4.3. SR 10-1-2015Request for Action
To
Item Number
Mayor and City Council
4.3
Agenda Section
Meeting Date
Prepared by
Consent
October 19, 2015
Justin Fe rite P.E., City Engineer
Item Description
Reviewed by
Pay Estimates
Tim Simon, Finance Director
Reviewed by
Cal Portner, City Administrator
Action Requested
Approve, by motion, the pay estimates as detailed below
Background/Discussion
The following pay estimates have been reviewed and found to be accurate and in accordance with the
approved contracts.
Financial Impact
PROJECT
WWTF Improvements
2015 Street Improvements
Attachments
■ Pay Estimates
PAY EST. # CONTRACTOR
11 Rice Lake Construction Group
5 North Valley, Inc.
AMOUNT
$755,263.92
$720,627.81
POWERED 6T
Template Updoted 4/14 INAWRE1
Application for Payment
Change Order Summary
Approved Change Orders
Number
Additions Deductions
t $
259,991.59
TOTALS
NET CHANGE BY
CHANGE ORDERS
$259,991.59 $0,09
$259,991.59
Contractor's Certification
The undersigned Contractor canines that (1) all previous pmgm
Payments received from Owner on a0peunt of Work done under t
Contract have been applied on account to discharge Contractor's lagitlml
obligations Inverted In connection with Work covered by prior Applicatlo
for Payment; (2) die of all Work, materials and equipment Incorporated
said Work or otherwise listed In or covered by this Application for Payne
Wil pass to Owner at Uma of payment free and clear of all Liens, secui
Interests and encumbrances (except such as are covered by a 6o
acceptable to Owner Indemnifying Owner against any such Llens, satin
interest or encumbrances); and (3) all Work covered by this Application
Payment Is In accordance wlih the Contract Documents and is t
defective.
1. ORIGINAL CONTRACT PRICE
2. Net change by Change Orders
3. CURRENT CONTRACT PRICE (Line 1 t 2)
4. TOTAL COMPLETED AND STORED TO DATE
(Column F on Progress Estimate)
5. RETAINAGE:
$16,525,200.00
$259,091.59
$16,785,191.59
$9,138,009.64
a. 5% x $9,136,009.64 Work Completed $458,800.48
b. 5% x $0.00 Stored Materials $0.00
c. Total Retalnaga(Line 5a+Line 5b) $456,800.48
8. AMOUNT ELIGIBLE TO DATE (Line 4. Line 5c) $8,879,209.16
T. LESS PREVIOUS PAYMENTS (Line 6 from prior Application) $7,923,945.24
S. AMOUNT DUE THIS APPLICATION
9. BALANCE TO FINISH, PLUS RETAINAGE
(Column G on Progress Estimate + Line 5 above)
Payment of $755,263.92
(Line 8 or other - attach explanation of other amount)
$755,263.92
$8,105,982.43
Is recommended by: Oct. 8, 2015
(Engineer) (Daft)
Payment of: $755,263.92
(Line 8 or other - attach explanation of other amount)
Is approved by:
Approved by:
(Finanee Director) (Date)
Funding Agency (if applicable) (Deft)
VCDC Na Cow (tam seam.)
P,sp is tFaam«n' Jolel Costntr Dotwese Commin"tad ta,IMM by rhtMWIlal etmrsh CwhecmwefAmerkasW ul Cwam of SWIffelmnr ivmun.
Project: WastewaterTroatment Faculty Improvements 2014 Owner: Cltyof Elk River Application Number 11
Contractor. Rice Lake Construction Group Date of application 10/5(2015
Engineer Bolton & Monk, Inc. Work rAmnlered rhrn,mh
Pay Item
Number
Item
Description
B
Scheduled Value
C
From Previous
Application(C+D)
D E
This Period Materials Presently
Stored (not In Cot D)
Total Completed
and Stored to Date
(C+D+E)
%
Balance to
Finish
01001
Performance Bond
$230,186.00
$230,186.00
$230,186.00
100.00
$0.00
01002
Insurance
$161,171.00
$161,171.00
$161,171.00
100.00
$0.00
01003
Mobilization
$635,418.00
$635,418.00
$635,418.00
100.00
$0.00
01004
Demobilization
$30,000.00
$0.00
$0.00
0.00
$30,000.00
01008
Project Allowances
$695,434.36
$0.00$0.00
0.00
$695,434.36
01005.1
Submittal Exchange
$9,795.00
$9.795.001
$9,795.00
100.001
$0.00
01005.2
Building Permit
$29,630.04
$29,530.041
$28,530.04
100.00
$0.00
01005.3
LIB Station SCADA System Allowance
$230,000.00
$242,268.591
$242,268.59
105.33
($12,268.59)
01005.4
COP#01 -Automatic Door Operators
$5,963.20
$5,963.20
$5,963.20
100.00
$0.00
01005.5
COP#02- Overflow for Biosollde Holding Tank
$2,787.42
$2,787.42
$2,787.42
100.00
$0.00
01005.6
COP#03- Additional Window In Door 1128
$323.84
$323.84
$323.84
100.00
$0.00
01005.7
COP#04 - Delay Costs
IN 001 BELOW
01005.8
COP#05-Revised Plana
$0.00
$0.00 #DIVl01
$0.00
01005.9
COP#08 - Black Material
$106,703.90
$106,703.90
$106,703.90
100.00
$0.00
01005.10
COP#07-Slide Gate t6
$5,361.91
$51361.91
$5,361.91
100.00
$0.00
01005.11
COP#08 -Aeration Basin Sumps
$10,693.54
$10,693.54$10,893.54
100.00
$0.00
01005.12
COP#09 - Blosollds OH Doors
$37,350;46
$37.350.461
$37,350.46
100.001
$0.00
01005.13
COP#10- Aeration Pipe Drop Legs -
($3,500.80)
($3,500.80)
($3,600.80)
100.001
$0.00
01005.14
COP#11 - Vlton Gaskets
$11,424.64
$11,424.54
$11,424.54
100.001
$0.00
01005-15
COP#12- Supernatant MH Vent
$3,686.92
$3,686.92
$3,686.92
100.00
$0.00
01005.16
COP413- Disinfection Channel Gate
($1,500.00)
$0.00
($1,500.00)
($1,500.00)
100.001$0.00
01005.17
COP#14 - WasherlDryer Hookups
$3,515.73
$0.00
$0.00
0.001
$3,515.73
01005.18
COP#15-Dumpsler Rails
$20,796.71
$0.00
$20,796.71$20,796.71
1011301
$0.00
01005.19
COP#16-Retaining Wall
TBD
$0.00
$0.00
0.001
TBD
01005.20
COP#17 -Additional Hydrant & Paving
$10,437.29
$0.00
$0.00
0.00
$10,437.29
01005.21
COP#18-Meter Manhole
$17,695.94
$0.00
$17,695.94
$17,695.94
100.00
$0.00
02080
Demolition of Existing Facilities/Pavement
02060.1
- Main Building
$40,000.00
$15,000.00
$15,000.00
37.50
$25,000.00
02060.2
-Blower Building
$15,000.00
$0.00
$0.00
0.00
$15,000.00
02060.3
-Aeration Tank
$20,000.00
$0.0u
$0.00
0.00
$20,000.00
02060.4
-Trickling Filters & Pump Station
$45,000.00
$0.00
$0.00
0.00
$45,000.00
02060.5
-Final Clarifier Sludge Wet Well
$101000.00
$0.001
$0.00
0.00
$10,000.00
Page 2 of 7
Project: Owner: City of Elk River Application Number 11
Date of application 1 01512 01 5
Work comDietedthrouah: tntw7nta
Wastewater Treatment Facility Improvements 2014
Contractor:
Ries Lake Construction Group
Engineer:
Bolton &hank, Inc.
Pay Item
Number
Rem
Description
B
Scheduled Value
C
From Previous
Application (C+D)
D
This PeriodMatedals
E
Presen9y
Stored (not In Col D)
Total Completed
and Stored to Date
(C+0+E)
%
(E)
Balance to
Finish
02060.6
-Pavement
$10,510.00
$8,600.00
$2,010.00
$10,510.00
100.00
$0.00
02140
Bypass Pumping
$75,000.00
$0.00
$0.00
0.00
$75,000.00
02220
Earthwork
02220.1
- New Aeration Basins
$355.815.00
$355,816.00
$355,815.00
100.00
$0.00
02220.2
- New Proposed Aerated Blosollds Control Bldg 2
$65,000.00
$65,000.00
$65,000.00
100.001
$0.00
02220.3
- New RASIWAS Building
$56,000.00
$58,000.00
$58,000.00
100.001
$0.00
02220.4
- New Operations Building
$85,000.00
$0.00
$0.00
0.001
$85,000.00
02550
Site Piping
02550.1
-Purchase
$690,000.00
$584,500.00
$60,000.00
$644,600.00
93.411
$45,500.00
02550.2
-Install
$426,947.00
$127,500.00
$100,000.00
$227,500.00
5329
$199,447.00
02600
Bituminous PavementiClass 5181dewaiks
$149,490.00
$0.00
$0.00
0.00
$149,490.00
02830
Chain Link Fence & Gates
$18,890.00
$10,000.00
$10,000.00
52.941
$8,890.00
02835
Retaining Walls
$25,000.00
$0.00
$0.00
0.00
$251000,00
02920
SeedingfLandscaping
$16,000.00
$0.00
$0.00
0.00
$16,000.00
03200
Concrete Reinforcement
03200.1
-Purchase
$661,997:00
$630,000.00
$5,000.00
$835,000.00
95.92
$28,997.00
03200.2
-Install
$312,185.00
$295,488.00
$5,000.00
$300,488.00
96.26
$11,677.00
03300
Concrete Work
03300.1
-Aeration Basin
$150,000.00
$1,190,000.00
$1,190,000.00
100.00
$0.00
03300.2
-RASANAS Building
$215,000.00
$125,000.00
$75,000.00
$200,000.00
93.021
$15,000.00
03300.3
-Aerated Blosollds Control Bldg No. 2
$110.000.00
$110,000.00
$110,000.00
100.001
$0.00
03300.4
-Operations Building
$148.000:00
$0.00
$0.00
0.00
$148,000.00
03300.5
-Generator& Transformer Pads
$20,000.00
$20,000.00
$20,000.00
100.00
$0.00
03400
Precast Walls & Plank
$1,062,500.00
$388,237,50
$388,237.60
36.54
$674,262.50
04810
Masonry
$75,000.00
$0.00
$0.00
0.00
$75,000.00
05600
Misc. Metals
05500.1
-Purchase
$200,000.00
S28,000.001
$28,000.00
14.00
$172,000.00
05500.2
-Install
$95,000.00
$10,000.00
$10,000.00
10.53
$85,000.00
08100
Carpentry
06100.1
-Purchase
$18,000.00
$2,500.00
$5,000.00
$7,500.001
41.671
$10,600.00
06100.2
-Install
$22,000.00
$2500.00
$5,000.00
$7,500.00
34.09
514,600.00
07150
Dampproo0ng
$31,638 AO
$5,000.00
$26,638.00
$31,638.00
100.00
$0.00
Page 3 of 7
Project: Owner: Clly of Elk River Application Number 11
Date of application 1015/2015
�m.,a. ......_i_._�.�-_.._..
Wastewater Treatment Facility Improvements 2014
Contractor:
Rice Lake Construction Group
Engineer.
Bolton 8 Monk, Inc.
Pay Item
Number
Item
Description
B
Scheduled Value
C
From Previous
Application (C+D)
D E
This Periotl Matenals Presently
Stored (not In Col D)
..-... „..,. y,........ n '.1.
Total Completed °/
and Stored to Date L)
(C + D+ E)
..1.I vIJ
Balance to
Finish
07535
07900
Roofing
Caulking
$235,078.00
$26,870.00
$68,000.00
$7,500.00
$5,000.00
$68.000.00
$12,500.00
28.93
46.52
$167,078.00
$14,370.00
08110
Doors 8 Frames
08110.1
08110.2
-Purchase
-install$35,000.00
$57,7B0.00
$25.000.00
$0.0ol
$15,000.00
$25,000.00
$15,000.00
43.27
42.86
$32,780.00
$20,000.00
08360
Upward Acting Sectional Doors
$36,600.00
$0.00
$8,400.00
$8,400.01)
22.95
$28,200.00
08500
Windows
$25,000.00
$0.00
$0.00
0.00
$25,000.00
08800
Steel Studs/Gypsum
$22,869.00
$0.001
$3,600.00
$3,500.00
15.30
$19,369.00
08310
Commic/Realllent Tile
$30,000.00
$0.00$0.00
0.001
$30,000.00
09510
Acoustical Coiling
$6,500.00
50.00
$0.00
0.00
$6,500.00
09900
Painting
$373,921.00
$127,500.00
$37,000.00
$164,500.00
43.99
$209,421.00
10110
Marker Boards/rollet Compartmentarroilet Accessories
10110.1
-Purchase
$8,000.00
$0.00
$0.00
0.00
$8,000.00
101102
-Install
$3,000.00
$0.00
$0.00
().001
$3,000.00
10250
Safety Devices
10250.1
-Purchase
$10,000.00
$0.00
$0.00
0.00
$10,000.00
10250.2
-Install
$3,500.00
$0.001
$0.00
0.00
$3,500.00
10506
Metal Lockers
10505.1
-Purchase
$10,000.00
$0.00
$0.00
0.00
$10,000.00
10505.2
-Install
$4,000.00
$0.00
$0.00
0.00
$4,000.00
11280
Hydraulic Gates
11280.1
-Purchase
$50,000.00
$5D,000.00
$50,000.00
100.00
$0.00
11280.2
-Install
$20,000.00
$0.00
$0.00
0.00
$20,000.00
11311
Submersible Centrifugal Pumps
11311.1
-Purchase
$278,888.00
$264,924.60
$264,924.60
95.00
$13,943.40
11311.2
-Install
$25,00.00
$0.D0
$0.00
0.00
$25,000.00
11345
Chlorination 8 Dechlorinatlon Eq.
11345.1
-Purchase
$330,000.00
$0.00
$0.00
0.00
$330.001
11345.2
-Install
$20,IM0.00
$0.00
$0.00
0.00
$20,000.00
11351
Clarifier Equipment
11351.1
-Purchase
$15,000.00
$13,507.74
$13,507.74
90.05
$1,492.26
11351.2
-Install
$12,000.00
$0.00
$0,00
0.00
$12,000.00
Page 4 of 7
Project: Wastewater Treatment Facility Improvements 2014 Owner: Clty of Elk River Application Number 11
Contractor: Rice Lake Construction Group Data of appika0on 101612015
Engineer: Bolton & Monk, Inc. Work completed through: 101512015
Pay Item
Number
Item
Description
B
Scheduled Velue
C
From Previous
Application (C+D)
0
This Period
E
Materials Presently
Stored (not In Col D)
Total Completed
and Stored to Date
(C+ D + E)
%�)
Balance to
Finis
11356
Screw Press
11356.1
-Purchase
$575,000.00
$0.00
80.00
0.00
$575,000.00
11356.2
-Install
$26,000.00
$0.00
$0.00
0.001
$26,000.00
11374
Fine Pore Aeration Equipment
11374.1
-Purchase
$100,OD0.00
$95,000.001
$95,000.00
95.00
$6,000.00
11374.2
-install
$75,000.00
$30,000.00
$20,000.00
$50,000.00
66.67
$26,000.00
11375
Rimer System (PD wlEnclosure)
11375.1
-Purchase
$180.000.00
$0.00
$95,000.00
$95,000.00
52.78
$85,000.00
11375.2
-Install
$30,000.OD
$0.00
$10,000.00
$10,000.00
33.33
$20,000.00
11378
Hybrid Blower System (Alt. No. 2)
11376.1
-Purchase
$270,000.00
$256,500.00
$256,500.00
95.00
$13,500.00
11376.2
-Install
$25,000.00
$6,500.00
$18,500.00
$26,000.00
100.00
$0.00
11385
Coarse Bubble Aerobic Digester Mixing System
11385.1
-Purchase
$85,000.00
$0.00
$61,750.00
$61,750.00
95.00
$3,250.00
11385.2
-Install
$40,000.00
$0.00
$10,000.00
$10,000.00
25.00
$30,000.00
11386
Rapid Mixers
11386.1
-Purchase
$28,000.00
$24,700.00
$24,700.00
96.00
$1,300.00
11388.2
-Install
$3,500.00
$0.00
$0.00
0.00
$3,500.00
11397
Submersible Mixers
11387.1
-Purchase
$75,000.00
$67,500.00
$3,750.00
$71,250.00
95.001
$3,750.00
11387.2
-Install
$12,000.00
$0.001
$3,500.00
$3,600.00
29.171
$8,600.00
11836
Phosphorus Analyzer
11636.1
-Purchase
$26,000.00
$18,500.00
$16,600.00
63.46
$9,600.00
11636.2
-Install
$5,000.00
$0.00
$0.00
0.00
$5,000.00
12346
Casework/Lab Eq,
$45,000.00
$0.00
$0.00
0.00
$45,000.00
13126
Circular Tank Covers
13126.1
-Purchase
$292,837.00
$0.00
$0.00
0.00
$282,837.00
13126.2
-Install
$75,000.00
$0.00
$0.00
0.00
$75,000.00
14300
Hoists & Cranes
14300.1
-Purchase
$40,000.00
$0.00
$0.00
0.001
$40,000.00
14300.2
-Install
$12,000.10C)l
$0.00
$0.00
0.00
$12,000.00
14500
Material Handling Equipment
Page 5 of 7
Project: Wastewater Treatment Facility Improvements 2014 owner: City of Elk River Application Number 11
Contractor. Rice Lake Construction Group Date of application 1 01512 01 5
Engineer: Bolton & Monk, Inc. Work completed throuah: lntalanln
Pay Item
Number
Item
Description
B
Scheduled Value
C
From Prevlous
Application (C+D)
D
This Period
E
Mstedala Presently
Stored (not In Col D)
Total Completed
and Stored to Date
(C + D + E)
%
Balance to
Finish
14500.1
-Purchase
$10,000.00
$0.00
$0.00
0.00
$10,000.00
14500.2
-Install
$2,500.00
$0.00
$0.00
0.00
$2,500.00
14600
Conveyance Equipment
14600.1
-Purchase
$135,000.00
$0.00
$0.00
0.00
$135,000.00
14600.2
-Install
$22,250.00
$0.00
$0.00
0.00
$22,250.00
14621
Power Winch
14621.1
-Purchase
$20,000:00
$20.000.001
$20,000.00
100.00
$0.00
14621.2
-Install
$3,000.00
$0.00
$0.00
0.00
$3,000.00
15060
Process Piping
11
15060.1
-Purchase
$650,000.00
$235,000.001
$85,000.00
$320,000.00
49.231$330,000.00
150602
-Install
$200,000.00
$70,000.001
$20,000.00
$90,000.00
45.001
$110,000.00
16100
Vaivea
15100.1
-Purchase
$265,000.00
$265,000.00
$265,000.00
100.00
$0.00
151002
-Install
$110,000.00
$30,000.00
$20,000,00
$50,000.00
45.45
$60,000.00
16300
Fire Protection
$45,000.00
$0.00
$0.00
0.00
$45,000.00
15400
Plumbing
15400.1
Copper Piping
16400.1.1
-Purchase
$45,000.00
$25,000.00
$25,000.00
55.56
$20,000.00
16400.1.2
-Install
$100,000.00
$65,000.00
$65,000.00
65.00
$36,000.00
15400.2
-Chemical Piping
15400.2.1
-Purchase
$18,000.00
$0.00
$0.00
0.001
$18,000.00
15400.2.2
-Install
$22,000.00
$0.00
$0.00
0.00
$22,000.00
15400.3
-Waste & Vent Piping
15400.3.1
-Purchase
$30,000.00
$27,000.00
$27,000,00
90.00
$3,000.00
16400.32
-Install
$62,000.00
$551800.00
$55,800.00
90.00
$6,200.00
15480
Packaged Compressed Air System
15480.1
-Purchase
$5,000.00
$0.00
$0.00
0.00
$5,000.00
15480.2
-Install
$1,500.00
$0.00
$0.00
0.00
$1,500.00
15600
HVAC
15500.1
Equipment
$286,200.00
$108,592.50
$7,797.00
$116,389.50
40.671
$169,810.50
155002
Labor
$169,020.00
$14,244.50
$13,307.00
$27,551.501
16.301
$141,468.50
15500.3
Duct Insulation
$24,780.001$O.ODI
$0.00
0.00
$24,780.00
Page 6 of 7
Project: Owner: Cityof Elk River Application Number 11
Date of application 101512015
Work completed through: 101512015
Wastewater Treatment Faclllty Improvemonts 2014
Contractor:
Rice Lake Construction Group
Engineer:
Bolton & Monk, Inc.
Pay Item
Number
Item
Description
B
Scheduled Value
C
From Prevlous
Application (C+D).
D
This Period
E
Materials Presently
Stored (not In Col D)
Total Gompleted
and Stored to Date
(C + D + E)
%
Balance to
Finish
15500.4
Tesla Balance
$5.000.00
$0.00
$0.00
0.00
$5,000.00
15950
HVAC Controls
$67,400.00
$7,000.00
$7,000.00
10.39
$60,400.00
16000
Electrical
16000.1
General Provisions
$55,000.00
$31,500.00
$31,500.00
57.27
$23,600.00
16000.2
Basic Materials and Methods
$265,000.00
$52,900.00
$18,900.001
$71,800.00
27.09
$193,200.00
16000.3
Motors
$32,000.00
$1,400.00
$1,400,00
4.38
$30,600.00
15000.4
Power Generation System
$414,000.00
$397,200.00
$397,200.00
95.94
$16,800.00
16000.5
Electrical Distribution
$385,000.00
$26,100.00
$1,450.00
$27,550.00
7.16
$357,450.00
16000.6
Lighting
$85,000.00
$26,760.00
$9,120.00
$35,870.00
42.20
$49,130.00
16000.7
Special Systems
$24,000.00
$980.00
$980.00
4.08
$23,020.00
16000.8
Starters and Motor Control
$330,000.00
$11,300.00
$11,300.00
3.42
$318,700.00
16000.9
Instrumentation and Control
$480,000.00
$36,900.00
$7,400.00
$44,300.00
9.23
$435,700.00
Change Order No. 1
$259,991.59
$259,991.59
$259,991.59
100.00
$0.00
$16,785,191.59
$6,340,994.99
$795,014.65
$0.00
$9,136,009.64
54.43
$7,649,181.95
EJCDC No. C-620 (2002 Edition)
Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the Aesoclated General Contractors of America and the Construction Speelfiestlons Institute.
Page 7 of 7
CONTRACTOR'S PAY REQUEST
DISTRIBUTION:
CONTRACTOR (1)
2015 STREET IMPROVEMENTS
OWNER (1)
CITY OF ELK RIVER
ENGINEER (1)
SAP 204-135-001, 204-107-007, 204-114-003, 204-116-002
BONDING CO. (1)
BMI PROJECT NO. N15.108340
TOTAL AMOUNT BID PLUS APPROVED CHANGE ORDERS
$3,953,239.73
TOTAL, COMPLETED WORK TO DATE
$3,076,449.03
TOTAL, STORED MATERIALS TO DATE
$0.00
DEDUCTION FOR STORED MATERIALS USED IN WORK COMPLETED
$0.00
TOTAL, COMPLETED WORK & STORED MATERIALS
$3,076,449.03
RETAINED PERCENTAGE ( 5%)
$153,822.45
TOTAL AMOUNT OF OTHER PAYMENTS OR (DEDUCTIONS)
$0.00
NET AMOUNT DUE TO CONTRACTOR TO DATE
$2,922,626.58
TOTAL AMOUNT PAID ON PREVIOUS ESTIMATES
$2,201,998.77
PAY CONTRACTOR AS ESTIMATE NO. 5
$720,627.81
Certificate for Partial Payment
I hereby certify that, to the best of my knowledge and belief, all items quantities and prices
of work and material shown on this Estimate are correct and that all work has been
performed in full accordance with the terms and conditions of the Contract for this project
between the Owner and the undersigned Contractor, and as amended by any
authorized changes, and that the foregoing is a true and correct statement of the
contract amount for the period covered by this Estimate.
Contractor: North Valley, Inc.
20015 Iguana St NW OD
owthen, N 553,30,
By
Name Title
Date 0 cd
CHECKED AND APPROVED AS TO QUANTITIES AND AMOUNT:
ENGINEER: POLTON 4 MENK, INC., 7533 Sunwood Drive NW, Suite 206, Ramsey, MN 55303
By PROJECT ENGINEER
Cody olmes, P.E11.
Date `� t
APPROVED FOR PAYMENT:
OWNER:
By
Name Title Date
And
Name Title Date
Partial Pay Estimate No.:
2015 STREET IMPROVEMENTS
CITY OF ELK RIVER
SAP 204-135-001.204-107-007.204-114-003.204-116-002
BMI PROJECT NO. N15.108340
YOn,<COMPLETED THROUGH SEPTEMBER 22.2015
IN
IN
1
2021.501 MOBILIZATION
$149,206.38
1 LUMP SUM
$149,206.38
1
LUMP SUM
$149,206.38
1.00 LUMP SUM
$149,206.38
2
2101.511 CLEARING AND GRUBBING
$3,733.15
1 LUMP SUM
$3,733.15
0.8
LUMP SUM
$2,986.52
1.00 LUMP SUM
$3,733.15
3
2104.501 REMOVE CONCRETE CURB & GUTTER
$4.80
880
LIN FT
$4,224.00
609
LIN FT
$2,923.20
787.00
LIN FT
$3,777.60
4
2104.501 REMOVE SEWER PIPE STORM
$10.93
764
LIN FT
$8,350.52
0
LIN FT
$0.00
614.00
LIN FT
$6,711.02
5
2104.503 REMOVE CONCRETE DRIVEWAY PAVEMENT
$1.33
5013
SQ FT
$6,667.29
4192
SQ FT
$5,575.36
4,192.00
SQ FT
$5,575.36
6
2104.505 REMOVE CONCRETE VALLEY GUTTER
$14.40
40
SQ YD
$576.00
56.2
SQ YD
$809.28
56.20
SQ YD
$809.28
7
2104.505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT
$5.07
1628
SQ YD
$8,253.96
3151.51
SQ YD
$15,978.11
3,151.50
SQ YD
$15,978.11
8
2104.505 REMOVE BITUMINOUS PAVEMENT
$6.24
400
SQ YD
$2,496.00
0
SQ YD
$0.00
0.00
SQ YD
$0.00
9
2105.501 COMMON EXCAVATION P
$17.60
16416
CU YD
$288,921.60
12222
CU YD
$215,107.20
12,222.00
CU YD
$215,107.20
10
2105.505 MUCK EXCAVATION LV
$0.53
12000
CU YD
$6,360.00
0
CU YD
$0.00
3,000.00
CU YD
$1,590.00
11
2105.507 SUBGRADE EXCAVATION EV
$10.13
710
CU YD
$7,192.30
1623
CU YD
$16,440.99
2,643.00
CU YD
$26,773.59
12
2105.521 GRANULAR BORROW CV
$0.53
14200
CU YD
$7,526.00
0
CU YD
$0.00
0.00
CU YD
$0.00
13
2105.522 SELECT GRANULAR BORROW CV
$0.53
710
CU YD
$376.30
0
CU YD
$0.00
3,000.00
CU YD
$1,590.00
14
2105.535 PLACE SALVAGED AGGREGATE FROM STOCKPILE CLASS 7
$4.00
7275
CU YD
$29,100.00
4150
CU YD
$16,600.00
4,150.00
CU YD
$16,600.00
15
2105.607 POND EXCAVATION P
$10.40
665
CU YD
$6,916.00
0
CU YD
$0.00
665.00
CU YD
$6,916.00
16
2118.607 AGGREGATE SURFACING CV CLASS 2
$63.90
925
CU YD
$59,107.50
646
CU YD
$41,279.40
646.00
CU YD
$41,279.40
17
2211.501 AGGREGATE BASE CV CLASS 5
$10.67
15570
TON
$166,131.90
2801
TON
$29,886.67
22,204.95
TON
$236,926.82
18
2215.501 BITUMINOUS PAVEMENT RECLAMATION IN-PLACE 8" DEPTH
$1.62
48764
SQ YD
$78,997.68
61018.68
SQ YD
$98,850.26
61,018.68
SQ YD
$98,850.26
19
2215.501 BITUMINOUS PAVEMENT RECLAMATION 8" DEPTH
$2.08
32576
SQ YD
$67,758.08
32576
SQ YD
$67,758.08
32,576.00
SQ YD
$67,758.08
20
2231.501 BITUMINOUS PATCHING MIXTURE
$0.01
675
TON
$6.75
27.33
TON
$0.27
27.33
TON
$0.27
21
2231.604 BITUMINOUS PATCH - SPECIAL ROADWAY
$42.35
800
SQ YD
$33,880.00
781
SQ YD
$33,075.35
781.00
SQ YD
$33,075.35
22
2231.604 BITUMINOUS PATCH - SPECIAL DRIVEWAY
$29.28
1938
SQ YD
$56,744.64
2023.5
SQ YD
$59,248.08
2,023.50
SQ YD
$59,248.08
23
2232.501 MILL BITUMINOUS SURFACE 1.5"
$1.38
4226
SQ YD
$5,831.88
10897
SQ YD
$15,037.86
10,897.00
SQ YD
$15,037.86
24
2232.501 MILL BITUMINOUS SURFACE 3"
$1.11
6563
SQ YD
$7,284.93
12852.86
SQ YD
$14,266.67
12,852.86
SQ YD
$14,266.67
25
2232.501 MILL BITUMINOUS SURFACE TAPER 0" - 2"
$0.92
11305
SQ YD
$10,400.60
8917
SQ YD
$8,203.64
8,917.00
SQ YD
$8,203.64
26
2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 2,C
$61.02
19037
TON
$1,161,637.74
10312.59
TON
$629,274.24
10,312.59
TON
$629,274.24
27
2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 4,E
$60.09
3486
TON
$209,473.74
3788.22
TON
$227,634.14
3,788.22
TON
$227,634.14
28
2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE 2,C
$54.65
11648
TON
$636,563.20
6186
TON
$338,064.90
9,272.40
TON
$506,736.66
29
2411.618 MODULAR BLOCK RETAINING WALL
$30.53
525
SQ FT
$16,028.25
0
SQ FT
$0.00
0.00
SQ FT
$0.00
30
2501.515 12" RC PIPE APRON
$602.64
16
EACH
$9,642.24
0
EACH
$0.00
16.00
EACH
$9,642.24
31
2501.515 15" RC PIPE APRON
$693.30
6
EACH
$4,159.80
0
EACH
$0.00
6.00
EACH
$4,159.80
32
2501.515 18" RC PIPE APRON
$735.96
6
EACH
$4,415.76
0
EACH
$0.00
6.00
EACH
$4,415.76
33
2501.601 DRAINAGE IMPROVEMENTS AND REPAIR PIPE CULVERT
$3,749.16
1 LUMP SUM
$3,749.16
1
LUMP SUM
$3,749.16
1.00 LUMP SUM
$3,749.16
34
2501.602 TRASH GUARD FOR 12" PIPE ARPON
$351.98
16
EACH
$5,631.68
0
EACH
$0.00
18.00
EACH
$6,335.64
35
2501.602 TRASH GUARD FOR 15" PIPE ARPON
$405.31
6
EACH
$2,431.86
0
EACH
$0.00
6.00
EACH
$2,431.86
36
2501.602 TRASH GUARD FOR 18" PIPE ARPON
$474.64
6
EACH
$2,847.84
0
EACH
$0:0:0:6.00
EACH
$2,847.84
37
2503.541 12" RC PIPE SEWER DESIGN 3006 CLASS V
$30.93
532
LIN FT
$16,454.76
0
LIN FT
$0.00
412.00
LIN FT
$12,743.16
38
2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V
$33.07
229
LIN FT
$7,573.03
0
LIN FT
$0.00
268.00
LIN FT
$8,862.76
39
2503.541 18" RC PIPE SEWER DESIGN 3006 CLASS V
$37.33
300
LIN FT
$11,199.00
0
LIN FT
$0.00
272.00
LIN FT
$10,153.76
40
2504.602 ADJUST GATE VALVE AND BOX
$266.65
13
EACH
$3,466.45
13
EACH
$3,466.45
13.00
EACH
$3,466.45
Partial Pay Estimate No.:
2015 STREET IMPROVEMENTS
CITY OF ELK RIVER
SAP 204-135-001.204-107-007.204-114-003.204-116-002
BMI PROJECT NO. N15.108340
YOn,<COMPLETED THROUGH SEPTEMBER 22.2015
41
2504.602 RECONSTRUCT VALVE BOX
$719.97
4
EACH
$2,879.88
0
EACH
$0.00
0.00
EACH
$0.00
42
2506.522 ADJUST FRAME AND RING CASTING
$426.65
25
EACH
$10,666.25
10
EACH
$4,266.50
30.00
EACH
$12,799.50
43
2511.501 RANDOM RIPRAP CLASS II
$98.13
42
CU YD
$4,121.46
0
CU YD
$0.00
42.00
CU YD
$4,121.46
44
2521.602 6" CONCRETE SPILLWAY SPECIAL
$213.32
89
EACH
$18,985.48
28
EACH
$5,972.96
81.00
EACH
$17,278.92
45
2531.501 CONCRETE CURB & GUTTER DESIGN B618
$10.61
26613
LIN FT
$282,363.93
9868
98687
LIN FT
$104,699.48
25,337.00
LIN FT
$268,825.57
46
2531.501 CONCRETE CURB & GUTTER DESIGN B818 MEDIAN
$10.61
760
LIN FT
$8,063.60
LIN FT
$0.00
0.00
LIN FT
$0.00
47
2531.503 CONCRETE MEDIAN 5"
$38.40
96
SO YD
$3,686.40
0
SO YD
$0.00
0.00
SO YD
$0.00
48
2531.507 CONCRETE DRIVEWAY PAVEMENT 7"
$43.20
1897
SO YD
$81,950.40
508.43
SO YD
$21,964.18
1,061.03
SO YD
$45,836.50
49
2531.604 CONCRETE MEDIAN NOSE - SPECIAL
$57.60
42
SO YD
$2,419.20
0
SO YD
$0.00
0.00
SO YD
$0.00
50
2531.604 7" CONCRETE VALLEY GUTTER
$57.60
40
SO YD
$2,304.00
56.2
SO YD
$3,237.12
56.20
SO YD
$3,237.12
51
2535.501 BITUMINOUS CURB 6"
$6.24
2100
LIN FT
$13,104.00
4159.5
LIN FT
$25,955.28
4,159.50
LIN FT
$25,955.28
52
2563.601 TRAFFIC CONTROL
$8,746.24
1 LUMP SUM
$8,746.24
0.95 LUMP SUM
$8,308.93
0.95 LUMP SUM
$8,308.93
53
2563.601 FLAG PERSON (BNSF CROSSING
$15,999.23
1 LUMP SUM
$15,999.23
0 LUMP SUM
$0.00
0.00 LUMP SUM
$0.00
54
2564.531 SIGN PANEL TYPE C
$32.00
435
SO FT
$13,920.00
3
SO FT
$96.00
3.00
SO FT
$96.00
55
2565.602 NMC LOOP DETECTOR 6'X 6'
$1,056.42
39
EACH
$41,200.38
38
EACH
$40,143.96
38.00
EACH
$40,143.96
56
2573.502 SILT FENCE TYPE MACHINE SLICED
$1.92
6498
LIN FT
$12,476.16
4026
LIN FT
$7,729.92
4,026.00
LIN FT
$7,729.92
57
2573.53 STORM DRAIN INLET PROTECTION
$127.99
48
EACH
$6,143.52
45
EACH
$5,759.55
45.00
EACH
$5,759.55
58
2573.533 SEDIMENT CONTROL LOG TYPE WOOD CHIP
$3.04
3870
LIN FT
$11,764.80
147
LIN FT
$446.88
876.00
LIN FT
$2,663.04
59
2573.535 STABILIZED CONSTRUCTION EXIT
$874.63
2
EACH
$1,749.26
0
EACH
$0.00
0.00
EACH
$0.00
60
2574.508 FERTILIZER TYPE 3
$0.53
1745
POUND
$924.85
350
POUND
$185.50
1,150.00
POUND
$609.50
61
2574.525 COMMON TOPSOIL BORROW CV
$9.07
2360
CU YD
$21,405.20
25
CU YD
$226.75
25.00
CU YD
$226.75
62
2575.501 SEEDING
$133.33
5
ACRE
$666.65
2
ACRE
$266.66
4.30
ACRE
$573.32
63
2575.502 SEED MIXTURE 25-121
$3.35
305
POUND
$1,021.75
62
POUND
$207.70
202.00
POUND
$676.70
64
2575.562 HYDRAULIC MATRIX TYPE BONDED FIBER
$1.07
17500
POUND
$18,725.00
3500
POUND
$3,745.00
3,500.00
POUND
$3,745.00
65
2582.501 PAVEMENT MESSAGE LEFT TURN ARROW EPDXY
$124.88
9
EACH
$1,123.92
8
EACH
$999.04
8.00
EACH
$999.04
66
2582.501 PAVEMENT MESSAGE RIGHT TURN ARROW EPDXY
$124.88
6
EACH
$749.28
6
EACH
$749.28
7.00
EACH
$874.16
67
2582.501 PAVEMENT MESSAGE LEFT-THRU ARROW EPDXY
$192.99
2
EACH
$385.98
2
EACH
$385.98
2.001
EACH
$385.98
68
2582.501 PAVEMENT MESSAGE THRU ARROW EPDXY
$124.88
2
EACH
$249.76
2
EACH
$249.76
3.00
EACH
$374.64
69
2582.501 PAVEMENT MESSAGE RR XING EPDXY
$737.91
4
EACH
$2,951.64
0
EACH
$0.00
0.00
EACH
$0.00
70
2582.502 4" SOLID LINE WHITE - EPDXY
$0.26
26856
LIN FT
$6,982.56
1693
LIN FT
$440.18
1,693.00
LIN FT
$440.18
71
2582.502 4" BROKEN LINE WHITE - EPDXY
$0.26
1660
LIN FT
$431.60
1740
LIN FT
$452.40
1,740.00
LIN FT
$452.40
72
2582.502 4" SOLID DOUBLE LINE YELLOW - EPDXY
$0.51
26428
LIN FT
$13,478.28
19099
LIN FT
$9,740.49
19,099.00
LIN FT
$9,740.49
73
2582.502 24" SOLID LINE WHITE - EPDXY
$7.95
285
LIN FT
$2,265.75
218.5
LIN FT
$1,737.08
218.50
LIN FT
$1,737.08
74
2582.503 CROSSWALK MARKING - EPDXY
$4.54
1458
SO FT
$6,619.321
1314
SO FT
$5,965.56
1,314.00
SO FT
$5,965.56
TOTAL AMOUNT:
$3,731,843.70
$2,249,354.35
$2,931,024.13
CHANGE ORDER #1
75
2021.501 MOBILIZATION
$149,206.38
0.05
LUMP SUM
$7,460.32
0.05 LUMP SUM
$7,460.32
0.05
LUMP SUM
$7,460.32
76
2105.501 REMOVE CONCRETE CURB & GUTTER
$4.80
35
LIN FT
$168.00
10
LIN FT
$48.00
10.00
LIN FT
$48.00
77
2231.501 BITUMINOUS PATCHING MIXTURE
$0.01
25
TON
$0.25
0
TON
$0.00
0.00
TON
$0.00
78
2232.501 MILL BITUMINOUS SURFACE (1.5")
$1.38
9900
SO YD
$13,662.00
9611
SO YD
$13,263.18
9,611.00
SO YD
$13,263.18
79
2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 2,C
$61.02
850
TON
$51,867.00
781.08
TON
$47,661.50
781.08
TON
$47,661.50
80
2531.501 CONCRETE CURB & GUTTER DESIGN B618
$10.61
35
LIN FT
$371.35
10
LIN FT
$106.10
10.00
LIN FT
$106.10
$73,528.92
$68,539.10
$68,539.10
CHANGE ORDER #2
81
2021.501 MOBILIZATION
$149,206.38
0.05
LUMP SUM
$7,460.32
0 LUMP SUM
$0.00
0.05
LUMP SUM
$7,460.32
82
2104.501 REMOVE CONCRETE CURB & GUTTER
$4.80
50
LIN FT
$240.00
0
LIN FT
$0.00
0.00
LIN FT
$0.00
Partial Pay Estimate No.:
2015 STREET IMPROVEMENTS
CITY OF ELK RIVER
SAP 204-135-001,204-107-007,204-114-003,204-116-002
BMI PROJECT NO. N15.108340
YOn,<COMPLETED THROUGH SEPTEMBER 22.2015
83
2105.501 COMMON EXCAVATION P
$17.60
815
CU YD
$14,344.00
0
CU YD
$0.00
690.00
CU YD
$12,144.00
84
2215.501 BITUMINOUS PAVEMENT RECLAMATION 8" DEPTH
$2.08
5870
SQ YD
$12,209.60
0
SQ YD
$0.00
4,964.00
SQ YD
$10,325.12
85
2232.501 MILL BITUMINOUS SURFACE TAPER 0" - 2"
$0.92
535
SQ YD
$492.20
0
SQ YD
$0.00
0.00
SQ YD
$0.00
86
2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 2,C
$61.02
865
TON
$52,782.30
0
TON
$0.00
0.00
TON
$0.00
87
2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE 2,C
$54.68
1016
TON
$55,554.88
0
TON
$0.00
818.76
TON
$44,769.80
88
2531.501 CONCRETE CURB & GUTTER DESIGN B618
$10.61
50
LIN FT
$530.50
0
LIN FT
$0.00
0.00
LIN FT
$0.00
89
2563.601 TRAFFIC CONTROL
$8,746.24
0.25 LUMP SUM
$2,186.56
0 LUMP SUMI
$0.00
0.25 LUMP SUM
$2,186.56
90
2573.530 STORM DRAIN INLET PROTECTION
$127.99
5
EACH
$639.95
0
EACH 1
$0.001
0.001
EACH
$0.00
91
2582.502 4" SOLID LINE WHITE - EPDXY
$0.26
2400
LIN FT
$624.00
0
LIN FT 1
$0.001
0.001
LIN FT
$0.00
92
2582.502 4" SOLID DOUBLE LINE YELLOW - EPDXY
$0.51
1200
LIN FT
$612.00
0
LIN FT 1
$0.001
0.001
LIN FT
$0.00
93
2582.502 24" SOLID LINE WHITE - EPDXY
$7.95
24
LIN FT
$190.80
0
LIN FT 1
$0.001
0.001
LIN FT
$0.00
$147,867.11
$0.00
$76,885.80
TOTAL AMOUNT:
$3,953,239.73
$2,317,893.45
$3,076,449.03