6.4 PCSR 03-22-2016 of ..._, Request for Action
River
To Item Number
Planning Commission 6.4
Agenda Section Meeting Date Prepared by
Public Hearing March 22,2016 Kristin Mroz,Environmental Technician
Item Description Reviewed by
City of Elk River Elk River request for Solar Energy
Systems Ordinance Amendment, Case No. OA 16- Reviewed by
03
Action Requested
Recommend approval of Ordinance Amendment related to Solar Energy Systems.
Background/Discussion
Elk River and Energy City have always been a supporter of renewable energy technology. Recently,we
have seen an influx of interest in residential and commercial solar installations in the city due to financial
incentives and regulatory acceptance.
In order to maintain uniformity of solar installations throughout the community, city staff,along with Elk
River Municipal Utilities (ERMU),is proposing a Solar Energy Systems Ordinance,guiding standards of
installation appearance, fire safety concerns,permitting and notifications, and building code compliance.
City and ERMU staff will work on developing a permit that will require approvals from the Planning,
Environmental, and Building Departments,along with Elk River Municipal Utilities staff.
The draft ordinance,prepared by both city and ERMU staff,has been through Site Plan Review and all
major concerns at that time have since been addressed and updated into the attached draft.
Financial Impact
None
Attachments
• OA 16-03
IP-111E1E1 11
NATURE
Solar Energy Systems
Definitions
Building-Integrated Solar Energy System. A solar energy system that is directly incorporated into the building
by replacing typical building materials.
Community Solar. Any centrally-located solar photovoltaic (PV) systems that provide electricity to
participating subscribers residing or located off-site from the location of the solar energy system under
the provisions of Minnesota statutes 216B.1641 or successor statute.
Concentrated Solar System (CSS). A system using low to high-tempe .ture collectors (mirrors,lenses or other
reflective surfaces) for the use of heating water or air. �:'
Ground-Mounted Solar Energy System. A solar energy system stalled onto the ground directly or by
means of brackets or poles.
Photovoltaic System (PV). An active solar energy sy at converts energy directly into electricity.
Roof means the cover of any building,includin. . r eaves and similar pro t •ns.
Roof,Flat means a roof having a slope of less than t of n every 12 s,•f run.
Roof-Mounted Solar Energy System. A -nergy system : to the roof of a s• cture.
Roof, Pitched means a roof having a slo • of rise fo = . 12 units of run or greater.
Solar Air Heat. See Solar Hot Air System
Solar Energy System inclu• on � r • Sys 'ems,whose primary purpose is to
provide for the co i:n,stora : •g . distrib olar ene or space heating or cooling,
�
electricity generation • :ter hea.,r -'
Solar Fu •lar Ho'
Solar .A comm � acilt ;;% converts ht into electricity,whether by photovoltaic (PV),
conce ' . g solar the K vice` , or other conversion technology, for the principal purpose of
wholesa E s of generate.-°F ?=rgy.
Solar Hot Air '. An active r energy system that includes a solar collector to provide direct
supplemental sp. ating by • g and re-circulating conditioned building air.
Solar Hot Water. See '" .1 System
Solar Storage Unit. A comp• t of a solar energy device that is used to store solar generated
electricity or heat for later use.
Solar Thermal System.A system that includes a solar collector and a heat exchanger that heats or
preheats either a liquid or gas for building heating systems or other hot water needs of the
building.
Permitted accessory use. Solar energy systems are allowable as an accessory use in all zoning districts, subject
to the following requirements:
a) Standards
1. Height.
a. All solar energy systems shall comply with the maximum height requirements in the
application zoning district.
b. On pitched roofs,no portion of a flush mounted or bracket mounted panel in any
position, shall not exceed more than 6 inches from the roof peak of the roof plane they
are attached to.
c. On flat roofs,no portion of a flush mounted or bracket mounted panel in any position,
shall exceed a height of five (5) feet above the flat roof they are attached to.
d. Ground-mounted solar energy systems shall not e -d the maximum accessory structure
height in any zoning district when oriented at •; m tilt.
2. Setbacks.
a. Roof-mounted solar energysgstems
1. Shall comply with all buil c ; etbacks in �1 .plicable zoning district and shall
not extend beyond th or perimeter o .wilding on which the system is
mounted.
2. Exterior piping for sofa : water sy ms shall be ed to extend beyond
the perimeter of the hulls • � an two (2) fe- side and rear yards
only.
Ground mounted solar ene-_ � � a
1. Shall be treate an . ory strut nd shall comply with all accessory
cture setbac ,,. the a. .le zo h strict.
extend • e s ear s.,•ack when oriented in any
osirio
or resits .1 system t., -ated within the urban service district, systems shall be
ted ear and s ardsonly.
3.
er ms shay s : Minn. Stats. §1305.3113.
r b. For all as o<rions service re, _ .R may be required.
4. Solar syste ,r all be ' ed and located in order to prevent reflective glare toward any
d buildings o 1•'acent . :„erties,as well as adjacent street right-of-way to the fullest
poss - tent. When •ssary,s r eening may be required to prevent glare.
a. rated Solar ;ms shall conduct a glare study to identify the impacts of the system on
d
occu d rights-of-way within a half-mile of the project boundary. The glare
.uil.• .�
study sh < . . . ess aviation impacts.
5. Exemption. Building Buildin4.0tegrated solar energy systems are exempt from the requirements of this
section and shall be regulated by the building code.
b)Permits and Notifications
1. Permits. The erection, alteration,improvement,reconstruction, and relocation of a solar energy
system require a building permit from the city.
a. Applications.An applicant for a solar system permit shall make application to the
Building Department. The application shall accurately state:
1. The name and contact information of the applicant.
2. The name and contact information of the installer.
3. The address of the project being applied for.
4. To-scale horizontal and vertical elevation drawings showing:
1. Location of the system on the building or on the property,
including property lines.
2. Any exterior devices (such as but not limited to inverters,
electrical boxes,batteries, etc.)
3. For roof-top solar:
a. All systems shall show the distance to the roof edges,
parapets,ridges,roof penetrations, or changes in roof
plane.
b. Pitched roof mounted systems shall show the highest
finished slope of - solar collector and the slope of
the finished r' face on which it is mounted.
b. Approval—Applications that meet the ements of this ordinance,and do
not require a variance, shall be granted a'x qk te 44.. approval by the Building
Official. Plan approval does not indi ci plianc a Building,Electric,or
Plumbing Code.
2. Utility Notification. The owner of a solar ener•, e 3 em that will physica I ect to a house or other
' d must a l for a ' :'*. agreement with the
building's electrical system and/or the electric .�_� gri pp y gr
municipal utility prior to the issuance of a building F �+ •t. -,
c) Compliance
1. Compliance with building codes. All solar s shall c. with the Minnesota Building
Code and any local building code req • nts.
a. Solar hot s shall co ' i�, 'th H elates s ' ements of the Energy
Code.
2. Compliance with elec All so ro ergy sys a .11 comp th the National Electrical Code.
a. Electric sola gy sys g compon j ust have a UL listing
b. S. s, •of water . ; " e an S rating
3. Compli�� � <' code.` ar they ste all comply with the Minnesota State Plumbing
p y g
co ..
d) Abandonmen
1. If the solar e system rem: `•,nonfun...nal or inoperative for more than twelve (12) consecutive
months, the s : x• shall cons e a public nuisance. The property owner shall obtain a demolition
permit and remo aband. system at their expense. Removal includes the entire structure,
including collector, t, . : ansmission equipment.
e) Conditional Uses
1.Any Community Solar or Solar Farm project shall require a Conditional Use Permit.
2.Any solar project exceeding 40 kW shall require a Conditional Use Permit.
3.Any solar project developed over public or semi-public existing infrastructure (i.e. trail,parking lot,
sidewalk,pavilion, etc.) shall require a Conditional Use Permit.