6.1C. ERMUSR 10-13-15 Elk River .
Municipal Utilities UTILITIES COMMISSION MEETING
TO: FROM:
Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent
John Dietz—Chair
Al Nadeau—Vice Chair
Daryl Thompson—Trustee
MEETING DATE: AGENDA ITEM NUMBER:
October 13, 2015 6.1c
SUBJECT:
Staff Update
DISCUSSION:
• Had seven new services.
• Continue working on collecting data with the GPS for our Arc View maps as time
permits.
• Continue working on changing out some of the rusty junction boxes or removing ones
that are no longer necessary.
• Continue working on changing out fuse pads. This has been an ongoing project that had
to be done due to our high fault current.
• Put rebuilding River Ranch in Otsego on hold until we have the new feeder from the
Waco substation to the court house area completed.
• Continue working on installing a new feeder out of the Waco substation the court house
area.
• Started installing wire for 16 new residential lots in Prestigious Woodland Hills Third
Addition.
• Changed out a single phase pole and hung a larger transformer to address a voltage
complaint for the cell tower on 205th Ave.
• A driver of a gravel truck that forgot to put his box down hit two single phase taps and
broke a pole after they hit the secondary service.
• Working on installation of a pole and blades for the County Road 12 Interconnection with
Connexus. We've also begun the process of replacing the stickers and locks on the
equipment with ours. While we're doing this, we'll make any necessary changes to the
maps and make notes on what needs to be fixed.
Zt,
PrOWEDED IT
Page 1 of 2 NATURE
Reliable Public
Power Provider P 0 WE 0.E D T O S F R Y E
90
• Curt Wark, Reid Nelson and Aaron White attended the Minnesota Municipal Utilities
Association(MMUA)Overhead Lineworker School September 15-18 in Marshall, MN.
Their education reports are attached.
ATTACHMENTS:
• Curt Wark Education Report
• Reid Nelson Education Report
• Aaron White Education Report
P40NEDED DI
Page 2 of 2 NATURE
Reliable Public Power Provider P O W E R E D T o S E R V E
91
ELK RIVER MUNICIPAL UTILITIES EDUCATION 1 SEMINAR REPORT
DATE (q - ic-,c 9-023-/S-
EMPLOYEE NAME C.tom.r LQ,{'14
TITLE OF EDUCATION!SEMINAR Di j3 er Dec c)4 c1. K►ggr/�j
ORGANIZATION SPONSORING EDUCATION SEMINAR in rn (A f
DATES ATTENDED q- is--/c I 9- /P- IS
LOCATION Mott-‘,IN,
WHY DID EMPLOYEE CHOOSE TO ATTEND TO 64.i+cr i i 17 i�9 ez.ti
(iv(hi Kixotal P 0-vci- Ski as
WHAT INFORMATION WAS LEARNED BY ATTENDING ..5a{ els o Se+
Lip a diner read Toad. ckar+S, z cL r►
for I+-f-hnj
WAS INFORMATION CONVEYED TO SUPERVISOR AND CO-WORKERS AND TO WHO
yes
SIG ATURE
92
ELK RIVER MUNICIPAL UTILITIES EDUCATION 1 SEMINAR REPORT
DATE 9/a25/1 5
EMPLOYEE NAME &iicl ,g,PJI1
TITLE OF EDUCATION/SEMINAR -12►r..I/
ORGANIZATION SPONSORING EDUCATION SEMINAR MM to\-
DATES ATTENDED SP, )S-) 7
LOCATION /Vim r5)14._
ll
WHY DID EMPLOYEE CHOOSE TO ATTEND v- 'I i Ch lr YY'IC.IC,_
Tic-A-1-1111 )(_) J hAnd 54snal$ and rijIn�1
WHAT INFORMATION WAS LEARNED BY ATTENDING Di,i).e►r )1911,0 Sir / and
.
WAS INFORMATION CONVEYED TO SUPERVISOR AND CO-WORKERS AND TO WHO
gefal
Pejri
IGNATURE
93
ELK RIVER MUNICIPAL UTILITIES EDUCATION !SEMINAR REPORT
DATE
EMPLOYEE NAME PIAg4nN Vk) -.a -i ,
TITLE OF EDUCATION/SEMINAR OW"-kejgO '5c, -t ..
ORGANIZATION SPONSORING EDUCATION SEMINAR /KM U0
DATES ATTENDED c 1/(9
LOCATION MAIL6,14A9 ( c--
WHY DID EMPLOYEE CHOOSE TO ATTEND
WHAT INFORMATION WAS LEARNED BY ATTENDING 110 T) SAr 2*.
ODD "T-E A- Or-GG cdfIL '"DeSeid-a-cA
WAS INFORMATION CONVEYED TO SUPERVISOR AND CO-WORKERS AND TO WHO
L stagirrillW
IGNA RT
94