8.4. SR 10-05-2015
Request for Action
To Item Number
Mayor and City Council 8.4
Agenda Section Meeting Date Prepared by
General BusinessOctober 5, 2015Cal Portner, City Administrator
Item Description Reviewed by
Discuss Work Session Items
Reviewed by
Action Requested
Review work session items listed below and identify future work session topics.
Background/Discussion
Work sessions will be added to the end of regular meetings on the first and third Mondays as needed. At
the first Council meeting of each month staff will present a list of future work session topics for Council
review.
Proposed work session topics are as follows:
Blight Update
Residential Rental Code Update
County Ditches
Budget
Elk River Fire Relief Association Bylaw Update
Council Review of Permits and Licenses
Line Avenue Cul-de-sac
Update on Engineering Design Standards
2016–2020 Capital Improvement Plan
Rivers Edge Commons Park Expansion (November 2, 2015)
Focused Area Study (October 19)
Park Dedication Fees (October 19)
Financial Impact
None
Attachments
None
-flofLQou-+ (O5115
Item
Model
Screen Size
Weight
Memory
Processor
Speed
Comparison
Current Price
(wifi + cellular)
Current Price
(wifionly)
1
iPad
9.7 Inch
1.6 Ib
256 MB
Apple A4
N/A
N/A
2
iPad 2
9.7 Inch
1.3 Ib
512 MB
Apple A5
N/A
N/A
3
iPad 3
9.7 Inch
1.46 Ib
1024 MB
Apple A5X
N/A
N/A
4
iPad 4
9.7 Inch
1.46 Ib
1024 MB
Apple A6X
N/A
N/A
5
iPad Air
9.7 Inch
1.05 Ib
1024 MB
Apple A7
$529 (16GB)
$399 (16GB)
6
iPad Air 2
9.7 Inch
.981b
2048 MB
Apple A8X
1.4x faster than
iPad Air
$629 (16GB)
$499 (16GB)
7
iPad Pro
12.9 Inch
1.59 lb
4096 MB
Apple A9X
2.5x faster than
iPad Air
$1079 (128 GB)
$799 (32GB)
8 Isurface Pro 3 112 Inch 11.76 Ib 14096 MB I Intel Core i3 I IN/A $699 (6466)