Loading...
EDSR INFORMATION #3 05-08-2000 Marc Nevinski 0rom: Marc Nevinski [mnevinski@ci.elk-river.mn.us] ent: Thursday, April 27, 2000 3:47 PM o: 'Mark Jenson'; Harlan Jacobs (E-mail) / Subject: RE: [Fwd: Elk River Incubator Facilities] (4 Harlan and Mark, I have checked with our building inspectors regarding the septic system ii at the incubator and their response is that the system is already overloaded. Apparently the drainfields were designed only to accomodate the restroom facilities and only as a temporary fix. Subsequnetly,the septic system would be ruined almost instantly by 300 gallons per day. Sewer and water is not far from the incubator. It extends along highway 10 as far east as 171st Ave (i.e. Stoplight by Bridgemans) . I am looking into what plans are in place for extending it further east down hwy 10. The planning dept. tells me that any extentions will likely be developer driven and a meaningful time frame for that is unknown. I will pass this information on the Larry Hickman and the EDA. Sincerely Marc Original Message From: Mark Jenson [mailto:mljenson@ecenet.com] Sent: Thursday, April 27, 2000 1:48 PM To: Marc Nevinski •ubiect: [Fwd: Elk River Incubator Facilities] Hi Marc, Here is a copy of a letter I sent to Harlan Jacobs detailing the changes needed for the Elk River facility. It includes the estimated water consumption both immediate and further out. Mark 41111