8.3. SR 09-21-2015 E04y1� ,.,�� Request for Action
River
To Item Number
Mayor and City Council 8.3
Agenda Section Meeting Date Prepared by
General Business September 21, 2015 Steve Benoit,Recreation Manager
Item Description Reviewed by
Youth Athletic Complex Field Dugouts Michael Hecker, Parks and Recreation Director
Reviewed by
Cal Portner, City Administrator
Action Requested
Accept,by motion, the bid submitted by Hanson Brothers for the construction of dugouts on fields five
and six at the Youth Athletic Complex (YAC).
Background/Discussion
In the 2015 park improvement fund, $95,000 was allocated for athletic field improvements. Staff notified
the local youth athletic associations of the available funds to get feedback for potential projects. The Elk
River Youth Baseball Association (ERYB) was the only association to respond. Staff met with
representatives from ERYB and developed a list of projects. One project identified was the installation
of dugouts on fields five and six at the YAC.
Two bids were received for the dugout project, one from Terra and one from Hanson Brothers. Due to
the current construction business climate acquiring additional bids was challenging.
Financial Impact
Terra Bid $107,308 (for 4 dugouts)
Hanson Brothers Bid $75,400 (for 4 dugouts)
A detailed bid from Hanson Brothers was not available at the time the Council packet was assembled.
Attached is an e-mail verifying their bid total. The detailed bid will be provided at the September 21 City
Council meeting.
Attachments
■ Terra Bid
■ Hanson Bid
POWERED 6T
AR
Address: YAC & Oak Knoll Fields
General Contractor: Terra General Contractors
Project Manager: Tom Brown
Superintendent: TBD
Schedule Duration: TBD
Total Sq Ft Sq ft
COST ITEM Estimate SUBCONTRACTOR
CODE DESCRIPTION NOTES
GENERAL CONDITIONS
01-0120 Permit allowance 2,998.05$ Allowance
01-0130 Liability insurance 672.09$ Liability Insurance
01-0140 Builders Risk Insurance N/A Not required for this project
01-1000 Supervision 6,000.00$ Supervision
01-1010 GC Misc 500.00$ Materials
01-1111 Preconstruction N/A
01-1550 Final Clean 800.00$ Incl final clean
General Conditions Total 10,970.14$ Total for General conditions
02-2070 Demolition NIC
02-2071 Earthwork 14,296.00$
02-2831 Fencing/Steel Framing 68,000.00$ Vinyl Coated, $8,500/Dugout. Galvanized Steel in Price
03-3053 Concrete 36,032.00$
04-4200 Masonry 22,176.00$
05-5120 Steel In Fencing
07-7400 Metal Roofing 37,632.00$ $4,704 per dugout
09-9910 Paint 6,000.00$ $750 per dugout, 2 coats
SUBTOTAL 195,106.14$
01-2400 OVERHEAD & PROFIT 10%19,510.61$
GUARANTEED NOT TO EXCEED TOTAL 214,616.75$
Alt# 1 Structural Steel 43,181.00$ $10,795 per Field (D&M Iron Works)
Alt# 2 Hot Dip Galvanize all Steel 9,120.00$ $1,140 per dugout (D&M Iron Works)
Note #1
Note #2
Note #3
SUBMITTED BY: Tom Brown - Project Manager
SIGNATURE:
ACCEPTED BY:
Elk River Youth Baseball Dugouts
Kalynn Wendt Justin Wendt
CEO VP
763.443.9175 763.238.2090
wendt.masonry@gmail.com
DATE: 07/09/2015
Elk River Baseball dugouts quote revised rock faced cmu instead of brick.
1field/ 2 dugouts = $18,696.00
4 fields/ 8 dugouts = $72,504.00
Revised: May 6, 2013
MACROPOXY® 646-100
FAST CURE EPOXY
PART A B58-620 SERIES PART B B58V620 HARDENER
Protective
&
Marine
Coatings
4.52
www.sherwin-williams.com/protective
PRODUCT DESCRIPTION
MACROPOXY 646-100 FAST CURE EPOXY is a high solids, less than 100 g/L VOC, high build, fast drying, polyamide epoxy designed to protect steel and concrete in industrial exposures. Ideal for maintenance painting and fabrication shop applications. The high solids content ensures adequate protection of sharp edges, corners, and welds. This product can be applied directly to
marginally prepared steel surfaces.
• Low VOC,<100 g/L • Chemical resistant
• Low odor • Abrasion resistant
• Outstanding application properties
PRODUCT CHARACTERISTICS
Finish: Semi-Gloss
Color: Mill White and a wide range of colors available through tinting
Volume Solids: 73% ± 2%, mixed Mill WhiteWeight Solids: 83% ± 2%, mixed Mill WhiteVOC (EPA Method 24): Unreduced: <100 g/L; .83 lb/gal
mixed Reduced 10%: <100 g/L; .83 lb/gal
Mix Ratio: 1:1 by volume
Recommended Spreading Rate per coat:
Minimum Maximum
Wet mils (microns)7.0 (175)13.5 (338)
Dry mils (microns)5.0*(125)10.0*(250)*
~Coverage sq ft/gal (m2/L)116 (2.8)232 (5.7)
Theoretical coverage sq ft/gal
(m2/L) @ 1 mil / 25 microns dft 1168 (28.6)
NOTE: Brush or roll application may require multiple coats to
achieve maximum fi lm thickness and uniformity of appearance.
*See Recommended Systems on reverse side. See Performance
Tips section also.
Drying Schedule @ 7.0 mils wet (175 microns):
@ 40°F/4.5°C @ 77°F/25°C @ 100°F/38°C
50% RH
To touch:4-5 hours 2 hours 1.5 hours
To handle:48 hours 8 hours 4.5 hours
To recoat:
minimum:48 hours 8 hours 4.5 hours
maximum:1 year 1 year 1 year
Cure for
service:10 days 7 days 4 days
immersion:14 days 7 days 4 days
If maximum recoat time is exceeded, abrade surface before recoating.
Drying time is temperature, humidity, and fi lm thickness dependent.
Pot Life:10 hours 4 hours 2 hours
Sweat-in-time:30 minutes 30 minutes 15 minutes
Shelf Life:36 months, unopened
Store indoors at 40°F (4.5°C)
to 100°F (38°C).
Flash Point: 61°F (16°C), PMCC, mixed
Reducer/Clean Up:Reducer R7K111 or Oxsol 100
continued on back
RECOMMENDED USES
• Marine applications
• Fabrication shops • Refi neries
• Pulp and paper mills • Chemical plants
• Power plants • Tank exteriors
• Offshore platforms • Water treatment plants
• Mill White is acceptable for immersion use for salt water and
fresh water
• Not acceptable for potable water
• Suitable for use in USDA inspected facilities
• Conforms to AWWA D102 OCS #5
• Approved with FIRETEX hydrocarbon coatings
PERFORMANCE CHARACTERISTICS
Substrate*: Steel
Surface Preparation*: SSPC-SP10/NACE 2
System Tested*:
1 ct. Macropoxy 646-100 Fast Cure @ 6.0 mils (150 microns) dft
*unless otherwise noted below
Test Name Test Method Results
Abrasion
Resistance
ASTM D4060, CS17
wheel, 1000 cycles,
1 kg load
84 mg loss
Accelerated
Weathering - QUV1
ASTM D4587,
QUV-A, 12,000
hours
Passes
Adhesion ASTM D4541 1,037 psi
Corrosion
Weathering1
ASTM D5894, 36
cycles, 12,000 hours
Rating 10 per ASTM
D714 for blistering;
Rating 9 per ASTM
D610 for rusting
Direct Impact
Resistance ASTM D2794 30 in. lb.
Dry Heat Resistance ASTM D2485 250°F (121°C)
Exterior Durability 1 year at 45° South Excellent, chalks
Flexibility ASTM D522, 180°
blend, 3/4" mandrel Passes
Immersion 1 year fresh and salt
water
Passes, no rusting,
blistering, or loss of
adhesion
Pencil Hardness ASTM D3363 3H
Salt Fog Resistance1 ASTM B117, 6,500
hours
Rating 10 per ASTM
D610 for rusting;
Rating 9 per ASTM
D1654 for corrosion
Water Vapor
Permeance
ASTM D1653,
Method B 1.16 grains/day
Epoxy coatings may darken or discolor following application and curing.
Footnotes:
1 Zinc Clad II Plus Primer
4.52
MACROPOXY® 646-100
FAST CURE EPOXY
PART A B58-620 SERIES PART B B58V620 HARDENER
Protective
&
Marine
Coatings
www.sherwin-williams.com/protective
SURFACE PREPARATION
Surface must be clean, dry, and in sound condition. Remove all oil, dust, grease, dirt, loose rust, and other foreign material to ensure adequate adhesion.
Refer to product Application Bulletin for detailed surface preparation in-formation.Minimum recommended surface preparation: Iron & Steel Atmospheric: SSPC-SP2/3 Immersion: SSPC-SP10/NACE 2, 2-3 mil (50-75 micron) profi le Aluminum: SSPC-SP1 Galvanizing: SSPC-SP1 Concrete & Masonry Atmospheric: SSPC-SP13/NACE 6, or ICRI No. 310.2, CSP 1-3 Immersion: SSPC-SP13/NACE 6-4.3.1 or 4.3.2, or
ICRI No. 310.2, CSP 1-3
Surface Preparation Standards
Condition of Surface ISO 8501-1BS7079:A1 Swedish Std.SIS055900 SSPC NACE
White Metal Sa 3 Sa 3 SP 5 1Near White Metal Sa 2.5 Sa 2.5 SP 10 2Commercial Blast Sa 2 Sa 2 SP 6 3Brush-Off Blast Sa 1 Sa 1 SP 7 4
Hand Tool Cleaning Rusted C St 2 C St 2 SP 2 -Pitted & Rusted D St 2 D St 2 SP 2 -
Power Tool Cleaning Rusted C St 3 C St 3 SP 3 -Pitted & Rusted D St 3 D St 3 SP 3 -
TINTING
Tint Part A with Maxitoners at 150% strength. Five minutes minimum mixing
on a mechanical shaker is required for complete mixing of color.
Tinting is not recommended for immersion service.
APPLICATION CONDITIONS
Temperature: 40°F (4.5°C) minimum, 140°F (60°C) maximum (air, surface, and material)
At least 5°F (2.8°C) above dew pointRelative humidity: 85% maximum
Refer to product Application Bulletin for detailed application information.
ORDERING INFORMATION
Packaging: Part A: 1 gallon (3.78L) and 5 gallon (18.9L) containers Part B: 1 gallon (3.78L) and 5 gallon (18.9L) containers
Weight: 13.24 ± 0.2 lb/gal ; 1.6 Kg/L
mixed, may vary by color
SAFETY PRECAUTIONS
Refer to the MSDS sheet before use.
Published technical data and instructions are subject to change without notice.
Contact your Sherwin-Williams representative for additional technical data and
instructions.
WARRANTY
The Sherwin-Williams Company warrants our products to be free of manufactur-
ing defects in accord with applicable Sherwin-Williams quality control procedures.
Liability for products proven defective, if any, is limited to replacement of the defec-
tive product or the refund of the purchase price paid for the defective product as
determined by Sherwin-Williams. NO OTHER WARRANTY OR GUARANTEE
OF ANY KIND IS MADE BY SHERWIN-WILLIAMS, EXPRESSED OR IMPLIED,
STATUTORY, BY OPERATION OF LAW OR OTHERWISE, INCLUDING MER-
CHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
PRODUCT INFORMATION
RECOMMENDED SYSTEMS
Dry Film Thickness / ct.
Mils (Microns)
Immersion and atmospheric:
Steel:
2 cts. Macropoxy 646-100 5.0-10.0 (125-250)
Concrete/Masonry, smooth:
2 cts. Macropoxy 646-100 5.0-10.0 (125-250)
Concrete Block:
1 ct. Kem Cati-Coat HS Epoxy Filler/Sealer 10.0-20.0 (250-500)
as needed to fi ll voids and provide a continuous substrate.
2 cts. Macropoxy 646-100 5.0-10.0 (125-250)
Atmospheric:
*Steel:
(Shop applied system, new construction, AWWA D102, can also be
used at 3 mils (75 microns) dft when used as an intermediate
coat as part of a multi-coat system)
1 ct. Macropoxy 646-100 Fast Cure Epoxy 3.0-6.0 (75-150)
1-2 cts. of recommended topcoat
Steel:
1 ct. Recoatable Epoxy Primer 4.0-6.0 (100-150)
2 cts. Macropoxy 646-100 5.0-10.0 (125-250)
Steel:
1 ct. Macropoxy 646-100 4.0-6.0
1-2 cts. Acrolon 218 Polyurethane 3.0-6.0 (75-150)
or Hi-Solids Polyurethane 3.0-5.0 (75-125)
or SherThane 2K Urethane 2.0-4.0 (50-100)
Steel:
2 cts. Macropoxy 646-100 5.0-10.0 (125-250)
1-2 cts. Tile-Clad HS Epoxy 2.5-4.0 (63-100)
Steel:
1 ct. Zinc Clad II Plus 3.0-6.0 (75-150)
1 ct. Macropoxy 646-100 5.0-10.0 (125-250)
1-2 cts. Acrolon 218 Polyurethane 3.0-6.0 (75-150)
Steel:
1 ct. Zinc Clad III HS 3.0-5.0 (75-125)
or Zinc Clad IV 3.0-5.0 (75-125)
1 ct. Macropoxy 646-100 5.0-10.0 (125-250)
1-2 cts. Hi-Solids Polyurethane-100 3.0-6.0 (75-150)
Aluminum:
2 cts. Macropoxy 646-100 5.0-10.0 (125-250)
Galvanizing:
2 cts. Macropoxy 646-100 5.0-10.0 (125-250)
The systems listed above are representative of the product's use, other systems may be appropriate.
DISCLAIMER
The information and recommendations set forth in this Product Data Sheet are
based upon tests conducted by or on behalf of The Sherwin-Williams Company.
Such information and recommendations set forth herein are subject to change and
pertain to the product offered at the time of publication. Consult your Sherwin-
Williams representative to obtain the most recent Product Data Information and
Application Bulletin.
Revised: May 6, 2013
MACROPOXY® 646-100
FAST CURE EPOXY
PART A B58-620 SERIES PART B B58V620 HARDENER
Protective
&
Marine
Coatings
4.52
www.sherwin-williams.com/protective
SURFACE PREPARATIONS
Surface must be clean, dry, and in sound condition. Remove all oil, dust, grease, dirt, loose rust, and other foreign material to ensure adequate adhesion.
Iron & Steel, Atmospheric Service:Minimum surface preparation is Hand Tool Clean per SSPC-SP2. Remove all oil and grease from surface by Solvent Cleaning per SSPC-SP1. For better performance, use Commercial Blast Cleaning per SSPC-SP6/NACE 3, blast clean all surfaces using a sharp, angular abrasive for optimum surface profi le (2 mils / 50 microns). Prime any bare steel within 8 hours or before fl ash rusting occurs.
Iron & Steel, Immersion Service:Remove all oil and grease from surface by Solvent Cleaning per SSPC-SP1. Minimum surface preparation is Near White Metal Blast Cleaning per SSPC-SP10/NACE 2. Blast clean all surfaces using a sharp, angular abrasive for optimum surface profi le (2-3 mils / 50-75 microns). Remove all weld spatter and round all sharp edges by grind-ing. Prime any bare steel the same day as it is cleaned.
AluminumRemove all oil, grease, dirt, oxide and other foreign material by Solvent Cleaning per SSPC-SP1.
Galvanized SteelAllow to weather a minimum of six months prior to coating. Solvent Clean per SSPC-SP1 (recommended solvent is VM&P Naphtha). When weathering is not possible, or the surface has been treated with chro-mates or silicates, fi rst Solvent Clean per SSPC-SP1 and apply a test patch. Allow paint to dry at least one week before testing adhesion. If adhesion is poor, brush blasting per SSPC-SP7 is necessary to remove these treatments. Rusty galvanizing requires a minimum of Hand Tool Cleaning per SSPC-SP2, prime the area the same day as cleaned.
Concrete and MasonryFor surface preparation, refer to SSPC-SP13/NACE 6, or ICRI No. 310.2, CSP 1-3. Surfaces should be thoroughly clean and dry. Concrete and mortar must be cured at least 28 days @ 75°F (24°C). Remove all loose mortar and foreign material. Surface must be free of laitance, concrete dust, dirt, form release agents, moisture curing membranes, loose cement and hardeners. Fill bug holes, air pockets and other voids with Steel-Seam FT910.
Concrete, Immersion Service:For surface preparation, refer to SSPC-SP13/NACE 6, Section 4.3.1 or 1.3.2 or ICRI No. 310.2, CSP 1-3.
Follow the standard methods listed below when applicable:ASTM D4258 Standard Practice for Cleaning Concrete.ASTM D4259 Standard Practice for Abrading Concrete.ASTM D4260 Standard Practice for Etching Concrete.ASTM F1869 Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete.SSPC-SP 13/Nace 6 Surface Preparation of Concrete.ICRI No. 310.2 Concrete Surface Preparation.
Previously Painted SurfacesIf in sound condition, clean the surface of all foreign material. Smooth, hard or glossy coatings and surfaces should be dulled by abrading the surface. Apply a test area, allowing paint to dry one week before testing adhesion. If adhesion is poor, or if this product attacks the previous fi nish, removal of the previous coating may be necessary. If paint is peeling or badly weathered, clean surface to sound substrate and treat
as a new surface as above.
Surface Preparation Standards
Condition of Surface ISO 8501-1BS7079:A1 Swedish Std.SIS055900 SSPC NACE
White Metal Sa 3 Sa 3 SP 5 1Near White Metal Sa 2.5 Sa 2.5 SP 10 2Commercial Blast Sa 2 Sa 2 SP 6 3Brush-Off Blast Sa 1 Sa 1 SP 7 4
Hand Tool Cleaning Rusted C St 2 C St 2 SP 2 -Pitted & Rusted D St 2 D St 2 SP 2 -
Power Tool Cleaning Rusted C St 3 C St 3 SP 3 -Pitted & Rusted D St 3 D St 3 SP 3 -
APPLICATION BULLETIN
APPLICATION CONDITIONS
Temperature: 40°F (4.5°C) minimum, 140°F (60°C)
maximum
(air, surface, and material)
At least 5°F (2.8°C) above dew point
Relative humidity: 85% maximum
APPLICATION EQUIPMENT
The following is a guide. Changes in pressures and tip sizes may
be needed for proper spray characteristics. Always purge spray
equipment before use with listed reducer. Any reduction must be
compliant with existing VOC regulations and compatible with the
existing environmental and application conditions.
Reducer/Clean Up ...........Reducer R7K111 or Oxsol 100
Airless Spray
Pump..............................30:1
Pressure.........................2800 - 3000 psi
Hose...............................1/4" ID
Tip ...................................017" - .023"
Filter ...............................60 mesh
Reduction .......................As needed up to 10% by volume
Conventional Spray
Gun ................................DeVilbiss MBC-510
Fluid Tip .........................E
Air Nozzle.......................704
Atomization Pressure .....60-65 psi
Fluid Pressure ................10-20 psi
Reduction .......................As needed up to 10% by volume
Requires oil and moisture separators
Brush
Brush..............................Nylon/Polyester or Natural Bristle
Reduction .......................Not recommended
Roller
Cover .............................3/8" woven with solvent resistant core
Reduction .......................Not recommended
If specifi c application equipment is not listed above, equivalent
equipment may be substituted.
continued on back
4.52
MACROPOXY® 646-100
FAST CURE EPOXY
PART A B58-620 SERIES PART B B58V620 HARDENER
Protective
&
Marine
Coatings
www.sherwin-williams.com/protective
APPLICATION BULLETIN
APPLICATION PROCEDURES
Surface preparation must be completed as indicated.
Mix contents of each component thoroughly with low speed power agitation. Make certain no pigment remains on the bottom of the can. Then combine one part by volume of Part A with one part by volume of Part B. Thoroughly agitate the mixture with power agitation. Allow the material to sweat-in as indicated prior to ap-plication. Re-stir before using.
If reducer solvent is used, add only after both components have been thoroughly mixed, after sweat-in.
Apply paint at the recommended fi lm thickness and spreading
rate as indicated below:
Recommended Spreading Rate per coat:
Minimum Maximum
Wet mils (microns)7.0 (175)13.5 (338)
Dry mils (microns)5.0*(125)10.0*(250)*
~Coverage sq ft/gal (m2/L)116 (2.8)232 (5.7)
Theoretical coverage sq ft/gal
(m2/L) @ 1 mil / 25 microns dft 1168 (28.6)
NOTE: Brush or roll application may require multiple coats to
achieve maximum fi lm thickness and uniformity of appearance.
*See Recommended Systems on reverse side. See Performance
Tips section also.
Drying Schedule @ 7.0 mils wet (175 microns):
@ 40°F/4.5°C @ 77°F/25°C @ 100°F/38°C
50% RH
To touch:4-5 hours 2 hours 1.5 hours
To handle:48 hours 8 hours 4.5 hours
To recoat:
minimum:48 hours 8 hours 4.5 hours
maximum:1 year 1 year 1 year
Cure for
service:10 days 7 days 4 days
immersion:14 days 7 days 4 days
If maximum recoat time is exceeded, abrade surface before recoating.
Drying time is temperature, humidity, and fi lm thickness dependent.
Pot Life:10 hours 4 hours 2 hours
Sweat-in-time:30 minutes 30 minutes 15 minutes
Application of coating above maximum or below minimum recommended spreading rate may adversely affect coating performance.
CLEAN UP INSTRUCTIONS
Clean spills and spatters immediately with Reducer R7K111 or Oxsol 100. Clean tools immediately after use with Reducer R7K111 or Oxsol 100. Follow manufacturer's safety recommendations when using any solvent.
DISCLAIMER
The information and recommendations set forth in this Product Data Sheet are
based upon tests conducted by or on behalf of The Sherwin-Williams Company.
Such information and recommendations set forth herein are subject to change and
pertain to the product offered at the time of publication. Consult your Sherwin-
Williams representative to obtain the most recent Product Data Information and
Application Bulletin.
PERFORMANCE TIPS
Stripe coat all crevices, welds, and sharp angles to prevent early failure in these areas.
When using spray application, use a 50% overlap with each pass of the gun to avoid holidays, bare areas, and pinholes. If necessary, cross spray at a right angle
Spreading rates are calculated on volume solids and do not include an application loss factor due to surface profi le, roughness or po-rosity of the surface, skill and technique of the applicator, method of application, various surface irregularities, material lost during mixing, spillage, overthinning, climatic conditions, and excessive fi lm build.
Excessive reduction of material can affect fi lm build, appearance, and adhesion.
Do not mix previously catalyzed material with new.
Do not apply the material beyond recommended pot life.
In order to avoid blockage of spray equipment, clean equipment before use or before periods of extended downtime with Reducer R7K111 or Oxsol 100.
Insuffi cient ventilation, incomplete mixing, miscatalyzation, and external heaters may cause premature yellowing.
Excessive fi lm build, poor ventilation, and cool temperatures may cause solvent entrapment and premature coating failure.
Tinting is not recommended for immersion service.
Use only Mil White for immersion service.
Quik-Kick Epoxy Accelerator is acceptable for use. See data page 4.99 for details.
Application of coating above maximum or below minimum recommended spreading rate may adversely affect coating performance.
For Immersion Service: (if required) Holiday test in accordance with ASTM D5162 for steel, or ASTM D4787 for concrete.
When coating over aluminum and galvanizing, recommended dft is 2-4 mils (50-100 microns).
Acceptable for Concrete Floors.
Refer to Product Information sheet for additional performance characteristics and properties.
SAFETY PRECAUTIONS
Refer to the MSDS sheet before use.
Published technical data and instructions are subject to change without notice.
Contact your Sherwin-Williams representative for additional technical data and
instructions.
WARRANTY
The Sherwin-Williams Company warrants our products to be free of manufacturing
defects in accord with applicable Sherwin-Williams quality control procedures.
Liability for products proven defective, if any, is limited to replacement of the de-
fective product or the refund of the purchase price paid for the defective product
as determined by Sherwin-Williams. NO OTHER WARRANTY OR GUARANTEE
OF ANY KIND IS MADE BY SHERWIN-WILLIAMS, EXPRESSED OR IMPLIED,
STATUTORY, BY OPERATION OF LAW OR OTHERWISE, INCLUDING MER-
CHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
D & M IRON WORKS, INC.
2500 WEST COUNTY ROAD B
ST. PAUL, MN. 55113
PHONE (651) 639-0009
FAX (651) 639-0025
To: Cory Kaminski
Terra General Contractors
From: Chris Kroohn
Number of pages to follow: None DATE: 07/02/15
RE: Dugout Improvement Project
Elk River, MN
Bid Sections:
– Metal Fabrications
BASE BID (2 dugouts) …..………………………… $ 10,795
BASE BID (8 dugouts) …………………………….. $ 43,181
NOTES:
1.Base bid is for material only, FOB jobsite
2.Base bid includes sales tax.
3.If Galvanized, add $1,140 per dugout
4.Included in base bids:
a.(6) TS6x6 posts at ea. dugout
b.(1) Roof frame at ea. dugout
c.(4) 2 ½” pipe posts w/ base plates at ea. Dugout
d.Anchor bolts as required
e.Connection hardware as required
f.Shop prime on all material
5.Excluded from base bids:
a.All chain link fencing.
6.Quotation is open to acceptance for 30 days
Any Questions, please call.
From: David Lodermeier [STP] <DLodermeier@SummitCoUS.com>
Sent: Thursday, September 17, 2015 12:07 PM
To: Benoit, Steve
Subject: Update on the Dugout Project.
Hi Steve,
I just got a text from Eric Hansen on an update to the cost of the project. We are planning on only putting the
new dugouts on YAC 5 & 6. The price for each dugout w/ a rock face knee wall w/cap, is $18,850.00. With 4
dugouts, that comes to a total cost of $75,400.00. With $80,000+ dollars left available to use, that puts us under
our budget for 2015. To me that is great news. Please let me know your thoughts. Thank you.
Dave Lodermeier, Nicet IV I Project Manager I e DLodermeier@SummitcoUS.com
WIRELESS 651.216.6624 I DIRECT 651.251.1871 I OFFICE 651.251.1880 1 FAx 651.251.1879
SUMMIT
COMPANIES
Fire . Life Safety . Consulting . Mechanical
575 Minnehaha Ave W . Sl. Paul, MN 55103
SUMMIT FIRE PROTECTION I SUMMIT MECHANICAL OF MN I MN CONWAY FIRE & SAFETY I ST. CLOUD FIRE EQUIPMENT I NORTHLAND FIRE & SECURITY
09/28/2015
Baseball Dugout Project
Youth Athletic Complex
Background
$95,000 allocated in the 2015 Park Improvement Fund
for athletic field improvements
Youth athletic associations contacted for possible
projects
Only Elk River Youth Baseball Association (ERYB)
responded
1
09/28/2015
Background
Staff met ERYB to develop a list of projects.
Drinking fountain
Yellow outfield fence PVC caps
Dugouts
Background
May 13, 2015 -Parks and Recreation Commission
presented an overview of the field improvement projects
Concerns raised regarding the cost of the dugouts and
the best use of the funds
The majority of the Commission supported moving
forward with the dugouts
2
09/28/2015
Background
Sept. 9, 2015 -2016 Park Improvement Budget
discussed at the Commission budget workshop
Concerns raised again regarding the cost and the best use
of the funds
The majority of the Commission recommended delaying
the project and rolling the funds into the 2016 budget
Background
The funds would be combined with funds allocated for
2016 field improvements.
Youth athletic associations would be contacted to again
determine needed projects.
3
09/28/2015
Background
Bids submitted to numerous contractors for pricing
At the time of the workshop only one bid was submitted
(Terra)
The current construction climate and project scope
made acquiring a challenge
Hanson Brothers submitted a bid after the workshop
Background
The bid request was for four dugouts on YAC Fields 5 & 6
Terra $107,308 ($26,827 /dugout)
Hanson Brothers$75,400 ($18,850 / dugout)
$80,995 currently remains in the 2015 Park Improvement
Fund for field improvements
4
09/28/2015
Current YAC Field 5 & 6 Dugouts
Current YAC Field 5 & 6 Dugouts
5
09/28/2015
Proposed Dugouts
Proposed Dugouts
6
09/28/2015
Cambridge/Isanti Mann Field
$14,769 per dugout
Cambridge/Isanti Mann Field
7
09/28/2015
Cambridge/Isanti SandquistPark
$8,889 per dugout
ChamplinAndrews Park
$12,500 per dugout
8
09/28/2015
Dugout Construction
Action Requested
Recommend, by motion, acceptance of the bid
submitted by Hanson Brothers for the construction of
dugouts on YAC Fields 5 & 6.
9