6.0. HRSR 02-24-1997 ELK RIVER HOUSING AND REDEVELOPMENT AUTHORITY MEMORANDUM TO: Housing and Redevelopment Authority ROM: Paul T. Steinman, Director of Economic `/ Development DATE: February 20, 1997 SUBJECT: Asbestos Removal - King and Main Issue Prior to demolition of the properties at the corner of King and Main, the HRA is required to make sure the environmental issues associated with these properties have been appropriately dealt with. At the closing, this issue was addressed by escrowing certain dollars from the purchase price of the properties and requiring the current property owners to address these • environmental issues prior to releasing the escrowed funds. It appears at this time that all of the environmental issues have been addressed with the exception of the following: • One tank to be removed from the basement of the clinic building - to be done by the property owners at the time of demolition. • Asbestos abatement Background At the closing, the HRA assumed responsibilities for removal of asbestos in the buildings. Approximately $2,900 was escrowed at closing in order to cover these costs. This dollar amount was estimated based upon some preliminary information from B.A. Liesch Associates, Inc., the HRA's environmental consultant. At the time of this estimate, the asbestos survey had not been completed at 317 King and 812 MainStreet. During the past months, staff worked with B.A. Liesch Associates in order to complete the necessary asbestos surveys. Once the surveys were completed and asbestos containing materials were identified, B.A. Liesch solicited bids from three separate abatement contractors for removal of asbestos in all HRA owned buildings at the corner of King and Main Street. The bids were as follows: • P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330-1743 • (612) 441-7420 • Fax: (612) 441-7425 Equal Opportunity Housing and Equal Opportunity Employment Company EnviroBate Metro Cost $16,315 • Company - Mayo Systems, Inc. Cost - $23,400 • Company National Surface Cleaning, Inc. Cost -$29,127 Each of these three bids are attached to this memo for review by the HRA. B.A. Liesch Associates has informed staff that any of the three contractors would be able to complete the asbestos abatement activities prior to the end of March, if the HRA approves a contract at its meeting on Monday, February 24th. Veit Companies, the HRA demolition contractor, will be prepared to undertake demolition as soon as asbestos abatement is complete. Action Requested Staff is recommending that the HRA approve entering into a contract with EnviroBate Metro to complete asbestos abatement in the properties at the corner of King and Main for a total cost of$16,315. \\elkriver\sys\shrdoc\eda\meetings\asbestos.doc • • • BID FORM TO: City of Elk River B.A. Liesch Associates, Inc. Attn: Mr. Paul Steinman Attn: Ms. Genevieve McJilton 13065 Orono Parkway 13400 15th Avenue North Elk River, Minnesota 55330 Plymouth, Minnesota 55441 Bid Deadline: February 11, 1997, 4:00 pm. The original bid needs to be delivered to Mr. Paul Steinman with copy sent to Genevieve McJilton of Liesch. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into the Contract with the City of Elk River to perform and furnish all work as specified or indicated in the Work Plan for the Contract Price and within the Contract Time indicated in the Work Plan. Bidder accepts all of the terms and conditions of the Bid Documents. This Bid will remain subject to acceptance for forty-five calendar days after the day of Bid opening. The undersigned, having examined the Work Plan and attachments; and having visited the site and examined the conditions affecting the work, hereby propose and agree to furnish all labor, materials, equipment, supplies, hand tools, insurance, taxes, permits, disposal, one percent fees, overhead and profit necessary for completion of the work in the specification for the costs delineated below. • This bid"will be broken out as follows; removal-and disposal of friable asbestos-containin materials (ACM) in each building, and removal and disposal of all friable and non friable ACM • in each building. This contract will be award to a single contractor and will be considered on a lump sum basis. The break out of costs by building is for billing and distribution purposes. - BASE BID WORK: 307 King Avenue 1. Lump sum cost to complete asbestos abatement of all friable ACM as specified within the Work Plan: $ 1,450.00 2. Lump sum cost to complete asbestos abatement of all friable and non-friable ACM as specified within the Work Plan: $ 13,400.00 317 King Avenue 1. Lump sum cost to complete asbestos abatement of all friable ACM as specified within the Work Plan: $ 250.00 2. Lump sum cost to complete asbestos abatement of all friable and non-friable ACM as specified within the Work Plan: • $ 8,800.00 812 Main Street 1. Lump sum cost to complete asbestos abatement of all friable ACM as specified within the Work Plan: $ 350.00 2. Lump sum cost to complete asbestos abatement of all friable and non-friable ACM as specified within the Work Plan: $ 1,200.00 Lump Sum Cost for Abatement of all friable ACM (All Buildings): $ 2,050.00 Lump Sum Cost for Abatement of all friable and non-friable ACM (All Buildings): $ 23,400.00 • UNIT PRICES: The unit prices listed below shall determine the value of extra work or changes in the work, as applicable. They shall be considered complete and shall include all material and equipment, labor, fees, overhead and profit for removal and disposal. Unit prices shall be used uniformly for additions or deductions. 1. Cost for Asbestos-Containing Pipe Insulation Removal (wrap and cut) One inch to four inch $ 12.00 per linear foot Four inch to eight inch $ 15.00 per linear foot 2. Cost for Asbestos-Containing Pipe Insulation Removal (glovebag, if needed) One inch to four inch $ 25.00 per linear foot Four inch to eight inch $ 28.00 per linear foot • 3. Cost for Asbestos-Containing Duct Wrap Removal: 411 $ 6.00 per square foot 4. Cost for Ceiling Texture Removal: $ 6.00 per square foot 5. Cost for Asbestos-Containing Floor Tile and Carpet Removal: $3.50 per square foot 6. Cost for Asbestos-Containing Two Layers of Floor Covering and Mastic Removal: $ 3.50 per square foot 7. Cost for Asbestos-Containing Roofing Material Removal: $ 4.00 per square foot 8. Labor Costs for Demolition of Floors, Walls and/or Ceilings: $45.00 hourly rate EXCEPTIONS AND/OR SUBSTITUTIONS: We have submitted our proposal complete, as specified in the specification for this project, • without exceptions or substitutions. (If you have made substitutions or exceptions, please explain on an attached sheet.) Bidder: MAVO SYSTEMS, INC Submitted By (Prince.': F BERGO Signature: 4/), f� Address: 1428 iA R.�'./LL STR" T NE MINNEAPOLIS, MN 55413 Phone #: (612) 331-6525 Fax #: (612) 331-6106 SA/61896/bidform97.wp BID FORM • TO: City of Elk River B.A. Liesch Associates, Inc. Attn: Mr. Paul Steinman Attn: Ms. Genevieve McJilton 13065 Orono Parkway 13400 15th Avenue North Elk River, Minnesota 55330 Plymouth, Minnesota 55441 Bid Deadline: February 11, 1997, 4:00 pm. The original bid needs to be delivered to Mr. Paul Steinman with copy sent to Genevieve McJilton of Liesch. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into the Contract with the City of Elk River to perform and furnish all work as specified or indicated in the Work Plan for the Contract Price and within the Contract Time indicated in the Work Plan. Bidder accepts all of the terms and conditions of the Bid Documents. This Bid will remain subject to acceptance for forty-five calendar days after the day of Bid opening. The undersigned, having examined the Work Plan and attachments; and having visited the site and examined the conditions affecting the work, hereby propose and agree to furnish all labor, materials, equipment, supplies, hand tools, insurance,taxes, permits, disposal, one percent fees, overhead and profit necessary for completion of the work in the specification for the costs delineated below. This bid will be broken out as follows; removal and disposal of friable asbestos-containing materials (ACM) in each building, and removal and disposal of all friable and non friable ACM in each building. This contract will be award to a single contractor and will be considered on a lump sum basis. The break out of costs by building is for billing and distribution purposes. BASE BID WORK: 307 King Avenue 1. Lump sum cost to complete asbestos abatement of all friable ACM as specified within the Work Plan: $ 800.00 2. Lump sum cost to complete asbestos abatement of all friable and non-friable ACM as specified within the Work Plan: $ 9,125.00 317 King Avenue 1. Lump sum cost to complete asbestos abatement of all friable ACM as specified within the Work Plan: $ 200.00 • 2. Lump sum cost to complete asbestos abatement of all friable and non-friable ACM as specified within the Work Plan: 1111 $ 6,600.00 812 Main Street 1. Lump sum cost to complete asbestos abatement of all friable ACM as specified within the Work Plan: $ 240.00 2. Lump sum cost to complete asbestos abatement of all friable and non-friable ACM as specified within the Work Plan: $ 590.00 Lump Sum Cost for Abatement of all friable ACM (All Buildings): $ 1,240.00 Lump Sum Cost for Abatement of all friable and non-friable ACM (All Buildings): $ 16,315.00 • UNIT PRICES: The unit prices listed below shall determine the value of extra work or changes in the work, as applicable. They shall be considered complete and shall include all material and equipment, labor, fees, overhead and profit for removal and disposal. Unit prices shall be used uniformly for additions or deductions. 1. Cost for Asbestos-Containing Pipe Insulation Removal (wrap and cut) One inch to four inch $ 7.00 per linear foot Four inch to eight inch $ 8.00 per linear foot 2. Cost for Asbestos-Containing Pipe Insulation Removal (glovebag, if needed) One inch to four inch $ 10.00 per linear foot Four inch to eight inch $ 14.00 per linear foot • 3. Cost for Asbestos-Containing Duct Wrap Removal: $ 5.00 • per square foot 4. Cost for Ceiling Texture Removal: $ 5.00 per square foot 5. Cost for Asbestos-Containing Floor Tile and Carpet Removal: $ 2.50 per square foot 6. Cost for Asbestos-Containing Two Layers of Floor Covering and Mastic Removal: $ 2.50 per square foot 7. Cost for Asbestos-Containing Roofmg Material Removal: $ 2.25 per square foot 8. Labor Costs for Demolition of Floors, Walls and/or Ceilings: $ 35.00 hourly rate EXCEPTIONS AND/OR SUBSTITUTIONS: • We have submitted our proposal complete, as specified in the specification for this project, without exceptions or substitutions. (If you have made substitutions or exceptions, please explain on an attached sheet.) Bidder: EnviroBate Metro Submitted By 'rint-d): t5 rn/N Signature: Address: 3301 East 26th Street Minneapolis, MN 55406 Phone #: (612) 729-1080 Fax #: (612) 729-1021 SA/61896/bidform97.wp • BID FORM • TO: City of Elk River B.A. Liesch Associates, Inc. Attn: Mr. Paul Steinman Attn: Ms. Genevieve McJilton 13065 Orono Parkway 13400 15th Avenue North Elk River, Minnesota 55330 Plymouth, Minnesota 55441 Bid Deadline: February 11, 1997, 4:00 pm. The original bid needs to be delivered to Mr. Paul Steinman with copy sent to Genevieve McJilton of Liesch. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into the Contract with the City of Elk River to perform and furnish all work as specified or indicated in the Work Plan for the Contract Price and within the Contract Time indicated in the Work Plan. Bidder accepts all of the terms and conditions of the Bid Documents. This Bid will remain subject to acceptance for forty-five calendar days after the day of Bid opening. The undersigned, having examined the Work Plan and attachments; and having visited the site and examined the conditions affecting the work, hereby propose and agree to furnish all labor, materials, equipment, supplies, hand tools, insurance, taxes, permits, disposal, one percent fees, overhead and profit necessary for completion of the work in the specification for the costs delineated below. This bid will be broken out as follows; removal and disposal of friable asbestos-containing materials (ACM) in each building, and removal and disposal of all friable and non friable ACM • in each building. This contract will be award to a single contractor and will be considered on a lump sum basis. The break out of costs by building is for billing and distribution purposes. BASE BID WORK: 307 King Avenue 1. Lump sum cost to complete asbestos abatement of all friable ACM as specified within the Work Plan: $ 1,475.00 2. Lump sum cost to complete asbestos abatement of all friable and non-friable ACM as specified within the Work Plan: $ 21,079.00 317 King Avenue 1. Lump sum cost to complete asbestos abatement of all friable ACM as specified within the Work Plan: $ 189.00 • 2. Lump sum cost to complete asbestos abatement of all friable and non-friable ACM as specified within the Work Plan: 110 $ 8,372.00 812 Main Street 1. Lump sum cost to complete asbestos abatement of all friable ACM as specified within the Work Plan: $ 760.00 2. Lump sum cost to complete asbestos abatement of all friable and non-friable ACM as specified within the Work Plan: $ 1,155.00 Lump Sum Cost for Abatement of all friable ACM (All Buildings): $ 2,424.00 Lump Sum Cost for Abatement of all friable and non-friable ACM (All Buildings): $ 29,127.00 UNIT PRICES: • The unitrices listed below shall determine the value of extra work or changes in the work, as applicable. They shall be considered complete and shall include all material and equipment, labor, fees, overhead and profit for removal and disposal. Unit prices shall be used uniformly for additions or deductions. 1. Cost for Asbestos-Containing Pipe Insulation Removal (wrap and cut) One inch to four inch $ 8.00 per linear foot Four inch to eight inch $ 18.00 per linear foot 2. Cost for Asbestos-Containing Pipe Insulation Removal (glovebag, if needed) One inch to four inch $ 16.00 per linear foot Four inch to eight inch $ 24.00 per linear foot • 3. Cost for Asbestos-Containing Duct Wrap Removal: $ 25.00 1110 per square foot 4. Cost for Ceiling Texture Removal: $ 8.00 per square foot 5. Cost for Asbestos-Containing Floor Tile and Carpet Removal: $ 4.00 per square foot 6. Cost for Asbestos-Containing Two Layers of Floor Covering and Mastic Removal: $ 6.00 per square foot 7. Cost for Asbestos-Containing Roofing Material Removal: $ 4.00 per square foot 8. Labor Costs for Demolition of Floors, Walls and/or Ceilings: $ 45.00 hourly rate EXCEPTIONS AND/OR SUBSTITUTIONS: We have submitted our proposal complete, as specified in the specification for this project, • without exceptions or substitutions. (If you have made substitutions or exceptions, please explain on an attached sheet.) Bidder: National Surface Cleaning, Inc. Submitted By (Printed : Larr Reese, Signature Ad / . 4358 Round Lake Road West Arden Hills, MN 55112 Phone #: 612-636-6829 Fax #: 612-636-8483 SA/61896/bidform97.wp •