Loading...
4.1. PCSR 12-22-20150 Elk t� River Request for Action To Item Number Planning Commission 4.1 Agenda Section Meeting Date I Prepared by Planni December 22, 2015 Chris Leeseber , Senior Planner Item Description Reviewed by Request by Elk River Independent School District Zack Carlton, Planning Manager Reviewed by #728 for a Conditional Use Permit to allow expansion of an Institutional Use at 900 School Street NW, Case No. CU 15-23 — Public Hearin Action Requested Recommend, by motion, approval of the Conditional Use Permit with the following conditions: 1. The Conditional Use Permit shall not be recorded until all applicable conditions have been substantially completed. 2. The authorized use shall not begin until the Conditional Use Permit is recorded. 3. If the authorized use ceases for more than six months, the Conditional Use Permit shall expire. 4. The Conditional Use Permit is not a building permit and the applicant must apply for and receive approval of required building and sign permits before construction may begin. 5. The Fire Chief shall verify the location of all fire hydrants, and may require additional hydrants necessary to preserve the health and safety of the residents. 6. The applicant shall add a left turn signal to the traffic signal system on School Street for eastbound to northbound movements, into the lot, prior to blocking or closing the existing north lane around the school. 7. A permeable sidewalk along the western wetland edge to decrease runoff and encourage infiltration shall be installed. 8. All comments in the Stormwater Coordinator Memo dated December 8, 2015 shall be addressed. 9. A Wedand Conservation Act Exemption application submittal is required. 10. The east side parking area drive lane shall provide an area for emergency vehicles to tum around, in accordance with MN State Fire Code Section 503.2.5. 11. The arena only parking area should be signed appropriately. Background/Discussion The applicant is seeking approval of a Conditional Use Permit (CUP) to allow expansion of an Institutional Use. The project includes a two (2) station gymnasium addition plus weight room addition to be built north of the existing building and east of the ice arena. Primary exterior building materials will consist of precast concrete wall panel, exterior brick veneer, integrated translucent wall panel clerestories on the east and west elevations and exterior aluminum storefronts at the main entrances and exits. Analysis Transportation/Circulation With the addition being built on the north side of the existing building and to the east of the existing ice arena, the vehicular circulation around the north side of the building and site will be eliminated. Staff and II�EAEI 11 �r1ATURE the applicant have, and continue to, work on solutions for vehicular movement in and around the school and arena site. The turning movements, interim parking plan, and the entrance of the access road concerns identified in the city engineer's memo dated December 8, 2015 have been addressed. Staff is recommending that the applicant add a left turn signal to the traffic signal system on School Street for eastbound to northbound movements into the lot. Staff is concerned that with elimination of access around the north side of the building traffic will build at the existing signal location along School Street. This will likely have significant traffic impacts to the area as drivers must find alternative routes to the main parking lot. The east side parking area is a dead end over 150 feet in length and needs an area for emergency vehicles to tum around, in accordance with MN State Fire Code Section 503.2.5. The applicant is working on revised designs to address this and will have updated plans at the meeting. Parking With the building placement, 65 stalls will be lost in the east lot and 8 stalls are lost in the south lot. The site plan shows the restriping for 90 parking stalls directly south of the ice arena entrance. These stalls will be utilized for arena parking only. Staff recommends the arena only parking area should be signed appropriately. Environmental Although not required, staff recommends that the School District apply for a Wetland Conservation Act exemption to address concerns that may arise in the future as a result of the project. The structure is within the 25 foot Wetland Buffer Strip which is intended to protect wetlands and filter stormwater by maintaining natural vegetation. The applicant has applied for a variance. (V 15-15) Staff recommends a permeable sidewalk along the western wetland edge to decrease runoff and encourage infiltration. Stormwater/Drainage Because the stormwater basin within the High School parking lot was not sized for the proposed addition, some of the existing stotmwater will be rerouted to the wetland north of the High School. Also, stormwater pre-treatment will be provided within the proposed design before it enters the wetland. The wetland should have ample capacity but if an issue arises the existing stormwater infrastructure can be utilized to take care of overcapacity issues. Applicable Regulation The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: Will not endanger, injure or detrimentally affect the use and enjoyment of otherproperty in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral welfare of the neighborhood or the city. The proposal is an addition to an already long standing established use and it will not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience or general welfare of the neighborhood or the city. 2. Will be consistent with the comprehensive plan. N:\Depa mts\Community DevelopmentVIanning\Case Files\CUP\CU 15-23 Ell: River ISD 728\CU 15-23 sr PC 12-22-15.doee The comprehensive plan guides the property for Public/Institutional and the proposed institutional use is consistent with comprehensive plan. 3. Will not impede the normal and orderly development and improvement of surrounding vacant property. There is no vacant property in the area to impede. 4. Will be served adequately by and null not adversely affect essential public facilities and seances including streets, police and fireprotection, drainage, refuse disposal, water and server systems, parks and schools; and will not, in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thorougbfares. The property will be served adequately by and will not adversely affect essential public facilities and services. 5. Will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons orpropen because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. Although it is an expansion to the school, the number of students will not increase. Additional traffic most likely will be introduced to School Street but it will not be excessive. A condition has been recommended to address the additional traffic on School Street. 6. Will not result in the destruction, loss or damage of a natural, scenic or historic featurr of major importance. The project will not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. 7. Will fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license orpermit to establish and operate the proposed use in the city. The project will fully comply with all other requirements of this code. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. Financial Impact None Attachments • Location Map • Applicants Narrative • Environmental Memo dated December 7, 2015 • Engineering Division memo dated December 8, 2015 • Stormwater Coordinator memo dated December 8, 2015 • Fire Department memo dated December 7, 2015 • Police Department memo dated December 7, 2015 • Existing/Demo Site Plan • Site Plan • Architectural Plans ■ Elevations • Fire Truck Turning Exhibit ■ Staging Plan N:\Departments\Community Development\Planning\Case Piles\CUP\CU 15-23 Elk River ISD 728\CU 15-23 sr PC 12-22-15.docx r b 4 ,4a z r Y`I G F 1 � TIP rD I� f h11(1N11 �.Bffi1Q1 . JI -.F t Church V a - y.:--, Q - C � C Y V A Ir_ - I III, In architects engineers www.woldae.com 305 St. Peter Street St. Paul, MN 55102 October 26, 2015 Zack Carlton Elk River Planning Commission 13065 Orono Parkway Elk River, Minnesota 55330 tel 651.227.7773 Re: Independent School District #728 Elk River Area Schools fax 651.223.5646 Elk River High School Additions and Renovations Narrative mail@woldae.com Commission No. 142178 Dear Zack, Independent School District #728 is submitting the following project narrative in compliance with the Site Plan Review application requirements for the Elk River High School Additions and Renovations project. Scope of Work: The above mentioned project includes a two (2) station gymnasium addition plus weight room addition to be built to the north of the existing building and to the east of the existing detached ice arena. Primary exterior building materials will consist of precast concrete wall panel, exterior brick veneer, integrated translucent wall panel clerestories on the east and west elevations and exterior aluminum storefronts at the main entrances and exits. This facility will address physical education, academic and athletic needs district wide. Additionally, the scope of work includes major renovations to portions of the existing interior building. The primary purpose of the renovation is to relocate the existing main office suite to the front of the building near the main entrance. The current main office is near the center of the building and does not provide a level of security or functionality consistent with District standard practices. The main office relocation will displace two (2) business education classrooms, one (1) marketing classroom and the school store. These spaces will be relocated to the current main office location. The existing special education department will also be reconfigured to better facilitate District special education teaching practices. All associated site reconfiguration due to building additions are included in the drawings portion of the Site Plan Review submittal. Thank you for your consideration! Sincerely, WOLD ARCHTIECTS AND ENGINEERS Sean Kelly cc: Mark Bezek, ISD #728 Terry Bizal, ISD #728 Tom Baranick, ISD #728 Vaughn Dierks, Wold Robert Sehm, Wold Minnesota Illinois Michigan Colorado Iowa designers and researchers for public environments Memorandum ver To: Planning Department From: Kristin Mroz, Environmental Division Date: 12-7-15 Subject: Site Plan Review Meeting _ December 71 2015 The department listed above has reviewed the application(s) fisted below and has the following comments: Case # CU 15-23, V 15_15 — Elk River School District #728 1. The wetland delineation was completed and approved by the TEP on 12-4-15. 2. The LGU would recommend a WCA exemption application by the school district. Although though an application is not required, it i come up later. The grading s recommended should any concerns work proposed appears to meet the De Minimis Exemption of less than 2,500 ft' of impacted wetland. 3. The structure will be within the 25 -foot Wetland Buffer Strip which is to maintain natural vegetation and reduce runoff. Staff would suggest a permeable sidewalk along the wetland side to decrease runoff and encourage infiltration. 4• The project will require a variance from the Wetland Buffer Strip and Wetland Buffer Strip Setback. Memorandum ver To: Planning Department From: Justin Femtite, P.E., City Engineer Date: 12-8-2015 Subject: Site Plan Review Meeting — December 7, 2015 The department listed above has reviewed the application(s) listed below and has the following comments: Case # CU 15-23, V 15-15 — Elk River School District #728 1 • The identified truck turning movements interfere with proposed parking spaces. This is not adequate. 2• When discussing the project with the architect prior to this submittal, we spoke of the need to show an interim parking plan that will be used until the full "west lot" is reconfigured (now indicated to be 2017). This shall include restriping of displaced parking stalls in closer proximity to the ice arena. Maintaining the existing conditions and layout for parking in the "west lot" is not sufficient. 3. At various planning meetings we have indicated the entrance of the access road, which goes between the proposed addition and the ice arena, should be reconfigured. It is hard to understand why the curbs are being put in only to require two sharp 90 degree movements. It is further difficult to understand how this new configuration might then tie into a final layout for the "west lot" in 2017. This should be revised to provide better flow and be set up to maximize parking and operational flow of the "west ice,. 4• We have had some discussions with your traffic engineer but have yet to receive a final report showing what will happen to traffic flow resulting from the disconnection of the existing north lane around the school. Preliminary discussions included the possible need to add a left turn signal to the traffic signal system on School Street for eastbound to northbound movements into the lot. If this is still the case, the project submittal should reflect making this improvement. Memorandum ver To: Planning Department From: Brandon Wisner, Stormwater Coordinator Date: December 8, 2015 Subject: Site Plan Review Meeting— December 7, 2015 The department listed above has reviewed the application(s) listed below and has the following comments: Case # CU 15-23, V 15-15 — Elk River School District #728 1 As noted in the August 7`h, 2015 Site Plan Review: 1. In accordance with city Ordinance Section 78-504. Redevelopment projects, on sites without restrictions that create new impervious surfaces shall capture and retain on site 1.1 inches of runoff from the new impervious surface and show a net pollutant reduction for any reconstructed impervious surfaces. quality report is also needed. A maintenance schedule for 2. If disturbance is one acre or more, an issued NPDES permit is required. A MIDS water long term maintenance is required for permanent BMPs. Inlet protection and sediment perimeter control is needed down gradient of proposed construction. Also, 1. This site is within 1 mile of an impaired waterbody so stabilization needs to occur in 7 days for areas that are not being actively worked. ZT-. L - .-- - ... Memorandum ver To: Planning Department From: Cliff Anderson, Fire Marshal Date: 12/7/15 Subject: Site Plan Review Meeting —December 7, 2015 The department listed above has reviewed the applications) listed below and has the following comments: Case # CU 15-23, V 15-15 — Elk River School District #728 1. Fire Lane issues have not been satisfied as of yet for the drive lane on the west side of new structure. (turning radiuses) 2• The east side parking area is a dead end over 150ft and needs a area for emergency vehicles to turn around, in accordance with MN State Fire Code Section 503.2.5 Case # LU 15-15, CU 15-24 - ERX 1 • No concerns or issues with the application as proposed. Case # SP 15-16 — Black & Veatch/AT & T 1 . No concerns or issues with the application as proposed. Case # SP 15-15 -, ERMU Water Treatment Plan Expansion 1 • No concerns or issues with the application as proposed. Case # SP 15-14 — American Messaging 1 • No concerns or issues with the application as proposed. Case # V 15-09 - Ron Dargis Roadway Vacation 1 • No concerns or issues with the application as proposed. Memorandum To: Planning Department From: Elk River Police Department Date: 12/07/2015 Subject: Site Plan Review Meeting _ December 7, 2015 The department listed above has reviewed the application(s) listed below and has the following comments: Case # CU 15-23, V 15-15 — Elk River School District #728 1 • I have concerns about the access to the parking lot north of the new addition. It will likely have a high level of pedestrian traffic. What are the site lines like for drivers going through that area? Will we be able to get larger fire vehicles into and out of that area? Where are the fire lanes? C � !;4 S53111109 1E 11 •s- 1099E �II_lIJIIIJ SO'022914' 222.00 c 0 ��« � Q�.i4�„ �' �/ � . � • � � � ® .EER., � � ., Q?0 �, ml SO°3238°W 1102.14 }pF g'rA'EAE y� y J $ N QVE GENERAL DEMOLITION NOTES F. ME IFTE w wR Mi P9fEOT GMLL MEET W EXCEED T1E •sum Km urE vale slccsrwnolm. 9. O]VIRV.'f011 E. eE IESNXLBIE iCfl RFA1oII1 0' ME EVIBIW6 SIPoILNPFS. r®AiE➢ tIT.. PRNXG, p..sIIXIV'E T.. AVo eN/ OTMA IXwIM10 IWRJh S A9 IIJED. BEE SITE MqN ssEORarbla. c [CMMRIXi is TO RENWE 0.Vo olstt6E 0' .VL oE&O. RUBBBN um OIIIEII WTEHI4B PEBY BE . OIEFAVENWS IE NPOERi OEAdJR011 OiFRRiMB.1. XTL w M]X1flWHLE MIN NL ILGL BrE.R N•DrbR FE0FN1 REpVIRiIp19 WhHI11Xp flIGTI Ci'pNIxx15. F, ME{E}IEI4I COMINCfgI S. TIME NL P(EGVIIIX•$xEct&GT'ro .0 PNPEMr MVHiF TO bA . RG°PRTEB ".Q ME IXYISIW.CTW INAFB pF 1N9 PIOIECI. ME COM0..C1piMLL BEIfSD sxEiv R¢wrslaE wR avr prwraa io lxE RwmFr PROEEm1Ea accuwnxB wwxo THE mxsmYrnw wwsEs oP Ma NaSs'f. rxE tx1lIRV.TM R EXISTING tlLLr TES M SI r ON ME lCCA1KKi umrax EIEVAnw 6 F ME u. Es sxom .I M Pwa Is .1. IE d P J a ME IN M PIEZ p]E NM I, FIO MEAT TO BE 04 4 AS SEN Ta Ix ME El LST ME wwR ISIB N]r io BE REUEo ox..S FE ITT OP AT LAST. WIFE 1pEI nr ca. 1r LEAST xoJME. IT un .1 METON TO IEW¢I FM:f T. ICGTTO TEI MUMS BE ME PFSNIHI.II FT OF ME ME I' TQ i0 IL110UIE.VL EYARVO 11111511¢ NHCY NNWCf Mm TIF PIIXpSED IYNGVEIIEHR SNTM ox M_PIRxs. II 0 DEMOLITION NOTES 1u ETa SITE.REYW® iu E XST EFF1FEYW ZSEAi0 BE 19LC.ETED 5B 1111118 [f1 WNt111PAVdEM RfIpVK BIO Wg1FL'f IX6111q 51Po1ClVES KORx Itl'¢RMKKi L4M]IIrpN 1 RxoarElxxmarl ElFav¢ I ❑ DEMOLITION DETAILS I ENI rP�rRVEi.T1ox S I� HERBYCERI WDISMISBEr OF NNE MATIMADX9wA104ISD E➢ Er EEE ox urrax Yn o1REcr BwEnvwlw, xxo r W r 1.w q war 11�raEn maEExaoxu Exon Em awoEx ME IA Wd or ME Kure of NwrEmrw Iel®ERK Wa1F Rb301WT011 NJ, SAFEngineering, PLLC Sib and Athlehc Fuiliity Engine �1 ELK RIVER ISD #728 K Engineering Associates, Inc. ia ���� [N(yNLEpS {ygNNERS 9/RKEIPS j (ANO MOtl )5 ENNRWYCNTAL 5!]FN)1B5 I ATS Cm 6M..9aASW E6511.4iRb _ _ _ _ _ _ I wms � uxssleo rcsNPsx-flu DEMOLITION PLAN y Na ELK PoVE3? RIGH SCHOOL cr AOIO706ANDIF&CVA7XMr6 RE -s � I C SO 02'29'W I 222.00 I� to I I IR I _zB5_______________ zxs SO 37;78°W _ f 1162 i4 GYMNA% M ADDITION FTE -810A0 e MPNJ9IKCr. _ WIIDIN3 ED3EA40 fWIWiIM � 81a m fA}1.2lRULR. e;. >r m _ m b I i L^ 4 wool s'rNl aFWPE Y� y J 4y 9 N ME G PROPOSED g ® awlxln OflpKl°FD PNNN46P/C6 0 ours of soLM'Nw GENERAL SITE NOTES w uL NudelOxedloex umronm ffcEaalwuxlrm omExMlEE vmEo. a uxless pnmrxaE slam. rxLEo our a scmEo nEceon a wrlux mE aPsrfvxrlas yuL arm Pao oarwaurao ro AfPMLT rA�xvo sou M IImrILED Pdl OEIM Al PALELaI dWL lE EffiINIFO IX fDbIMA4(£ NrrX LfTA4LMU91PE EMIIE PMgxG LTNFANONLIRMIGI CNUR. L. NLPAgdXILm BmX VS WRPIrSdWLeE IHBrNlIDP91 pE(NLIS. 0 SITE NOTES 1 � I C SO 02'29'W I 222.00 I� to I I IR I _zB5_______________ zxs SO 37;78°W _ f 1162 i4 GYMNA% M ADDITION FTE -810A0 e MPNJ9IKCr. _ WIIDIN3 ED3EA40 fWIWiIM � 81a m fA}1.2lRULR. e;. >r m _ m b I i L^ 4 wool s'rNl aFWPE Y� y J 4y 9 N ME G PROPOSED — mruurE wPswvp wrlEP. ® awlxln OflpKl°FD PNNN46P/C6 0 ours of soLM'Nw GENERAL SITE NOTES w uL NudelOxedloex umronm ffcEaalwuxlrm omExMlEE vmEo. a uxless pnmrxaE slam. rxLEo our a scmEo nEceon a wrlux mE aPsrfvxrlas yuL arm Pao oarwaurao ro AfPMLT rA�xvo sou M IImrILED Pdl OEIM Al PALELaI dWL lE EffiINIFO IX fDbIMA4(£ NrrX LfTA4LMU91PE EMIIE PMgxG LTNFANONLIRMIGI CNUR. L. NLPAgdXILm BmX VS WRPIrSdWLeE IHBrNlIDP91 pE(NLIS. 0 SITE NOTES IM fmcx rPusnrELavuroouarslwPrs tlrrlrwu IA fPNYi MbE M➢IIEDYELLONBtNPF&20fW10C.EK apPf£e lrtE ffiE NLIGIHM1 TLPa1 eu rfPwaaero Naa Emsnxscam ❑ SITE DETAILS [aL MM®LHVP R4iNdCfWN% p0 aX[nflELI0.M'NX [M mNOM pUry A9llUli MN1m IW TlVF1L0.0W MPVe lin aJ PA9ixp'FlPE WIE BNIV IR Cp1OElE RUMS ]M m130.W AT a16.x9 WIiFA M ".AT.CE TOE alz aNaErEawPNodrtrel PP mnaflE wuxlExNlasl� mn awn uxn fdn£wM avdEarE ra ImEoxa WxaEleama Mroamw IIEP®V CFRfIFYTNi TNmfEr6NN6 Mm yEaflGiYW WNREG/I® mYEORpKEGMYMRELT WPFAWIa1.N0TMTIMIPNLY 116P9FD r/P}aE/E-Jello/x//u�EWIfEfTAwoen TxEl�wvnEmAlEvuxEmrw �/L/ � 1&14MI6 A61 'fZrWEE,Pe MlE RPofmM1KEP0. SAFEngineering, PLLC Site and Athletic Facility Engineerinit Engineering Associates, Inc. I az flEV-8 MN I:1 MAOI LEVEL GYM ABOmar. 1277R SF mwu�amaanox AMAIN LEVEL FLOOR PLAN - AREA A4 NORTH MAIN LEVEL OFFICE RENOVATION: 8,457 SF MAIN LEVEL FLOOR PLAN - AREA Al SOUTH H7 Inb•. r-0 _�� MAIN LEVEL WEIGHT ROOM & SUPPORTING SPACE ADDITION: 9,419 SF AMAIN LEVEL FLOOR PLAN - AREA A4 SOUTH MAIN LEVEL WRESTLING RENOVATION: 4,433 SF I 1 MAIN LEVEL FLOOR PLAN - AREA Al NORTH F4 Ine-=1o� v MAIN LEVEL BUSINESS EDUCATION RENOVATION: 6,817 SF �I r 4MAIN LEVEL FLOOR PLAN - AREA A9 SOUTH T tnb'=1'-0' 1^ MEZZANINE LEVEL MECHANICAL ROOM: 1,976 SF aMEZZANINE LEVEL FLOOR PLAN - AREA A4 Inb'=1C' v-. OVERALL RENOVATION: 32,524 SF OVERALL ADDITION: 25,173 SF MAIN LEVEL SPECIAL EDUCATION RENOVATION: 12,817 SF i ` 7 I N I L I I I S�n�L�AIN LEVEL FLOOR PLAN - AREA A3 NORTH CITY OF ELK RIVER SUBMITTAL ELN RIVER HIGH SCHOOL ADDITION AND RENOVATIONS xnsmml vxw snw.,r. mx.x INOEPENOENT SCHOOL OISTRICT078 els n w,...., MN N smzm Imb architects engineers www.woldaexom ST_ j" NET PUN FLOOR PLANS A2 MN A 1PP M1Mm1 4'i l { a f Pi bYM EAST ELP/ATION e., GYM NORTH ELEVATION H1 va•. ro �H oev rcxniwu:lEcricV. �',.w 1. r CITY OF ELK RIVER SUBMITTAL ELN RIVER HIGH SCHOOL ADDITION AND RENOVATIONS m olds" sl. Ell R'd, MX Y INDEPENDENT SCHOOL DISTRICT 4720 ns Hdl."' Ell Port, MN • architects engineers www.woldae.com STS Lv.BGNSdl EXTERIOR ELEVATIONS M.. wmfV6eC A3 E 6 M!R V! rtNp iP �B i i Bm.�waP r e., GYM NORTH ELEVATION H1 va•. ro �H oev rcxniwu:lEcricV. �',.w 1. r CITY OF ELK RIVER SUBMITTAL ELN RIVER HIGH SCHOOL ADDITION AND RENOVATIONS m olds" sl. Ell R'd, MX Y INDEPENDENT SCHOOL DISTRICT 4720 ns Hdl."' Ell Port, MN • architects engineers www.woldae.com STS Lv.BGNSdl EXTERIOR ELEVATIONS M.. wmfV6eC A3 CITY OF ELK RIVER SUBMITTAL ELN RIVER HIGH SCHOOL ADDITION AND RENOVATIONS m olds" sl. Ell R'd, MX Y INDEPENDENT SCHOOL DISTRICT 4720 ns Hdl."' Ell Port, MN • architects engineers www.woldae.com STS Lv.BGNSdl EXTERIOR ELEVATIONS M.. wmfV6eC A3 22200 0 Q. � GYMNASIUM ADDMM FFE = 910.50 u I I I I I I I I y 1 � a I , I I SO 323rW M 1!0274 I/ I I I l0 0 BF�E Y� A�. N us>E mren NEA®Y CFFLIfV TMi wyC .NO TIAMI�MWA9YIEPIL® iY Va tll V/LEANYMREC!&1PdN91R1.MN1 IMLIOVLYLISINli0 rw9a're7eaaw ealeas v(9u(v(ou(me uwe or nc mAre or weeorrl KL1Wm1.Pc mm RWWIW.IW w SAFEngineering, PLLC sib and Athletic Facility amineetlne ���� al¢-elsaan wo LNa Nx mu I.m.wuu.+� 1N11 LP/µ(IS OMI N YS LYM' CEI PfID,IECT W. INITIAL DATE DPOR FM ITS OR,V ELK RIVER ISO #728 Engineering Associates, Inc. ENQVfFNS PLANNCRS 9/RKRXi LANOS2MP� •NNR�'4C AL�i �ENF51� (6iNli tel'+ LISMM IW S51F0 /V ta5N45[-/IY FIRETRpCUMFU MILIIYPLO IBMs ELK MVEfi HG4 SCHOOL .mal C2f A DITOMSA MV14AT06 ' S53'71'09'E - rl �I(£MEIU.YY'Fb6 WiE tt11IINIX6 MCX N10 �. I B _rll eEOJw1Y fFRCEHw � i P IA6EYflWPoFIBN race uam romwav AaEmMPEE,E L -W a.� 9 .r J � N �A QVE G�� o av ,s• �c�tweffr STAGING PLAN NOTES ,MEEar�RIIPYTDIT@WPofwvewosTFMA ewwvmFs.+m arra murmvMrMlREcr wrEavlewn.uornv SAM a wav LcERSEn A/g�f/E)�M///4��H.AREE�Ii M'OFA'T1E I.1M Li 11EBE11EKMIMIEBOE.� �/L/ /�� 1LIIFNI6 3A 91 Neli®eBIPE W1f RWa1RAMR1Ip. SAFEngineering, PLLC Sb and AlWaft Facllb Engineedng Engineering Associates, Inc. MNI�FFRS iLANNFRS F/RKYaPf 4l0 AROII RS FNNRdIYCN AL R I$ LFY10 (OSiN4�J ID (651NY-111➢ ING PLAN OA7 M 1 Mw HUH 5ChVCX ®'wE cis AM EAOVAnaOS acv -a I ` I I S _ 1 a.� 9 .r J � N �A QVE G�� o av ,s• �c�tweffr STAGING PLAN NOTES ,MEEar�RIIPYTDIT@WPofwvewosTFMA ewwvmFs.+m arra murmvMrMlREcr wrEavlewn.uornv SAM a wav LcERSEn A/g�f/E)�M///4��H.AREE�Ii M'OFA'T1E I.1M Li 11EBE11EKMIMIEBOE.� �/L/ /�� 1LIIFNI6 3A 91 Neli®eBIPE W1f RWa1RAMR1Ip. SAFEngineering, PLLC Sb and AlWaft Facllb Engineedng Engineering Associates, Inc. MNI�FFRS iLANNFRS F/RKYaPf 4l0 AROII RS FNNRdIYCN AL R I$ LFY10 (OSiN4�J ID (651NY-111➢ ING PLAN OA7 M 1 Mw HUH 5ChVCX ®'wE cis AM EAOVAnaOS acv -a