Loading...
5.1. LIBSR 09-22-2015 i Capital Improvement Plan 20105 thru 2019 t7ctaarttttcrrf Library City of Elk River; Minnesota Contact t°ark&Rec.Director 1­y'l;c Cmg�rovrrncnt Pro iect rr L13-(l U'Sefnl tI e Unassigned Project Name Literary Facility Category Building Maintenance Priority nla Description lnaprovements to the Library'1 wilding and 2015-Back building entrance improvements;Paver replacement with Asphalt or Concrete, 2016-2017- LED Lighting and Parking,Ballard's improvement. 2f1i" 3•ir6armRma tau m......m ZV 1 4,;� ex aim C, '° °P�m� . Ongoing Tree.replacement Plan(2015-2019) Justificadou Beautification and maintenance of ilia library grounds and building,_ Cxpeuditures 2035 2016 2017 2018 2019 Total Buildings 113d1d0 -.100 Grounds 7,000 5,000 5,000 5,000 5,000 27,000 Parking Lot 9,000 002 5,000 10,000 Total 16,000 1;OOd 10,000 5,000 15,000 58,000 mpm Fmidiug Sources 2015 2016 2017 2018 2019. Total Library 16,000 10,000 10,000 5,000 15,000 56,000 Total 16,000 10,000 10,000 5,000 15,000 56,000 DRA17 2015-2019 C AP IAL 1,1111PtCJtTAC✓y'Jt"Y PLAN ]?'age i