6.2. PRSR 02-10-2016 1 _ Request for Action
River-
To
iver
To Item Number
Mayor and City Council 6.2
Agenda Section Meeting Date Prepared by
Action Item February 10,2016 Michael Hecker,Parks and Recreation Director
Item Description Reviewed by
Maintain Pedestrian Easement and Trail Cal Portner,City Administrator
Reviewed by
Action Requested
1. Discuss existing pedestrian easement and consider construction of a bituminous trail located at
11936 190th Circle NW.
2. Recommend,by motion,the city maintain the existing pedestrian easement located at 11936 190th
Circle NW and improve the easement with the construction of a bituminous trail.
Background/Discussion
At the January 19,2016,Work Session,the City Council referred the discussion regarding the
maintenance and improvement of an existing pedestrian easement located at 11936 190th Circle NW to
the Parks and Recreation Commission.
The easement,located on the west side of the property owned by Harold and Valerie Williams,was
included in the original plat,aptly named"School View" to allow movements between the school and the
neighborhood to the north. The Williams'requested the city either maintain the trail or vacate the
easement. The city maintained the easement for many years,before it was abandoned four years ago
because it was unpaved and difficult to maintain.
If the city is to maintain the easement,staff recommends constructing a bituminous trail that can easily be
maintained. It is recommended in the Parks and Recreation Master Plan (page 55) to ensure safe walking
and biking routes to schools. The preliminary cost estimate to construct a trail on the easement is
approximately$15,000,which could be paid for out of the Park Improvement Fund.
The Park Improvement Fund has $89,000 in trail repairs to replace the Orono Parkway trail. Staff
recently decided that this project be moved to 2017 when the road is scheduled to be replaced and the
trail can become part of that project. Therefore,a portion of these funds dedicated to the Orono trail can
be used this year to pave this easement.
Financial Impact
The approximate cost to construct the bituminous trail is $15,000.
Attachments
• City Council Staff Report
• Aerial Maps
ratsr rats � r
NAME
L
Request for Action
ver
To Item Number
Mayor and City Council 9.1
Agenda Section Meeting Date Prepared by
Work Session January 19,2016 Zack Carlton,Planning Manager
Item Description Reviewed by
Pedestrian Easement and Trail Discussion Michael Hecker,Parks and Recreation Director
Reviewed by
Cal Portner,City Administrator
Action Requested
Provide direction regarding the easement on the west 12 feet of the property located at 11936 190th
Circle NW.
Background/Discussion
During the Open Forum of the January 4,2016,City Council meeting,Harold and Valerie Williams spoke
to the Council about a pedestrian easement located on the west side of their property. They stated that
the trail was used regularly when the development was first constructed,but more recently has been used
as a smoking refuge for students.
They requested the city to either maintain the trail or vacate the easement and allow them to utilifie that
portion of their yard. In speaking with them after the meeting their preference was to have the city
maintain the trail.
The easement was included in the original plat to allow movement between the school and the
neighborhood to the north. The easement has also been used during sporting events at the school and
the athletic fields west of the neighborhood. There is also an opportunity for residents to use the
easement to move north and south in the area without the need to walk to Jackson Ave in the east or
Proctor Avenue in the west.
Staff recommends constructing a bituminous trail to connect the northwest corner of what is today the
arena parking lot in the south and 190th Avenue in the north. The preliminary cost estimate prepared by
staff is approximately$15,000,which could be paid for out of the Park Improvement Fund in the 2016
budget.
The Parks Maintenance Superintendent is comfortable with the additional maintenance resulting from
trail construction. The Parks Department can provide additional information regarding funding and
maintenance during the meeting.
Financial Impact
The approximate cost to construct the bituminous trail is $15,000.
Attachments
• Aerial Maps
IFIVEREI IT
NATURE
•
410'$1111
1
:
N
Z
*
FA
I
p
4._7......- ..„..„„,„,..................j
m
Q
P
[3
ti
um
i
Is'
i ...,
s
i
r Iit 141 ......„,,..„ -
2
.. i._ 0
l
L /
1 1
i .
. i
0
y
r
1 t
4
ilt
A` ...
i
't \ • - I - _
iik
i .
"l'''''N.:—.- I lit
ii 4,' tr7
1 — t r.-
I
f 1 °gym