Loading...
7.1. SR 03-21-2016 Request for Action To Item Number Mayor and City Council 7.1 Agenda Section Meeting Date Prepared by Public HearingMarch 21, 2016Chris Leeseberg, Senior Planner Item Description Reviewed by Conditional Use Permit for Building Addition at Zack Carlton, Planning Manager 17219 U.S. Highway 10 Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, the Conditional Use Permit with the following conditions: 1.The Conditional Use Permit shall not be recorded until all applicable conditions have been substantially completed. 2.The authorized use shall not begin until the Conditional Use Permit is recorded. 3.If the authorized use ceases for more than six months, the Conditional Use Permit shall expire. 4.The Conditional Use Permit is not a building permit and the applicant must apply for and receive approval of required building and sign permits before construction may begin. 5.The building shall meet all building and fire codes. 6.The Fire Chief shall verify the location of all fire hydrants, and may require additional hydrants necessary to preserve the health and safety of the residents. 7.All comments in the Stormwater Coordinator Memo dated February 3, 2016, shall be addressed. 8.All sources of artificial lights shall be so fixed, directed, designed or sized that the minimum subtotal of their illumination will not increase the level of illumination on any nearby residential property by more than 0.1 footcandle in or within 25 feet of a dwelling or by more than 0.5 footcandle on any part of the property. 9.All comments in the Minnesota Department of Transpiration memo dated February 18, 2016, shall be addressed. Background/Discussion Case No. CU 16-04 The property is zoned C-3 Highway Commercial where car, truck, RV, and marine sales and services require a Conditional Use Permit (CUP). The applicant is seeking a CUP to construct multiple additions to their car dealership which will complete their final phase of the expansion project. The submitted plans have been modified from what was originally proposed in 2006 with the building footprint smaller. The proposal is to expand three separate areas of the existing building. In the northwest corner a new 8,162 square foot section for office and showroom, in the northeast corner a 4,280 square foot parts area and heavy truck service, and 12,126 square foot expansion of their service lane and new oil express in the southeast corner. The additions will be composed of two types of building materials, silver/gray architectural metal panels and precast concrete panels. Transportation/ Circulation Access and vehicular circulation around the site will not be changed. The area just north of the building, which is now gravel, will be paved and bound by concrete curb and gutter. Approximately 66 existing parking stalls will be displaced with the proposal but the 66 stalls will be relocated to the north side of the building and approximately another additional 50 stalls will be created. The parking area to the southeast of the existing building will be eliminated and modified with the proposed expansion. The proposed oil express/service lane will aid the traffic flow and provide plenty of stacking for customers waiting in line. Landscaping/Lighting The tree requirements were met with the 2006 CUP application. They are proposing to add an additional 14 trees. Four additional light poles will be erected in the parking area on the north side of the building. Planning Commission meeting summary No one spoke for or against the proposal and the Planning Commission felt the request was straight forward and consistent with what was initially proposed. They unanimously recommended approval of the request. Financial Impact None Attachments  Planning Commission Memo dated February 23, 2016 Request for Action To Item Number Planning Commission 16.1 Agenda Section Meeting Date Prepared by Public Hearin February 23, 2016 Chris Leeseber , Senior Planner Item Description Reviewed by Cornerstone Auto Elk River — 17219 U.S. Highway Zack Carlton, Planning Manager 10 Conditional Use Permit for building addition, Reviewed by Case No. CU 16-04 Action Requested Recommend, by motion, approval of the Conditional Use Permit (CUP) with the following conditions: 1. The Conditional Use Permit shall not be recorded until all applicable conditions have been substantially completed. 2. The authorized use shall not begin until the Conditional Use Permit is recorded. 3. If the authorized use ceases for more than six months, the Conditional Use Permit shall expire. 4. The Conditional Use Permit is not a building permit and the applicant must apply for and receive approval of required building and sign permits before construction may begin. 5. The building shall meet all building and fire codes. 6. The Fire Chief shall verify the location of all fire hydrants, and may require additional hydrants necessary to preserve the health and safety of the residents. 7. All comments in the Stormwater Coordinator Memo dated February 3, 2016 shall be addressed. 8. All sources of artificial lights shall be so fixed, directed, designed or sized that the minimum subtotal of their illumination will not increase the level of illumination on any nearby residential property by more than 0.1 footcandle in or within 25 feet of a dwelling or by more than 0.5 footcandle on any part of the property. 9. All comments in the Minnesota Department of Transpiration memo dated February 18, 2016 shall be addressed. Background/Discussion The property is zoned C-3 Highway Commercial where car, truck, RV, and marine sales and services require a Conditional Use Permit (CUP). The applicant is seeking a CUP to construct multiple additions to their car dealership which will complete their final phase of the expansion project. The submitted plans have been modified from what was originally proposed in 2006 with the building footprint smaller. Some of the areas that were identified as building in 2006 will now be parking. Analysis Building Expansion The proposal is to expand three separate areas of the existing building. In the northwest corner a new 8,162 square foot section for office and showroom, in the northeast corner a 4,280 square foot parts area and heavy truck service, and 12,126 square foot expansion of their service lane and new oil express in the southeast corner. P B N E R E® 1 1 NATURE The additions will be composed of two types of building materials, silver/gray architectural metal panels and precast concrete panels. Transportation/ Circulation Access and vehicular circulation around the site will not be changed. The area just north of the building, which is now gravel, will be paved and bound by concrete curb and gutter. Approximately 66 existing parking stalls will be displaced with the proposal but the 66 stalls will be relocated to the north side of the building and approximately another additional 50 stalls will be created. The parking area to the southeast of the existing building will be eliminated and modified with the proposed expansion. The proposed oil express/service lane will aid the traffic flow and provide plenty of stacking for customers waiting in line. Signage While no additional freestanding signage is being proposed, additional wall signs are included on all four elevations. In the C-3 zoning district, the total wall sign area shall not exceed 15 percent of facade area. Landscaping/Lighting The tree requirements were met with the 2006 CUP application. They are proposing to add an additional 14 trees. Four additional light poles will be erected in the parking area on the north side of the building. Applicable Regulation The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 1. Will not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral welfare of the neighborhood or the city. It will not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience or general welfare of the neighborhood or the city. 2. WIN be consistent with the comprehensive plan. It will be consistent with the comprehensive plan. 3. W1 ill not impede the normal and orderly development and improvement of surrounding vacant property. It will not impede the normal and orderly development and improvement of surrounding vacant property. 4. lYlill be served adequately by and will not adversely affect essential public facilities and services including streets, police and fare protection, drainage, refuse disposal, water and sewer ystems, parks and schools; and Y411 not, in particular, create trafc congestion or interference with trafc on adjacent and neighboring public thoroughfares. It will be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and schools; and will not, in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. 5. Will not involve uses, activities, processes, materials, equipment and conditions of operation that mill be detrimental to any persons or property because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. N:ADepartments\Community Development\Planning\Case Files\CUP\CU 16-04 Cornerstone Auto\CU 16-04 sr PC 2-23-16.docx 4 '"h"',�•'. `� 8 . it � � ... `' • $ k *�}SS' ..'ia� •� . ' " , •spam., , it r; �' _� � } i4 JTT"• � n 'r ti In It gig - k plum 941 It i;. r gin .40 is AV • ,.s w n r _ r �- , •` tw. qtr ,. - ♦- •"rt a�.x , -ter" 1 4k v tri .1eRRY �h• It will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons or property because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. 6. Weill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. It will not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. 7. Willfulycomply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license orpermit to establish and operate the proposed use in the city. It will fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. Staff's analysis of the application show compliance with all seven of the conditions required for approval of the CUP. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. Financial Impact None Attachments ■ Location Map ■ Applicants Narrative ■ Stormwater Coordinator memo dated February 3, 2016 ■ Minnesota Department of Transpiration memo dated February 18, 2016 ■ Site Plans ■ Architectural Plans/Elevations N:ADepartments\Community Development\ Planning\ Case biles\CUP\CU 16-04 Cornerstone Auto\CU 16-04 sr PC 2-23-I6.docx MEMORANDUM To: Mayor, City Council and Planning Commissioners From: Stephen Rohlf, Cornerstone Auto Resource Date: January 25, 2016 Subject: Conditional Use Permit Request — Cornerstone Ford/Chrysler ■•rrrrr urrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr� Re nest Cornerstone Auto of Elk River is requesting a conditional use permit to expand our Elk River Ford/Chrysler facility f 17219 Highway 10 Elk River - 75-821-O105�. In 2005/2006 we received approval of a conditional use permit to expand our campus in phases. The first phase was our parking lot and associated lighting, landscaping and drainage for our site. Our car wash was the second phase. This current building expansion is the final phase. We are required to go through the CUP process again because this final phase has been modified from what was originally proposed. Our proposed expansion is smaller than what was approved in 2006. The difference between the two is some of what was building is now parking lot. Building Foot Print We will be expanding three separate areas of our building: In the northwest corner we are proposing a new 8,136 square feet section of office/showroom (4,799 square feet of showroom and 3,337 square feet of office). The new showroom will be for Chrysler and the exiting showroom will be expanded and used for Ford. In the Northeast corner of our building we are proposing 4,281 square feet of parts area and heavy truck service (1,705 square feet of parts and 2,576 square feet of service). The service expansion includes a new larger locker room so additional service technicians may be hired. The last area is an 11,444 square feet expansion of our service lane and a new Oil Express wing in the southwest corner of our building. The Oil Express area will not only increase our ability to do more and faster oil changes, it will also free up five hoists in our main shop for more major auto repair. The expansion of our service lane will lessen traffic confusion at our facility and allow us to have indoor delivery of vehicles, which is especially important during bad weather conditions. The total expansion we our requesting is 28,861 square feet. A floor plan for the additions and building elevations are attached. Building Exterior Showroom The exterior of the Chrysler showroom will feature their distinctive Millennium Arch and silver/gray architectural metal panels. Their four wall badges, Chrysler, Dodge, Ram, Jeep, will face Highway 10. Our name, "Cornerstone", will be over the entrance arch. Our exiting showroom will be remodeled on the outside with Ford's sweeping arch and their silver/gray architectural metal panels. Ford's blue oval will be on the arch and our other name, "Cornerstone" will be to the west of it. Ford's and Chrysler's architectural metal panels are only slightly different in shade. To separate the look of the two franchises we are proposing a narrow white tower with the Cornerstone logo on the top. Office, Oil Express and Parts/Truck Service All of these expansions will be precast concrete panels with architectural reveals painted in similar tones as our existing building (grays and blues). On the office area we will use tones that are complimentary to the adjacent Chrysler showroom. Site Landscaping, Drainage and Lighting We have submitted a landscape plan, drainage plan and lighting plan. Our green space/tree requirements were met when our lot was redone in 2006. Our lot lighting was approved and installed in 2006. As part of this current proposal, one light pole will be eliminated to accommodate the entrance to the Oil Express. Wall lighting will be sued to replace this light. Four new poles will be added for the new parking area on the north side of our building adjacent to the office and parts/service additions. The only other exterior lighting that is changing will be the removal and addition of lights on our building. None of our perimeter lighting is changing. Our building is in the center of a fairly large parcel, so consequently none of the lighting changes will have any effect on neighboring properties. Our drainage, that featured bio -retention ponds was also approved and built in 2006. Our proposed building foot print is now smaller and there is less impervious area. Parking and Drives As noted above, the Oil Express/service lane expansion proposed will aid the traffic flow of our site. Currently service, sales and Oil Express traffic mingle in a confusing mess of conflicting turn movements. The most commonly use entrance to our site is off of 17151 Avenue. As you enter our site from that direction, our proposed layout immediately separates Oil Express and service traffic from sales traffic. The Oil Express and service traffic is then further separated from each other with plenty of stacking for customers waiting in line. Fire Protection Fire Hydrants for an expansion were approved and installed in 2006. Also at that time the water lines on our site were looped to ensure appropriate pressure to those hydrants. The Fire Marshall will need to approve the new fire sprinkler riser, location of fire department connection, lock box, etc., but site infrastructure regarding fire is in place. New Signage Free Standing Signage None Wall Signage North Elevation New "CORNERSTONE" over Chrysler's arch - 70 square feet New - Cornerstone Logo on separation tower — 80 square feet West Elevation New - Four Chrysler Wall Badges - 60 square feet (9 Series, see attachment) New - Ford Oval — 45 square feet (see attachment) Existing — 25 square foot " SERVICE" sign South Elevation New - Ford Oval over Ford's arch — 45 square feet New - "CORNERSTONE" — 70 square feet New - Cornerstone Logo on separation tower — 80 square feet East Elevation "OIL EXPRESS" - 20 square feet (existing sign will be moved from the west elevation to the new entrance) "SERVICE" - 20 square feet (existing sign will be moved from the west elevation to the new entrance) All signage being proposed is within what is allowed by City Code. Remodel Our project will include an interior face lift for our existing building: new floor finishes in areas, new ceiling tile, fresh paint, etc. We will also be upgrading our existing interior lighting, adding fire suppression to the areas that currently don't have it, re -roofing our existing building and replacing all but three of our existing HVAC units with high efficiency units. Three of our units have been recently replaced. .Kiver To: Planning Department Memorandum From: Brandon Wisner, Stormwater Coordinator Date: February 3, 2016 Subject: Site Plan Review Meeting — February 1, 2016 The department listed above has reviewed the application(s) listed below and has the following comments: Case # CU 16-04 — Cornerstone Auto Elk River 1. NPDES permit is needed for construction activity disturbing more than one acre. Proof of the SWPPP designer's `Design of Construction SWPPP' certification. 2. Updated `Operation and Maintenance' document for all associated permanent stormwater best management practices and an updated SWPPP sheet with all required notes. 3. In the approved plans from 2006, less stormwater was proposed to be sent to the larger basin east of the main Cornerstone building. The basin to the east is shown to be on a different property, owned by a different party. Provide necessary documentation that further stormwater directed to the east basin is approved by the appropriate property owner. ���"600'4 Minnesota Department of Transportation Metropolitan District P Waters Edge Building 1500 County Road B2 West Roseville, MN 55113 February 18, 2016 Debbie Huebner City of Elk River 13065 Orono Parkway Elk River, MN 55330 SUBJECT: Cornerstone Ford/Chrysler MnDOT Review 4CUP16-001 NE quad of US 10 and 170th(Twin Lakes Pkwy) Elk River, Sherburne County Control Section 7101 Dear Ms. Huebner: Thank you for the opportunity to review the proposed additions to the Cornerstone Ford/Chrysler development. The Minnesota Department of Transportation (MnDOT) has reviewed the site plans and has the following comments: Right of Way: There are no impacts to the MnDOT right of way. However, a label should be added to the plans labeling the existing MnDOT right of way line. For questions regarding these comments please contact Matt Aguil a at 651-234-7199 or matthew.aguirre@state.mn.us. Water Resources: MnDOT will need to see drainage calculations, drainage plans, and drainage area maps for both existing and proposed conditions. The drainage calculations and permit from the earlier development should also be provided. These calculations must show that the site is not increasing any drainage to the MnDOT right of way. For questions regarding these comments please contact Brian Kelly at 651-234-7536 or Brian.kel lyQstate.mn.us Permits: Should any of these plans change, any use of or work within or affecting MnDOT right of way will require a permit. Permit forms are available from MnDOT's utility website at www.dot.state.iim.us/tecsup/utility . Please include one 11 x 17 plan set and one full size plan set with each pen -nit application. Please direct any questions regarding permit requirements to Buck Craig (651-234-7911) of MnDOT's Metro Permits Section. Review Submittal Options: MnDOT's goal is to complete the review of plans within 30 days. Submittals sent in electronically can usually be turned around faster. There are four submittal options. Please submit either: 1. One (1) electronic pdf. version of the plans. MnDOT can accept the plans via e-mail at metrodevr_eviews.dot@state.mn.us provided that each separate e-mail is under 20 megabytes. 2. Three (3) sets of full size plans. Although submitting seven sets of full size plans will expedite the review process. Plans can be sent to: MnDOT — Metro District Planning Section Development Reviews Coordinator 1500 West County Road B-2 Roseville, MN 55113 3. One (1) compact disc. 4. Plans can also be submitted to MnDOT's External FTP Site. Please send files to: ftp://ftp2.dot.state.mn..us/pub/iuicoming,/MetroWatersEdge/Planning Internet Explorer doesn't work using ftp so please use an FTP Client or your Windows Explorer (My Computer). Also, please send a note to metrodevreviews.dottstate.mn.us indicating that the plans have been submitted on the FTP site. If you have any questions concerning this review, please contact me at (651) 234-7784. Sincerely, Karen Seheffmg Principal Planner Copy sent via E -Mail: Brian Kelly, Water Resources Buck Craig, Permits Brian Kaiy, Area Engineer Matt Aguirre, Right -of -Way . Clare Lackey, Traffic Gayle Gedstad, Traffic Nancy Jacobson, Design cozosal .a.a sr u z �+^o sz :orr 3+u N0 '"s zr. �• 'm°" NVId SIVAON3M $ ONLLSIX3 00 eN 3 Ms4 NN '83AIN >113 ONI'S3JLVIOOSSV $ S1N3N3AO8dNl 03SOdO8d 9 —3r :xe ias3a -n., NOS€1303d 'IHVDO8 N xonaws3a �w� el �I z:alao,,, �•,�,:,,� '�w".�� 2l3Ala H13 3NO1S83N800 � a sa• — — i — wWG.JWwW W5W5W3 Ws35WWeWWww �c� n < o r Y.8Bf�8 g af'F 3€ I' q3 I Es 5 •J y�� 'F E'y E& E 5 [ -.. m �:f53Sfi3. �L u P I I U 't 1 1 1 p j A a an .� 10 y 9 c v r 1 o G ter MINNEgOTA Of f MI=r I I Crve $$ a TOIG, spoil Ai& �� aha 3 e J L)s a fOZ05'41 '6 tl NOSNtlkS ii3f .•'aj�.auz�ivu urci OD�-il -0N 31l! -- .Ow65 �•-� Vim. NV -1d 3115 00 --mass NN '83A18 N13 —r «„w �N� 'Satnoossr r S1N31"3A08dW1 03SOdO8d NOSN303d '1tltlO08 = 2I3AIM N73 3N015213Ni'!OJ W WWWW€ WwWesza o $ €awl -Nv;- ,., �•Lflyi is ;moo iz &8R E.. fi 1 Quo & it sx. n j p o ho x t o a e �gg HE, 315$1 I -. .e, .-•- -- L F -- ., ., lk i ................'.�........... .i it 73 8 C _F /:o.+ m0 Ell it ° }11 n' � si< F,II�tN 3 e3 >,W� j til It Hi vUN) NL t U=m ',iJii mew gkl ' -„ v h I !i� mb m �'PO'TA X n,-FA�T�EN USFNi� �rAY fije f020g"al '�L 9 l4 �°�°4 TF '.N 3R3 NOSNVk5 i13f .p.u6,5 Mvmx —3,u oaw 'AB 03N33NJ -ae Nxvao '9N1 '$31tlC Nosumid fill pq gg NaWrc353C 3Lsn � /3n � 9t/it/2 ]IM I.� wp m�n�a °47� K.+r E R ?rY �is8gg 'O� 15� c ac S° g e_E g•g£ = iFo Eli 8E'33 x a=9 n �,�_�� ep�n�s S�s�`-,s$ 'ie"s s•s jxxe E - - F�agsas5`Sb3�B<. e s ¢x^. � aso 11E Fei€B$a€-s s -�s x9�gxgxFx"r= & xbeYs`'EaxB xg c,z x 13:s�aPxS.;.Ea.a As 2S AOUR eNA�E$R € fro E Yrt.EB R S Rs's E¢ a §6x""y'yyl�s (gac�eg •��€k�a6=�i � s6 a � etc �a s2 �� �sw3�u�ir�W3�3WW���ciW�•WWW&� 3 a o���€ak € �a d --OI 08 NV -Id NOISON3 ONV ONIOV8900 NN 'N3AI8 X13 S1N3W3AOadWI 03SOd08d H3AR1 >113 3NOIS63N800 6 iJU_ 10 &0s' ILI VdKy . roza .0 •e.x �:.wa _ _ 3szc :ou3W uosu+xstrr Rn x«w �� NVId ununpO — s,� " s an NN 'a3Al8 >1138N1':A8 P91�3MJ 'ONI's31vlO0ssv 8 S1N3W3AOMdM 03SOdONd —x:A N�I90 ,,, � 01 �''� NOSN303d 'laro0e OAIN NM 3NOIS83NHOO N t g �{--�--_-- 8 s S _ 89 fi �y $ fis 5_gs` E6� Es og s p � ° F€ c °g R €gF fies`x, �5 ` i x a€fr �sM� M` P o�SLL j Is Rz— W OR r ��o Joao dao-` i s w , x a r HIGN`r,)al �In Joe, US i.iU� iU A � $ \ - \ \� \� \�� \� � � /\� \�� \� � � /\� .� � \ � � \� / i ? \ \ uj Luj F -IT-, 0; ^ � � | F -i U), w Ct!l F- 0i Z)i /z Z°° ��_=,Jcn Oww. a I J a oo0 mi- ze s m d z J9F y 3 $ '8 dw S F------------------� � w b� ms I � I P I I WYE I 1 I ce - -- me - Al do .__. •n I I 'µI I Lei i d❑ a `� I: b I I �� "f/�Py5N01�b,69 3 3 yy b6, N z Ni e C g �� gg= ` 3a �� � •�w a �$. g � bx �b 8.�a� 2 ": �Y € �3� �h 4` � 4c �� � �� e a x xx a Mil a x "s IF u a �� IF xw @ F o n s d #x i is H, ���:� x� kU W€ o x£ e 8 7 § 4 x s s x -max s< $ a- s ff a is xx €e g s xs Y o m g a s a= n xsy xd€iq els g€€ aybgeg x x s8 ; Q h 3 x s 8 €R 3 W im GC x F€ s i E° x:a all 11 eix15 x lyg� 4#'Q° p5� q ffi5q fi y�g & s$b �gQE3 E sT�p ?� �6 lip 3 z 2 -MCC oc x Z�g 10, t ul 02 OX ------- Z , W, 1 o CC < Ho E= 1� _J L T It 41 --Tm / v 9� h N. 91 T-7 HI'S Z z w ulgg ij U)! 91PP 1� H81 'N !11,81 - 14 qui Pill, I gu� f gi MT P5 dil IM411 1111H HIM Lui Z' 0 I ZI 10) GD) r ---------- _T_ LU U) 0 C) _j ---------- a. #o;_- t�.L__ z ZI W J$ ----------- M — of co UY LLIF C W°W z [ �� � ��K I f ' ! ci N p�YE�O 2 � CSO I V: I 5 a w �' w 0° a e W° a e W o PI lil Him d Hl.�Ixaas I W00000000a000000000 I I of — k I I I 4i W i ! I BB y8y� I j ESB g I ; i jj ' - J 71 4 O b � 4 H- e Fi _ 1 � I I I i I --- I �`��= I — f " HEL day ZI a a i 'i rt• o 21 W -,- L1 W 1 Fa-: \ (n'b I. w a oj_s1 >�a zI2 Cornerstone Conditional Use Permit Background  Zoned C-3  Car, truck, RV, and marine sales and services -CUP  Multiple additions proposed Building Expansion  Three separate areas  ~24,500 sqft  Architectural treatment  silver/gray metal panels  Precast concrete panels Transportation/Circulation  Access & vehicular circulation not changed  North of bldg–gravel  66 stalls displaced  50 additional Landscaping/Lighting  Landscaping requirements met in 2006 CUP  Adding 14 trees  Four additional light poles CUP Requirements  Staff’s analysis of the application show compliance with all seven of the conditions required for approval of the CUP. Planning Commission  No one spoke for or against the request  PC consistent with initial proposal  Unanimously recommended approval Action Requested  Approve, by motion, the Conditional Use Permit with the conditions outlined in memo.