Loading...
9.3. SR 04-18-2016 EOty1� ,.,�� Request for Action River To Item Number Mayor and City Council 9.3 Agenda Section Meeting Date Prepared by Work Session April 18, 2016 Zack Carlton,Planning Manager Item Description Reviewed by Nottingham Construction— Concept Review for Chris Leeseberg, Senior Planner Senior Housing Project on Line Avenue Reviewed by Cal Portner, City Administrator Action Requested Provide informal, nonbinding feedback regarding the propose project. Background/Discussion Nottingham Construction is proposing a 100 to 120 unit Senior Housing project on the NE corner at the intersection of Line Avenue and 181st Avenue. The property is currently owned by the United States Postal Service. The project would include a number of amenities for the residents,including a salon, movie theatre,pub room, community room,wood working shop, craft room, and fitness room. Resident units include independent, assisted, and memory care rooms. The final mix of rooms will be determined based on market demands. Comprehensive Plan and Zoning The parcel is currently zoned Business Park but the Comprehensive plan guides the site for Mixed Use which allows a mixture of housing,jobs and/or retail uses within close proximity to each other. The land use creates the potential for people to live close to their jobs and retail services, and offers an environment where one can live with less reliance on the car. It also provides another setting for high density residential land uses. The Comprehensive Plan supports the proposed use. The proximity to retail and restaurant uses would create less reliance on cars and encourage residents to walk to those uses. The applicant may develop the site as a Planned Unit Development (PUD),which would include the required zone change procedure. Site Plan The building is located at the high point of the site and will provide the facility strong sight lines to and from Highway 169. There is a single parking lot in front of the building and additional underground parking is proposed. Drainage and landscaping improvements were not included in the submitted sketch, but will be reviewed as part of a future Conditional Use Permit. A fire lane providing access around the building will be required. Access, Circulation, and Parking The property will be accessed from 183rd Circle NW. Access will not be permitted from County Road 12 (181 st Ave) or Line Ave. The city is currently reviewing access changes along Line Ave,which may eliminate the connection of Line Ave at 181st Ave. If that option is recommended,vehicular access would likely come from the connection of Line Ave and Twin Lakes Road. Pedestrian access across 181st POWERED 6T Template Updoted 4/14 INAMIRE1 Ave would be maintained at the signal. Staff recommends completing a traffic study and identifying the changes to Line Ave prior to final approval of the project. Long term transportation plans also identify a possible road connection on the east side of the parcel. Staff recommends that this possibility be considered when preparing the site plan. Parking needs will be identified when the final unit configuration is established. Requirements vary significantly between independent and assisted living uses. Financial Impact None Attachments ■ Location Map ■ Applicant's Narrative dated March 31, 2016 ■ Concept Plan dated March 31, 2016 ■ Sketch Elevations ■ Building Plans N:APublic Bodies\Agenda Packets\04-18-2016\Final\x9.3 sr Concept-Nottingham Construction.docx !ZS .. S) g��- s. AN +4 o!r'e. IV Ar 44 f{8 _ Sa �r r l 44L L if P opw a- / r , I I u } I �i f 4M. • 6 pL W �J ,11 1M Evans Ave N�+ ` __� M�rs'liivc�iw I N Hearpth Development 6750 Stillwater Blvd. Suite 200 Stillwater, MN 55082 Project Summary March 31, 2016 Hearth Development is proposing a 100-120 unit Senior Housing Project located on the SW corner at the intersection of Line Ave NW and 183rd Circle NW in Elk Rlver. The site sits one block East of Highway 169. Sitting on a ridge, the site has commanding views to the south. This sites proximity to commercial amenities is a great benefit to our residents and visitors alike The current comprehensive plan designates this area as mixed use. This project is a great fit as a transition from the heavy commercial use to the south and the less intensive single family use to the north on Line Ave, Building amenities will include; a salon, movie theater, pub room, community and private dining rooms, wood working shop, craft room and fitness room. All resident rooms will have private bathrooms. All Independent and Assisted rooms will have full kitchens. As we see our demographics evolve, we want to make sure we are listening to the market and what it is demanding, With that in mind, we have designated a larger percentage of units to be 1 bedroom, 1 + Den and 2 Bedroom units. With a proven track record,we demand a high quality of construction in our projects, everything from the structure through the mechanicals and finishes, our buildings are something we take great pride in, we want and expect the project to be an enhancement to the community, something everyone is proud to be a part of. Recently selected one of the top 10 Senior Housing Developers in the Twin Cities, we have a long term commitment to the Twin Cities market. We work with reputable operators who like ourselves, are committed to offering our residents a first class experience. The level of care and programing at our facilities is of great importance to us as owners and our operators. Residents of this building will have the option of living independently, utilizing our services for help with assisted living or memory care needs. The facility will have licensed nurses available to residents 24/7; this along with a higher staff to resident ratio allows us to serve a wider range of acuity levels than the traditional "assisted care facility". Our goal is to provide a continuum of care, allowing our resident to age in place as their needs increase. www.HearthDevelopment.com 9 (651) 383-4850 O • s ♦t OOOK r - w � a LLJ -i CD co Ilk � I { fI 4 �jC` I 7. � I I � - I I f I •, •1 f ` I . 1 � �wAir NIIII III a.sY i I �i IIIIII �III I ■E WWI on mu >.a�r 1C �C� I:Gum a AM / E _ M ____ e®: - _ .�. a=l ........... --- 04 4, 0 0 ............ 10 0 0 oo 0 i mo Min K A I ml lid �nr to R Fm DI gg IE [F Em! DI (CJI S Art � Coll)� � �� FS 3 >y a+t 4 4 x i � Y UM e tJ C�