5.2. SR 09-07-2004Item ~ 5.2. Memorandum TO: Mayor and City Council FROM: Rebecca Haug, Environmental Tech. DATE: September 7, 2004 SUBJECT: Wetland Conservation Act Decision - Schuer, Inc. - WCA 04-07 Proposal- Schuer, Inc. is proposing to impact 8,280 square feet of Type 2 wetland, all in one location, to accommodate the excavation of gravel. A map showing the proposed wetland impact and replacement is attached. The Elk River City Council is the Local Unit of Government charged with decision-making authority for the Wetland Conservation Act (WCA). Schuer, Inc. is proposing to expand a gravel mining operation adjacent to the J & B Mining site, which also has wetland impacts. The wetland restoration for the two projects ties together. Wetland restoration can't be deemed complete for either project until both are finished. Further, J & B Mining is purchasing some of the excess wetland credits from the Schuer site. FINDINGS Liesch Companies prepared a Wetland Delineation Report for the property. Combined notification of the proposed wetland impact and replacement plan was mailed out to the appropriate governmental agencies on June 2, 2004. The Technical Evaluation Panel (TEP) reviewed the delineation and replacement plan on May 5, 2004 and June 8, 2004. The minutes of these meetings are attached. The comment period on this issue ended on June 23, 2004. The appeal period for this issue is 15 working days after the Council's decision. RECOMMENDATION Staff recommends approval of the filling and mitigation plan for this project with the following stipulations: 1. A restrictive covenant and drainage and utility easement be recorded over the mitigation and buffer areas. 2. The petitioner secures letter of credit in favor of the City of Elk River, which covers the cost of the mitigation work. e Monitoring of the wetland mitigation will commence as soon as restoration is completed on both this site and the Sehuer, Inc. site and continue for a period of 3 to 5 years, as needed, as determined by city staff. The petitioner shall submit a written monitoring report on the replacement wetlands to the city after the first year of monitoring. Upon approval of this report by city staff the letter of wetland credit may be released. TEP Minutes -June 8, 2004 Attending: Brad Wozney, BWSR; Paul Diedrich, DNR-Fisheries; Yvonne Berner, ACOE; Terry Mauer, City Engineer; Roger Schmidt & Glen Johnson, Schmidt Gravel Mine; Jon Blaha and Warren Tuel, Liesch Assoc, Inc; Wayne Jacobson, Applied Environmental Services; Jason Bebeau & Michelle Christensen, J & B Mining; Donald Wester, Bill Saaranen, Duane Betker, Dean Mealhouse, Trout Brook Farms; Rebecca Haug and Steve Rohlf, City of Elk River Schuer Gravel Mine Leisch Assoc, Inc installed three monitoring wells and took soil borings. The information collected supports their earlier opinion that the wetlands at the site are supported by a shallow water table and not due to perched conditions. However, Bill Bronder is unsure if they have enough information to make that determination. It was discussed that the letter of credit guarantees that the wetland is supported by a shallow water table and not perched. If the plan doesn't work, the City will require them to fix it. Some of the additional wetland credits that this mine will have will be given to J & B Mining. Yvonne Berner explained that the ACOE may not accept these credits since they do not approve deep water habitats. It was discussed that there would be no dewatering at the site. The CUP for will need to be written in such a way to make sure the water levels are working. Monthly data for the monitoring wells will need to be provided to the City for the first year and quarterly data for the monitoring wells will need to be provided to the City for the second year. There may be a potential for bounce. Benchmarks will need to be established so a person can take elevations. GRO and DRO will need to be addressed. The wetland mitigation will be accomplished by removing the gravel deposits to a depth of 15 to 16 feet. Then fill will be brought back in up to grade in the Type 5 area, and 1 ft below the grade in the Type 3 area. Muck will be used to line the Type 3 area in preparation for planting. The second mitigation will be completed by removing the top 0.5 ft of existing reed canary grass and then replanting with natives. The slopes will be no greater than 5:1. A buffer area will be created averaging 25 ft in width. The Type 2 replacement is the only area that credit is wanted for. BWSR and ACOE are unsure they will be able to accept the credits because it is connected to deep water habitat. The TEP is satisfied with the wetland application for this project. J & B Mining Yvonne Berner emphasized to the applicant the importance of keeping their impacts under 2 acres. Also, the setbacks on the north, east and south sides for the mine will need to be changed. The setback adjoining the Schmidt mine may be already but the others will have to be 50 ft back. The setback changes will affect the wetland impacts so this will be looked at again at the next TEP meeting. There is still the issue of transportation for this project. Trott Brook Farms Homeowner's Association The Trott Brook Farms Homeowner's Association was in to discuss what can be done about the vegetation in and around their sedimentation ponds. It was discussed that barley straw can be added to the ponds in April to control the algae growth. It was also discussed that some of the cattails can be removed but the majority should remain because they absorb the nutrients that cause the algae bloom in the pond. It was also discussed that the association should talk to the lawn mowers about mowing the grass clippings away from the ponds. At this time, there are no rules restricting vegetation removal from sedimentation basis only recommendations, Bill Bronder gave them his card so they could further discuss options for vegetation. TEP Minutes- May ,5, 2004 Attending:. Paul Wozney, BWSR; Paul Diedrich, DNR-Fisheries; John Norgren, Sherburne County Ditch Inspector; Yvonne Berner & Marge Thompson, ACOE; Terry Mauer, City Engineer; Paul Cherne, Pioneer Engineering; Bill Blackwen, Pioneer Engineering; Roger Schmidt, Schmidt Gravel Mine; Jori Blaha and Warren Tuel, Liesch Assoc, Inc; Wayne Jacobson, Applied Environmental Services; Rebecca Haug and Steve Rohlf, City of Elk River Schuer Gravel Mine The applicant is proposing to mine gravel adjacent to an existing Type 2 wetland, which may or may not be a perched wetland. Liesch Assoc., Inc has been hired by the applicant to make this determination. They will be installing three monitoring wells. The applicant is proposing to restore the wetland and get credit for wetland banking. It was discussed as to whether or not the ACOE would approve a wetland bank for this type of project. Trout Brook Estates At the previous TEP meeting several changes were requested. The proposed trail at the end of Becker Trail has been relocated. Street has been shortened but the Park and Recreation Commission would like to see the trail to connect to Street E causing wetland impacts. Terry Mauer commented on the lack of accessibility to the sedimentation ponds by Outlot G. This will cause a change in Street E and the trail. Yvonne Berner stated that the ACOE is developing new criteria for trails. She also commented that if the project exceeds 10,000 sq. ft. (over 2 acres) of wetland impacts, the approval process will require a public notice and will be more difficult to receive approval. Lots 8 & 9, Block 20 were looked at since the City doesn't allow wetland fill for building sites. The road may be redesigned or the house made smaller to fit the sites. The same concerns were discussed for Lots 4 & 5, Block 15. A narrower house and retaining wall were discussed for Lot 9, Block 15. A new plan will be submitted; however, the TEP will not be discussing this project again. Robert Droen This homeowner is requesting a permit to dig out a wetland on his property and place the spoils on an upland area of his yard. ACOE does not regulate this activity. It was discussed that the slopes would be 4:1 and no deeper than 4 - 5'. (Bill Bronder and Rebecca Haug inspected the site on May 7, 2004. During the inspection it was determined that the wetland is a Type 2, 6 and he is exempt under WCA for his project.) / // ~EST PHASE I ! PHASE ,4- ~N~N¢ 'i · M~N~N~ -- EAST NORTH SOUTH ........................................... (~26~7 ~.¥.) .... j CROSS SECTION A - A' ~' ~ ..... / / CROSS SECTION ~- ~' N CROSS-SECTION LOCATION MAP ...... ' .... ' '" ........ "' '~ ..... ~ Schuer, Inc. ~s mo~ Phase 1, Phase 2E and Phase 4 Development Plan 2 A