Loading...
2.7. ERMUSR 09-08-2015 Elk River *-- Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Troy Adams, P.E. —General Manager John Dietz—Chair Al Nadeau—Vice Chair Daryl Thompson—Trustee MEETING DATE: AGENDA ITEM NUMBER: September 8, 2015 2.7 SUBJECT: Minnesota Municipal Utilities Association Safety Management Program Contract Renewal BACKGROUND: Elk River Municipal Utilities (ERMU) contracts with Minnesota Municipal Utilities Association (MMUA)to provide safety training through their Safety Management Program and Job Training and Safety(JTS) Program. The Safety Management Program provides required trainings on topics such as blood borne pathogens and right to know. The program also provides customer specific trainings like Pole Top Rescue training and OSHA compliance inspections for water and electric facilities. Elk River Municipal Utilities is one of 11 municipals in the Central Group of the Safety Management Program. The JTS program provides training more specifically for the electric and technical service departments. Elk River Municipal Utilities is one of six in our JTS group. The contract period runs from October—September. DISCUSSION: For the 2015-2016 MMUA Safety Management Program contract period, ERMU's costs increase $1,300 to an annual total of$21,900. This provides two days per month. Since 2009, the MMUA JTS Program's cost for ERMU has been$6,000 annually. There will be no increase for this program for the 2015-2016 program period. ACTION REQUESTED: Staff recommends approval to execute of the 2015-2016 MMUA Safety Management Program renewal. ATTACHMENTS: • 2015-2016 Minnesota Municipal Utilities Association Safety Management Program Memo and Amendment to Services Agreement—dated July 20, 2015. POWERED BI Page 1 of 1 NATURE Reliable Public f Power Provider P O W E R E D T o S E R V E 84 MIIBRI .Ir 1,1111 Weil Minnesota Municipal Utilities Association July 20, 2015 MEMORANDUM To: Safety Management Participants From: Mike Willetts, Director of Job Training and Safety Subject: 2015-16 Safety Management Program Contract It is time to renew your safety management program contract. If we held a regional group meeting earlier this year, please note that the budgets have not changed since then, unless to make specific corrections. For those where we did not hold a group meeting this year, please note that the budgets have been created with the goal of having minimal price increases while covering MMUA's costs in providing your service. The contract amendments will cover October 1, 2015 through September 30, 2016, to coincide with MMUA's fiscal year. Two copies of your contract amendment are enclosed. Please sign both contracts keeping one for your records and mailing the other to the address shown below. Please do not send payment at this time. You will be billed October 1. Mail your signed contract to: .Larry Pederson, Director of Finance Minnesota Municipal Utilities Association 3025 Harbor Lane North, Suite 400 Plymouth, MN 55447-5142 If you have any concerns with the new contract, please contact me or Larry as follows: Mike Willetts: phone 763-746-0705 or e-mail mwilletts @mmua.org Larry Pederson: phone 763-746-0704 or e-mail Ipederson @mmua.org Thank you for being part of MMUA's safety management groups. With this program and your support we have proven that working together as a group we can develop a safety program that is affordable and at the same time works. 3025 Harbor Lane North•Suite 400•Plymouth,MN 55447-5142.71 .551.1230.800.422.0119(MN)•Fax 763.551.0459•www.mmua.org Minnesota Municipal Utilities Association AMENDMENT TO SERVICES AGREEMENT Safety Management Proaran Contract Date: July 7, 2015 Contract Number: 5-2016 The services agreement entered into between Minnesota Municipal Utilities Association (MMUA) and Elk River Municipal Utilities (Elk River), dated August 11, 2014, contract number 5-2015, is amended as follows: PART II, Section 1. 1. DURATION: This Agreement shall remain in force from October 1, 2015 until September 30, 2016 (the "expiration date"). PART III, Section 1. 1. COMPENSATION: For the services covered by this Agreement, Elk River shall pay MMUA an annual fee of twenty-one thousand nine hundred dollars and 00 cents ($ 21,900.00) for the 2015-16 annual period. Such compensation shall be due and payable according to the selected payment terms below. Payment terms for the fee agreed to above shall be based on one of the following options (select one): ❑ Annual Payment ($21,900.00) ❑ Quarterly Payments ($5,475.00 each) For any term of less than twelve full calendar months, the fee shall be a portion of the annual fee, pro-rated based on the number of calendar months or partial calendar months in which the services were provided as a percentage of twelve (12). The parties hereby accept the terms of the Agreement as modified. Elk River Municipal Utilities Minneso Municipal Utilities Association By By /sfr7 Title Title Executive Director Date Date July 7, 2015 Purchase Order # 86 To 7) LL N R N I 1 e N n I v F r N y- CO NNNN v..-NDr' :.; ,O .- o o o o o 0 o 0 o 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O O 10 C OOO000OO000 O I§ 7 ON8p C R 8 '' 2 N� 0 O O O N V ) j O r N)N N A 69 N E9 ia N M E9 69 b A fA A -. pp pp pp pp pp pp pp pp pp g 8 8 0 8 8 0 8 8 8 8 8 8� a§§§aa 8 8 69 69 c 88888888888 8 ill C C// Nr 6.6O N O)Q C)r,1." P pp V H444N47NlbU44a In `q Y C 88888888888 8 888888 8 aR to C t O ppOpp888,8888888O88O88pp8pp8 8 88888888 8 v.0 =v A t e SSSB g "O)NR CO 4., 2 BNa)c'4 O) O 7 w d r d) n gi U)O CO O)O A P 4 O F CD CO N IA N M E ♦ p L NN N GA r' N b9 r• CO ER69 CA CA6949 N V gi dC V in EA i9 EA in EA EA EA 6Ni E9 th L II .1c2v O . C NcDa N� p A e4 s .- 5 4.] N A C (W I ' N-' O VN CD Q, a -04 1.. TO E cn O x 8 .5 2 031441.1 d• y Cr.' " IIIIIiilH a ro LUll p g1 N ( r Q i ci DISTRIBUTION SYSTEM PIPING AND APPURTENANCES PART 8 8.2 SYSTEM DESIGN 8.2.1 Pressure All water mains, including those not designed to provide fire protection, shall be sized after a hydraulic analysis based on flow demands and pressure requirements. The system shall be designed to maintain a minimum pressure of 20 psi(140 kPa) at ground level at all points in the distribution system under all conditions of flow. The normal working pressure in the distribution system shall be at least 35 psi (240 kPa)and should be approximately 60 to 80 psi (410 -550 kPa) and not less than 35 psi (240 kPa). 8.2.2 Diameter The minimum size of water main which provides for fire protection and serving fire hydrants shall be six-inch diameter. Larger size mains will be required if necessary to allow the withdrawal of the required fire flow while maintaining the minimum residual pressure specified in Section 8.2.1. The minimum size of water main in the distribution system where fire protection is not to be provided should be a minimum of three(3) inch diameter. Any departure from minimum requirements shall be justified by hydraulic analysis and future water use, and can be considered only in special circumstances. 8.2.3 Fire protection When fire protection is to be provided, system design should be such that fire flows and facilities are in accordance with the requirements of the State Insurance Services Office. 84.4 Dead ends: a. Dead ends shall be minimized by making appropriate tie-ins whenever ractical.rn order ta; provide inbreased reliability of slice and,reduce dread lr b Dead end mains shall be equipped with a means to provide adequate flushing. Flushing devices should be sized to provide flows which will give a velocity of at least 2.5 feet per second in the water main being flushed. They may be provided with a fire hydrant if flow and pressure are sufficient. No flushing device shall be directly connected to any sewer. 8.3 VALVES A sufficient number of valves shall be provided on water mains to minimize inconvenience and sanitary hazards during repairs. Valves should be located at not more than 500 foot intervals in commercial districts and at not more than one block or 800 foot intervals in other districts.Where systems serve widely scattered customers and where future development is not expected,the valve spacing should not exceed one mile. 8.4 HYDRANTS 8.4.1 Location and spacing a. Fire hydrants should be provided at each street intersection and at intermediate points between intersections as recommended by the State Insurance Services Office. Generally, fire hydrant spacing ranges from 350 to 600 feet depending on the area being served. -116- • u�,.. '3 c. • littictS V' €5tp 434.e I£5,ei P.O.Box 335 Big Lake,Minnesota 55309 Phone:763-263-3100 or Fax:763-241-1798 Website:www.brentesoncompanies.com - Email:info(rubrentesoncompanies.com BUDGET QUOTE To:Bodnar Builders LLC Work Site:Heritage Prak Attn:Alex Bodnar Attn: Address: Address: City/St/Zip: City/St/Zip:Elk River,MN Phone:763-923-5026 Date of Plan:04/15/15 email:alexbodnar85 @gmail.com Addenda: QUOTATION#: 1 DATE: 05/06/2015 We hereby propose to furnish the material and perform the labor necessary for completion of the project as follows: Inclusions: > Mobilization D Install Sanitary Sewer and Watermain,and services, as shown on drawings dated 04/15/15. Exclusions:Restoration/replacement of section corner marker and property corner markers;Erosion Control;Landscaping;soil correction; Class 5;Paving;handling or testing of contaminated soil;damage to public or private utilities,except those correctly marked by Gopher State One Call;locating private utilities;winter conditions;Spring Road Restrictions;soil conditioning;importing soil;exporting soil;sand cushion;vapor barrier;drain tile;soil testing;staking;dewatering;tree protection fence;lawn restoration;temporary erosion control; concrete wash out;trench drains and sump basket;Sanitary Sewer or Storm Sewer Connections at Building;SAC/WAC;County Permits; Bond. All material is guaranteed to be as specified and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workman-like manner for the sum of: Budget Bid: $ 141,276.00 This Proposal is valid for 30 days from the date prepared and noted above. This Proposal shall become part of any Contract,as an Exhibit. Any alteration or deviation from above specifications involving extra cost will be executed only upon written orders and will be an extra charge over and above the estimate. All Agreements are contingent upon strikes,accidents,or delays beyond our control. Owner is to carry fire,tornado and other necessary insurance on above work. Workman's Compensations and Public Liability Insurance on above work is to be taken out by Brenteson Companies,Inc. Quotation prepared by: Matthew Brenteson,BRENTESON COMPANIES,INC. Quotation accepted by: Please sign and date above to accept this Quotation. Date Forwarded message From: "Mike Loehrer" <mike @brentesoncompanies.com> Date: May 7, 2015 11:41 Subject: RE: Heritage Park Quote (Breakdown) To: "Alex Bodnar"<alexbodnar85 @amail.com> Cc: Alex, The following is a breakdown of our Budget Quote. General Condition: $5670.00 Mobilization: $2016.00 Tree Clearing: $11,825.00 Demo Asphalt: $475.00 Asphalt Patch: $2720.00 Demo 100 Gal Tank: $2050.00 Sanitary Sewer Main: $22,600.00(approx. $45.57 per foot) Sanitary Sewer Manholes: $11,975.00(approx.$5987.50 Each) Sanitary Services: $7525.00(approx.$1881.25 Each) Water Main: $61,960.00(approx.$70.33 per foot) Hydrant: $6190.00 Water Services: $6270.00(approx. $1567.50 Each) Let me know if you have any questions,Thanks- Check out our Website @ http://www.brentesoncompanies.com Mike Loehrer P.o.Box 335 Big Lake,MN 55309 763-263-3100 Office 763-241-1798 Fax 612-790-7761 Cell mailto:mike@brentesoncompanies.com