7.5. SR 12-21-2015Request for Action
To
Item Number
Mayor and City Council
7.5
Agenda Section
Meeting Date
Prepared by
Public Hearin s
December 21, 2015
Zack Carlton, Planning Manager
Item Description
Reviewed by
Elk River Machine
Chris Leeseber , Senior Planner
Reviewed by
■ Zone Change to Planned Unit
Development
Cal Portner, City Administrator
■ Conditional Use Permit to Establish
Planned Unit Development Zoning District
Action Requested
1. Adopt, by ordinance, the ordinance amendment changing the zoning of 828 4th Street from
multiple zoning districts (PUD, I-1 and 1-2) to Planned Unit Development (PUD), with the
following condition:
1. The five parcels included in the request shall be combined to create one parcel.
2. Approve, by motion, the Conditional Use Permit request to create a PUD, with the following
conditions:
1. All conditions of the Zone Change are satisfied.
2. Required building permits must be approved prior to construction beginning.
3. Re -stripe the parking lot to delineate all parking areas and stalls.
4. Submittal of an updated site plan identifying parking and circulation areas.
5. Submittal of an existing grading plan and a plan showing proposed changes.
6. A PUD agreement shall be developed and signed by both parties prior to issuance of a
building permit.
Background/Discussion
Case Nos. ZC 15-10 & CU 15-20
Elk River Machine Company (ERMC) has operated in Elk River since 1961 and has grown into a
prominent, full-service contract manufacturing facility. As they grew, they acquired land and have
identified zoning and land use concerns. With the current applications, they look to expand operations at
their existing location, bring their property into zoning compliance, and establish a PUD to support
future growth.
The business operates on five separate parcels which are regulated by three different zoning districts
making expansion approvals difficult as some of the uses cross property lines or are located in two
different zoning districts. The requested actions will clean up the zoning concerns and allow expansion
on one parcel with reduced concern for setbacks, structure limits, or building area maximums. They are
also pursuing administrative procedures to combine the parcels.
paWIREO 0
A URS
Analysis
Zoning and Comprehensive Plan
The subject properties are in the I-1 (Light Industrial), 1-2 (Medium Industrial), and Lions Park Center
PUD districts. Their operations are supported as Conditional Uses in the I-1 and I-2 districts. The
rezoning to PUD will allow office, light manufacturing, heavy manufacturing, and outside storage as
permitted uses on the property. These reflect existing uses that ERMC plans to continue into the future.
The property is guided by the Mississippi Connections Plan and designates the area as mixed-use which
emphasizes employment options north of Highway 10. The proposed expansion supports the growth of
ERMC and future employment opportunities in the area. The plan also emphasizes transforming Jackson
Avenue into a parkway to serve as a central corridor and entrance to the core downtown area south of
Hwy 10. The proposed zone change and PUD will not impact the city's ability to change Jackson Avenue
in the future.
Access
There are no proposed access changes with the current applications. Access to the rear of the site is from
two driveways along 4t'' Street, with a third access to a parking lot near the intersection with Railroad
Drive.
Parking
The property has approximately 115 parking spaces to serve 150 employees working three different shifts.
The current building uses require 143 parking spaces per ordinance and the additional warehouse and
shop space identified on the plan will require 12 additional parking spaces and three landscape islands. An
updated site plan showing parking, circulation and landscape islands is required as a condition of
approval.
Applicable Regulation
The establishment of a PUD district shall meet the following standards as outlined in Sec. 30-1564 of the
city code:
(7) Land will be honed into the PUD honing district only upon approval of a concept plan for the PUD, pursuant to the
procedure set forth in this section. A PUD will be authorized on land in a PUD Zoning district only upon issuance of
a conditional use permit, pursuant to the procedure set forth in this section.
The applicant submitted a concept plan identifying future expansion plans. An updated plan showing
parking, circulation, and topography is a condition of approval.
(2) The uses allowed in a PUD shall be limited to land uses consistent with the city's comprehensive plan and land use
map, and to those uses ident f ed in the concept plan for the PUD Zoning district and the conditional use permit for the
PUD.
The proposed uses on the property will comply with those of the current zoning district and the uses
are consistent with the comprehensive plan.
(3) The area of land to be included in a PUD shall be in uniform control of the applicant.
The applicant owns all of the property included in the proposed district.
(4) APUD shall be designed to form a desirable unified environment within its proposed boundaries, including uniform
design elements, landscaping lighting and signage.
Design requirements will be consistent with those of the existing I-2 industrial districts.
N:\Public Bodies\Agenda Packets\ 1 2-21-2015\LASERFICHE\x7.5 sr ERMC.docx
(S) A PUD shall not cause undesirable impacts on adjacent lands and land uses. In particular, uses on the PUD
perimeter shall be compatible with adjacent uses outside the PUD.
The PUD is bordered to the north by Lion John Weicht Park, commercial businesses to the east and
south, and the railroad to the west. The border along Lion John Weicht Park has been discussed with
previous approvals, and the trees planted along the property line were planted to screen the use. The
proposed use is compatible with other uses in the area.
(6) A PUD shall be served by adequate transportation, water, sanitary sewer and drainage systems.
The property is served by city utilities and access is from a public street.
(7) APUD shall not adversely affect existing orproposedparks, schools, streets or otherpublic facilities.
The existing use does not differ from the proposed use and will not adversely affect existing or
proposed parks or services.
(8) The council may establish varied and reasonable lot area, frontage, sideyard, and setback requirements far a PUD and
may authori.Ze a density which it determines to be appropriate under the circumstances. Any permitted density shall be
consistent with the city's comprehensive plan and not adversely affect the public health, safety and welfare.
Setbacks within the PUD district will be consistent with the I-2 zoning district.
(9) More than one principal building may be constructed on a lot within a PUD if authorited by the council. Unless
otherwise permitted by the council, a PUD shall comply with the schedules of dimensional regulations set forth in this
article, except that individual lots shall have no less than 80 percent of the minimum area for similar uses.
The PUD will include more than one principal building. The second principal building was
previously authorized by the City Council via CUP.
If denial should occur, it shall accompany recommendations or determinations by findings or a report
stating how the proposed use does not comply with the standards set forth in Section 30-1564.
Planning Commission
During the public hearing Chris Fairchild of ERMC supported both requests explaining their goal to
build a new accessory structure and store much of their finished products indoors.
The Planning Commission did not have any concerns with the proposal and unanimously recommended
approval of both applications.
Financial Impact
None
Attachments
■ Location Map
■ Applicants Narratives
■ Site Plan
■ Ordinance Amendment
N:\Public Bodies\Agenda Packets\ 1 2-21-2015\LASERFICHE\x7.5 sr ERMC.docx
i
e
w a
Y,
/
d'
1
Ik
ru;
V
o"
�XY
Yom^
Elk River Machine Case No: ZC 15- 10
Zone Change and Conditional Use Permit CU 15-20 E1,Pliver
Elk River Machine Company (ERMC)
Zone Change Application
Project Narrative
Detailed description / scooe of oroiect. What is being or000sed?
ERMC is proposing to consolidate all five of its existing parcels, representing three different zoning
districts into one PUD zoning district.
What are the reasons / purposes for the proposed Zone Change?
ERMC currently uses all five parcels to support one integrated manufacturing operation. Combining the
three existing zones into one new PUD zone would facilitate ERMC to seek approval to add necessary
Accessory Buildings essential for supporting the future growth of the business and on-going efforts to
improve site aesthetics.
What has changed to warrant the Zone Change?
Since commencing operations on the current property in the 1960's, ERMC has consistently grown
which has necessitated multiple additions to the facility. These expansions, in terms of facility and
employment growth, have been accommodated without the requirement to harmonize the site's
various zoning districts. Consolidating into one zone will allow for ERMC to continue its long term
growth plans.
Specifically, ERMC is requesting to add (two) Accessory Building(s) which will allow materials currently
stored outside on the property in various locations to be moved inside and sheltered from the elements.
By approving this request, ERMC is able to continue its record of employment growth and improve the
aesthetics of the facility.
Elk River Machine Company (ERMC)
Conditional Use Permit Application
Project Narrative
Detailed Description / Scope of Proiect:
ERMC is proposing to consolidate all five of its existing parcels, representing three different zoning
districts into one PUD zoning district. ERMC currently uses all five parcels to support one integrated
manufacturing operation. Combining the three existing zones into one new PUD zone would facilitate
ERMC to seek approval to add necessary Accessory Buildings essential for supporting the future growth
of the business and on-going efforts to improve site aesthetics.
Hours of Operation:
ERMC conducts operations subject to business volumes ranging from one to three shifts.
Number of Employees:
ERMC currently employs less than 150 employees.
Number of Parking Stalls. existing and additional:
ERMC has 115 existing parking stalls.
Is there proposed screening of the Site:
There are no current plans to increase screening.
Proposed Building Materials (i.e., compliance with applicable building standards):
The proposed Buildings would be constructed utilizing commercial grade post frame type construction
incorporating maintenance free painted metal exterior panels and roofing system.
Signage (quantity / size / location / tVpe):
No changes to existing signage are included in this rezoning application.
Is there outdoor storage (what / quantity / proposed screening):
The proposed Accessory Buildings would be utilized to relocate and store materials currently stored
outdoors.
6 I J I < I s I 2
REVI
DESCRIPTION L(
A FIRST ISSUE
ELK RIVER MACHINE CO.
0
IS❑METRIC BUILDING VIEW
8 7 b 5 4 1 3 2 1 1
�N
Ordinance 15 -
St fi _ethre._gt.., to be removed
Underlines to be added
An Ordinance Amending the City of Elk River Zoning Map to Rezone Certain
Property from Planned Unit Development, Light Industrial, and Medium Industrial
to Planned Unit Development
Case No. ZC 15-10
The City Council of the City of Elk River does hereby ordain as follows:
SECTION 1. That the duly adopted Zoning Map of the City of Elk River is hereby amended to
rezone the property described on attached Exhibit A from Planned Unit Development (PUD), Light
Industrial (I-1), and Medium Industrial (I-2) to Planned Unit Development (PUD).
SECTION 2. That the rezoning approved by this Ordinance is based on the following findings:
1. THE REZONING IS CONSISTENT WTH THE CITY OF ELK RIVER LAND USE
PLAN ADOPTED AS PART OF THE CITY OF ELK RIVER COMPREHENSIVE
PLAN.
SECTION 3. That this Ordinance shall take effect and be in full force from and after the date of its
publication.
Passed and adopted by the City Council of the City of Elk River this 21st day of December, 2015.
John J. Dietz, Mayor
ATTEST:
Tina Allard, City Clerk
P O W E R E D 6 f
AWR
Last Updated March 2014 INI
sfri _.. --_.-,,9._t,., 1to be removed
o.
Underlines to be added
Exhibit A
Elk River Machine Company (ERMC)
8284 th Street, Elk River, MN 55330
Property Descriptions
Property ID # 75-404-0017
• Elk River City
• Sec: 34 TWP: 33.0 RG: 26 W: Lot: 1 BLK: Acres: 0.31
• Auditors Subdivision NO 4
• W 109 FT OF 125 FT OF E 489.5 FT OF LOT 1
Property ID # 75-404-0016
• Elk River City
• Sec: 34 TWP: 33.0 RG: 26 W: Lot: 1 BLK: Acres: 0.12
• Auditors Subdivision NO 4
• W 40.5 FT OF S 125 FT OF E 3805 FT — LOT 1
Property ID # 75-404-0013
• Elk River City
• SEC: 34 TWP: 33.0 RG: 26 W: LOT: 1 BILK: Acres: 5.77
• Auditors Subdivision NO 4
• THAT PT OF LOT 1 LYING W OF E 270 FT EX S
• 150 FT OFW70FTOFE340FT&EXW149.5
Property ID # 75-134-2306
• Elk River City
• SEC: 34 TWP: 33.0 RG: 26 W: LOT: BILK: Acres: 5.29
• ALL THAT PT OF LOT 1, OF THE DULY RECORDED PLAT OF AUDITOR'S SUBDIVISION # 4 & OF THE
SW 1-4OFTHE NW 1-40FSECT 34
Property ID # 75-133-1401
• Elk River City
• SEC: 33 TWP: 33.0 RG: 26 W: LOT: BILK: Acres: 0.48
• THAT PT OF SEI -4 OF NE 1-4LYING WILY 0FRRROFWASDES ININST176290SAID T0BE
PART OF LOT 4, AU # 3
Last Updated March 2014
P0wIR10 1
4NATURE]