Loading...
6.13. SR 09-20-2004 Item 6.13. 13065 Orono Parkway Elk River, MN 55330 September 13, 2004 File: 824180]-0030 The Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: 2005 S1REET RECONS1RUTION PROJECT Dear Councilmembers: /""' As you are aware, a few years ago the City Council adopted a Pavement Management Program which called for streets in the old core village to be reconstructed. The outline of the program was to do a reconstruction project every other year. This allowed time for public involvement through the feasibility and design stage, plus an 18-month construction process to allow the final lift of bituminous paving to be placed the year after major construction was completed. The first such project was undertaken on 4ill Street and the adjacent side streets in 2003. That project is now complete; therefore, it is time to consider initiation of the 2005 street reconstruction project. City staff is recommending Sill Street, Tipton Avenue and Upland Avenue be considered for the 2005 street reconstruction program, along with the adjacent side streets. The area is shown on the attached exhibit. This area is slightly larger than the 2003 project. Two reasons that staff is recommending this area are: First, it is adjacent to the 2003 street reconstruction project, and therefore, will complete the reconstruction of all streets roughly in the triangular area bounded by Trunk Highway 10, Main Street and Lake Orono. The second reason is there is a storm sewer system that runs through some rear yard areas flowing from north of Trunk Highway 10, ultimately outletting into the Elk River near Main Street, which has from time to time caused problems in the rear yard areas. Sinkholes have developed and pipes have broken which have had to be repaired. Street reconstruction in this project will allow the City the opportunity to deal with the storm sewer issue and put most of the pipe system in street rights-of-way. It will also allow the City to address the long standing water issue at the intersection of Tipton Avenue and Upland Avenue. -- Attached is a resolution for the City Council's consideration which would order the feasibility study for the reconstruction of the streets shown on the attached exhibit. Since this is a city-initiated project, this resolution requires a four-fifths majority. Once the Phone: 763.635.1000 Fax: 763,635.1090 \oVWW.cLelk-river.mn.us 2005 Street Reconstruction Project September 20, 2004 Page 2 ,- feasibility study is ordered, City staff will undertake the preliminary survey work, investigation of the underground utilities, and a preIiminary design and estimate of the costs of construction. When all of this information is available, City staff will coordinate and hold a public informational meeting with the affected property owners. Prior to holding a public informational hearing, we work to update the City Council to keep you informed and seek any direction you may want to provide. The minutes from the informational meeting will become a part of the feasibility study. Therefore, the feasibility study will likely not be brought back to the City Council for approximately 90 to 120 days. If you have any questions regarding this issue, I will be in attendance at your September 20, 2004 City Council meeting. Sincerely, ~~ Terty J. Maurer, P.E. City Engineer ~ - S:\PLANNING\Teny Maurer\2005 Reconstruct proj.doc -'J Z '1 n U -c--,-111m~~ , TOWER X,""" I_~ , s 'x , [ . I '1' 0 n. h .1":"" AU D 7)3 ::)'11 tVl1011 C .r11+<~>,>s>. , U I .~. v I - - . - ... 'x. .... o .~. Ct:j"....x.., ..."........:>.. I I OF '1 '=: - <::...'1.,....... ..J.=~~2~.;;=:>.'-.J~,OT): . "~ETf~>~< ); ,~-~~:::---:::~~ ~ -" ~ "v 01' '. .".- '., , " A V. J--~---===~--::_-------~ PROPOSED STREET RECONSTRUCTION ..... 2003 RECONSTRUCTION I. 2005 PROPOSED STREET RECONSTRUCTION ~ N RESOLUTION 04 . A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION FOR THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE PAVEMENT MANAGEMENT STREET IMPROVEMENT OF 2005 WHEREAS the City has determined that it should consider improving certain property by reconstructing the following streets (the Improvement); S,h Street - Norfolk Avenue - Tipton Avenue - Upland Avenue - 5th Street - Quinn Avenue - Rush Avenue - Seymour Avenue - Oxford Avenue - and Norfolk Avenue to west end 1H 10 to 4'h Street Main Street to Upland Avenue Main Street to 1H 10 Upland Avenue to west end S'h Street to 1H 10 S'h Street to 1H 10 5th Street to 1H 10 5th Street to 1H 10 WHEREAS Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to Howard R. Green Company, who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 20th day of September, 2004. ATTEST: Stephanie A. Klinzing, Mayor Joan M. Schmidt, City Clerk S:\PLANNING\ T eny Maurer\Resolutions\Pave mgmt 200S.doc