Loading...
5.2. SR 10-04-2004 Item 5.2. MEMORANDUM TO: Mayor and City Council FROM: Rebecca Haug, Environmental Technician DATE: October 4, 2004 SUBJECT: Consider Curlyleaf Pond Weed Remediation in Lake Orono On October 20, 2003, the Elk River City Council approved a drawdown of Lake Orono to help eradicate curlyleaf pond weed which had proliferated in the lake. This is a non- native invasive species that can clog shallow areas of waterways if not controlled. According to Wendy Crowell, Aquatic Biologist, Exotic Species Program, Department of Natural Resources (DNR), the drawdown did reduce the abundance of the curly leaf pondweed; however, temperatures were not as cooperative causing several curly leaf pondweed plants to survive the drawdown. At the August 18, 2004 Lake Orono Water Quality Task Force Meeting, it was discussed that another drawdown could reduce the abundance even more. City Staff has discussed this with DNR Waters, Fisheries and Aquatic Plant representatives and none of them had concerns with another drawdown. The drawdown would be done the same way it was last year. It is proposed to start on November I, 2004 with a gradual four-foot drawdown of the lake (approximately over a one-week period), allowing the lake sediment to dry (approximately one week depending on weather) and having cold temperatures to freeze the plant bulbs that are contained in the sediment of the lake (approximately ten days). The lake will then be refilled gradually (approximately over a one-week period). If temperatures are cooperative, the drawdown is proposed to only last one month. DNR Fisheries will determine if the lake needs to be refilled sooner if there is a threat of a fish-kill. The public will be notified of the drawdown through the City's website, The Current, the Elk River Star News and the Lake Orono Improvement Association flyer sent to all lake shore owners. Anyone wishing work along their shoreline other than general cleanup, will need to contact the Building and Environmental Department to make sure their project conforms with shore land regulations. Staff has discussed this with both Elk River Municipal Utilities and the Street Department. The cost for this remediation is $0.