Loading...
8.1. EDSR 12-11-2000 ELK RIVER ECONOMIC DEVELOPMENT AUTHORITY MEMORANDUM TO: Economic Development Authority FROM: Catherine Mehelich, Director of Economic Development DATE: December 11, 2000 SUBJECT: Snowmobile Trail Request - Update The EDA Board at the last meeting took action to approve a snowmobile trail permit on the EDA (Brown)property in the East Business Park. One of the conditions of approval was final approval by the City Engineer for snowmobile access across Tyler Street. Attached is a memo from Engineer, Terry Maurer that concludes that the snowmobile access across Tyler Street is not possible from either the northeast or southeast corner of the 'lir EDA property. As a result, the snowmobile trail permit for the EDA property will be limited to an area 300'along the west property line. Access to enter and exit the property will be limited to the northwest and southwest corner. The Snow Riders Club will be encouraged to obtain trail permits from the adjacent landowners. Attachment • Memo from Terry Maurer, P.E., Howard Green Company 13065 Orono Parkway • P. O. Box 490 • Elk River, MN 55330-1743 •x(612) 441-7420 • Fax (612) 441-7425 Equal Opportunity Housing and Equal Opportunity Employment Item 8.1. PP l Howard R. Green Company CONSULTING ENGINEERS December 7, 2000 File: 230000M-0325 Ms. Cathy Mehelich Director of Economic Development City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: SNOWMOBILE TRAILS ON THE EDA SITE Dear Ms. Mehelich: As you requested, we have reviewed the issue before the EDA of granting snowmobile trails along their north and south property lines on the property they own in Eastern Elk River. As we have discussed previously, at both the north and south property lines of the EDA site where that property meets Tyler Street, there is no crossing available for • snowmobiles. There is a barrier curb on the outside and a 20-foot wide median surrounded by 6-inch high raised concrete curb and gutter. Also, at the north property line, the crossing of Tyler Street would be right near a curve in the road with not the best sight distance. The other issue we have talked about is at the south property line the opportunity to go west has now been removed. Previously, the south property line was the alignment of 173rd Avenue, which included a crossing of the railroad tracks. As part of the East Elk River improvement project, 173rd Avenue has been removed along with the railroad crossing. A new crossing was constructed at 171st Avenue where Tyler Street meets the railroad. We understand it would be possible for one year for snowmobilers to continue along the railroad tracks across the old 173rd road to the Eull property, then continue down to 171st where there is a railroad crossing available. In conclusion, we have given this issue considerable thought and have not come up with a way for snowmobiles to leave the EDA site at either the north or south property lines and get to the east side of Tyler Street where the bituminous trail is located. If you have any questions or would like additional work done on this item, please call. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. • TJM:tw C:\windows\TEMP\Ltr 12-07-00 Mehelich.doc 1326 Energy Park Drive • St. Paul, MN 55108 • 651/644-4389 fax 651/644-9446 toll free 888/368-4389