EDSR MEMORANDUM 01-21-1997 ELK`RIVER ECONOMIC DEVELOPMENT AUTHORITY
•
MEMORANDUM
TO: Economic Development Authority
OM: Paul T. Steinman, Director of Economic
p.,ER
Development
DATE: January 13, 1997
SUBJECT: Strategic Planning
I. PURPOSE OF MEMO
The purpose of this memo is to outline the discussion items for the
EDA special meeting on Monday, January 21, 1997.
II) II. OVERVIEW
In December, 1996, the Strategic.Planning Task Force requested that
the EDA undertake the task of outlining an action plan and
recommending such action plan to the Strategic Planning Task Force.
At its last special meeting, the EDA undertook a discussion of eight
alternate areas which could be appropriate for business and industrial
park development. Regarding each of these eight areas, the EDA felt
it was appropriate for staff to identify criteria indicating the
advantages and disadvantages as business park or industrial sites.
Additionally, staff indicated that it would have available at the next
EDA special meeting, a concept of an industrial base action plan for
review by the EDA.
III. PRIMARY ISSUES TO CONSIDER
• What are the criteria for each of the areas identified by
staff?
•
13065 Orono Parkway • P. O. Box 490 • Elk River, MN 55330-1743• (612) 441-7420 • Fax (612) 441-7425
Equal Opportunity Housing and Equal Opportunity Employment
Strategic Planning
January 13, 1997
Page 2
41) Area 1 -Proposed Business Park Zoning, 65 Acres
0 Bordered by business park property on the north and residential
properties on the south,east, and west side.
0 Contiguous to 70 acre BP on north.
0 Meets topographical constraints for development, i.e. flat, no
wetlands, etc.
0 Appropriate buffer by berming and landscaping may be provided
on south and east sides of property.
0 Waco Street and County Road 30 provide a physical separation
to residential areas.
0 Transportation challenges regarding businesses accessing the
Minneapolis/St. Paul metro area.
0 May not be convenient for distribution type of business.
0 Single owner.
0 Previous concern of property owner regarding how BP fits with
surrounding area.
0 Planned signalized intersection at Waco Street and Highway 10.
0 Good access to St. Cloud and west markets.
0 Sewer and water may be extended to serve area.
Area 2-Proposed Business Park (BP) Zoning. 17 Acres
0 High visibility site.
0 Immediate access to Highway 169.
0 Planned signalized intersection at 197th.
O Surrounded on north, west, and south sides by residential uses
and religious facility.
0 Adjacent neighborhood was previously concerned with proposed
commercial development in Area 2.
0 Vacant, no environmental constraints, fairly easy to develop.
0 City services to be extended from 193rd along Holt Street.
0 Single owner.
Area 3-Proposed II Zoning, 33 Acres
0 Good access,transportation.
0 Property owner issues relative to rezoning.
0 Multiple property owners.
0 Existing residential homes (approx. 3)
0 South half wooded - sensitivity to natural environment.
0Adjacent to current Il area (Industrial Hardfacing).
400 Physical separation on west by County Road 12.
Strategic Planning
January 13, 1997
Page 3
0 East separation by large wetland and proposed road.
• 0 Utility timing is dependent upon Council desire to extend
utilities east and commercial and residential development
pressure.
0 Land Use Plan currently identifies area as Light Industrial.
Area 4-Proposed IIZoning, 8 Acres
0 Transportation/access challenges.
0 Wetlands/ditch along west side of property.
0 Primarily vacant with an office in the northwest corner.
0 Long and skinny site.
0 No room for frontage road.
0 Possible Highway 169 access (right in/right out).
0 Access off of Main Street.
0 Utilities are available.
0 Single family to west.
0 Two property owners.
0 Adjacent on south to treatment facility and UPA
0 May require soil corrections.
111 Area 5-Proposed I11BP Zoning, 24 Acres
0 Parcel is part of proposed commercial development of Earl
Hohlen property.
0 Good access potential and visibility.
0 Single property owner.
0 Development challenges,i.e., wetlands, power lines, possible soil
corrections.
0 Utilities not presently available.
Area 6 & 7-Proposed II Zoning, 102 Acres
0 Multiple property owners.
0 Two residential homes.
0 Possible rail access.
0 Areas to be rezoned dependent upon road alignment and natural
features of site, i.e., wetlands, trees, etc.
0 Developmental constraints,i.e., UPA lines, wetlands, natural
gas, and possible soil conditions.
0 Transportation is good if corridor concept is constructed as
shown.
•
Strategic Planning
January 13, 1997
Page 4
• Area 8-Proposed BP Zoning, 190 Acres
0 Good visibility and access.
0 Signal planned at 165th and Highway 10.
0 One residential home/business.
0 Adjacent to BP on northeast.
0 Adjacent to river on southwest, river side may be more
appropriate for housing.
0 Currentlywithin Wild and Scenic River District, boundary of
Y
which is currently being for modification.
n.reviewed
0 Single owner.
0 Timing of utilities to site will drive development (5-10 years?)
0 Definitely a "future" business park area.
0 Appropriate land use mix, frontage road issues, etc. should be
considered.
• What would be a sample action plan based upon the concept
of developing the existing BP/I1 areas, in addition to the
eight alternate areas identified by staff?
Staff will hand out at the meeting a sample action plan which,
based upon a phasing approach, will identify a time period for
• rezoning each of the eight alternate areas. In addition, the action
plan provides detail regarding development and marketing of the
existing appropriately zoned areas in addition to the eight
alternates.
The action plan will be in concept form only and is intended to
provide a basis for EDA discussion regarding action steps, timing
issues, and identification of people/groups responsible for
completing each action item. This action plan, once modified by the
EDA, will be presented to the Strategic Planning Task Force for its
review and modification, if necessary, prior to being included as
part of the strategic plan which will ultimately be presented to the
City Council.
• What are overall percentages of 11/I2/BP zoned area in Elk
River?
1.) Total Urban Service Area = 8,324 ac.
I1 = 700 ac. or 8.4%
I2 = 132 ac. or 1.6%
BP = 233 ac. or 2.8%
• 8 Alternate Areas = 440 ac. or 5.3%
Strategic Planning
January 13, 1997
Page 5
• 2.) Total City Area = 28,052 ac.
I1 = 850 ac. or 3.03%
I2 = 616 ac. or 2.20%
BP = 440 ac. or 1,57%
3.) Other Communities:
Fridley = 22.1% industrial
Eden Prairie = 6.0% industrial
Brooklyn Park = 7.0% industrial
Bloomington = 8.2%industrial
Golden Valley = 7.7%industrial
Richfield = .6% industrial
Roseville = 8.7%industrial
St. Louis Park = 5.5%industrial
Metro Area = 12.6% industrial
IV. CONCLUSION
In conclusion, the EDA will likely complete its strategic planning
activities at this meeting. The EDA's alternate area analysis and
action plan will be presented to the Strategic Planning Task Force on
110 February 5, 1997. It is anticipated at that time the Strategic Planning
Task Force will also review recommendations on an action plan made
by the HRA regarding the number 4 priority issue Downtown
Redevelopment.
Upon completion by the Task Force, the strategic plan will be
presented for review and modification, if necessary, and acceptance by
the City Council. Staff will then begin to initiate implementation of
the action steps as identified within the plan.
EDA members are asked to bring with them to this meeting, the map
which was provided in the last packet identifying the eight alternate
areas.