Loading...
6.1. HRSR 09-24-2001 • Item 1 6.1. City of Elk River MEMORANDUM TO: Housing and Redevelopment Authority FROM: Stephen Rohlf, Building and Zoning Administrator S�Z DATE: September 24, 2001 SUBJECT: Request for Proposal (RFP) for Historic Study of Downtown Area Attached to this memo is a RFP to conduct the following historical research in the downtown area: • ➢ Context Study-The context study will identify the historical themes significant to the heritage and development of Elk River. This study,which is city wide,acts as a framework that will be used to help determine the historic significance of particular buildings and places within the city. ➢ Phase 1 Historic Survey - The RFP includes conducting a Phase 1 survey of the entire Downtown Redevelopment Study Area. This is a fairly quick survey that will place the structures downtown into one of two categories, non-significant or potentially significant. The basis used to determine the significance of the buildings include: the historic contexts identified in the context study,the eight criteria for rezoning property to"Heritage Preservation Overlay Zoning District"found in the city's Ordinance and the four criteria for determining eligibility for the National Register. Buildings that are less than fifty years old or that have not retained their original integrity are immediately placed on the "non-significant" list. The remaining buildings will require a more in depth evaluation to determine if they should be deemed significant to Elk River's history. ➢ Phase 2 Evaluation-The RFP requests a budget and scope of work to conduct a Phase 2 evaluation for up to ten buildings. This is the more in depth evaluation pointed out in the previous paragraph. Details like who built the building,when was it built and for what purpose was it built are thoroughly researched during a Phase 2 evaluation. If a redevelopment project requires a federal permit,a State Historical Preservation Office(SHPO) review is triggered. SHPO will require a Phase 2 evaluation of the buildings identified as potentially significant during the Phase 1,before they can be razed. The HPC feels confident that the context study and Phase 1 survey can be conducted for the$12,000 estimate. If it turns out that a great number of buildings downtown do require a Phase 2 evaluation,it might be that a decision on which ones to do at this time will have to be made to stay within the budget. The HPC does not anticipate numerous buildings in the downtown area requiring a Phase 2 evaluation because they are either less than fifty years old or they have been altered to an extent that their original integrity can not be restored. They do, however, eligible anticipate some buildings being for Nation Register status. The following exhibits are included with the RFP: ➢ Exhibit A-A map of the Downtown Study Area,which will be used to identify the boundaries for the Phase 1 survey. ➢ Exhibit B - The eight criteria that are considered during a rezoning to "Heritage Preservation Overlay Zoning District". ➢ Exhibit C - A timeframe for conducting the context study, Phase 1 survey and • Phase 2 evaluation. This timeframe is ambitious, but the Heritage Preservation Commission is trying to complete the studies as timely as possible. Attached to this memo is a fairly comprehensive list of qualified local firms that that have done similar studies for other municipalities. All those on this list will be sent a RFP. The last attachment to this memo is a letter from Michael Koop of the State Historic Preservation Office. In his letter,Mr.Koop talks about financial incentives for rehabilitating income-producing historic buildings, the regulations associated with the demolition of properties with National Register potential and other related issues. • THE CITY OF ELK RIVER • REQUEST FOR PROPOSALS HISTORIC CONTEXT STUDY AND RESOURCES SURVEY PROJECT SCOPE The City of Elk River,through its Heritage Preservation Commission(HPC),is seeking a qualified consultant to assist in preparing a historic context study of the city and a focused historic resources survey (Phase 1) of its downtown area. Boundaries of the focused resource survey area are shown on the attached Exhibit A. These defined limits of the focused resource survey contain approximately 210 properties within an approximate 122 acre land area. This portion of the project will result in a comprehensive inventory and report of historic sites within the focused study area relating to the historic contexts identified for the city, as well as recommendations for the eligibility of properties based on both the eight standards found in Section 900.10 (21) (C) of the Elk River Code of Ordinances for rezoning to Heritage Preservation Overlay Zoning District(attached Exhibit B)and the four criteria for determining eligibility for the National Register. Additionally,the city is requesting a scope of work and budget to conduct a Phase 2 evaluation for up to ten properties within the study area. The consultant selected for the project will meet Secretary of Interior Professional Qualification Standards(Federal Register,September 29, 1983)and willutilize the Minnesota • State Historic Preservation Office document entitled Guidelines for SHPO Architecture/History Projects(July 1991)as a guide in completing the project.All work to be completed under this project will conform to the Secretary of Interior's Standards for Archaeology and Historic Preservation(September 29, 1983).Both City staff and volunteers from the Heritage Preservation Commission will contribute to the project by assisting the consultant with research and by reviewing drafts of the report. The project will be carried out in conformance with the timeline as found on Exhibit C. In completing the project, the consultant will be required to: A. Work with the HPC and city staff. B. Prepare a historic context study of the city. C. Conduct specific research design following the Secretary of Interior's Guidelines for Identification (Federal Register, September 29, 1983). Develop survey forms. D. Conduct a reconnaissance survey(Phase 1)of approximately 210 properties-within a defined approximate 122 acre survey area. E. Conduct a Phase 2 evaluation for up to ten properties,at the discretion of the HPC. F. Prepare individual file folders for each site to include one to two(35 MM)black and white photos,survey forms,location maps,and other site documentation.Forms for each site shall be numbered according to the recommended SHPO numbering system. G. Assign survey properties to appropriate historic contexts. • S:\B&Z\STEVER\CONTEXT 1110 H. Initiate and maintain a comprehensive filing system for the HPC,incorporating all information collected on survey sites.This system shall be designed for expansion as new information is collected or added. I. Provide periodic written reports to, and meet with, the Heritage Preservation Commission and Housing and Redevelopment Authority(HRA)for the City of Elk River. J. Submit a draft final report to the Heritage Preservation Commission for review.Said report to include a minimum of the following: • Project introduction • Project objectives and methodology • Description of project components • Inventory list of all sites surveyed • Development of historic contexts identifying significant themes in Elk River History • The assignment of survey sited to appropriate context(s) K. Prepare a final narrative report (8 lh " x 11" format), which conforms to the Secretary of Interior Standards and Guidelines for reports identification results (Federal Register, September 29, 1983, pages 44711 through 44723). L. Provide file folders with labels and other supplies as required to complete the project. M. Provide electronic media in the format of choice. N. Present final reports to the HRA. • The City will provide: A. Project administration and supervision. B. Elk River Heritage Preservation Commission participation. C. Publicity and required hearing notices will be provided by Elk River Heritage Preservation Commission, if required. D. Sherburne County Historic Society assistance to advise consultant(where needed) relative to survey and context work. All proposals shall include the following information: A. Resumes of key personnel who will participate in completing the project. It is emphasized that at least one of these shall meet Secretary of Interior Professional Qualification Standards. B. A brief statement,which identifies key personnel experiences with and knowledge of Secretary of Interior Planning Standards. C. A preliminary outline explaining the proposed process to be followed in completing the project and to what extent local support services will be used. Additionally, a graphic flow chart reflecting the timing/completion of project elements shall be included. D. Hourly rate structure and description of scope of services,which can be provided for $12,000. E. Portfolios and references are strongly encouraged. S:\B&Z\STEVER\CONTEXT • The project will be financed by the City of Elk River. Proposals by qualified persons to complete the survey project for the City of Elk River are required to be at Elk River City Hall on or before November 15,2001. Proposals are to be sealed and clearly marked PROPOSAL-HISTORIC CONTEXT AND RESOURCES SURVEY and be submitted to: Stephen Rohlf, Building and Zoning Administrator City of Elk River 13065 Orono Parkway NW PO Box 490 Elk River, MN 55330 The City of Elk River will consider all proposals received and will award a contract on the basis of qualifications; quality of the proposals in relation to the identified needs expressed by the City; proposed study approach; extent of local resource utilization; and proposed project bid. The City of Elk River reserves the right to reject any and all proposals and to award the contract to other than the lowest bidder,if in its discretion the interests of the city will be best served. Questions relative to this request may be direct to Stephen Rohlf, (763) 441-4904. • • S:\B&Z\STEVER\CONTEXT EXHIBIT A I• . ` D I 0.101111101111: 14 __- o � o M o ;Pie IMF .1 r - k — , AI r / ,- -›- I 1 F Y r 1 - ' I '1` 1 : F ! flf -left= ar 41 n =Nom �._ i111111111 / D t .. u / rioni."1 ftEr PA 0 ., \'' . Ira I'.11-1:14714,4 0 I/so 74-Li 1 ii, g Ai„ 7. ,... , 1 , ,, 1 cr, _ _ _ fr, MIMI iir1 IRVING //' AMIN co i ' N AINNF OLT cn `�' A4 mu. , \ , A INN .1111111111111111 m — f 0 :-1 W-11111 J IIkV.. i* "%dr AIME C11Z*4 7ar.4411 ta { \ionic �® h Ia„ {` I _..: I I AVFNUF I 1I I - • EXHIBIT B C. Standards The Heritage Preservation Commission shall recommend to the Planning Commission that an area, building district, or object be rezoned to the Heritage Preservation Site Overlay Zoning District upon determining that such site meets one or more of the following criteria: i. It has character, interest, or value as part of the development, heritage or cultural characteristics of the City of Elk River, State of Minnesota, or the United States; ii. Its location is the site of a significant historic event; iii . It has yielded, or is likely to yield, information important in pre-history or history; iv. It is associated with a person or persons who significantly contributed to the culture and development of the City; • v. It embodies distinctive characteristics of an architectural style, period, form, or treatment; vi . It represents the work of an architect or master builder whose individual work has influenced the development of the City of Elk River; vii. It embodies elements of architectural design, detail, materials, or craftsmanship which represent a significant architectural innovation; or viii. Its unique location or singular physical characteristics represents an established and familiar visual feature of a neighborhood, community, or the City of Elk River. • S:\B&Z\STEVER\CONTEXT • EXHIBIT C TIMELINE CITY OF ELK RIVER HISTORIC CONTEXT AND RESOURCES SURVEY TASK COMPLETION DATE Consultant-prepare specific research design 12-13-01 and survey forms, purchase supplies and set up information and filing systems, and initial meeting with HPC. Consultant submits progress report HPC. 01-10-02 • Consultant submits draft context study and Phase 1 02-14-02 inventory to HPC. HPC determines which properties involved in Phase 2. Consultant submits draft Phase 2 report for H.P.C. review.03-14-02 Consultant submits final report to HPC. 04-11-02 Consultant meet with HRA and submit final report 04-22-02 Project closeout and submission of final documentation 05-03-02 to SHPO • S:\B&Z\STEVER\CONTEXT • Rolf T. Anderson 212 W. 36th Street Landscape Research Inc. Carole Zellie Minneapolis, MN 55408 Research/Planning/Public Education 1466 Hythe St. St. Paul, MN 55108 BRW Inc. Garneth Peterson Thresher Square Paul Larson 700 Third Street So. 641 Asbury Street Minneapolis, MN 55415 St. Paul, MN 55104 Donald Empson Scott D. McGinnis 1206 N. Second Street PEER Environmental & Engineer Stillwater, MN 55082 Resources, Inc. 7710 Computer Avenue, Suite 101 Minneapolis, MN 55435 Robert M. Frame III, Ph.D. 178 Goodrich St. Paul, MN 55102 Patrick Nunnally 2001 Sargent Avenue St. Paul, MN 55105 Susan Granger and Scott Kelly • Gemini Research 15 East 9th Street Oertel Architects Morris, MN 56267 Jeffery Oertel 1795 St. Clair Avenue St. Paul, MN 55105 The Foster House 100 North First Street Minneapolis, MN 55401 Marcia Ohlhausen 3909 Aldrich Ave. So. Apt. #6 Hoisington Preservation Consultants Minneapolis, MN 55409 P.O. Box 13790 Roseville, MN 55113 The 106 Group Limited The Dacotah Building Deborah Morse-Kahn 370 Selby Avenue 4314 Linden Hills Boulevard St. Paul, MN 55102 Minneapolis, MN 55410 Carmen Tschofen 2667 Parkview Blvd. Camille Kudzia Robbinsdale, MN 55422 5208- 39th Avenue South Minneapolis, MN 55417 • iRobert C. Vogel & Associates 216 Cleveland Ave. SW New Brighton, MN 55112-3508 Thomas R. Zahn & Assoc., Inc., Historical Design, Research & Preservation Consultants 807 Holly Avenue St. Paul, MN 55104 i SEP. 19.2001 4:29PM MN HISTORICAL SOC N0.768 P.2,3 • liI MINNESOTA HISTORICAL SOCIETY 19 September 2001 • Stephen Rohlf Building and Zoning Administrator City of Elk River 13065 Orono Parkway Elk River,MN 55330 Dear Steve, It was good to talk to you last week about the potential loss of the historic commercial buildings in downtown Elk River. I hope that my comments below will help you articulate to the city council and other interested parties justification for retaining these important cultural resources, • I'm encouraged that the city is about to become a Certified Local Government(CLG) with a qualified Heritage Preservation Commission(HPC), This will allow Elk River to integrate historic preservation into local planning. Preservation planning is a process that organizes preservation activities (identification, evaluation,registration and treatment of historic properties) in a logical sequence.Decisions about the identification, evaluation, registration and treatment of historic properties are most reliably made when the relationship of individual properties to other similar properties is understood. Information about historic properties representing aspects of history and architecture must be collected and organized to define these relationships. This organizational framework is called a"historic context."The historic context organizes information based on a cultural theme and its geographical and chronological limits. Contexts describe the significant broad patterns of development in an area that may be represented by historic properties. Twenty of Minnesota's thirty Certified Local Governments have completed historic context studies.We strongly encourage cities to prepare context studies because they form the foundation for decisions about identification, evaluation,registration and treatment of historic properties. We spoke about the need to do an intensive level survey of the two-block area of downtown in order to properly assess the potential significance of these buildings. An intensive survey is most useful when it is necessary to know precisely what historic properties exist in a given area or when information sufficient for later evaluation and treatment decisions is needed on individual historic properties. • 345 KELLOGG BOULEVARD WEST/SAINT PAUL,MINNESOTA 55102-1906 TELEPHONE:651-296-6l26 SEP.19.2001 4:29PM MN HISTORICAL SOC NO.768 P.3/3 • Page 2/Stephen Rohlf Depending on the potential significance and physical integrity of the downtown buildings, it may be possible to designate some or all of them either locally through the city's historic preservation ordinance,or by entering them on the National Register of Historic Places. One of the benefits available to the owners of designated properties is a 20%tax credit for the certified rehabilitation of an income-producing historic building. In addition,the city of Elk River may be able to use funds from the Small Cities Development Program to rehabilitate commercial buildings in the downtown area. If the buildings are historically significant the State Historic Preservation Office would need to review plans for improvements to the buildings, Under federal regulations,the State Historic Preservation Office examines proposed federally assisted undertakings in the state to determine whether any properties listed on or eligible for the National Register may be harmed by those projects. If potential damaging effects are identified,the federal agency involved is required to explore alternatives that avoid or mitigate harm.In addition,the Minnesota Environmental Quality Board requires that an Environmental Assessment Worksheet be completed for destruction of a National Register property in cases where the demolition requires a federal, state or local action, such as issuance of demolition permits.While this does not prohibit destruction, it does provide a mechanism for public review and possible • intervention before destruction of a property occurs. Buildings such as those in the two-block area of downtown Elk River contribute to the community's history and to a sense of place, a special quality that sometimes is not fully appreciated until it is too late. With the enactment of the city's recent historic preservation ordinance,it seems ironic that some of the last remaining vestiges of the city's commercial history are at risk, I urge you and the city council to take the time to conduct a survey and historic context of these downtown buildings and explore all the alternatives. If we can be of further assistance,please do not hesitate to contact us. Sin - el/y, AIIP Michael Koop Historic Preserva.on Program Specialist State Historic Preservation Office • IV:: --. - '-,‘;F:';::::,E:::::tZi.i_.0i!-:::':tY::ii-EV2E--,t7:;,,7',ET--..--ii.,-:A,YrE:'- :'"!',','_,E_:Eir--: • ,, ______: :: :::. „ . . Elk River Minnesota .,_,______,_:___ _ Downtown ._: :: ...__. _:. Riverfront . , ,:_ . _ __ _ _ ,_ _ . Redevelopment 4.-:,, .:...-,, , __ �� t s u - Presentation by Ehlers &_. „ - - , , ,,t Associates . . . „:__-=_.-.i‘'.•;,,..4,C'A_.--r,'i-, -i:-----_-:.:--- ,i'.4':,.. -:.:'":--, :-:--'-:::-. - :"-‘, ------,r- . „.t .\_,,,,,,„,„__ , .„„___,-.: ,_,.,:ta„._,,.. .„„:„ ,„ „. ..... 0, -.... _ .t.:. -. ----„ ,„:„.__ _____ -_::-;!:;1_.--..44 ::',-•:16-. ':,-.--:—,•_:-;:,‘; ;- '-,•'..'„;‘--;,--,,:- , ° Sid• Inman• _ , ,_ . . _______,,._ , „ . „ a Jim Prosser _. ._ . „.., ....i...r.,, -::. : , _ .... 4.,..., ,,,..vit-.?_:.i.„,,,, ...--,,_::-..,„ ,....,--.---, -Ni,-: ' .,--. ':-_-::,-E:!:-:::-:q z -' -`� _ :----:---,:,::: :=,,,,-. ai .yam r! j-'pxgps t • Elk River Minnesota Downtown Riverfront Redevelopment Presentation by t iv7l a4 Ehlers&Associates �y 1.4.4 \441t .� �a Sid Inman ay \441 ` � Jim Prosser t d n Strategies for Successful Redevelopment • Establish clear goals • 4444, • Develop communications strategy • Verify market feasibility • Assess financial feasibility • Select experienced developer • Define clear and reasonable expectations (development agreement) Efered assci3es A. ?� rot' �ZC Y t , 4 Redevelopment Goals • Assure long term viability of downtown • Provide community focal point 7:44 ti • Highlight Riverfront location �� • Replace market/economic obsolete buildings • Strengthen commercial climate 444, E,ers s assoc:a!es I� 2003 • 1 S t44 Communication Strategy ito • Convey need for redevelopment(Why) 1 • Discuss redevelopment process(How) ' • Communicate roles of those involved with redevelopment(Who) MI • Forecast time frame and major issues(When) • Review development options and proposals ISA (What) 1 ?r • Feedback feedback iVr _e«s associates 2001 Communications Elements • • Key messages • = I` • Target audiences • Strategies and Options • Timetable • Responsibilities n Associates • Market Feasibility a • Identify developers with market match • Feedback prior to plan refinements IA • Develop concept options 4 • Developer RFP process aI • Preliminary and final development agreements E ers a Associates • 2 . Development Agreement IA s_ Preliminary Final gm 1. Refine site plans 1. Establish schedule 2 Clarify community 2 Document financial expectations expectations Refine market and 3 Establish land financial data acquisition ltfiils 4. Determine final responsibilities. ='r agreement issues a Elers 8 Asscciat=5 2001 Developer Selection tRit<§ • Establish clear"desired outcomes" • • Competitive RFP process • Focus on developer experience and capability • Review concepts site plans and programs • Select a developer not a development • Assess market and financial feasibility Eters&P.ss..ates ASA 2001 71-rt Oaritt:V2 NON Financial Feasibility • Land acquisition+relocation+public improvements=developer land payment+ assistance(TIF/grants) • Analysis of development options • Analysis of submitted proposals • Rate of return analysis • "But for"analysis Elers 8 Assccta:es 2 : • 3 s Representative Projects • Mound—Lakefront Downtown Redevelopment szl • Eagan—Cedarvale Shopping Center • Shoreview—Lexington and"D"strip mall and ?,Y auto service redevelopment • Falcon Heights—Northome Shopping Center ',Ilk • Osseo—Hans Auto site and Senior Housing Ee gau .....� zoo' Representative Projects 0$4ton, • West St. Paul -South Robert Street i6,0 • St.Anthony Village—Apache Center and _�� Stonehouse site • Richfield -Lyndale/66th; Urban Village; Best Buy;Shops at Lyndale;Gramcery Senior Housing `�` :, Eiers3 ass.^csa;es 200, 11Z41. ASA OA Final Thoughts ovt • Understand complexity/controversy • Measured pace No • Establish clear expectations • Emphasis on community involvement 4 • Competitive process • Understand experience of developers • Minimize(but not eliminate)risk Eters 8 Asst r �`�-;` .. Cif i 4 FREERS • & ASSOCIATES INC September 21, 2001 Catherine Mehelich Director of Community Development 13065 Orono Parkway PO Box 490 Elk River,MN 55330 Subject: Proposal for Services Dear Ms. Mehelich; Thank you for the opportunity to submit a proposal for financial advisory services in conjunction with proposed redevelopment of the Downtown Riverfront Area. Assumptions Our proposal for services is based upon the following issues identified during our recent discussion: ❖ The City of Elk River has identified a desire to explore redevelopment of the Downtown Riverfront • Area. ❖ Several studies have been conducted over the past years to identify redevelopment project components. ❖ The City has received one formal proposal for redevelopment. ❖ The City has not yet identified formal project design guidelines or general project goals. ❖ The City has not yet developed review criteria for redevelopment proposals. Scope of Services As financial advisor, Ehlers would provide the following services related to the Downtown Riverfront area redevelopment: 1. Evaluate the proposals received for the Downtown Riverfront area. 2. Develop tax increment revenue projections. 3. Prepare financial analysis including establishment of financial proof for the"but for"test and verify the need for public assistance. 4. Conduct pro-forma analysis. 5. Coordinate the establishment of tax increment district(s)as appropriate. %i • Equal Opportunity Employer LEADERS IN PUBLIC FINANCE Charter Member of the National Association of Independent Public Finance Advisors 3060 Centre Pointe Drive, Roseville, MN 55113-1105 651.697.8500 fax 651.697.8555 www.ehlers-inc.com Ehlers & Associates also proposes to assist with the redevelopment of Downtown Riverfont by providing • development management and financial advisor services including: 1. Market redevelopment plans to developers. 2. Coordinate strategies to identify,qualify and evaluate development proposals. 3. Assess project and market feasability. 4. Coordinate land assembly. 5. Assist with coordination of project communications with the general public, neighbors and impacted businesses and property owners. 6. Assist with negotiation of developer agreements. 7. Prepare TIF plans and documents. Project Staff Ehlers staff assigned to this project would include Jim Prosser and Sid Inman. Copies of qualifications are attached for your review. Mr.Prosser is currently providing Development Management services for the cities of Eagan, Mound, Shoreview, Osseo, West St. Paul and Falcon Heights. Mr. Inman has assisted in the establishment and analysis of over 100 TIF districts. Proposed Fee for Services The fee for services related to preparation of TIF plans is$4,500. Other services will be billed on a hourly basis. It is expected that the project management services will require an average of 15-25 hours per month.The cost for these services are generally reimbursed from developer fees and tax increment administrative fees. • Ehlers' Strengths Ehlers extensive experience with municipal finance, tax increment and development management services provide a solid foundation for assisting cities to achieve their redevelopment goals. We look forward to the opportunity to discuss this proposal with you at your convenience. Sincerely, EHLERS &ASSOCIATES, INC. (6d7/14,44.e.--, Jim Prosser Sid Inman Financial Advisor Vice President • N:\Minnsota\EIk River\Riverfront\prop.9.21..01.wpd . . • Jim r sser, MPA EXPERIENCE ❑ Over 25 years city management experience in cities in Illinois and Minnesota. LI Assisted in the development of nationally recognized housing reinvestment programs. ❑ Coordinated planning, financing, design and implementation of major roadway construction,Village Hall,regional wastewater treatment plant, ice arena, public works maintenance facility and water supply systems. + ` it ❑ Supervised a wide variety of tax increment projects including retail, office, multi-housing and single family housing totaling over$100 million. ❑ Assisted in the development of a variety of multi-jurisdictional local government services including;housing,human service planning, insurance (health and liability) and economic development. LI President Association of Metropolitan Municipalities, 1997-1998. tei SPECIAL EXPERTISE ❑ Redevelopment Project management,including coordination of planning, public involvement, developer recruitment,financing options, financial analysis, project budget, communications and property acquisition and relocation. ❑ Implementation of economic development and redevelopment strategies. Li Financial planning including development of"Key Financial Strategies"for operating and capital budgets. ❑ Housing rehabilitation, and community revitalization programs for single and multiple family housing. ❑ Development of community visioning and strategic planning programs. PROFESSIONAL MEMBERSHIPS Li International City/County Management Association (ICMA) ❑ Minnesota City Management Association Li Adjunct Faculty, Hamline University Graduate School ❑ Minnesota Government Finance Officers Association ❑ National Association of Housing and Redevelopment Organizations (NAHRO) • • Sid Inman, CIPFA EXPERIENCE 44 '�z U Actively involved in local government finance since 1978. 34,0 ❑ Served as financial advisor to cities in this region. U Served as Financial Analyst for Minneapolis Public Schools ❑ Served as Finance Director for the City of Fridley f U Participated in over 200 different development projects covering all forms of 4 local participation in the development process. U Participated in public finance projects involving all forms of borrowing :mfwicomgzo including general obligation municipal bonds, revenue bonds, current and { advance refundings, lease purchases and economic development issues. SPECIAL EXPERTISE U Recognized leader in field of tax increment financing in the State of Minnesota, involved in the creation of more than 200 tax increment financing ao*****06t, districts. U Significant experience in conducting financial feasibility and pro-forma analysis of development projects, including: Brooklyn Park , MN Village Project $115,000,000 * Duluth (MN) Northwest Airbus Project hf Edina (MN) Centennial Lakes Business Park t Hopkins (MN) Hopkins Center for the Arts and Entertainment $4,000,000 Wvi- ... ,,„ Complex Minneapolis (MN) Target Center Sports Arena $22,000,000 Minnetonka (MN) Westridge/Boulevard Gardens (Mixed Use $52,000,000 Redevelopment Project) Richfield (MN) Shops at Lyndale (Retail Redevelopment $14,000,000 Project) Richfield (MN) Office Redevelopment Project $150,000,000 PROFESSIONAL MEMBERSHIPS U National Association of Independent Public Financial Advisors U National Association of Housing and Redevelopment Organizations ❑ Economic Development Association of Minnesota ❑ Minnesota Government Finance Officers Association • U Minnesota City Clerks Association