Loading...
6.2. PRSR 02-10-2016 1 _ Request for Action River- To iver To Item Number Mayor and City Council 6.2 Agenda Section Meeting Date Prepared by Action Item February 10,2016 Michael Hecker,Parks and Recreation Director Item Description Reviewed by Maintain Pedestrian Easement and Trail Cal Portner,City Administrator Reviewed by Action Requested 1. Discuss existing pedestrian easement and consider construction of a bituminous trail located at 11936 190th Circle NW. 2. Recommend,by motion,the city maintain the existing pedestrian easement located at 11936 190th Circle NW and improve the easement with the construction of a bituminous trail. Background/Discussion At the January 19,2016,Work Session,the City Council referred the discussion regarding the maintenance and improvement of an existing pedestrian easement located at 11936 190th Circle NW to the Parks and Recreation Commission. The easement,located on the west side of the property owned by Harold and Valerie Williams,was included in the original plat,aptly named"School View" to allow movements between the school and the neighborhood to the north. The Williams'requested the city either maintain the trail or vacate the easement. The city maintained the easement for many years,before it was abandoned four years ago because it was unpaved and difficult to maintain. If the city is to maintain the easement,staff recommends constructing a bituminous trail that can easily be maintained. It is recommended in the Parks and Recreation Master Plan (page 55) to ensure safe walking and biking routes to schools. The preliminary cost estimate to construct a trail on the easement is approximately$15,000,which could be paid for out of the Park Improvement Fund. The Park Improvement Fund has $89,000 in trail repairs to replace the Orono Parkway trail. Staff recently decided that this project be moved to 2017 when the road is scheduled to be replaced and the trail can become part of that project. Therefore,a portion of these funds dedicated to the Orono trail can be used this year to pave this easement. Financial Impact The approximate cost to construct the bituminous trail is $15,000. Attachments • City Council Staff Report • Aerial Maps ratsr rats � r NAME L Request for Action ver To Item Number Mayor and City Council 9.1 Agenda Section Meeting Date Prepared by Work Session January 19,2016 Zack Carlton,Planning Manager Item Description Reviewed by Pedestrian Easement and Trail Discussion Michael Hecker,Parks and Recreation Director Reviewed by Cal Portner,City Administrator Action Requested Provide direction regarding the easement on the west 12 feet of the property located at 11936 190th Circle NW. Background/Discussion During the Open Forum of the January 4,2016,City Council meeting,Harold and Valerie Williams spoke to the Council about a pedestrian easement located on the west side of their property. They stated that the trail was used regularly when the development was first constructed,but more recently has been used as a smoking refuge for students. They requested the city to either maintain the trail or vacate the easement and allow them to utilifie that portion of their yard. In speaking with them after the meeting their preference was to have the city maintain the trail. The easement was included in the original plat to allow movement between the school and the neighborhood to the north. The easement has also been used during sporting events at the school and the athletic fields west of the neighborhood. There is also an opportunity for residents to use the easement to move north and south in the area without the need to walk to Jackson Ave in the east or Proctor Avenue in the west. Staff recommends constructing a bituminous trail to connect the northwest corner of what is today the arena parking lot in the south and 190th Avenue in the north. The preliminary cost estimate prepared by staff is approximately$15,000,which could be paid for out of the Park Improvement Fund in the 2016 budget. The Parks Maintenance Superintendent is comfortable with the additional maintenance resulting from trail construction. The Parks Department can provide additional information regarding funding and maintenance during the meeting. Financial Impact The approximate cost to construct the bituminous trail is $15,000. Attachments • Aerial Maps IFIVEREI IT NATURE • 410'$1111 1 : N Z * FA I p 4._7......- ..„..„„,„,..................j m Q P [3 ti um i Is' i ..., s i r Iit 141 ......„,,..„ - 2 .. i._ 0 l L / 1 1 i . . i 0 y r 1 t 4 ilt A` ... i 't \ • - I - _ iik i . "l'''''N.:—.- I lit ii 4,' tr7 1 — t r.- I f 1 °gym