Loading...
5.0. HRSR 04-23-2001 77) • City ** of Elk River MEMORANDUM TO: Housing & Redevelopment Authority FROM: Catherine Mehelich, Director of Economic Development DATE: April 23, 2001 SUBJECT: Downtown Sidewalk Project Update The City Council, at its April 16,2001 meeting, approved the attached resolution accepting the recommended bid for the downtown sidewalk replacement improvement. Terry Maurer, Engineer will be present at the HRA meeting to update the HRA on the improvement project and construction schedule. The HRA should consider the funding arrangement for the HRA's portion of the • improvement project,which was estimated at$231,600. The remaining 20% of the estimated$290,100 total project cost will be assessed to the affected property owners. Staff recommendation for the HRA funding will be presented at the meeting for consideration. Since the bid result was positive, staff has prepared the attached beautification plan for the HRA's consideration as part of the total project. • r. Item 4.6. • LeAd Howard R. Green Company April 13, 2001 812420j-0071 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: DOWNTOWN SIDEWALK IMPROVEMENTS CONSTRUCTION BIDS Dear Council Members: We have tabulated the bid results for the Downtown Sidewalk Improvements. The bids were opened Thursday, April 12, 2001, at 10:00 a.m. There were a total of three bidders. The ' following table provides a summary of the bidders and their total bids: Schmidt Curb Co., Inc. $209,943.80 • Glacial Ridge, Inc. 224,490.50 Environmental Assoc., Inc. 240,744.00 The low bid, submitted by Schmidt Curb Co., Inc., is approximately 20% below the estimated construction cost contained in the feasibility study prepared in February 2001 It should be noted, however, that this is a unit cost bid and some units, such as concrete curb and gutter replacement, may over-run the bid amount, causing the final cost to be slightly higher. Schmidt Curb Co., Inc. has previously successfully completed projects within the City of Elk River. Therefore, we would recommend award to them as the lowest responsible bidder, in the amount of $209,943.80. Attached is a resolution for the City Council's consideration which awards the contract to Schmidt Curb Co., Inc. If you have any questions regarding this project, I will be in attendance at next Monday's City Council meeting. Sincerely, Howard R. Green Company TerryJ. surer, P.E. TJM:tw • Attch. 0:1PROJ1812420J10071 Vtr 041201 Council awerd.doc 1326 Energy Park Drive • St. Paul.MN 55108 - 651/644.4389 fax 651/644-9446 toll free 8881368-4389 a • RESOLUTION 01 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE DOWNTOWN SIDEWALK REPLACEMENT IMPROVEMENT OF 2001 WHEREAS pursuant to City Council direction, competitive bids were solicited and received for the Downtown Sidewalk Replacement Improvement; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that Schmidt Curb Company, Inc., is the lowest responsible bidder, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Schmidt Curb Company, Inc., as is approved by the City Attorney for the completion of the Downtown Sidewalk • Replacement improvement according to the approved plans and specifications designated by City Council Resolution. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract above specified. Passed and adopted this 16th day of April, 2001. ATTEST: Stephanie A. Klinzing, Mayor Sandra A. Peine, City Clerk • O:IPROJ181242010071\RESOLUTION 4-13.01.doc TOTAL P.03 • City of Elk River MEMORANDUM TO: Housing & Redevelopment Authority FROM: Phil Hals, Street & Parks Superintendent DATE: April 23, 2001 SUBJECT: Downtown Sidewalk Beautification Items Issue The River's Edge Downtown Association and Operation Elk River groups have discussed the need for beautification of the downtown Elk River area. Staff has prepared the following proposal for the HRA's consideration as part of the downtown sidewalk improvement project. Attachments 10 • Map of Downtown Beautification Plan • Photo of proposed tree grate, trash and planter receptacles • Correspondence from River's Edge Downtown Business Association Overview The attached beautification plan is an effort to balance the boulevard trees and planters in a uniform pattern and calls for removal of 31 existing boulevard trees, the replanting of 10 boulevard trees, the addition of 18 planters and 13 trash receptacles. The present boulevard trees that are marked for removal have been so designated for one of following reasons. They have overgrown their location, are blocking building signs, have been damaged or diseased, are the wrong species for the location, or have displaced the sidewalk. To avoid this situation in the future, all replacement trees will be Japanese tree lilacs or a variety of flowering crabapple trees that has a more vertical branch growth habit. This plan was presented to and supported by the River's Edge Committee on April 11,2001. Attached is their letter of commitment for supplying the flowers for the planters. The tree grates will be changed to allow the paver bricks to be placed near the tree trunks. I will have photos available at the HRA meeting to better explain. The electrical outlets will be below grade in a waterproof box, available at each tree location. S The City Street Department will do the tree planting,installing the tree grates, and coordinate the electrical outlet installation during the sidewalk construction. Once the April 23,2001 HRA Downtown Sidewalk Beautification Items Page 2 of 2 • project is completed the Street Department will assume responsibility for twice a week watering of the trees and planters. The trees could be lighted for the holiday season as in the past. I would strongly suggest that the Street Department remove the planters and about half of the trash receptacles in the late fall to facilitate snow removal. The planters and trash receptacles would be replaced down town again after the snow season. The beautification cost breakdown is as follows: 18 Planters - $489.00 each including tax & freight $ 8,802.00 13 Trash Receptacles - $489.00 each 6,357.00 10 Replacement Trees - $200.00 each 2,000.00 21 Boulevard Tree Electrical Connection - $100.00 each 2,100.00 1 Lot Miscellaneous Metal for Tree Grate Renovation 250.00 TOTAL $19,509.00 I will be present for the HRA meeting to answer any questions. Action Requested Staff recommends the HRA consider authorizing an amount not to exceed$20,000 for the proposed beautification elements as part of the downtown sidewalk improvement project. • IIIIIIIiIH ■ ETI River's Edge downtown business association April 12, 2001 Cathy Mehelich C/O The City of Elk River Elk River,Mn. 55330 Dear Cathy, As part of our downtown beautification project,we would like to offer our support for the planting of flowers this year. We have secured funds to accommodate this years plantings through donations from local businesses. We have also approached two other sources, for long term commitments ,with a positive response. It is our goal to raise funds through Rivers Edge, each year,to pay for the annual plantings of the flowers, • otherwise,we have a strong network for donations each year to pay for this project. This has been on our agenda as well as through the operation ER committee. It has been well received in our community. Our members consist of a large portion of downtown business owners/operators,who wish to have planters placed on the sidewalks, after the improvements are done, to accommodate the plantings and to beautify the downtown district. We hope the City will work with us to make this happen. Sincerely, 6/1/41- t<0191(e-C Cindy Koonce Secretary, Rivers Edge Downtown Business Association 411 717 main street nw • downtown • elk river, mn 55330 • (763) 441-6385 ,, • .._,„..1.,...4„,,,Q v.. ...w... 4 _. , x r- • . ... ._._ ...,...,,.... ,...„. , ...i.,„*, ��" T ,..-z!„,.,,...„.„....,,--2.--,•.-!,- „mss — .-,..,0.-..-4,Nw ' . ...27':-.1. '''''''''''s 1..„,-,:„.,,i.,71,..:.::::',..71,.....s.7'..7:.,:.-.--:-.-...' -.T.i..;,.,',..'..'--...'-',..1..' _H �*. ---.-..1,1,-.1.1,:,--4.-:-%-.4.:7..5.-=...: '-'tet -tee" ` -'��: a • 1 • I , 1 .,.......,.., rk:-aicifr.„, . ,., , ,,,,.. „ , tcal.„4.01.11rp, . .. _ - _ . , . rn y . ,.. ..,„,„.„..„4„4:7:„.., , ,,,„,;:i..„..„,,,,,, „:4,,,I..,„4.....„..., e..,7,,, ,„ _,t ,,..„..,,,,...;:;...::, cep si sC .,,,,,t1,4..„,,, • ,, ,.,„4 .. .:.„....,;,„,,,,..:e.,t. ;1 a' ,�a �� o t` - The Deerfield series portrays the classic strength and style of gothic architecture,while prnvidfog iuncfional litter control. ipY ti The Deerfield planters are one of . * , the more flexible "' styles available. yrs FBecause . of its classic .g,it call fit styli. %I th just about any landscapeb•design and plant type.Its wide base and lower height P a stable base i >` for whatever you ill decide to pla.lt in it. ' \ I 5 p 6 61 . -Jr03t LOWELL AVENUE K 01 • L_ J \\\\\\\\N\\\ LOWELL AVENUE • N 1,t,'•; \ \ N \ \\\ " \ • 11 g 11$1 \ \ Y Afi \ 1 T 1/ •• \ Z 1111 \ N g 111 W g KING AVENUE KING AVENUE \\\\\\\L ,fqY'i...`l':•lC::y CFS ` ._.. .. .. \ , r ` • • • • • • Ili \ \ \ c \ \ c 6.:,“NNNNNNNNNNN CD : \ JACKSON AVENUE !n 0 r g r9 cs _c cS \ 93 gi lo, \\\\NNNNN\NNNNN 1\\1 i 9 . 1 \ x 1 1 .s\\\\\\\ \\\\\\ \a 1 \ m moil \ �1 O 111 10 \ \ 11 \ \ • g \ \ \ Z .g. \ \ r- Lii z . 1 I V •,3 Rp 42 .. „., , O