Loading...
6.0. EDSR 02-14-2000 • Elk River Economic Development Authority Tax Increment Financing Policy & Application Adopted: August, 1991 Revised: January, 2000 • Table of Contents • I. Policy Purpose 3 II. Objectives of Tax Increment Financing 3 III. City of Elk River Policies for the Use of TIF 4 IV. Qualifications 5 General 5 Economic Development Districts 5 Redevelopment Districts 6 Additional Districts 6 V. Subsidy Agreement & Reporting Requirements 6 VI. Application Process 7 VII. Application 8 Applicant Information 8 Project Information 9 Public Purpose 9 Sources & Uses 10 Checklist & Additional Information 11 • VIII. Application Review Worksheet 12 Economic Development District 12 Redevelopment District 14 IX. Exhibits 16 A Corporation/Partnership Description 16 B Project Description 17 C Shareholders 18 D But-for Analysis 19 E Prospective Lessees 20 • 2 II. POLICY PURPOSE For the purposes of this document, the term "City"shall include the Elk River City Council, Economic Development Authority, and Housing and Redevelopment Authority. . The purpose of this policy is to establish the City of Elk River's position relating to the use of Tax Increment Financing (TIF) for private development above and beyond the requirements and limitations set forth by State Law. This policy shall be used as a guide in the processing and review of applications requesting tax increment assistance. The fundamental purpose of tax increment financing in Elk River is to encourage desirable development or redevelopment that would not otherwise occur but for the assistance provided through TIF. The City of Elk River is granted the power to utilize TIF by the Minnesota Tax Increment Financing Act, as amended. It is the intent of the City to provide the minimum amount of TIF at the shortest term required for the project to proceed. The City reserves the right to approve or reject projects on a case by case basis, taking into consideration established policies, project criteria, and demand on city services in relation to the potential benefits from the project. III. OBJECTIVES OF TAX INCREMENT FINANCING As a matter of adopted policy, the City will consider using TIF to assist private development projects to achieve one or more of the following purposes: • • To retain local jobs and/or increase the number and diversity of jobs that offer stable employment and/or attractive wages and benefits. • To encourage additional unsubsidized private development in the area, either directly or indirectly through "spin off' development. • To facilitate the development process and to achieve development on sites which would not be developed without TIF assistance. • To remove blight and/or encourage redevelopment of commercial and industrial areas in the city that result in high quality redevelopment and private reinvestment. • To offset increased costs of redevelopment (i.e. contaminated site clean up) over and above the costs normally incurred in development. • To create opportunities for affordable housing. • To contribute to the implementation of other public policies, as • adopted by the city from time to time, such as the promotion of quality urban or architectural design, energy conservation, and decreasing capital and/or operating costs of local government. 3 IV. POLICIES FOR THE USE OF TIF a. When possible, TIF shall be used to finance public • improvements associated with the project. The priority for the use of TIF funds is: 1. Public improvements, legal, administrative, and engineering costs. 2. Site preparation, site improvement, land purchase, and demolition. 3. Capitalized interest, bonding costs. b. TIF assistance will be provided to the developer upon receipt of the increment by the City, otherwise referred to as the pay-as- you-go method. Requests for up front financing will be considered on a case by case basis. c. A maximum of ten percent (10%) of any tax increment received from the district shall be retained by the City to reimburse administrative costs. d. Any developer receiving TIF assistance shall provide a minimum of twenty percent (20%) cash equity investment in the project. • e. TIF will not be used in circumstances where land and/or property price is in excess of fair market value. f. Developer shall be able to demonstrate a market demand for a proposed project. TIF shall not be used to support purely speculative projects. g. TIF will not be utilized in cases where it would create an unfair and significant competitive financial advantage over other projects in the area. h. TIF shall not be used for projects that would place extraordinary demands on city services or for projects that would generate significant environmental concerns. i. The developer must provide adequate financial guarantees to ensure completion of the project, including, but not limited to: assessment agreements, letters of credit, personal guaranties, etcetera. j. The developer shall adequately demonstrate, to the City's sole • satisfaction, an ability to complete the proposed project based on past development experience, general reputation, and credit 4 history, among other factors, including the size and scope of the proposed project. • k. For the purposes of underwriting the proposal, the developer shall provide any requested market, financial, environmental, or other data requested by the City or its consultants. V. PROJECT QUALIFICATIONS A. General Qualifications All TIF projects considered by the City of Elk River must meet each of the following requirements: a. To be eligible for TIF, a project shall result in: i. The new construction of a minimum of 25,000 square feet. ii. A minimum increase of$25,000 per year in property taxes. iii. Have a market value of at least $1,000,000 upon completion. b. The project shall meet at least two of the objectives set forth in section II of this document. c. The developer shall demonstrate that the project is not financially feasible but-for the use of TIF. d. The project must be consistent with the City's Comprehensive Plan, Land Use Plan, and Zoning Ordinance. e. The project shall serve at least one of the following public purposes: • Job creation • Industrial development that will spawn additional private investment in the area. • Fulfillment of the City's Strategic Plan for Economic Development. • Removal of blight or the rehabilitation of a high profile or priority site. • 5 B. District Qualifications The application for Tax Increment Financing will be considered based on the following criteria for each district. • Economic Development Districts The purpose of an Economic Development District is to preserve and enhance job opportunities and the tax base through the retention, expansion, or creation of industrial enterprises. In addition to the requirements and criteria set forth by the State of Minnesota, the City of Elk River will consider tax increment financing applications for the creation of economic development districts based on the following: • All applicants shall meet the criteria established in Section IV, Subdivision A of this document. • The project should result in the creation of 1 job per $20,000 of TIF with attractive wages and benefits. Redevelopment Districts The purpose of a redevelopment district is to remove blighted buildings or improve marginal land to encourage redevelopment. In addition to the requirements and criteria set forth by the State of Minnesota, the City of Elk River will consider tax increment financing applications for the creation of redevelopment districts based on the following: • All applicants shall meet the criteria established in Section IV, Subdivision A of this document. • • At a minimum, the market value of a redeveloped site shall increase by a ratio of 1:1.5. • The project shall result in an increased tax base and, subsequently, the creation of jobs with attractive wages and benefits. • The project shall remove blight and promote the highest and best use of underutilized property. Other Districts The City of Elk River will consider the establishment of other TIF districts not identified above on a case-by-case basis. VI. SUBSIDY AGREEMENT & REPORTING REQUIRMENTS All developers/businesses receiving Tax Increment Financing assistance from the City of Elk River shall be subject to the provisions and requirements set forth by state statute 116J.993 and summarized below. All developers/businesses receiving TIF assistance shall enter into a subsidy agreement with the City of Elk River that identifies: the reason for the subsidy, the public purpose served by the subsidy, and the goals • for the subsidy, as well as other criteria set forth by statute 116J.993. 6 The developer/business shall file a report annually for two years after the date the benefit is received or until all goals set forth in the application and performance agreement have been meet, which ever • is latter. Reports shall be completed using the format drafted by the State of Minnesota and shall be filed with the City of Elk River no later than March 1 of each year for the previous calendar year. Businesses fulfilling job creation requirements must file a report to that effect with the city no within 30 days of meeting the requirements. The developer/business owner shall maintain and operate its facility at the site where TIF assistance is used for a period of five years after the benefit is received. In addition to attaining or exceeding the jobs and wages goals set forth in the Subsidy Agreement, the borrower shall achieve at least two of the objectives set forth in Section II of this document. Developers /Businesses failing to comply with the above provisions will be subject to fines, repayment requirements, and be deemed ineligible by the State to receive any loans or grants from public entities for a period of five years. VII. APPLICATION PROCESS • 1. Applicant submits the completed application along with all application fees. 2. City staff reviews the application and completes the Application Review Worksheet. 3. Results of the Worksheet are submitted to the appropriate governing authorities for preliminary approval of the proposal. 4. If preliminary approval is granted, the Tax Increment Financing Plan, along with all necessary notices, resolutions and certificates are prepared by City staff and/or consultants. 5. Notices are published and sent to the county and school board. 6. Public hearing(s) on the proposed project are held. 7. The City grants final approval of the proposal. • 7 VII. APPLICATION FOR TAX INCREMENT FINANCING A. APPLICANT INFORMATION Name of Corporation/Partnership Address Primary Contact Address Phone Fax Email On a separate sheet, please provide the following: • Brief description of the corporation/partnership's business, including history, principal product or service, etc... Attach as Exhibit A . • Brief description of the proposed project. Attach as Exhibit B. • List names of officers and shareholders/partners with more than • five percent (5%) interest in the corporation/partnership. Attach as Exhibit C. • A but-for analysis. Attach as Exhibit D. Attorney Name Address Phone Fax Email Accountant Name Address Phone Fax Email Contractor Name Address Phone Fax Email Engineer Name Address Phone Fax Email • Architect Name Address Phone Fax Email 8 B. PROJECT INFORMATION The project will be: Industrial Greenfield: New Construction Expansion • Commercial Redevelopment: New Construction Expansion Industrial Redevelopment: New Construction Rehabilitation Other The project will be: _Owner Occupied Leased Space If leased space, please attach a list names and addresses of future lessees and indicate the status of commitments or lease agreements.Attach as Exhibit E. Project Address Legal Description Site Plan Attached: Yes No Amount of Tax Increment Requested: Land $ Public Improvement $ Site Improvement $ Current Real Estate Taxes on Project Site: $ • Estimated Real Estate Taxes upon Completion: Phase I $ Phase II $ Construction Start Date: Construction Completion Date: If Phased Project: Year % Completed Year % Completed C. PUBLIC PURPOSE It is the policy of the City of Elk River that the use of Tax Increment Financing should result in a benefit to the public. Please indicate how this project will serve a public purpose. _Job Creation: Number of existing jobs Number of jobs created by project Average hourly wage of jobs created New industrial development which will result in additional private investment in the area. The project contributes to the fulfillment of the City's Strategic Plan for Economic Development. Removal of blight. Rehabilitation of a high profile or priority site. • _Other: 9 D. SOURCES & USES • SOURCES NAME AMOUNT Bank Loan $ Other Private Funds $ Equity $ Fed Grant/Loan $ State Grant/Loan $ EDA Micro Loan $ Tax Increment $ ID Bonds $ TOTAL $ USES AMOUNT Land Acquisition $ Site Development $ Construction $ Machinery & Equipment $ Architectural & Engineering Fees $ Legal Fees $ Interest During Construction $ Debt Service Reserve $ Contingencies $ • TOTAL $ • 10 E. ADDITIONAL DOCUMENTATION Applicants will also be required to provide the following documentation. • A) Written business plan, including a description of the business, ownership/management, date established, products and services, and future plans B) Financial Statements for Past Two Years Profit & Loss Statement Balance Sheet C) Current Financial Statements Profit & Loss Statement to Date Balance Sheet to Date D) Two Year Financial Projections F) Personal Financial Statements of all Major Shareholders Profit & Loss Current Tax Return G) Letter of Commitment from Applicant Pledging to Complete During the Proposed Project Duration 1111 H) Letter of Commitment from the Other Sources of Financing, Stating Terms and Conditions of their Participation in Project I) Application fee of$5000 (to be returned upon project completion.) Note: All Major shareholders will be required to sign personal guarantees if up front financing of the project is required. The undersigned certifies that all information provided in this application is true and correct to the best of the undersigned's knowledge. The undersigned authorizes the City of Elk River to check credit references and verify financial and other information. The undersigned also agrees to provide any additional information as may be requested by the City after the filing of this application. Applicant Name Date By • Its 11 TAX INCREMENT FINANCING PROPOSAL REVIEW WORKSHEET ECONOMIC DEVELOPMENT DISTRICT • The project meets the criteria set forth in Yes Section V of the Tax Increment Financing policy. No 1. Ratio of Private to Public Investment in Project: Points: $ Private investment 5:1 5 $ Public Investment 4:1 4 Ratio Private : Public Financing 3:1 3 2:1 2 Less than 2:1 1 2. Job Creation in the City of Elk River: Points: Number of new jobs as a result of the project. 50+ 5 Number of existing/retained jobs divided by 10. 30+ 4 Total 25+ 3 15+ 2 Less than 15 1 • 3. Ratio of TIF to new jobs created: Points: $ TIF request $15,000 or less 5 Number of new jobs created $20,000 or less 4 $ of TIF per new job created $22,000 or less 3 $25,000 or less 2 Over $25,000 1 4. Wage Level of jobs created: Points: Average hourly wage Over $21/hour 5 of jobs created: $18 —21 /hour 4 $14-17/hour 3 $10-13 /hour 2 Under $10 /hour 1 5. Project size: Points: The project will result in the construction Over 120,000 5 of square feet 100,000+ 4 80,000+ 3 60,000+ 2 III 50,000+ 1 12 6. Type of Project: Points: 100% Owner Occupied 5 . Mix Owner Occupied & Investment 4 Investment Property 3 8. Use: Points: Manufacturing 5 Warehouse/Distribution 3 Commercial 1 7. The project will pay annual Points: property taxes in the first fully 150,000+ 5 assessed year of$ 100,000+ 4 75,000+ 3 50,000+ 2 25,000+ 1 Below 25,000 0 8. Likelihood that the project will result in Points: unsubsidized, spin-off development. High 5 • Moderate 3 Low 1 Sub - Total Points: of a possible 45 points. 9. Bonus Points Bonus Points: The project will be 100%Pay-as-you-go TIF. 3 points The project contributes to the goals of Energy City. 2 points • Product promotes sensible use of energy, OR • Project utilizes significant energy efficient design &/or materials in construction. Total Points: Overall project analysis: High 45-39 points Moderate 38-31 points Low 30-24 points Not Eligible 23-0 points • 13 • TAX INCREMENT FINANCING PROPOSAL REVIEW WORKSHEET REDEVELOPMENT DISTRICT The project meets the criteria set forth in Yes Section V of the Tax Increment Financing policy. No 1. Ratio of Private to Public Investment in Project: Points: $ Private investment 4:1 5 $ Public Investment 3:1 4 Ratio of Private to Public Financing 2:1 3 1:1 2 Less than 1:1 1 2. Increase in Real Estate Value: Points: $ Value of Site before redevelopment 1:5+ 5 $ Value of site after redevelopment 1:4 4 $ Ratio of value before:after redevelopment 1:3 3 1:2 2 Less than 1:2 1 • 3. New Job Creation in the City of Elk River: Points: Number of new jobs as a result of the project. 50+ 5 Number of existing/retained jobs divided by 10. 30+ 4 Total 25+ 3 15+ 2 Less than 15 1 4. Ratio of TIF to new jobs created: Points: $ TIF request $15,000 or less 5 Number of new jobs created $20,000 or less 4 $ of TIF per new job created $22,000 or less 3 $25,000 or less 2 Over $25,000 1 5. Wage Level of jobs created: Points: Average hourly wage Over $21/hour 5 of jobs created: $18 —21 /hour 4 $14-17 /hour 3 $10-13 /hour 2 Under $10 /hour 1 • 14 6. Project size: Points: The project will result in the construction Over 120,000 5 of square feet 100,000+ 4 • 80,000+ 3 60,000+ 2 50,000+ 1 7. Type of Project: Points: 100% Owner Occupied 5 Mix Owner Occupied & Investment 4 Investment Property 3 8. Use: Points: Industrial 5 Warehouse/Distribution 4 Commercial 3 Housing 1 9. The project will pay annual Points: property taxes in the first fully assessed 150,000+ 5 year of$ 100,000+ 4 75,000+ 3 50,000+ 2 25,000+ 1 • Below 25,000 0 10. Likelihood that the project will result in Points: unsubsidized, spin-off development. High 5 Moderate 3 Low 1 Sub - Total Points: of a possible 50 points. 11. Bonus Points Bonus Points: The project will be 100%pay-as-you-go TIF. 3 points The project contributes to the goals of Energy City. 2 points • Product promotes sensible use of energy, OR • Project utilizes significant energy efficient design&/or materials in construction. Total Points: Overall project analysis: High 50-43 points Moderate 42-34 points 411 Low 33-26 points Not Eligible 25-0 points 15