page 5 of 7 Item B C D E Total Completed % Balance to Pay Item Number Description Scheduled Value From Previous Application (C+D) This Period Materials Presently Stored (not in Col D) and Stored to Date (C + D + E) U Finish 11376 Hybrid Blower System (Alt. No. 2) 11376.1 -Purchase $270,000.00 $0.00 $256,500.00 $256,500.00 95.00 $13,500.00 11376.2 -Install $25,000.00 $0.00 $6,500.00 $6,500.00 26.00 $18,500.00 11385 Coarse Bubble Aerobic Digester Mixing System 11385.1 -Purchase $65,000.00 $0.00 $0.00 0.00 $65,000.00 11385.2 -Install $40,000.00 $0.00 $0.00 0.00 $40,000.00 11386 Rapid Mixers 11386.1 -Purchase $26,000.00 $24,700.00 $24,700.00 95.001 $1,300.00 11386.2 -Install $3,500.00 $0.00 $0.00 0.00 $3,500.00 11387 Submersible Mixers 11387.1 -Purchase $75,000.00 $67,500.00 $87,500.00 90.00 $7,500.00 11387.2 -Install $12,000.00 $D.00 $0.011 0.00 $12,000.00 11636 Phosphorus Analyzer 11636.1 -Purchase $26,000.00 $16,500.00 $16,500.00 63.46 $9,500.00 11636.2 -Install $5,000.00 $0.00 $0.00 0.00 $5,000.00 12346 CaceworklLab Eq. $45,000.00 $0.00 $0.00 0.001 $45,000.00 13126 Circular Tank Covers 13126.1 -Purchase $292,837.00 $0.00 $0.00 0.00 $292,837.00 13126.2 -Install $75,000.00 $0.001 $0.00 0.00 $75,000.00 14300 Hoists & Cranes 14300.1 -Purchase $40,000.00 $0.00 $0.00 0.00 $40,000.00 14300.2 -Install $12,000.00 $0.00 $0.00 0.00 $12,000.00 14500 Materiel Handling Equipment 14500.1 -Purchase $10,000.00 $0.00 $0.00 0.001 $10,000.00 14500.2 -Install $2,500.00 $0.00 $0.00 0.00 $2,500.00 14600 Conveyance Equipment 14600.1 -Purchase $135,000.00 $0.00 $0.00 0.00 $135,000.00 14600.2 -Install $22,250.00 $0.00 $0.00 0.00 $22,250.00 14621 Power Winch 14621.1 -Purchase $20,000.00 $0.00 $20,000.00 $20,000.00 100.00 $0.00 14621.2 -Install $3,000.00 $0.00 $0.00 0.00 $3,000.00 15060 Process Piping 15060.1 -Purchase 1 $650,000.00 $95,000.00 $140,000.001 1 $235,000.00 36.15 $415,000.00 Page 5 of 7 Project: Omer: City of Elk River Application Number 10 Date of application 914f2015 Work completed through: 9412015 Wastewater Treatment Facility Improvements 2014 Contractor: Rice take Construction Group Engineer: Bolton & Menk, Inc. Page 6 of 7 Item B C D E Total Completed % Balance to Pay Item Number Description Scheduled Value From Previous Application (C -D) This Period Materials Presently Stored (not in Col D) and Stored to Date (C t D + E) U Finish 15060.2 -Install $200,000.00 $20,000.00 $50,000.00 $70,000.00 35.00 $130,000.00 15100 Valves 15100.1 -Purchase $265,000.00 $257,000.00 $8,000.00 $265,000.D0 100.00 $0.00 15100.2 -Install $110,000.00 $15,000.00 $15,000.00 $30,000.00 27.27 $86,000.00 15300 Fire Protection $45,000.00 $0.00 $0.00 0.00 $45,000.00 15400 Plumbing 15400.1 -Copper Piping 15400.1.1 -Purchase $45,000.00 $25,000.00 $25,000.00 55.56 $20,000.00 15400.1.2 -Install $100,000.00 $65,000.00 $65,000.00 65.00 $35,000.00 15400.2 -Chemical Piping 15400.2.1 -Purchase $18,000.00 $0.00 $0.00 0.00 $18,000.00 15400.2.2 -Install $22,000.00 $0.00 $0.00 0.00 $22,000.00 15400.3 -Waste & Vent Piping 15400.3.1 -Purchase $30,000.00 $27,000.00 $27,000.00 gatiol $3,000.00 15400.3.2 -Install $62,000.00 $55,800.00 $55,800.00 90.00 $6,200.00 15480 Packaged Compressed Air System 15480.1 -Purchase $5,000.00 $0.00 $0.00 0.00 $5,000.00 15480.2 -Install $1,500.00 $0.00 $0.00 0.00 $1,500.00 15500 HVAC 15500.1 Equipment $286,200.00 $106,3`18.001 $2,274.50 $108,592.50 37.94 $177,607.50 15500.2 Labor $169,020.00 $14,244.50 $14,244.50 8.43 $154,775.50 15500.3 Duct Insulation $24,780.00 $0.00 $0.00 0.001 $24,780.00 15500.4 Teat & Balance $5,000.00 $0.00 $0.00 0.001 $5,000.00 15950 HVAC Controls $67,400.00 $7,000.00 $7,000.00 10.39 $60,400.00 16000 Electrical 16000.1 General Provisions $55,000.00 $31,500.00 $31,500.00 57.27 $23,500.00 16000.2 Basic Materials and Methods $265,000.00 $31,500.00 $21,400.00 $52,900.00 19.96 $212,100.00 16000.3 Motors $32,000.00 $0.00 $1,400.00 $1,400.00 4.38 $30,600.00 16000.4 Power Generation System $414.000.00 $4,70D.00 $392,500.00 $397,200.00 95.94 $16,800.00 16000.5 Electrical Distribution $385,000.00 $9,700.00 $16,400.00 $26,100.00 6.78 $358,900.00 16000.6 Lighting $85,000.00 $17,600.00 $9,150.00 $26,750.00 31.47 $58,250.00 16000.7 Special Systems $24.000.00 $0.00 $980.00 $980.00 4.08 $23,020.00 16000.8 Istarters and Motor Control $330,000.00 $7,100.00 $4.200.001 1 $11,300.001 3.42 $318,700.00 Page 6 of 7 Project: Owner: City of Elk River Application Number 10 Date of application 9/412015 Work completed through: 914!2015 Wastewater Traatment Faculty Improvements 2014 Contractor: Rica Lake Construction Group Engineer: Bolton & Monk, Inc. Item Pay Item Number Description B Scheduled Value C From Previous Application (C+D) D This Period E Materials Presently Stored (not in Col D) Total Completed and Stored to Date (C+ D+ E) % (E) Balance t0 Finish 16000.9 Instrumentation and Control $480,000.00 $0.00 $36,900.00 $36,900.00 7.69 $443,100.00 Change Order No. 1 $259,991.59 $259,991.59 $259,991.59 100.00 $0.00 $16,785,191.59 $6,947,790.49 $1,393,204.50 $0.00 $813401994.99 49.69 $8,444,196.80 FJCDC No. C-620 (2002 Edition) Prepared by the E 8i ' Joint C t M Dommmis Committee and eudoned by the Associated General Contractan of America and the Canstroetion Specifications Institute. Page 7 of 7 CONTRACTOR'S PAY REQUEST DISTRIBUTION: CONTRACTOR (1) 2015 STREET IMPROVEMENTS OWNER (1) CITY OF ELK RIVER ENGINEER (1) SAP 204-135-001, 204-107-007, 204-114-003, 204-116-002 BONDING CO. (1) BMI PROJECT NO. N15.108340 TOTAL AMOUNT BID PLUS APPROVED CHANGE ORDERS $3,953,239.73 TOTAL, COMPLETED WORK TO DATE $2,317,893.45 TOTAL, STORED MATERIALS TO DATE $0.00 DEDUCTION FOR STORED MATERIALS USED IN WORK COMPLETED $0.00 TOTAL, COMPLETED WORK & STORED MATERIALS $2,317,893.451 RETAINED PERCENTAGE ( 5%) $115,894.67 TOTAL AMOUNT OF OTHER PAYMENTS OR (DEDUCTIONS) $0.00 NET AMOUNT DUE TO CONTRACTOR TO DATE $2,201,998.77 TOTAL AMOUNT PAID ON PREVIOUS ESTIMATES $1,725,130.05 PAY CONTRACTOR AS ESTIMATE NO. 4 $476,868.72'. Certificate for Partial Payment I hereby certify that, to the best of my knowledge and belief, all items quantities and prices of work and material shown on this Estimate are correct and that all work has been performed in full accordance with the terms and conditions of the Contract for this project between the Owner and the undersigned Contractor, and as amended by any authorized changes, and that the foregoing is a true and correct statement of the contract amount for the period covered by this Estimate. Contractor: North Valley, Inc. 20015 Iguana St NW # 100 ow 'en, M 5 Byc Name Title Date CHECKED AND APPROVED AS TO QUANTITIES AND AMOUNT: ENGINEER: OLTON & ENK, INC., 7533 Sunwood Drive NW, Suite 206, Ramsey, MN 55303 By f , PROJECT ENGINEER dy Lj Holmes, PP. -E-. Date APPROVED FOR PAYMENT: OWNER: By Name Title Date And Name Title Date Partial Pay Estimate No.: 2015 STREET IMPROVEMENTS CITY OF ELK RIVER SAP 204-135-001.204-107-007.204-114-003.204-116-002 BMI PROJECT NO. N15.108340 WCI=IX COMPLETED THROUGH AUGUST 28. 2015 1 2021.501 MOBILIZATION $149,206.38 1 LUMP SUM $149,206.38 1 LUMP SUM $149,206.38 1.00 LUMP SUM $149,206.38 2 2101.511 CLEARING AND GRUBBING $3,733.15 1 LUMP SUM $3,733.15 0 LUMP SUM $0.00 0.80 LUMP SUM $2,986.52 3 2104.501 REMOVE CONCRETE CURB & GUTTER $4.80 880 LIN FT $4,224.00 609 LIN FT $2,923.20 609.00 LIN FT $2,923.20 4 2104.501 REMOVE SEWER PIPE STORM $10.93 764 LIN FT $8,350.52 0 LIN FT $0.00 0.00 LIN FT $0.00 5 2104.503 REMOVE CONCRETE DRIVEWAY PAVEMENT $1.33 5013 SQ FT $6,667.29 4192 SQ FT $5,575.36 4,192.00 SQ FT $5,575.36 6 2104.505 REMOVE CONCRETE VALLEY GUTTER $14.40 40 SQ YD $576.00 56.2 SQ YD $809.28 56.20 SQ YD $809.28 7 2104.505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT $5.07 1628 SQ YD $8,253.96 977.4 SQ YD $4,955.42 3,151.50 SQ YD $15,978.11 8 2104.505 REMOVE BITUMINOUS PAVEMENT $6.24 400 SQ YD $2,496.00 0 SQ YD $0.00 0.00 SQ YD $0.00 9 2105.501 COMMON EXCAVATION P $17.60 16416 CU YD $288,921.60 0 CU YD $0.00 12,222.00 CU YD $215,107.20 10 2105.505 MUCK EXCAVATION LV $0.53 12000 CU YD $6,360.00 0 CU YD $0.00 0.00 CU YD $0.00 11 2105.507 SUBGRADE EXCAVATION EV $10.13 710 CU YD $7,192.30 483 CU YD $4,892.79 1,623.00 CU YD $16,440.99 12 2105.521 GRANULAR BORROW CV $0.53 14200 CU YD $7,526.00 0 CU YD $0.00 0.00 CU YD $0.00 13 2105.522 SELECT GRANULAR BORROW CV $0.53 710 CU YD $376.30 0 CU YD $0.00 0.00 CU YD $0.00 14 2105.535 PLACE SALVAGED AGGREGATE FROM STOCKPILE CLASS 7 $4.001 7275 CU YD $29,100.00 561 CU YD $2,244.00 4,150.00 CU YD $16,600.00 15 2105.607 POND EXCAVATION P $10.40 665 CU YD $6,916.00 0 CU YD $0.00 0.00 CU YD $0.00 16 2118.607 AGGREGATE SURFACING CV CLASS 2 $63.90 925 CU YD $59,107.50 646 CU YD $41,279.40 646.00 CU YD $41,279.40 17 2211.501 AGGREGATE BASE CV CLASS 5 $10.67 15570 TON $166,131.90 0 TON $0.00 2,801.00 TON $29,886.67 18 2215.501 BITUMINOUS PAVEMENT RECLAMATION IN-PLACE 8" DEPTH $1.62 48764 SQ YD $78,997.68 61018.68 SQ YD $98,850.26 61,018.68 SQ YD $98,850.26 19 2215.501 BITUMINOUS PAVEMENT RECLAMATION 8" DEPTH $2.08 32576 SQ YD $67,758.08 0 SQ YD $0.00 32,576.00 SQ YD $67,758.08 20 2231.501 BITUMINOUS PATCHING MIXTURE $0.01 675 TON $6.75 27.33 TON $0.27 27.33 TON $0.27 21 2231.604 BITUMINOUS PATCH - SPECIAL ROADWAY $42.35 800 SQ YD $33,880.00 781 SQ YD $33,075.35 781.00 SQ YD $33,075.35 22 2231.604 BITUMINOUS PATCH - SPECIAL DRIVEWAY $29.28 1938 SQ YD $56,744.64 977.4 SQ YD $28,618.27 2,023.50 SQ YD $59,248.08 23 2232.501 MILL BITUMINOUS SURFACE 1.5" $1.38 4226 SQ YD $5,831.88 108971 SQ YD $15,037.86 10,897.00 SQ YD $15,037.86 24 2232.501 MILL BITUMINOUS SURFACE 3" $1.11 6563 SQ YD $7,284.93 12852.86 SQ YD $14,266.67 12,852.86 SQ YD $14,266.67 25 2232.501 MILL BITUMINOUS SURFACE TAPER 0" - 2" $0.92 11305 SQ YD $10,400.60 8917 SQ YD $8,203.64 8,917.00 SQ YD $8,203.64 26 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 2,C $61.02 19037 TON $1,161,637.74 10312.59 TON $629,274.24 10,312.59 TON $629,274.24 27 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 4,E $60.09 3486 TON $209,473.74 3788.22 TON $227,634.14 3,788.22 TON $227,634.14 28 2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE 2,C $54.65 11648 TON 636563.2 6186 TON $338,064.90 6,186.00 TON $338,064.90 29 2411.618 MODULAR BLOCK RETAINING WALL $30.53 525 SQ FT $16,028.25 0 SQ FT $0.00 0.00 SQ FT $0.00 30 2501.515 12" RC PIPE APRON $602.64 16 EACH $9,642.24 0 EACH $0.00 0.00 EACH $0.00 31 2501.515 15" RC PIPE APRON $693.30 6 EACH $4,159.80 0 EACH $0.00 0.00 EACH $0.00 32 2501.515 18" RC PIPE APRON $735.96 6 EACH $4,415.76 01 EACH $0.00 0.001 EACH $0.00 33 2501.601 DRAINAGE IMPROVEMENTS AND REPAIR PIPE CULVERT $3,749.16 1 LUMP SUM $3,749.16 1 LUMP SUM $3,749.16 1.00 LUMP SUM $3,749.16 34 2501.602 TRASH GUARD FOR 12" PIPE ARPON $351.98 16 EACH $5,631.68 0 EACH $0.00 0.00 EACH $0.00 35 2501.602 TRASH GUARD FOR 15" PIPE ARPON $405.31 6 EACH $2,431.86 0 EACH $0.00 0.00 EACH $0.00 36 2501.602 TRASH GUARD FOR 18" PIPE ARPON $474.64 6 EACH $2,847.84 0 EACH $0.00 0.00 EACH $0.00 37 2503.541 12" RC PIPE SEWER DESIGN 3006 CLASS V $30.93 532 LIN FT $16,454.76 0 LIN FT $0.00 0.00 LIN FT $0.00 38 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V $33.07 229 LIN FT $7,573.03 0 LIN FT $0.00 0.00 LIN FT $0.00 39 2503.541 18" RC PIPE SEWER DESIGN 3006 CLASS V $37.33 300 LIN FT $11,199.00 0 LIN FT $0.00 0.00 LIN FT $0.00 40 2504.602 ADJUST GATE VALVE AND BOX $266.65 13 EACH $3,466.45 13 EACH $3,466.45 13.00 EACH $3,466.45 41 2504.602 RECONSTRUCT VALVE BOX $719.97 4 EACH $2,879.88 0 EACH $0.00 0.00 EACH $0.00 42 2506.522 ADJUST FRAME AND RING CASTING $426.65 25 EACH $10,666.25 10 EACH $4,266.50 10.00 EACH $4,266.50 43 2511.501 RANDOM RIPRAP CLASS II $98.13 42 CU YD $4,121.46 0 CU YD $0.00 0.00 CU YD $0.00 44 2521.602 6" CONCRETE SPILLWAY SPECIAL $213.32 89 EACH $18,985.48 0 EACH $0.00 28.00 EACH $5,972.96 45 2531.501 CONCRETE CURB & GUTTER DESIGN B618 $10.61 26613 LIN FT $282,363.93 634 LIN FT $6,726.74 9,868.00 LIN FT $104,699.48 46 2531.501 CONCRETE CURB & GUTTER DESIGN B818 MEDIAN $10.61 760 LIN FT $8,063.60 0 LIN FT $0.00 0.00 LIN FT $0.00 47 2531.503 CONCRETE MEDIAN 5" $38.40 96 SQ YD $3,686.40 0 SQ YD $0.00 0.00 SQ YD $0.00 48 2531.507 CONCRETE DRIVEWAY PAVEMENT 7" $43.20 1897 SQ YD $81,950.40 447.93 SQ YD $19,350.58 508.43 SQ YD $21,964.18 49 2531.604 CONCRETE MEDIAN NOSE - SPECIAL $57.60 42 SQ YD $2,419.20 0 SQ YD $0.00 0.00 SQ YD $0.00 50 2531.604 7" CONCRETE VALLEY GUTTER $57.60 40 SQ YD $2,304.00 56.2 SQ YD $3,237.12 56.20 SQ YD $3,237.12 Partial Pay Estimate No.: 2015 STREET IMPROVEMENTS CITY OF ELK RIVER SAP 204-135-001.204-107-007.204-114-003.204-116-002 BMI PROJECT NO. N15.108340 YOn,<COMPLETED THROUGH AUGUST 28.2015 51 2535.501 BITUMINOUS CURB 6") $6.24 2100 LIN FT $13,104.00 4159.5 LIN FT $25,955.28 4,159.50 LIN FT $25,955.28 52 2563.601 TRAFFIC CONTROL $8,746.24 1 LUMP SUM $8,746.24 0.5 LUMP SUM $4,373.12 0.95 LUMP SUM $8,308.93 53 2563.601 FLAG PERSON BNSF CROSSING $15,999.23 1 LUMP SUM $15,999.23 0 LUMP SUM $0.00 0.00 LUMP SUM $0.00 54 2564.531 SIGN PANEL TYPE C $32.00 435 SQ FT $13,920.00 3 SQ FT $96.00 3.00 SQ FT $96.00 55 2565.602 NMC LOOP DETECTOR 6'X 6' $1,056.42 39 EACH $41,200.38 38 EACH $40,143.96 38.00 EACH $40,143.96 56 2573.502 SILT FENCE TYPE MACHINE SLICED $1.92 6498 LIN FT $12,476.16 0 LIN FT $0.00 4,026.00 LIN FT $7,729.92 57 2573.53 STORM DRAIN INLET PROTECTION $127.99 48 EACH $6,143.52 45 EACH $5,759.55 45.00 EACH $5,759.55 58 2573.533 SEDIMENT CONTROL LOG TYPE WOOD CHIP $3.04 3870 LIN FT $11,764.80 0 LIN FT $0.00 147.001 LIN FT $446.88 59 2573.535 STABILIZED CONSTRUCTION EXIT $874.63 2 EACH $1,749.26 0 EACH $0.00 0.001 EACH $0.00 60 2574.508 FERTILIZER TYPE 3 $0.53 1745 POUND $924.85 350 POUND $185.50 350.001 POUND $185.50 61 2574.525 COMMON TOPSOIL BORROW CV $9.07 2360 CU YD $21,405.20 25 CU YD $226.75 25.00 CU YD $226.75 62 2575.501 SEEDING $133.33 5 ACRE $666.65 2 ACRE $266.66 2.00 ACRE $266.66 63 2575.502 SEED MIXTURE 25-121 $3.35 305 POUND $1,021.75 621 POUND $207.70 62.00 POUND $207.70 64 2575.562 HYDRAULIC MATRIX TYPE BONDED FIBER $1.07 17500 POUND $18,725.00 3500 POUND $3,745.00 3,500.00 POUND $3,745.00 65 2582.501 PAVEMENT MESSAGE LEFT TURN ARROW EPDXY $124.88 9 EACH $1,123.92 8 EACH $999.04 8.00 EACH $999.04 66 2582.501 PAVEMENT MESSAGE RIGHT TURN ARROW EPDXY $124.88 6 EACH $749.28 6 EACH $749.28 6.00 EACH $749.28 67 2582.501 PAVEMENT MESSAGE LEFT-THRU ARROW EPDXY $192.99 2 EACH $385.98 2 EACH $385.98 2.00 EACH $385.98 68 2582.501 PAVEMENT MESSAGE THRU ARROW EPDXY $124.88 2 EACH $249.76 2 EACH $249.76 2.00 EACH $249.76 69 2582.501 PAVEMENT MESSAGE RR XING EPDXY $737.91 4 EACH $2,951.64 0 EACH $0.00 0.00 EACH $0.00 70 2582.502 4" SOLID LINE WHITE - EPDXY $0.26 26856 LIN FT $6,982.56 1693 LIN FT $440.18 1,693.00 LIN FT $440.18 71 2582.502 4" BROKEN LINE WHITE - EPDXY $0.26 1660 LIN FT $431.60 1740 LIN FT $452.40 1,740.00 LIN FT $452.40 72 2582.502 4" SOLID DOUBLE LINE YELLOW - EPDXY $0.51 26428 LIN FT $13,478.28 19099 LIN FT $9,740.49 19,099.00 LIN FT $9,740.49 73 2582.502 24" SOLID LINE WHITE - EPDXY $7.95 285 LIN FT $2,265.75 218.5 LIN FT $1,737.08 218.50 LIN FT $1,737.08 74 2582.503 CROSSWALK MARKING - EPDXY $4.54 1458 SQ FT $6,619.32 1314 SQ FT $5,965.56 1,314.001 SQ FT $5,965.56 TOTAL AMOUNT. $3,731,843.70 $1,747,387.27 $2,249,354.35 CHANGE ORDER #1 75 2021.501 MOBILIZATION $149,206.38 0.05 LUMP SUM $7,460.32 0.05 LUMP SUM $7,460.32 0.05 LUMP SUM $7,460.32 76 2105.501 REMOVE CONCRETE CURB & GUTTER $4.80 35 LIN FT $168.00 10 LIN FT $48.00 10.00 LIN FT $48.00 77 2231.501 BITUMINOUS PATCHING MIXTURE $0.01 25 TON $0.25 0 TON $0.00 0.00 TON $0.00 78 2232.501 MILL BITUMINOUS SURFACE (1.5") $1.38 9900 SQ YD $13,662.00 9611 SQ YD $13,263.18 9,611.00 SQ YD $13,263.18 79 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 2,C $61.02 850 TON $51,867.00 781.08 TON $47,661.50 781.08 TON $47,661.50 80 2531.501 CONCRETE CURB & GUTTER DESIGN B618 $10.61 35 LIN FT $371.35 10 LIN FT $106.101 10.00 LIN FT $106.10 $73,528.92 $68,539.10 $68,539.10 CHANGE ORDER #2 81 2021.501 MOBILIZATION $149,206.38 0.051 LUMP SUMI $7,460.32 01 LUMP SUMI $0.00 01 LUMP SUM $0.00 82 2104.501 REMOVE CONCRETE CURB & GUTTER $4.80 501 LIN FT 1 $240.00 01 LIN FT 1 $0.00 01 LIN FT 1 $0.00 Partial Pay Estimate No.: 2015 STREET IMPROVEMENTS CITY OF ELK RIVER SAP 204-135-001,204-107-007,204-114-003,204-116-002 BMI PROJECT NO. N15.108340 YOn,<COMPLETED THROUGH AUGUST 28.2015 83 2105.501 COMMON EXCAVATION P $17.60 815 CU YD $14,344.00 0 CU YD $0.00 0 CU YD $0.00 84 2215.501 BITUMINOUS PAVEMENT RECLAMATION 8" DEPTH $2.08 5870 SQ YD $12,209.60 0 SQ YD $0.00 0 SQ YD $0.00 85 2232.501 MILL BITUMINOUS SURFACE TAPER 0" - 2" $0.92 535 SQ YD $492.20 0 SQ YD $0.00 0 SQ YD $0.00 86 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 2,C $61.02 865 TON $52,782.30 0 TON $0.00 0 TON $0.00 87 2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE 2,C $54.68 1016 TON $55,554.88 0 TON $0.00 0 TON $0.00 88 2531.501 CONCRETE CURB & GUTTER DESIGN B618 $10.61 501 LIN FT $530.50 0 LIN FT $0.00 0 LIN FT $0.00 89 2563.601 TRAFFIC CONTROL $8,746.24 0.25 LUMP SUM $2,186.56 0 LUMP SUM $0.00 01 LUMP SUM $0.00 90 2573.530 STORM DRAIN INLET PROTECTION $127.99 5 EACH $639.95 0 EACH $0.00 0 EACH $0.00 91 2582.502 4" SOLID LINE WHITE - EPDXY $0.26 2400 LIN FT $624.00 0 LIN FT $0.00 0 LIN FT $0.00 92 2582.502 4" SOLID DOUBLE LINE YELLOW - EPDXY $0.51 1200 LIN FT $612.00 0 LIN FT $0.00 0 LIN FT $0.00 93 2582.502 24" SOLID LINE WHITE - EPDXY $7.95 24 LIN FT $190.80 0 LIN FT $0.00 0 LIN FT $0.00 $147,867.11 $0.00 $0.00 TOTAL AMOUNT: r $3,953,239.73 $1,815,926.37 $2,317,893.45