Loading...
6.1c. ERMUSR 11-17-2015 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent John Dietz—Chair Al Nadeau—Vice Chair Daryl Thompson—Trustee MEETING DATE: AGENDA ITEM NUMBER: November 17, 2015 6.1c SUBJECT: Staff Update DISCUSSION: • Had nine new services. • Continue working on collecting data with the GPS for our ArcView maps as time permits. • Continue working on changing out some of the rusty junction boxes or removing ones that are no longer necessary. • Continue working on changing out fuse pads. This has been an ongoing project that had to be done due to our high fault current. • Continue rebuilding River Ranch in Otsego as time permits. The bore rig crew has been working on the installation of wire in the Connexus acquisition area. • Continue working on installing a new feeder out of the Waco substation to the court house area. • Continue installing wire for 16 new residential lots in Prestigious Woodland Hills Third Addition. • Continue to replace stickers and locks on the equipment in the Connexus acquisition area. While we're doing this, we'll make any necessary changes to the maps and make notes on what needs to be fixed. • Replaced a pole with a feeder riser and switch on the southwest corner of HWY 169 and 197`h Avenue after a car hit the pole. • Installed wire and a transformer for Sportech. • Installed a three phase primary loop between Cornerstone KIA and Preferred Powder Coat. • Scott Thoreson,Matt Schwartz and Aaron White went to Shakopee to assist with building the field for the 2016 Lineworkers Rodeo. POWERED OV iq Page 1 of 2 NATURE Reliable Public Power Provider P OWE 0.E D T o SERV E 164 • Aaron White took a job with Xcel Energy;his last day was October 30`h. We hired Jerad Rolstad to fill the position; his first day will be November 16`h 'POWERED BY • Page 2 of 2 NATURE Reliable Public Power Provider P OWERED T O S ERV E 165