7.1. PRSR 02-10-2016 hi
Request for Action
River
To Item Number
Parks and Recreation Commission 7.1
Agenda Section Meeting Date Prepared by
Discussion Items February 10,2016 Michael Hecker,Parks and Recreation Director
Item Description Reviewed by
Hillside Park Report for 2015 Cal Portner,City Administrator
Reviewed by
Action Requested
For discussion
Background/Discussion
The amount of work completed at Hillside Park is tremendous. The Park Steward of Hillside,Sue
Seeger,completed a report for 2015. Dirtwirx referred to in the report is the name of the group of
volunteers who work at the park on a regular basis year-round.
Sue Seeger plans to attend the Commission meeting to provide an overview of her report and answer any
questions.
Financial Impact
None
Attachments
• Hillside Parks Report(Dirtwirx Report 2015)
POIEIEI Ir
NATURE
DirtWirx Report 2015:
Trail repairs&rebuilds(23 total)
Hours:Approx 850 (minimum)
About this work:
Prioritizing rebuilds&repairs at Hillside is tricky. Someone inexperienced could easily mistake
well-loved rough areas for things that"need to be fixed". This would upset many of our users. This
year heavy spring rains damaged many sections of older trail so we had more repairs to do than
usual.
With Hillside's unique topography, terrain, and poor soil quality,we often have to combine methods
we've developed ourselves with other trail building techniques we've learned through IMBA(the
international mountain biking association),the DNR, and ideas other trails around the country are
trying. DirtWirx has been building at Hillside for over 10 years now, and having a working
knowledge of what we've tried in different areas already is extremely helpful. It was a tough year
erosion-wise but we made a lot of headway.
Hillside is known for being a standout trail among the now 15 mtb trails around the metro area;
known for being a challenging, technical, natural trail, in contrast to the many flow trails which are
becoming the norm. It is the reason people drive to Elk River from all over the metro—to find that
different type of riding only we offer. That overarching philosophy guides all our work at the trail.
Trees cleared from the trail (75 minimum) (possibly more)
Hours: Approx 450
About this work:
When trees go down on the trail it is usually pretty time sensitive to remove them asap for the
safety of users. An in-depth knowledge of the park's layout and shorthand for locations along with
the over 10 years of experience our crew has doing this together makes us very efficient. We can
work through a fairly large list of trees because logistically we plan ahead, know all the fastest
routes,and have worked together so much doing this work it goes relatively fast. I might add, we
have been doing it for over 10 years without one single injury ever.
There have been big storms the night before events that have required us to be at the trail at 4
a.m. cutting trees off the trail. One benefit of our crew is that we're able to work any time of the
day,and any day of the week. Without that flexibility,the trail would have to be closed more often
and events would have had to been cancelled.
Routine maintenance
Hours: Approx 175(minimum)
About this work:
Trimming back brush,weed whipping trail edges, blowing leaves/debris off the trail, sand removal,
picking up trash; all of these tasks sound simple, but we've found ways of doing them all that save
us tons of labor. Some of our practices are counter-intuitive, but other trails now copy them. Every
new volunteer has to be trained on how we specifically want each task performed. Something as
simple as shoveling sand off the trail needs to be done a specific way. Shoveling down the trail,
instead of across,or digging into the trail surface below the sand build-up, using a spade instead of
a square shovel, piling the removed sand in the wrong spot,or failing to address the drainage issue
are all mistakes that turn a vital task into a worse problem. Whipping down the vegetation along
trail edges, if done incorrectly, can spur re-growth, or exacerbate erosion,or over-widen the trail.
Some weeds we want left as a"cover crop" because we've determined their height works well for
us.
These tasks may sound simple, but like everything at Hillside,there are specific ways things need
to be managed, to make them work for an mtb trail in the most efficient way possible.
Grooming the trail for winter use
Hours: Approx 60
About this work:
Machine grooming takes place at night, so that the trail has some time to settle and hopefully pack
a bit before people begin trying to use it. If this is done during daylight hours people immediately
start riding/walking on it and win the entire groom and it has to be redone. This is also a job that
requires experience. Steady controlled speeds need to be maintained so the tracks are not digging
up the trail rather than packing it, and you have to know where there are roots, rocks, logs etc
under the snow that may damage a track. The sleds have to be finessed over these obstacles so
that they are not damaged. There are also certain spots the sleds have to be lifted over things or
around tight turns. This has to be done in teams of 2 people with in-depth knowledge of the trail
who are very experienced in driving snomobiles. This is a skilled job, not just a matter of going for a
"fun ride"through the woods.
Sometimes the trail requires packing by snowshoes in advance of the sleds in deep snow. This
requires either a team of 2, or 1 person going over the same trail twice alternating footprints.
Needless to say this is very time consuming and tiring. Features such as skinnies require
shoveling off by hand. Like most jobs at Hillside, knowing all the shortcuts through the woods
makes everything go faster.
Our crew pioneered preparing the trail for winter riding years before it became popular. We held
the first winter mountain bike race in the state 10 years ago! We have had trails as far away as
Alaska contact us for advice about how best to groom trails for winter riding.
Other projects and tasks
Dual slalom
More improvements were made to this ongoing major project this year and the first race was held
in June,which people drove all the way from Duluth to attend, on a Wed night. It is the only dual
slalom mtb course in the state currently and we are very fortunate to have expert riders on our
crew qualified to build this.
Held 6 races including a state series race and a 25 hour race
Others included a time trial, short track,the afore mentioned dual slalom and the historic winter
race we pioneered 10 years ago that continues to be a favorite with racers from all over the region.
Each of these races requires many hours of preparation on the organizational level
(communication with sponsors, securing prizes, promotion, planning the course, organizing
volunteers&vendors, etc)and physical on the ground work—marking the course properly, setting
up the registration and timing areas, dealing with parking, emceeing,etc. The winter race requires
huge amounts of firewood be collected from all over the park, split and stacked for multiple
bonfires. Our crew made a fire ring as well as several fire barrels and donated them to the park.
Holding events like this can only be done successfully with very experienced race directors running
the show in cooperation with a very dedicated trail crew. The races are one of the park's most
powerful promotional tools. People come from all over the state to race at Hillside, and they buy
gas and eat and shop in Elk River when they do. It has been said Hillside wins"mean more".
I should add that our sponsors support racing at Hillside specifically because of DirtWirx's, and our
race director Rich Omdahl's reputation and credibility in the mtb community and they have made
this very clear to us.
Researching dirt
You read that right. Dirt, is apparently, not just dirt, but comes in many forms and configurations.
This year,the type we've been getting from Plaistad's for the last 10 years ran out and had to be
replaced with something new. A lot of time was spent meeting with Plaistad's trying to find the right
formula for Hillside. This involved several trips to their plant to inspect dirt piles in person to ensure
the city did not waste money on dirt that would not be suitable for our uses. It was much more
complicated than we imagined but we have it nearly dialed in now.
Tool modification
One of the tools we use most is called a McLeod. It's a tool for packing dirt. The large nut on the
bottom has always been problematic, so this year I finally just took them all home and removed the
nut and welded the bottom plates to the handles and repainted them. No charge.
Educational efforts
This is one of the most important tasks we have in terms of protecting the trail and enhancing
users experiences at the trail. Each year we put a lot of thought into how we can improve our
signage and hand-outs educating users on trail conditions&rules, as well as proper trail etiquette
&safe trail use guidelines. A lot of our communications are being adopted by other trails. We
already have ideas for how to improve this even more in 2016.
Online communications
DirtWirx enjoys a large, loyal online following and our trail users depend on us to provide up to date
and accurate information on all things Hillside related. Many of our volunteers are recruited from
following our online posts. They go from fans,to helpers.
Neighborhood outreach
Early this year a resident suggested we do a better job letting our park neighbors know what is
going on at the trail, so to that end we went door to door to every single residence bordering the
park and distributed a hand-out explaining who we are and what work we do at the park, along with
contact info encouraging them to contact us with any concerns or questions. We want them to
care about the park and be involved. People really liked this. It led to a couple of follow-up visits at
the request of residents asking questions about things near their property, and we even got a new
volunteer out of the deal. We will probably be creating an email list or facebook group for these
folks in 2016 so they can be kept in the loop.
Procurement of donated items
Every year supporters come along who want to donate materials to the park. This is not incredibly
time consuming, but it is another task; to coordinate with these folks and physically receive the
items. This year I also went to Cretex a couple of times scavenging concrete chips to be used in
place of flagstone(which we ran out of). Wrestling chucks of cement into a pickup and delivering
them to the park was heavy, hot work for one 51 year old woman, so I am making note of it.
Luckily for us—last week a Hillside fan &friend of Dave Anderson came through with 2 dump truck
loads(!)of sandstone! (This is stuff that would not happen without the networking our crew&the
parks commission has done over years and years to form these connections.)
Ecogrid
This is one of those oddball benefits of a dedicated crew invested in making the trail the best it can
possibly be—constant experimentation. Ecogrid is a soil retention system you implant in the
ground. I became curious about it as a possible solution for chronic erosion spots at the trail so
found a manufacturer willing to supply a substantial amount for free as a sample. I got them to
ship it for free too,as long as we could go to Woodbury to pick it up. We did; on our own dime. It
is not cheap so requires a minimum 2 year testing time-line to see if it's worth ordering (in our
opinion). (We hate seeing money wasted). We're only 1 year in.
Police reports
Unfortunately several of these had to be filed for vandalism and people trespassing in the closed
park last spring. Twice I came to the park late at night to let cops in the gate so they could kick
kids out of the back lot,just to make it easier for the police, not because I had to or was even
asked to. Sometimes the police are very nice to deal with and other times they make it very clear
they think we are being a pain in the butt. Twice they've acted a bit like jerks really. It is not a part
of the job I enjoy doing. I certainly have other things to do with my time too.
Other stuff
A lot of time and energy is spent on intangible stuff like:
-Double checking easement info for possible tree removals
-Prioritizing possible park improvements
-Going to meetings
-Learning about"way-finding"
-Figuring out how to get our shed back in use after being shut down by the fire marshal
-Trying to deal with a building inspector who wants us shut down
-Meeting with trail users who have ideas(not just Bob Meuller—this has happened 3 times this
year)
-Fielding emailed questions/inquiries
-Cleaning a porto potty and trying to make it more nice and functional for users
This all goes with the territory of being a Trail Steward I suppose, at least at Hillside. It is probably
a bit more involved than many realize and takes a good deal of time, physical work, and energy.