7.3. SR 01-04-2016Template Updated 4/14 Request for Action To Mayor and City Council Item Number 7.3 Agenda Section Public Hearings Meeting Date January 4, 2016 Prepared by Chris Leeseberg, Senior Planner Item Description Elk River ISD #728 Conditional Use Permit to Allow Expansion of an Institutional Use at 900 School St. NW Reviewed by Zack Carlton, Planning Manager Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, the Conditional Use Permit with the following conditions: 1. The Conditional Use Permit shall not be recorded until all applicable conditions have been substantially completed. 2. The authorized use shall not begin until the Conditional Use Permit is recorded. 3. If the authorized use ceases for more than six months, the Conditional Use Permit shall expire. 4. The Conditional Use Permit is not a building permit and the applicant must apply for and receive approval of required building and sign permits before construction may begin. 5. The fire chief shall verify the location of all fire hydrants, and may require additional hydrants necessary to preserve the health and safety of the residents. 6. The applicant shall add a left turn signal to the traffic signal system on School Street for eastbound to northbound movements, into the lot, prior to blocking or closing the existing north lane around the school. 7. A permeable sidewalk along the western wetland edge to decrease runoff and encourage infiltration shall be installed. 8. All comments in the stormwater coordinator’s memo dated December 8, 2015, shall be addressed. 9. A Wetland Conservation Act Exemption application shall be submitted to the city. 10. The east side parking area drive lane shall provide an area for emergency vehicles to turn around, in accordance with MN State Fire Code Section 503.2.5. 11. The entire turnaround fire lane east of the addition shall be striped and the perimeter signed as required by the Fire Department. Background/Discussion Case No. 15-23 The applicant is seeking approval of a Conditional Use Permit (CUP) to allow expansion of an Institutional Use. The project includes a two-station gymnasium and weight room addition to be built north of the existing building and east of the ice arena. Primary exterior building materials will consist of precast concrete wall panel, exterior brick veneer, integrated translucent wall panel clerestories on the east and west elevations and exterior aluminum storefronts at the main entrances and exits. N:\Public Bodies\Agenda Packets\01-04-2016\Final\x7.3 sr School Addition.docx Planning Commission meeting summary The Board of Adjustments approved the necessary wetland setback variances for this project. During that meeting, two residents questioned the impact the building would have on the wetland. Staff indicated to the commission that engineering, environmental, and stormwater staff reviewed the project and addressed concerns with conditions for approval. The Planning Commission question how the parking area north of the proposed addition would be accessed. Staff clarified the site plan changes that accommodate access. No one spoke for or against the request and the Planning Commission unanimously recommended approval. Financial Impact None Attachments  Planning Commission Memo dated December 22, 2015 0 Elkt River Request for Action To Item Number Planning Commission 4.1 Agenda Section Meeting DateI Prepared by Planni December 22, 2015 Chris Leeseber , Senior Planner Item Description Reviewed by Request by Elk River Independent School District Zack Carlton, Planning Manager Reviewed by728foraConditionalUsePermittoallow expansion of an Institutional Use at 900 School Street NW, Case No. CU 15-23 — Public Hearin Action Requested Recommend, by motion, approval of the Conditional Use Permit with the following conditions: 1. The Conditional Use Permit shall not be recorded until all applicable conditions have been substantially completed. 2. The authorized use shall not begin until the Conditional Use Permit is recorded. 3. If the authorized use ceases for more than six months, the Conditional Use Permit shall expire. 4. The Conditional Use Permit is not a building permit and the applicant must apply for and receive approval of required building and sign permits before construction may begin. 5. The Fire Chief shall verify the location of all fire hydrants, and may require additional hydrants necessary to preserve the health and safety of the residents. 6. The applicant shall add a left turn signal to the traffic signal system on School Street for eastbound to northbound movements, into the lot, prior to blocking or closing the existing north lane around the school. 7. A permeable sidewalk along the western wetland edge to decrease runoff and encourage infiltration shall be installed. 8. All comments in the Stormwater Coordinator Memo dated December 8, 2015 shall be addressed. 9. A Wedand Conservation Act Exemption application submittal is required. 10. The east side parking area drive lane shall provide an area for emergency vehicles to tum around, in accordance with MN State Fire Code Section 503.2.5. 11. The arena only parking area should be signed appropriately. Background/Discussion The applicant is seeking approval of a Conditional Use Permit (CUP) to allow expansion of an Institutional Use. The project includes a two (2) station gymnasium addition plus weight room addition to be built north of the existing building and east of the ice arena. Primary exterior building materials will consist of precast concrete wall panel, exterior brick veneer, integrated translucent wall panel clerestories on the east and west elevations and exterior aluminum storefronts at the main entrances and exits. Analysis Transportation/Circulation With the addition being built on the north side of the existing building and to the east of the existing ice arena, the vehicular circulation around the north side of the building and site will be eliminated. Staff and II EAEI 11 r1ATURE the applicant have, and continue to, work on solutions for vehicular movement in and around the school and arena site. The turning movements, interim parking plan, and the entrance of the access road concerns identified in the city engineer's memo dated December 8, 2015 have been addressed. Staff is recommending that the applicant add a left turn signal to the traffic signal system on School Street for eastbound to northbound movements into the lot. Staff is concerned that with elimination of access around the north side of the building traffic will build at the existing signal location along School Street. This will likely have significant traffic impacts to the area as drivers must find alternative routes to the main parking lot. The east side parking area is a dead end over 150 feet in length and needs an area for emergency vehicles to tum around, in accordance with MN State Fire Code Section 503.2.5. The applicant is working on revised designs to address this and will have updated plans at the meeting. Parking With the building placement, 65 stalls will be lost in the east lot and 8 stalls are lost in the south lot. The site plan shows the restriping for 90 parking stalls directly south of the ice arena entrance. These stalls will be utilized for arena parking only. Staff recommends the arena only parking area should be signed appropriately. Environmental Although not required, staff recommends that the School District apply for a Wetland Conservation Act exemption to address concerns that may arise in the future as a result of the project. The structure is within the 25 foot Wetland Buffer Strip which is intended to protect wetlands and filter stormwater by maintaining natural vegetation. The applicant has applied for a variance. (V 15-15) Staff recommends a permeable sidewalk along the western wetland edge to decrease runoff and encourage infiltration. Stormwater/Drainage Because the stormwater basin within the High School parking lot was not sized for the proposed addition, some of the existing stotmwater will be rerouted to the wetland north of the High School. Also, stormwater pre-treatment will be provided within the proposed design before it enters the wetland. The wetland should have ample capacity but if an issue arises the existing stormwater infrastructure can be utilized to take care of overcapacity issues. Applicable Regulation The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: Will not endanger, injure or detrimentally affect the use and enjoyment of otherproperty in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral welfare of the neighborhood or the city. The proposal is an addition to an already long standing established use and it will not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience or general welfare of the neighborhood or the city. 2. Will be consistent with the comprehensive plan. N:\Depa mts\Community DevelopmentVIanning\Case Files\CUP\CU 15-23 Ell: River ISD 728\CU 15-23 sr PC 12-22-15.doee The comprehensive plan guides the property for Public/Institutional and the proposed institutional use is consistent with comprehensive plan. 3. Will not impede the normal and orderly development and improvement ofsurrounding vacant property. There is no vacant property in the area to impede. 4. Will be served adequately by and null not adversely affect essential publicfacilities and seances including streets, police andfireprotection, drainage, refuse disposal, water and server systems, parks and schools; and will not, in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thorougbfares. The property will be served adequately by and will not adversely affect essential public facilities and services. 5. Will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons orpropen because ofexcessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. Although it is an expansion to the school, the number of students will not increase. Additional traffic most likely will be introduced to School Street but it will not be excessive. A condition has been recommended to address the additional traffic on School Street. 6. Will not result in the destruction, loss or damage of a natural, scenic or historicfeaturr ofmajor importance. The project will not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. 7. Willfully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance ofa license orpermit to establish and operate the proposed use in the city. The project will fully comply with all other requirements of this code. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. Financial Impact None Attachments Location Map Applicants Narrative Environmental Memo dated December 7, 2015 Engineering Division memo dated December 8, 2015 Stormwater Coordinator memo dated December 8, 2015 Fire Department memo dated December 7, 2015 Police Department memo dated December 7, 2015 Existing/Demo Site Plan Site Plan Architectural Plans Elevations Fire Truck Turning Exhibit Staging Plan N:\Departments\Community Development\Planning\Case Piles\CUP\CU 15-23 Elk River ISD 728\CU 15-23 sr PC 12-22-15.docx r b 4 ,4a z r Y` I G F 1 TIP rD I f h11(1N11 Bffi1Q1 . JI F t Church V a - y.:--, Q - C C YVAIr_ I III, In architects engineers www.woldae.com 305 St. Peter Street St. Paul, MN 55102 October 26, 2015 Zack Carlton Elk River Planning Commission 13065 Orono Parkway Elk River, Minnesota 55330 tel 651.227.7773 Re: Independent School District #728 Elk River Area Schools fax 651.223.5646 Elk River High School Additions and Renovations Narrative mail@woldae.com Commission No. 142178 Dear Zack, Independent School District #728 is submitting the following project narrative in compliance with the Site Plan ReviewapplicationrequirementsfortheElkRiverHighSchoolAdditionsandRenovationsproject. Scope of Work: The above mentioned project includes a two (2) station gymnasium addition plus weight room additiontobebuilttothenorthoftheexistingbuildingandtotheeastoftheexistingdetachedicearena. Primary exteriorbuildingmaterialswillconsistofprecastconcretewallpanel, exterior brick veneer, integrated translucent wall panelclerestoriesontheeastandwestelevationsandexterioraluminumstorefrontsatthemainentrancesandexits. Thisfacilitywilladdressphysicaleducation, academic and athletic needs district wide. Additionally, the scope of work includes major renovations to portions of the existing interior building. The primarypurposeoftherenovationistorelocatetheexistingmainofficesuitetothefrontofthebuildingnearthemainentrance. The current main office is near the center of the building and does not provide a level of security or functionalityconsistentwithDistrictstandardpractices. The main office relocation will displace two (2) business educationclassrooms, one (1) marketing classroom and the school store. These spaces will be relocated to the current main officelocation. The existing special education department will also be reconfigured to better facilitate District special educationteachingpractices. All associated site reconfiguration due to building additions are included in the drawings portion of the Site Plan Reviewsubmittal. Thank you for your consideration! Sincerely, WOLD ARCHTIECTS AND ENGINEERS Sean Kelly cc: Mark Bezek, ISD #728 Terry Bizal, ISD #728 Tom Baranick, ISD #728 Vaughn Dierks, Wold Robert Sehm, Wold Minnesota Illinois Michigan Colorado Iowa designers and researchers for public environments Memorandum ver To: Planning Department From: Kristin Mroz, Environmental Division Date: 12-7-15 Subject: Site Plan Review Meeting _ December 71 2015 The department listed above has reviewed the application(s) fisted below and has the followingcomments: Case # CU 15-23, V 15_15 — Elk River School District #7281. The wetland delineation was completed and approved by the TEP on 12-4-15. 2. The LGU would recommend a WCA exemption application by the school district. Although though an application is not required, it i come up later. The grading s recommended should any concernsworkproposedappearstomeettheDeMinimisExemptionoflessthan2,500 ft' of impacted wetland. 3. The structure will be within the 25 -foot Wetland Buffer Strip which is to maintainnaturalvegetationandreducerunoff. Staff would suggest a permeable sidewalk along thewetlandsidetodecreaserunoffandencourageinfiltration. 4• The project will require a variance from the Wetland Buffer Strip and Wetland BufferStripSetback. Memorandum ver To: Planning Department From: Justin Femtite, P.E., City Engineer Date: 12-8-2015 Subject: Site Plan Review Meeting — December 7, 2015 The department listed above has reviewed the application(s) listed below and has the followingcomments: Case # CU 15-23, V 15-15 — Elk River School District #7281 • The identified truck turning movements interfere with proposed parking spaces. This isnotadequate. 2• When discussing the project with the architect prior to this submittal, we spoke of theneedtoshowaninterimparkingplanthatwillbeuseduntilthefull "west lot" isreconfigured (now indicated to be 2017). This shall include restriping of displacedparkingstallsincloserproximitytotheicearena. Maintaining the existing conditionsandlayoutforparkinginthe "west lot" is not sufficient. 3. At various planning meetings we have indicated the entrance of the access road, whichgoesbetweentheproposedadditionandtheicearena, should be reconfigured. It is hardtounderstandwhythecurbsarebeingputinonlytorequiretwosharp90degreemovements. It is further difficult to understand how this new configuration might thentieintoafinallayoutforthe "west lot" in 2017. This should be revised to provide betterflowandbesetuptomaximizeparkingandoperationalflowofthe "west ice,. 4• We have had some discussions with your traffic engineer but have yet to receive a finalreportshowingwhatwillhappentotrafficflowresultingfromthedisconnectionoftheexistingnorthlanearoundtheschool. Preliminary discussions included the possibleneedtoaddaleftturnsignaltothetrafficsignalsystemonSchoolStreetforeastboundtonorthboundmovementsintothelot. If this is still the case, the project submittalshouldreflectmakingthisimprovement. Memorandum ver To: Planning Department From: Brandon Wisner, Stormwater Coordinator Date: December 8, 2015 Subject: Site Plan Review Meeting— December 7, 2015 The department listed above has reviewed the application(s) listed below and has the followingcomments: Case # CU 15-23, V 15-15 — Elk River School District #7281AsnotedintheAugust7`h, 2015 Site Plan Review: 1. In accordance with city Ordinance Section 78-504. Redevelopment projects, on sites withoutrestrictionsthatcreatenewimpervioussurfacesshallcaptureandretainonsite1.1 inches ofrunofffromthenewimpervioussurfaceandshowanetpollutantreductionforanyreconstructedimpervioussurfaces. quality report is also needed. A maintenance schedule for2. If disturbance is one acre or more, an issued NPDES permit is required. A MIDS water long term maintenance is requiredforpermanentBMPs. Inlet protection and sediment perimeter control is needed downgradientofproposedconstruction. Also, 1. This site is within 1 mile of an impaired waterbody so stabilization needs to occur in 7 daysforareasthatarenotbeingactivelyworked. ZT-. L - .-- - ... Memorandum ver To: Planning Department From: Cliff Anderson, Fire Marshal Date: 12/7/15 Subject: Site Plan Review Meeting —December 7, 2015 The department listed above has reviewed the applications) listed below and has the followingcomments: Case # CU 15-23, V 15-15 — Elk River School District #7281. Fire Lane issues have not been satisfied as of yet for the drive lane on the west side ofnewstructure. (turning radiuses) 2• The east side parking area is a dead end over 150ft and needs a area for emergencyvehiclestoturnaround, in accordance with MN State Fire Code Section 503.2.5 Case # LU 15-15, CU 15-24 - ERX 1 • No concerns or issues with the application as proposed. Case # SP 15-16 — Black & Veatch/AT & T1 . No concerns or issues with the application as proposed. Case # SP 15-15 -, ERMU Water Treatment Plan Expansion1 • No concerns or issues with the application as proposed. Case # SP 15-14 — American Messaging1 • No concerns or issues with the application as proposed. Case # V 15-09 - Ron Dargis Roadway Vacation1 • No concerns or issues with the application as proposed. Memorandum To: Planning Department From: Elk River Police Department Date: 12/07/2015 Subject: Site Plan Review Meeting _ December 7, 2015 The department listed above has reviewed the application(s) listed below and has the followingcomments: Case # CU 15-23, V 15-15 — Elk River School District #7281 • I have concerns about the access to the parking lot north of the new addition. It will likelyhaveahighlevelofpedestriantraffic. What are the site lines like for drivers going through thatarea? Will we be able to get larger fire vehicles into and out of that area? Where are the fire lanes? C !;4 S53111109 1E 11 •s- 1099E II_lIJIIIJ SO'022914' 222.00 c 0 Q.i4„ ' / . • ® . EER., ., Q?0 , ml SO°3238°W 1102.14 pF g'rA'EAE y yJ $ N QVE GENERAL DEMOLITION NOTES F. ME IFTE w wR Mi P9fEOT GMLL MEET W EXCEED T1E sum Km urE vale slccsrwnolm. 9. O]VIRV.'f011 E. eE IESNXLBIE iCfl RFA1oII1 0' ME EVIBIW6 SIPoILNPFS. r®AiE tIT.. PRNXG, p..sIIXIV'E T.. AVo eN/ OTMA IXwIM10 IWRJh S A9 IIJED. BEE SITE MqN ssEORarbla. c [CMMRIXi is TO RENWE 0.Vo olstt6E 0' .VL oE&O. RUBBBN um OIIIEII WTEHI4B PEBY BE . OIEFAVENWS IE NPOERi OEAdJR011OiFRRiMB.XTL w M]X1flWHLE MIN NL ILGL BrE.R N•DrbR FE0FN1 REpVIRiIp19 WhHI11Xp flIGTI Ci'pNIxx15. F, ME{E}IEI4I COMINCfgI S. TIME NL P(EGVIIIX•$xEct&GT'ro 0 PNPEMr MVHiF TO bA . RG°PRTEB ".Q ME IXYISIW.CTW INAFB pF 1N9 PIOIECI. ME COM0..C1piMLL BEIfSD sxEiv R¢wrslaE wR avr prwraa io lxE RwmFr PROEEm1Ea accuwnxB wwxo THE mxsmYrnw wwsEs oP Ma NaSs'f. rxE tx1lIRV.TM R EXISTINGtlLLr TES M SIr ON ME lCCA1KKiumraxEIEVAnw6FMEu. Es sxom .M Pwa Is1. IE d PJ a ME IN M PIEZ p]E NM FIO MEAT TO BE 044 AS SEN Ta Ix ME El LST ME wwR ISIB N]r io BE REUEo ox..S FE ITT OP AT LAST. WIFE 1pEInrca. 1r LEAST xoJME. IT un 1 METON TO IEW¢I FM:f T. ICGTTO TEI MUMS BE ME PFSNIHI.II FT OF ME ME I' TQ i0 IL110UIE.VL EYARVO11111511¢ NHCY NNWCf Mm TIF PIIXpSED IYNGVEIIEHR SNTM ox M_PIRxs. II 0 DEMOLITION NOTES 1u ETa SITE.REYW® iu E XST EFF1FEYW ZSEAi0 BE 19LC.ETED 5B 1111118 [ f1 WNt111PAVdEM RfIpVK BIO Wg1FL'f IX6111q 51Po1ClVES KORx Itl'¢RMKKi L4M]IIrpN 1 RxoarElxxmarl ElFav¢ I DEMOLITION DETAILS I ENI rP rRVEi.T1ox S I HERBYCERI WDISMISBEr OF NNE MATIMADX9wA104ISD E Er EEE ox urrax Yn o1REcr BwEnvwlw, xxo rW r 1.w q war 11 raEn maEExaoxu Exon Em awoEx ME IAWd or ME Kure of NwrEmrw Iel®ERK Wa1F Rb301WT011 NJ, SAFEngineering, PLLC Sib and Athlehc Fuiliity Engine 1 ELK RIVER ISD #728 K Engineering Associates, Inc. ia [N(yNLEpS {ygNNERS 9/RKEIPS j (ANO MOtl )5 ENNRWYCNTAL 5!]FN)1B5 I ATS Cm 6M..9aASW E6511.4iRb I wms uxssleo rcsNPsx-flu DEMOLITION PLAN y Na ELK PoVE3? RIGH SCHOOL cr AOIO706ANDIF&CVA7XMr6 RE -s I C SO 02'29'W I 222.00 I toI I IR I zB5_______________ zxs SO 37;78°W f 1162 i4 GYMNA% M ADDITION FTE -810A0 e MPNJ9IKCr. _ WIIDIN3 ED3EA40 fWIWiIM81a m fA}1.2lRULR. e;. r m m b I i L^ 4 wool s'rNl aFWPE Y yJ 4y 9 N ME G PROPOSED g awlxln OflpKl°FD PNNN46P/C6 0 ours of soLM'Nw GENERAL SITE NOTES w uL NudelOxedloex umronm ffcEaalwuxlrm omExMlEE vmEo. a uxless pnmrxaE slam. rxLEo our a scmEo nEceon a wrlux mE aPsrfvxrlas yuL arm Pao oarwaurao ro AfPMLT rA xvo sou M IImrILED Pdl OEIM Al PALELaI dWL lE EffiINIFO IX fDbIMA4(£ NrrX LfTA4LMU91PE EMIIE PMgxG LTNFANONLIRMIGI CNUR. L. NLPAgdXILm BmX VS WRPIrSdWLeE IHBrNlIDP91 pE(NLIS. 0 SITE NOTES 1 I C SO 02'29'W I 222.00 I toI I IR I zB5_______________ zxs SO 37;78°W f 1162 i4 GYMNA% M ADDITION FTE -810A0 e MPNJ9IKCr. _ WIIDIN3 ED3EA40 fWIWiIM81am fA}1.2lRULR. e;. r m m b I i L^ 4 wool s'rNl aFWPE Y yJ 4y 9 N ME G PROPOSED mruurE wPswvp wrlEP. awlxln OflpKl°FD PNNN46P/C6 0 ours of soLM'Nw GENERAL SITE NOTES w uL NudelOxedloex umronm ffcEaalwuxlrm omExMlEE vmEo. a uxless pnmrxaE slam. rxLEo our a scmEo nEceon a wrlux mE aPsrfvxrlas yuL arm Pao oarwaurao ro AfPMLT rA xvo sou M IImrILED Pdl OEIM Al PALELaI dWL lE EffiINIFO IX fDbIMA4(£ NrrX LfTA4LMU91PE EMIIE PMgxG LTNFANONLIRMIGI CNUR. L. NLPAgdXILm BmX VS WRPIrSdWLeE IHBrNlIDP91 pE(NLIS. 0 SITE NOTES IM fmcx rPusnrELavuroouarslwPrs tlrrlrwu IA fPNYi MbE M IIEDYELLONBtNPF&20fW10C.EK apPf£e lrtE ffiE NLIGIHM1 TLPa1 eu rfPwaaero Naa Emsnxscam SITE DETAILS aL MM®LHVP R4iNdCfWN% p0 aX[nflELI0.M'NX M mNOM pUry A9llUli MN1m IW TlVF1L0.0W MPVe lin aJ PA9ixp'FlPE WIE BNIV IR Cp1OElE RUMS M m130.W AT a16.x9 WIiFAM ".AT.CE TOE alz aNaErEawPNodrtrel PP mnaflE wuxlExNlasl mn awn uxn fdn£wM avdEarE ra ImEoxa WxaEleama Mroamw IIEP®V CFRfIFYTNi TNmfEr6NN6 Mm yEaflGiYW WNREG/I® mYEORpKEGMYMRELT WPFAWIa1.N0TMTIMIPNLY 116P9FD r/P}aE/E- Jello/ x//u EWIfEfTAwoen TxEl wvnEmAlEvuxEmrw L/ 1&14MI6 A61 fZrWEE,Pe MlE RPofmM1KEP0. SAFEngineering, PLLC Site and Athletic Facility Engineerinit Engineering Associates, Inc. I az flEV-8 MN I:1 MAOI LEVEL GYM ABOmar. 1277R SF mwu amaanox AMAIN LEVEL FLOOR PLAN - AREA A4 NORTH MAIN LEVEL OFFICE RENOVATION: 8,457 SF MAIN LEVEL FLOOR PLAN - AREA Al SOUTH H7 Inb•. r-0 _ MAIN LEVEL WEIGHT ROOM & SUPPORTING SPACE ADDITION: 9,419 SF AMAIN LEVEL FLOOR PLAN - AREA A4 SOUTH MAIN LEVEL WRESTLING RENOVATION: 4,433 SF I 1 MAIN LEVEL FLOOR PLAN - AREA Al NORTH F4 Ine-=1o v MAIN LEVEL BUSINESS EDUCATION RENOVATION: 6,817 SF I r 4MAIN LEVEL FLOOR PLAN - AREA A9 SOUTH T tnb'=1'-0' 1^ MEZZANINE LEVEL MECHANICAL ROOM: 1,976 SF aMEZZANINE LEVEL FLOOR PLAN - AREA A4 Inb'=1C' v-. OVERALL RENOVATION: 32,524 SF OVERALL ADDITION: 25,173 SF MAIN LEVEL SPECIAL EDUCATION RENOVATION: 12,817 SF i ` 7I N IL I I I SnL AIN LEVEL FLOOR PLAN - AREA A3 NORTH CITY OF ELK RIVER SUBMITTAL ELN RIVER HIGH SCHOOL ADDITION AND RENOVATIONS xnsmml vxw snw.,r. mx.x INOEPENOENT SCHOOL OISTRICT078 elsnw,...., MNNsmzm Imb architects engineers www.woldaexom ST_ j" NET PUN FLOOR PLANS A2 MN A 1PP M1Mm1 4'i l a f Pi bYM EAST ELP/ATION e., GYM NORTH ELEVATION H1 va•. ro H oev rcxniwu:lEcricV. ',.w 1. r CITY OF ELK RIVER SUBMITTAL ELN RIVER HIGH SCHOOL ADDITION AND RENOVATIONS m olds" sl. Ell R'd, MX Y INDEPENDENT SCHOOL DISTRICT 4720 ns Hdl."' Ell Port, MN • architects engineers www.woldae.com STS Lv. BGNSdl EXTERIOR ELEVATIONS M.. wmfV6eC A3 E 6 M!R V! rtNp iP B i i Bm.waP r e., GYM NORTH ELEVATION H1 va•. ro H oev rcxniwu:lEcricV. ',.w 1. r CITY OF ELK RIVER SUBMITTAL ELN RIVER HIGH SCHOOL ADDITION AND RENOVATIONS m olds" sl. Ell R'd, MX Y INDEPENDENT SCHOOL DISTRICT 4720 ns Hdl."' Ell Port, MN • architects engineers www.woldae.com STS Lv. BGNSdl EXTERIOR ELEVATIONS M.. wmfV6eC A3CITYOFELKRIVERSUBMITTAL ELN RIVER HIGH SCHOOL ADDITION AND RENOVATIONS m olds" sl. Ell R'd, MX Y INDEPENDENT SCHOOL DISTRICT 4720 ns Hdl."' Ell Port, MN • architects engineers www.woldae.com STS Lv. BGNSdl EXTERIOR ELEVATIONS M.. wmfV6eC A3 22200 0 Q. GYMNASIUM ADDMM FFE = 910.50 u IIIIIII I y1 a I , II SO 323rW M 1!0274 I/ III l0 0 BF E Y A. N us>E mren NEA®Y CFFLIfV TMi wyC . NO TIAMI MWA9YIEPIL® iYVa tll V/LEANYMREC!&1PdN91R1.MN1 IMLIOVLYLISINli0 rw9a're7eaaw ealeas v(9u(v(ou(me uwe or nc mAre or weeorrl KL1Wm1.Pc mm RWWIW.IW w SAFEngineering, PLLC sib and Athletic Facility amineetlne al¢-elsaan wo LNa Nx mu I.m.wuu.+ 1N11 LP/µ(IS OMI N YS LYM' CEI PfID,IECT W. INITIAL DATE DPOR FM ITS OR,V ELK RIVER ISO #728 Engineering Associates, Inc. ENQVfFNS PLANNCRS 9/RKRXi LANOS2MP •NNR'4C ALi ENF51 6iNli tel'+ LISMM IW S51F0 /V ta5N45[-/IY FIRETRpCUMFU MILIIYPLO IBMs ELK MVEfi HG4 SCHOOL .mal C2f A DITOMSA MV14AT06 ' S53'71'09'E - rl I(£MEIU.YY'Fb6 WiE tt11IINIX6 MCX N10 I B _rll eEOJw1Y fFRCEHw i P IA6EYflWPoFIBN race uam romwav AaEmMPEE,E L -W a. 9rJ N A QVE G o av ,s• c tweffr STAGING PLAN NOTES MEEar RIIPYTDIT@WPofwvewosTFMA ewwvmFs.+marramurmvMrMlREcrwrEavlewn.uornv SAM a wav LcERSEn A/g f/E)M///4 H.AREE Ii M'OFA'T1E I.1M Li 11EBE11EKMIMIEBOE. L/ / 1LIIFNI6 3A 91 Neli®eBIPE W1f RWa1RAMR1Ip. SAFEngineering, PLLC Sb and AlWaft Facllb Engineedng Engineering Associates, Inc. MNI FFRS iLANNFRS F/RKYaPf 4l0 AROII RS FNNRdIYCN AL R I$ LFY10 (OSiN4 J ID (651NY-111 ING PLAN OA7 M 1 Mw HUH 5ChVCX wE cis AM EAOVAnaOS acv -a I I S 1 a. 9rJ N A QVE G o av ,s• c tweffr STAGING PLAN NOTES MEEar RIIPYTDIT@WPofwvewosTFMA ewwvmFs.+marramurmvMrMlREcrwrEavlewn.uornv SAM a wav LcERSEn A/g f/E)M///4 H.AREE Ii M'OFA'T1E I.1M Li 11EBE11EKMIMIEBOE. L/ / 1LIIFNI6 3A 91 Neli®eBIPE W1f RWa1RAMR1Ip. SAFEngineering, PLLC Sb and AlWaft Facllb Engineedng Engineering Associates, Inc. MNI FFRS iLANNFRS F/RKYaPf 4l0 AROII RS FNNRdIYCN AL R I$ LFY10 (OSiN4 J ID (651NY-111 ING PLAN OA7 M 1 Mw HUH 5ChVCX wE cis AM EAOVAnaOS acv -a • Conditional Use Permit ISD #728 City of Elk *( =:,- dMi River ° O i wry w e Uemen[ary Z, 'School St NW Srh6ol S1 NW aj twwan r-- 7 Church > 1IL �- C Y fks.: Background ■ Zoned RI -c ■ Institutional Use — CUP required ■ 24,500 sqft addition ■ Two gyms and weight room C . ,r Y Transportation ■ Biggest concern with this project ■ Circulation around north side will be eliminated 0 • _ � LA i Middle School 1 Lincoln Dementaa P School A Z i p central Z Lutheran r i6 ,aG as ` lI a Crrh ti 4 K1►r •�:, o 4 {.� 0 • _ � LA ............ Ft moi' Middle a School 'p { Lincoln School `�' i Elementary r, School School St NW St NW z — a Central ► Z ► + Lutheran r i6 Q) l a C-tw+rh CL 4 t K1►r �:, 2 0 • _ � 'S LA Middle 3 a School 'p { Lincoln IRUyvwwr W1 School z-F i Dementaa r, School School St NW OOL St NW z — a Central ► Z ► + Lutheran r i6 a w K1►r �:, 0 0 • _ � 'S LA i = - z Middle School ;.. _- ... O 7 o l.7 LincxAn School ElementaryScriod �r kt . y - Schoo#li_.. Scher. �t NWS Central Z Lutheran r i6 as ` CL K1►r.' !t �o ` Y 0 • _ � 'S LA i = - Middle School ;.. _- ... O 7 o l.7 i SchoEle ol �r - M - Schon#li_.. Sch-. !>t NW !IT central Z Lutheran r i6 as ` I a C�ffch ti 4 t K1►r �:, o • /• .4 a 4 -E ll �pY� Transportation J ■ Recommending ethat the applicant add a left turn signal to the traffic � signal system on School Street for eastbound to northbound ` '; movements into the lot 3 4�� 1 C . ,r Y Transportation ■ East side parking area ■ Dead end over 150 feet in length ■ Needs emergency vehicle turn around c - � f � r i s l z C) O (y 1 t z O m p^ ! d o a= < p m / p Z O ¢ Y iW ❑Z O T 1 WETLAND FLAGS(7"YPJ C3 > ❑ o ! LI Al LL rj� CD s+ C:) `,/ WETLAN - LU LL d Q J¢ Ir p �m ❑Z 11J Y co W a m O ¢ 00 ti r -D C) LLM < OZ M LL 99'0£ m i m I ¢ 3 \INNM ¢mgrs 11.58' m m H CL z a 4 ¢srs� LL Ocia 2 fS Z C) o ❑O n o v co ¢ h o ar `moi co U 55.1' m z p r ar, p CD J S m C!] 1L3 a- 01 O O QnCc s l z C) O (y 1 t z O m p^ Z ! p Z O ¢ Y iW ❑Z O T 1 WETLAND FLAGS(7"YPJ C3 > ❑ o ! LI Al LL rj� CD s+ C:) `,/ WETLAN LU LL d Q J¢ Ir a O m Q o 0 W ¢ r- r Z azo = ®¢ -. Q U-m < OJ Z :. -3D m� srs � (3 p CL m ¢ 3 p ~ J m 01 m H z a 4 0 to O LL Co aZD D ❑a F ao ❑O¢ n o v LL co ¢ h LL t i�1 o ar _ .. `moi - 13.27' U 55.1' m � z p r � p CD J Q (!] 10 a O ,O Own C) LU LUN ' J< CO Ngo B 1 zo 03 P t NO FLAGS(TY2.) t, - / WETLAND f r : w zc -E C7 C39E'OE c ' SIS W — Q3� 5� •vis"`T.. T 3 '_ - •-I Y 'f''. Z •� I 4 o az o LL z Z w 0 a O = c7 a m 629' ca 7711.31' j ''..7n' r. •i i rr'`:•' .r 13.27' m O O a N zO= 0 CD � r LL w 4 to m z() __11JL-- `•� 0 17 R C Y fks.: Parking ■ 65 stall lost on east side ■ 8 stalls lost on south side ■ Res trip ing 90 stalls rn n 04 Lot". o hn Z a.� FF 4 / Q 4z o aoa ,� z _ Z 55.1' N � F J I Fi S. d,u a w I F-9 _: I � � � � � at�� ,ac•el ,z � o 6 0 I I 6 Q Q a � I a i — a ta�- tT C fks.: Elevations ■ Primary exterior building materials: ■ Precast concrete wall panel ■ Exterior brick veneer ■ Integrated translucent wall panel clerestories —� ELK RIVER HIGH SCHOOL ADDITION AND RENOVATIONS .� r — INDEPENDENT SCHOOL - DISTDICT#728 MN _ ------------------------------------ ------------------------------------ ------------------------------------ -------- -------- ------- -------- -------- ---- architects 2 fhg I f1 2 e r S oldae.com o., STAH L i El I a I ia,n CGYM NORTH ELEVATION - ' -- n1 I i xro.ror.e F,GYELEV M WEST ATION .z 6.7 iF.6 H 6 H q J.' ,J.q) N5 3� .rs V ql 1 R.11 E� I EXTERIOR - _ ELEVATIONS �1 WEST ELEVATION- Al SOUTH �1EAST ELEVATION-AREA A3 SOUTH FRONT ENTRANCE WEST ELEVATION II 2.01 C Applicable Regulations ■ It appears all seven regulations are met C 4u ,r Wetlands ■ BOA approved wetland setback variances ■ Engineering, environmental, and stormwater staff reviewed the project and addressed concerns with conditions for approval C Y Planning Commission ■ Parking area to the north accessed? ■ No one spoke for or against the request ■ PC unanimously recommended approval C 4a ,r Action Requested ■ Approve, by motion, the CUP with the conditions outlined in the memo c - � f � r i