4.3. SR 06-20-2016City of
Elk —
River
Request for Action
To
Item Number
Mayor and City Council
4.3
Agenda Section
Meeting Date
Prepared by
ConsentJune
20, 2016
Justin Femrite P.E., City Engineer
Item Description
Reviewed by
Pay Estimates
Lori Ziemer, Finance Director
Reviewed by
Cal Portner City Administrator
Action Requested
Approve, by motion, the pay estimates as detailed below
Background/Discussion
The following pay estimates have been reviewed and found to be accurate and in accordance with the
approved contract.
Financial Impact
PROJECT
WNWF Improvements
Eastern Area Trail and Mobility
Attachments
■ Pay Estimates
PAY EST. # CONTRACTOR
19 Rice Lake Construction Group
1 US Sitework
AMOUNT
$224,529.99
$207,243.93
P a w E A E U a r
NaA f RE]
• BCS L_TCN & M r-= N K
Consulting Engineers & Surveyors
" 12224 Nicollet Avenue • Burnsville, MN 55337
Phone (952) 890-0509 • Fax (952) 890-8065
www.bolton-menk.com
June 7, 2016
Mr. Justin Femrite, P.E.
City Engineer
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: Elk River WWTF
WWTF Improvements Project
Project No.: T21.106811
Dear Justin:
NG®
Please find enclosed Pay Application No. 19 for the above referenced project. I have reviewed the Pay
Application and find it to be complete and in order. I recommend that payment be made in the amount
shown. If you agree, please sign and return one signed copy to the Contractor with payment and one to
me for our files.
If you have any questions on the above, please call.
Sincerely,
BOLTON & MENK, INC.
-e---A 7
Seth A. Peterson, P.E.
Project Manager
Ce: Tej Bala, Bolton & Menk, Inc.
Enclosures
GAE1k River\121.106811_Ramsey\8_ Construction Phase\Pay Requests\Pay app 19\Femrite pay app 19.docx
DESIGNING FOR A BETTER TOMORROW
Bolton & Menk is an equal opportunity employer
Contractor's Application For Payment No. 19
is approved by:
Approved by:
(Finance Director)
Funding Agency (if applicable)
EJCDC No. C-620 (2002 Edition)
Prepared by the Engineers' Joint Contract Documents Committee and mclorxd by the Associated General Contractan of America and the Construction Specifications rnstifisO.
(Date)
(Date)
Application Period To: 5/31/2016
Application Date:
5/31/2016
To (Owner): City of Elk River
From (Contractor): Rice Lake Construction Group
Via (Engineer): Balton & Menk, Inc.
Project: Wastewater Treatment Facility Improvements 2014
Contract: All Construction
Owner's Contract No.:
Contractor's Project No.: 1422
Application for Payment
Change Order Summary
Approved Change Orders
1. ORIGINAL CONTRACT PRICE
$16,525,200.00
Number Additions Deductions 2. Net change by Change Orders
$259,991.59
1 $ 259,991.59
3. CURRENT CONTRACT PRICE (Line 1 t 2)
$16,785,191.59
4. TOTAL COMPLETED AND STORED TO DATE
(Column F on Progress Estimate)
$13,899,995.83
5. RETAINAGE:
a. 5% x $13,899,995.63 Work Completed
$694,999.79
b. 5% x $0.00 Stored Materials
$0.00
c. Total Retainage (Line 5a + Line 5b)
$694,999.79
S. AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c)
$13,204,996.04
7. LESS PREVIOUS PAYMENTS (Line 6 from prior Application)
$12,980,466.05
TOTALS
$259,991.59
$0.00 8• AMOUNT DUE THIS APPLICATION
$224,529.99
8. BALANCE TO FINISH, PLUS RETAINAGE
NET CHANGE BY
(Column G on Progress Estimate+ Line 5 above)
$3,580,195.55
CHANGE ORDERS
$259,999.59
Contractor's Certification
The undersigned Contractor certifies that (1) all previous progress
Payment of: $224,529.99
payments received from Owner on account of Work done under the
(Line 8 or other - attach explanation of other amount)
Contract have been applied on account to discharge Contractor's
legitimate obligations incurred in connection with Work covered by prior
Applications for Payment; (2) title of ail Work, materials and equipment
is recommended by: l
tulle 7, 2016
incorporated in said Work or otherwise listed in or covered b this
7y
Application for Payment will pass to Owner at time of payment free and
(Eingineer)
(Date)
dear of all Liens, security interests and encumbrances (except such as are
covered by a Bond acceptable to Owner indemnifying Owner against any
$224, 529.99
such Liens, security interest or encumbrances); and (3) all Work Covered
Payment of:
by this Application for Payment is in accordance with the Contract
(Line 8 or other - attach explanation of other amount)
Documents and is not defective,
is approved by:
Approved by:
(Finance Director)
Funding Agency (if applicable)
EJCDC No. C-620 (2002 Edition)
Prepared by the Engineers' Joint Contract Documents Committee and mclorxd by the Associated General Contractan of America and the Construction Specifications rnstifisO.
(Date)
(Date)
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River
Coniractor: Rice Lake Construction Group
Enaineer: Bolton & Menk, Inc.
Application Number 19
Date of application 6131/2016
Work completed through: 513112016
Pay Item
Number
Item
Description
B
Scheduled Value
C
From Previous
Application (C+D)
D E Total Completed
This Period Materials Presently and Stored to Date
Stared (not in Col D) (C + D + E)
%
(�
Balance to
Finish
01001
Performance Bond
$230,186.00
$230,186.00
5230,186.00
100.00
$0.00
01002
Insurance
$161,171.00
$161,171.00
$161,171.00
100.00
$0.00
01003
01004
Mobilization
Demobilization
$635,41B.001
$30,000.00
$635,418.00
$0.00
$635,418,00
$0.00
100-001
0,001
$0.00
$30,000.00
01005
Project Allowances
$540,367.04
$0.00
$0.00
0.00
$540,367.04
01005.1
01005.2
Submittal Exchange
Building Permit
$9,795.00
$29,530.04
$9,795.00
$29,530,04
$9,795.00
$29,530.04
100,00 1$0.00
100.00
$0,00
01005.3
Lift Station SCADA System Allowance
$230,000.00
$242,268.59
$242,268.59
105.33
($12,288.59)
01005.4
COP#01 - Automatic Door Operators
$5,963.20
$5,963.20
$5,963.20
100.00
$0.00
01005.5
COP#02 - Overflow for Biosclids Holding Tank
$2,787.42
$2,787.42
$2,787.42
100.00
$0.00
01005.6
COP403 - Additional Window in Door 1126
$323.84
$323.84
$323.84
100.00
$0.00
01005.7
COP#04 - Delay Costs
IN C01 BELOW
01005.8
COP905 - Revised Plans
$49,5109.90
$0.00
$15,204.99 $15,204.99
30.71
$34,304.91
01005.9
01005.10
COP#06 - Black Material
COP#07 - Slide Gate 16
$106,703.90
$5,361.91
$106,703.90
$5,361.91
$106,703.90
$5,361.91
100.00
100.00
$0.00
$0.00
01005.11
COP#08 - Aeration Basin Sumps
$10,693.54
$10,693.54
$10,693.54
100.00
$0.00
01005.12
COP409 - Biosolids OH Doors
$37,350.46
$37,350.46
$37,350.46
100.00
$0.00
01005.13
01005.14
OOP#10- Aeration Pipe Drop Legs
OOP#11 - Viton Gaskets
($3,500,80)
$11,424.54
($3,500.80)
$11,424.54
($3,500.80)
$11,424.54
100.00
100.00
$0.00
$0.130
01005.15
01005.16
COP#12 - Supernatant MH Vent
COP#13 - Disinfection Channel Gate
$3,686.92
($1,500.00)
$3,686.92
($1,500.00)
$3,686.92
($1,500.00)
100.00
100.00
$0.00
$0.00
01005.17
01005.18
01005.19
01005.20
01005.21
01005.22
COP#14 - Washer/Dryer Hookups
COP#15 - Dumpster Rails
COP#16 - Retaining Wali
COP#17 - Additional Hydrant & Paving
COP#18 - Meter Manhole
COP#19 - LS Stairs
$3,515.73
$20,796.71
$10,236.72
$10,437.29
$17,695-94
($9,420.00)
$0.00
$20,796.71
$10,236.72
$0.00
$17,695.94
($9,420.00)
$0.00
$20,796.71
$10,236.72
$0,00
$17,695.94
($9,42000)
0.00
100.00
0.00
0.00
100.00
100.00
$3,515.73
$0.010
$0.00
$10,437,29
$0.00
$0.00
01005.23
COP#20 - Yard Hydrants
$6,169.00
$6,169.00
$6,169.00
100.00
$0.00
01005.24
CDP#21 - Seal Fail Modules
$5,125.94
$5,125.94
$5,125-94
100.00
$0.00
01005.25
COP#22-Sand Filter Roof
$1,802.00
$1,802.00
$1,802.00
100.00
$0.00
01005.26
COP#23-Aeration Basin Lights
$4,167.00
$4,167.00
$4,167.00
100.00
$0.00
0100527
COP#24 - Lockers
$0.00
$0.00
$0.00 #DIV101
$0.00
01005.28
OP#25 - Parapet at RASIWAS Bldg
$861.00
$861.00
$861.00
100.00
$0.00
01005.29
COP#26 - Field Order 19
$4,996.90
$4,996.90
$4,996.90
100.00
$0.00
Page 2 of 7
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River
Contractor: Rice Lake Construction Group
Engineer: Bolton & Menk, Inc.
Application Number 19
Date of application 613112016
Work completed through: 5/31/2016
Pay Item
Number
Item
Description
B
Scheduled Va$ue
C
From Previous
Application (C+D)
D E
This Period Materials Presently
Stored (not in Col D)
Total Completed
and Stored to Date
(C + D + E)
%
(E)
Balance to
Finish
01005.30
COP427 - Field Order 20
$5,255.62
$5,255,62
$5,255.62
100.00
$0.00
01005.31
COP428 - Field Order 22
$11,637.96
$11,637.96
$11,637.96
100.00
$0.00
01005.32
JCOP#29 - Field Order 23
$10,217.14
$10,217.14
$10,217.14
100.001$0.00
01005.33
COP#30 - Field Order 26
$22,043.01
$22,043.01
$22,043.01
100.00
$0-00
01005.34
COP#31 - Field Order 25
$3,538.55
$0.00
0.00
$3,538.55
01005.35
COP932- Field Order 18
$4,187.88
$4,187.88
$4,187.86
100.00
$0.00
01005,36
COP433 - Trickling Filter Disposal Costs
$0.00 #DIV10!
$0-00
01005.37
COP#34 - Field Order 24
$17,91833
$0.00
0,00
$17,918.33
01005,38
COP#35-Additional Demo
$6,175.22
$6,175.22
$6,175.22
100.00
$0.00
01005.39
COP#36 - Reaction Tank Drains
$1,645.15
$1,645,15
$1,645.15
100.00
$0.00
01005.40
COP#37 - Retaining Wall Credit
-$1,000.00
$0.00
0.00
($1,000.00)
02060
Demolition of Existing Facilltles/Pavement
02060.1
Main Building
$40,000,00
$40,000.00
$40,000.00
100.00
$0.00
02060.2
Blower Building
$15,000-00
$15,000.00
$15,000.00
100.00
$0-00
02060,3
Aeration Tank
$20,000.00
$20,000.00
$20,000-00
100-00
$0.00
02060.4
Trickling Filters & Pump Station
$45,000.00
$27,500.00
$17,500.00
$45,000.00
100.00
$0-00
02060.5
Final Clarifier Sludge Wet Well
$10,000.00
$10,000,00
$10,000.00
100,00
$0.00
02060.6
Pavement
$10,510.00
$10,510.00
$10,510,00
100.00
$0.00
02140
Bypass Pumping
$75,000.00
$75,000,00
$75,000.00
100.00
$0.00
02220
Earthwork
02220.1
New Aeration Basins
$355,815.00
$355,815.00
$355,815.00
100,00
$0-00
022202
New Proposed Aerated Biosolids Control Bldg 2
$65,000.00
$65,000.00
$65,000.00
100.00
$0.00
02220.3
New RASlWAS Building
$58,000.00
$58,000.00
$58,000.00
100,00
$0.00
02220.4
New Operations Building
$85,000.00
$0.00
$0.00
0.00
$65,000.00
02650
Site Piping
02550.1
-Purchase
$690,000.00
$679,500.00
$679,500.00
98.48
$10,500,00
02550.2
-Install
$426,947.00
$387,500.00
$20,000.00
$407,500.00
95.45
$19,447,00
02600
Bituminous PavementfClass 6/Sidewalks
$149,490.00
$5,000.00
$5,00000
3.34
$144,490,00
02830
Chain Link Fence & Gates
$18,890.00
$10,000.00
$10,000.00
52-94
$8,890,00
02836
Retaining Walls
$25,000,00
$0.00
$0.00
0.00
$25,000.00
02920
Seeding/Landscaping
$16,000.00
$0.00
$0.00
0.00
$16,000.00
03200
Concrete Reinforcement
03200.1
-Purchase
$661,997.00
$635,000.00
$635,000.00
95.92
$26,997.00
032002
-Install
$312,165.00
$300,488.00
$300,488.00
96.26
$11,677.00
Page 3 of 7
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River
Contractor: Rice Lake Construction Group
Engineer: Bolton & Menk, Inc.
Application Number 19
Date of application 5!3112016
Work completed through: 513112016
Pay Item
Number
Item
Description
B
Scheduled Value
C
From Previous
Application (C+D)
D E Total Completed
This Period Materials Presently and Stared to Date
Stored (not in Col D) (C + D + E)
%
(F)
Balance to
Finish
03300
Concrete Work
03300.1
-Aeration Basin
$1,190,000.00
$1,190,000.00
$1,190,000.00
100.00
$0,00
03300.2
-RASIWAS Building
$215,000.00
$215,000.00
$215,000.00
100.00
$0.00
03300.3
-Aerated Biosolids Control Bldg No. 2
$110,000.00
$110,000.00
$110,000-00
100.00
$0.00
03300.4
-Operations Building
$148,000.00
$0.00
$0.00
0.00
$148,000.00
03300.5
-Generator & Transformer Pads
$20,000,00
$20,000.00
$20,000.00
100.00
$0.00
03400
Precast Walls & Plank
$1,062,500.00
$871,250.00
$871,250.00
82-00
$191,250.00
04810
Masonry
$75,000.00
$75,000.00
$75,000.00
100.00
$0.00
05500
Misc. Metals
05500.1
-Purchase
$200,000.00
$200,000.00
$200,000,00
100,00
$0.00
05500.2
-Install
$95,000.00
$95,000.00
$95,000,00
100.00
$0.00
06100
Carpentry
06100.1
-Purchase
$18,000.00
$15,000.00
$15,000.00
83.33
$3,000.00
06100.2
-Install
$22,000.00
$16,000.00
$16,000.00
72.73
$6,000.00
07150
Dampproofrng
$31,638.00
$31,638.00
$31,638.00
100.00
$0.00
07535
Roofing
$235,078.00
$116,000.00
$118,000.00
50.20
$117,078.00
07900
Caulking
$26,870.00
$17,500.00
$17,500.00
65.13
$9,370.00
08110
Doors & Frames
08110.1
-Purchase
$57,780.00
$40,000.00
$40,000.00
69.23
$17,780.00
08110,2
-Install
$35,000.00
$15,000.00
$15,000.00
42.86
$20,000.00
08360
Upward Acting Sectional Doors
$36,600.00
$8,400.00
$8,400.00
22.95
$28,200.00
08500
Windows
$25,000.00
$5,560.00
$5,560.00
22.24
$19,440.00
08800
Steel Studs/Gypsum
$22,869.00
$3,500.00
$3,500.00
15.30
$19,369.00
09310
CeramielResilient Tile
$30,000.00
$12,000.00
$12,000.00
40.00
$18,000.00
09610
Acoustical Ceiling
$6,500.00
$0.00
$0.00
0.00
$6,500.00
09900
Painting
$373,921.00
$314,500.00
$10,000.00 $324,500.00
86.78
$49,421.00
10110
Marker BoardslToilet Compartmentsfroilet Accessories
10110.1
-Purchase
$8,000.00
$0.00
$0.00
0.00
$8,000.00
10110.2
-Install
$3,000.00
$0.00
$0.00
0.00
$3,000.00
10250
Safety Devices
10250.1
-Purchase
$10,000.00
$0.00
$0.00
0.00
$10,000.00
10250.2
-Install
$3,500.00
$0.00
$0.00
0-00
$3,500-00
10505
Metal Lockers
10505.1
-Purchase
$10,000.00
$0.00
$0.00
0,00
$10,000.00
Page 4 of 7
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River
Contractor: Rice Lake Construction Group
Engineer: Bolton & Menk, Inc.
Application Number
Date of application 513112016
Work completed through: 513112016
Pay Item
Number
Item
Description
B
Scheduled Value
C
From Previous
Application (C+D)
D E
This Period Materials Presently
Stored (not in Col D)
Total Completed
and Stored to Date
(C + D + E)
%
(F)
Balance to
Finish
10505.2
-Install
$4,000-00
$0.00
$0.00
0-00
$4,DOO.00
11280
Hydraulic Gates
11280.1
-Purchase
$50,000.00
$50,000.00
$50,000,00
100.001$0.00
11280.2
-Install
$20,000.00
$20,000,00
$20,000.00
100100
$0.00
11311
Submersible Centrifugal Pumps
11311.1
-Purchase
$276,668.00
$264,924.60
$264,924.60
95.00
$13,943.40
11311.2
-Install
$25,000.00
$22,500.00
$22,500.00
90.00
$2,500.00
11345
Chlorination & Dechlorination Eq.
11345-1
-Purchase
$330,000.00
$273,386.25
$40,113.75
$313,500.00
95.00
$16,500,00
11345.2
-Install
$20,000.00
$0.00
$20,000.00
$20,000.00
100.00
$0.00
11351
Clarifier Equipment
11351.1
-Purchase
$15,000.00
$13,507.74
$1,492.26
$15,000.00
100.00
$0.00
11351.2
-Install
$12,000.00
$12,000.00
$12,000.00
100.00
$0.00
11366
Screw Press
11356.1
_Purchase
$575,000.00
$575,000,00
$575,000.00
100.00
$0.00
11356.2
-Install
$25,000,00
$25,000.00
$25,000.00
100.00
$0.00
11374
Fine Pore Aeration Equipment
11374.1
-Purchase
$100,000.00
$100,000.60
$100,000.00
100.00
$0.00
11374.2
-Install
$75,000.00
$50,000.00
$50,000.00
66.67
$25,000.00
11375
Blower System (PD wlEnclosure)
11375.1
-Purchase
$180,000.00
$180,000.00
$180,000.00
100.00
$0.00
11375.2
-Install
$30,000.00
$15,000,00
$15,000.00
50.00
$15,000.00
11376
Hybrid Blower System (Alt. No. 2)
11376.1
-Purchase
$270,000.00
$270,000.00
$270,000.00
100,00
$0.00
113762
-install
$25,000.00
$25,000.00
$25,000,00
100.00
$0.00
11385
Coarse Bubble Aerobic Digester Mixing System
11385.1
-Purchase
$65,000.00
$61,750.00
$61,750.00
95.00
$3,250.00
11385.2
-Install
$40,000.00
$25,000-00
$25,000.00
62.50
$15,000.00
11386
Rapid Mixers
11386.1
-Purchase
$26,000.00
$24,700.00
$24,700.00
95.00
$1,300.00
11386.2
-Install
$3,500.00
$3,500.00
$3,500.00
100-00
$0.00
11367
Submersible Mixers
11387.1
-Purchase
$75,000.00
$71,250-00
$71,250.00
95.00
$3,750.00
11387.2
-Install
$12,000,00
$8,500.00
$8,500.00
7083
$3,500,00
Page 5 of 7
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River
Contractor: Rice Lake Construction Group
Engineer Bolton & Monk, Inc.
Application Number
Date of application 613112016
Work Completed through: 613112016
Pay Item
Number
Item
Description
B
Scheduled Value
C
From Previous
Application (C+D)
D E
This Period Materials Presently
Stored (not in Col D)
Total Completed
and Stored to Date
(C + D + E)
%
U
Balance to
Finish
11636
Phosphorus Analyzer
11636.1
-Purchase
$26,000.00
$16,500.00
$8,200.00
$24,700.00
95.00
$1,300-00
11636.2
-Install
$5,000.00
$0.00
$5,000.00
$5,000,00
100,00
$0.00
12346
Casework/Lab Eq.
$45,000.00
$4,000.00
$4,000.00
8.89
$41,000.00
13126
Circular Tank Covers
13126.1
-Purchase
$292,837-00
$0.00
$0.00
0.00
$292,837.00
13126.2
-Install
$75,00000
$0.00
$0.00
0.00
$75,000-00
14300
Hoists & Cranes
143001
-Purchase
$40,000.00
$0,00
$0.00
0.00
$40,000.00
14300.2
-Install
$12,000.00
$0.0o
$0.00
0.00
$12,000.00
14500
Material Handling Equipment
14500.1
-Purchase
$10,000.00
$0.00
$0.00
0.00
$10,000.00
14500.2
4nstall
$2,500.00
$0.00
$Q.00
000
$2,500,00
14600
Conveyance Equipment
14600.1
-Purchase
$135,000.00
$135,000.00
$135,000.00
100.00
$0.00
14600.2
-Install
$22,250.00
$22,250.00
$22,250.00
100,00
$0.00
14621
Power Winch
14621.1
-Purchase
$20,000.00
$20,000.00
$20,000-00
100.00
$0-00
14621.2
-Install
$3,000.00
$3,000.00
$3,000.00
100.00
$0.00
15060
Process Piping
15060,1
-Purchase
$650,000.00
$614,000.00
$614,000.00
94.46
$36,000.00
15060.2
-Install
$200,000,00
$187,500.00
$187,500.00
93.75
$12,500.00
16100
Valves
15100.1
-Purchase
$265,000.00
$265,000.00
$265,000.00
100.00
$0.00
15100.2
-Install
$110,000.00
$93,000,00
$93,000.00
84.55
$17,000.00
16300
Fire Protection
$45,000.00
$0.00
$0.00
0.00
$45,000.00
16400
Plumbing
15400.1
-Copper Piping
15400.1 .1
-Purchase
$45,000.00
$36,250.00
$36,250.00
80.56
$8,750.co
15400.1.2
-Install
$1o0,o00.00
$84,00000
$84,000,00
84,00
$16,000,00
15400.2
-Chemical Piping
15400.2 ,1
-Purchase
$18,000.00
$12,000.00
$6,000.00
$18,000.00
100.00
$0,00
15400,2.2
-Install
$22,000.00
$14,000.00
$8,000 00
$22,000-00
100.00
$0.00
15400.3
-Waste & Vent Piping
Page 6 of 7
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River Application Number 19
Contractor: Rice Lake Construction Group Date of application 5/3112016
Engineer: Bolton & Menk, Inc. Work completed through: 513112016
Pay Item
Number
item
Description
B
Scheduled Value
C
From Previous
Application (C+D)
D
This Period
E
Materials Presently
Stored (not in Col D)
Total Completed
and Stored to Date
(C + D + E)
%
(F)
Balance to
Finish
15400.3.1
-Purchase
$30,000.00
$27,000.00
3327,000.00
90.00
$3,000.00
15400.3.2
-Install
$62,000.00
$55,800.00
$55,800.00
90.00
$6,200.00
16480
JPackaged Compressed Air System
15480.1
-Purchase
$5,000.00
$5,000.00
$5,000.00
100.00
$0.00
15480.2
-install
$1,500.00
$1,500.00
$1,500.00
100.00
$0.00
16500
HVAC
15500.1
Equipment
$286,200.00
$177,227.50
$177,227.50
61.92
$108,972.50
15500.2
Labor
$169,020.00
$80,874.00
$80,874.00
47.85
$88,146.00
15500.3
Duct Insulation
$24,780.00
$4,460.40
$4,460.40
18.00
$20,319,60
15500.4
Test & Balance
$5,000.00
$0,00
$1,500-00
$1,500.00
30.00
$3,500.00
15950
HVAC Controls
$67,400.00
$32,000.00
$32,000.00
47.48
$35,400.00
16000
Electrical
16000.1
General Provisions
$55,000.00
$42,680.00
$2,600.00
$45,280.00
82.33
$9,720.00
16000,2
Basic Materials and Methods
$265,000.00
$180,320.00
$4,900.00
$185,220.00
69.89
$79,780.00
16000.3
Motors
$32,000.00
$22,865.00
$1,130,00
$23,995.00
74.98
$8,005.00
16000.4
Power Generation System
$414,000.00
$414,000.00
$414,000.00
100.00
$0.00
16000.5
Electrical Distribution
$385,000.00
$369,040.00
$369,040.00
95.85
$15,960.00
16000.6
Lighting
$85,000.00
$45,450.00
$45,450.00
53.47
$39,550.00
16000.7
Special Systems
$24,000.00
$9,960.00
$800.00
$10,760.00
44.83
$13,240.00
16000.8
Starters and MotorControi
$330,000.00
$296,400.00
$13,600.00
$310,000.00
93.94
$20,000.00
16000.9
Instrumentation and Control
$480,000.00
$418,550.00
$4,400.00
$422,950.00
88.11
$57,050.00
Change Order No. 1
$259,991.59
$259,991.59
$259,991.59
100.00
$0.00
$16,785,191.59
$13,663,648.47
$236,347.36
$om
$13,899,995.83
82.81
$2,885,195.76
F,JCDC No. C-620 (2002 Edition)
Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications institute.
Page 7 of 7
CONTRACTOR'S PAY REQUEST DISTRIBUTION:
EASTERN AREA TRAIL AND MOBILITY IMPROVEMENTS CONTRACTOR (1)
CITY OF ELK RIVER OWNER (1)
SP 204-090-003; MINN. PROJ. NO. TA 7115 (269) ENGINEER (1)
BMI PROJECT NO. N15.108488 BONDING CO. (1)
TOTAL AMOUNT BID PLUS APPROVED CHANGE ORDERS $529,645.30
TOTAL, COMPLETED WORK TO DATE $218,151.51
TOTAL, STORED MATERIALS TO DATE $0.00
DEDUCTION FOR STORED MATERIALS USED IN WORK COMPLETED $0.00
TOTAL, COMPLETED WORK & STORED MATERIALS $218,151.51
RETAINED PERCENTAGE ( 5%) $10,907.58
TOTAL AMOUNT OF OTHER PAYMENTS OR (DEDUCTIONS) $0.00
NET AMOUNT DUE TO CONTRACTOR TO DATE $207,243.93
TOTAL AMOUNT PAID ON PREVIOUS ESTIMATES $0.00
PAY CONTRACTOR AS ESTIMATE NO. 1 $207,243.93
Certificate for Partial Payment
I hereby certify that, to the best of my knowledge and belief, all items quantities and prices
of work and material shown on this Estimate are correct and that all work has been
performed in full accordance with the terms and conditions of the Contract for this project
between the Owner and the undersigned Contractor, and as amended by any
authorized changes, and that the foregoing is a true and correct statement of the
contract amount for the period covered by this Estimate.
Contractor: ZfRiver,_MN55330
ework
83rd Circle NW, Suite B
Bya
Name Title
Date
CHECKED AND APPROVED AS TO QUANTITIES AND AMOUNT:
ENGINEER: BOLTON & MENK, INC__ 7533 SUNWOOD DRIVE, SUITE 206, RAMSEY, MN 55303
41
By 41"r 17 ✓ , PROJECT MANAGER
CODY HOLMES, P.E.
Date 6/2/2016
APPROVED FOR PAYMENT:
OWNER: CITY OF ELK RIVER, MN
By
Name Title Date
And
Name Title Date
N
Q
r
W
m
z
Z
r °D
ao
Wpop
Oo
cc4i
a z
Z .
20
Z
CD U
O W
rn O
O
o a
N
U) m
D
O O
O (D
(D N
O W
0 0
0 In
O O
O In
n O
In O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
N
W r
r Z
O O
O W
O h
N W
N n
In In
O W
W O
D N
O In
v
O O
v v
O (D
v W
O O
D v
h O�
r
O
v
O O
M v
r O
O h
0 0
v v
N 0
h v
0 0
v v
In O
h v
In (D
D
h In
N
0 0
v v
0 0
v v
0 0
v v
0 0
v v
(n
(yl
Q
2 O
In 0
N 4
v3
0 r
N
v3
v3
h r
r In
v3 v3
M N
r
Go
(D
M
O
h
O
In
M h
O N
co Go
r
r
Go
In
N
va
O
W M
va co
r
va
N
va
Zt In
v3 v3
n r
O 4
va va
W
Q
ill Q
7
�
co
E fl
GoW
D
O
0
= W
u)
W H
H❑❑
H
H x❑❑❑❑
u)
❑
H 2
2
2 2
H H❑
H
x H
H H❑❑
u) u)
x
H x
H❑❑
W❑❑
H H
W
r
W
W LL
LL}}
LL
LL U
}}}
Z Z}
Z
LL U
LL U
U U
LLLL
} LL
U LL
LL LL
U❑
LL U
LL Z}
x
Z }
x
LL LL
J
p
W F
w x
D H
x z
H J
0
U d
z
d J
z a
J W
w DD
D U
x
U U
0 0
p,
u)
0 a
u) W
z a
J W
a a
W W
O Z
u) J
O O
u) u)
a Z
W J
z z
J J
w w
a O
W 2
z a
J W
z
J 0
x U
U a
p
00
z 0
J 0
Q Z
J
J
J J
W
d
O
(D
(D O
O (D
W r
0 h
0 0
0 In
C7 0
In r
W O
r O
O Q)
O O
N O
O O
O O
M M
W In
0 0
0 0
0 0
0 0
0
7
WQ
In N
O
N M
p h
N
Lo O
O
N
N
N
O
N O
In
O
m N
D
O OO
O O
O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O O
O
O
w r
r Z
o 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0 0
v3 v3
0
vi
W
2 O
Q
w Q
Lu
W
W
❑❑
x❑❑❑
❑Z
❑
>>
uu}}LL
x
w❑❑
fn
Ux
WWLLLL
LL U}
)
ZZ
00
0
LL0LL000LLLL}
LL
U
LL LL
U =)
U❑❑
LL
LL LL Z},Z}LLLL
x
x
O
W r
wx
H
x Z
H J
00
w o
0 Z
0 J
Z a
J w
w x
U
x x
U U~~
0
u) ~
0 a
u) W
Z a
J W
a a
W W
0 Z
0 J
0
w o
a Z
W J
Z z
J J��
w w
a 0
W 2
z a
J W
z
J 0
x U
U a
00
Z O
J 0
W
Q Z
J
J
J J
W
d
a
N O
Lu
0
00
0 0
O O
0 0
o't
O W
0 0
h N
h O
0 0
O O
In O
0 0
In O
h o
0 0
O In
In In
0 0
In In
N h
0 0
O O
O In
0 0
In In
N W
0 0
O O
O O
0 0
O O
D)
0 0
O O
O h
0 0
O O
G
0 0
O O
O W
0 0
O O
N In
0 0
O O
O In
0 0
O O
O O
0 0
O O
O O
0 0
In O
O In
0 0
O O
D>
0 0
O O
In In
0 0
(D co
�
0 0
r (D
D>
0
M
(fl
W r
r Z
O N
O n
(D N
h M
h D)
h D
N N
Q O
M N
r N
(D
M (D
h O
M W
r 0
O W
h W
In In
(D r
N h
In
r In
c7 0
In OD
h N
- N
r W
N O
h h
N c7
O O
In N
In D)
D»
(D r
W Q
In N
h r
cm
r N
co h
h In
In
cm
c7 (D
O M
cm
O O
W h
7
fD
Q
In D)
4 r
V3 Go
r O
N Go
r M'zt
O
r (D
h 4
O N
v3
N v3
co r
In
r (D
O O
4 n
v3
n
M r
(D N
O
to In
m
r2 O
N v3
v3
v3 v3
v3 v3
v3
v3 �
Go
v3 r
v3
v3 co
v3
r h
v3 v3
� Go
v3
v3
v3
co
v3 v3
N r
v3 v3
v3 v3
r N
v3 v3
v3 v3
v3
v3 v3
v3 v3
N Go
v3
v3 N
v3
v3
N
Lo
F 2
Q
W
m
N
W
UW
W H
H❑❑
H
H❑❑❑
2
u)}}}ZZ}Z
❑
H 2
H x
x 2
H H❑
H
2 H
H H
D
x�
u- x�
❑
❑ W
❑ ❑
u- u-
Q
<0
0!
w x
W LLLL}}LLLLU
x Z
o
z
z a
w
LLULLUUULLLL}LLULLLLLLu)u)U❑LLU
O a
Z a
a a
O Z
o
a z
z z
w w
a O
z a
LLZ}�Z}LLu-
z x
O
x
z O
F r
�
J
o
u) u)
o
cn J
J w�
x
U
x x��
00
O,
u)
u) W
J W
W W
0 J
o
w o
W J
J J��
W 2
J W
J 0
x
U a
O
00
J 0
Q Z
Q
J
r (D
(D zt
n O
In O
Inr
J
r h
In In
O In
O h
O r
W r
r
M
N W
N In
O O
J J
r r
N In
h In
O O
O In
W
(D
F D
(n O
W
In
In N
co
O r
h r
W o
co
h
(D
(D (D
r
r (D
N
M O
M h
N
M
r h
`M M
O N
N M
h
(D M
co
(D N
co Nco
O h
In
O
O In
M
N
h M
M Q)
r V
Z
O O
O O
O O
O n
O
L6 v3
O O
O r
In
W v3
v3
O O
r co
In
v v3
O O
O M
In
v3 v3
O O
In O
W O
N N
v3 N
v3
O O
O In
In (D
(D N
co v3
r
O O
In In
(D In
N (D
v3 v3
O O
O O
h
O r
v3
v3
O
N
N In
co In
In O
v3 r
v3
O O
In O
O O
c7 r
v3 h
N
O O
O O
c7 O
In
In
v3 v3
O O
O O
O h
c7 O
In W
N v3
O O
co 0
(D O
v3 co
v3
O O
0 0
In (D
O�
v3
v3
O O
0 0
(D In
co co
(D v3
v3
O O
0 In
In
h (D
v3
v3
O O
O O
O O
In m
D)
^
O O
O O
In N
n W
v3 v3
O O
In O
In
v D
v3
O O
r 0
v3 v
O O
0 0't
In *
N r
v3 In
v3
O n
co
co O
v3 v3
In O
(D r
O (D
v3 v3
a
NN
Go
v3
m
v3
v3
v3 v3
r
o
mN
Z
7
� a
O
Z
W
m j�:
Q
W
�5
W d
i�: U
Q
Lu
x
[
u) m
x
r
O
d
w
J N
W
m
m
r
❑
Q LL,
>-
J
w x
m
❑
0
LL
u)
u) X
5
J
a
C.7
z
C.7
u)
❑
JOS
O
W
a
W
r
mZz
J 0
Z
W W
a
H W
u)
❑
N N
Z
_
m
d
>
U
U
x
a J
w
d
>
J
U`�
a U
W jZ
T
c7
a
U
m
N N
co
u)
LU U}
~}
0
W
�0m<<
�-
W
>
W
W
z W
(iu)j0z
UX
u)m
T
W
�d
>>
u)
O
u)HHOO
u)0C7rx
YOd
zww
D—
T
Hd
d
Z
~Za
0 a
J
U(�zT
U-
p
a
W
a
J o2)
Z_
Hg
D
(.7m
mo
O
m
U
ax0"�x
W
J N
a
J
W
C:S
❑
W ❑❑U
❑
Ow0~(.'3
mea>mLL
a W
a
W
g z
ZUW
p
>
��
Z❑
Y
U
m W
W
ZZ
(�(�J
LL
U
xw
m
W
JN0
0co
m
J
Nm
r J
Z
W-
HY
ZwOop
amZZZ
W d❑>a('3�u)�Q
a
Z
U
❑ a-
❑m
W
Yd
U>
W JaZJ05
axaamxg0
❑
m
D 0
J
W
cn cn
W W
Z
Om
m
Z
mz,
W
d
0
Nm2m
H
a
z
O
mU���UwpaXOu)mm
�Z❑❑❑Z
W
W-
U
fi x
W a
W W
�n�J
pa
W
W
u)W
~
W
}
x
xU❑
W U
Z❑
2
❑U
Z
❑❑�
W W
ZZ-u)H
o
(7
ww
}-
Z0
Z
}
0,
u)
[L
0
W
�Z
O
W Y
❑
O��
H
W
W W
W (.'3
H H
�n
T
an d
W a
a
W�
H
W W
a W
Z
a w
U U
0
W W
W m�
U
L
�
❑
x U
z J
Ho
C3
a z
T O
z W
U m
W W
m--
m
W
W W
Q Z
Z
❑—aa
a N
(D (3
o
d d
add
a J
d�
a LL
Ci W�
a
J
W W
U mw
U W
,U
Q RLLj
Z❑
W
L u
0
X5
Ja
m Q
m 0
0 0
o Z
>>
o O
0 m
x x
(.'3 (.'3
w w
o<
m x
O x
O U
w z
x�
w w
LL (3
O Z
LL x��
Z
O❑❑
O
p p
W
O J
m W
W W
W a
J J
a a
J
W O❑
m a
H
('j ('j
d d
}}
O U
^❑
W❑
U O
❑W
❑ u)
--
J
W m~
J O,
❑W W
O W
Lu
W
U
�0
Nh
O O
mmmxcnwom
O O
M In
O O
In C2
O r
M
N N(D
0
In
cncnaa���z
h h
o o
In In
0 0
W r
o 0*
Or
W M
h
Na�ainUdHaz§§HLLmd(n0
r N
r O
co
N N
O N
(D
O O
M W
M r
N M
o o
In �
0 0
n n
0 0
co M�
N In
op
N
N M
0 In
co h
nLLU
M W
m o
co
n
In
N O
In
nw�U
N m
O N
In In
N m
op
N N
r
O
0
Z Z
N O
O
O O
O O
O O
O O
O O
O O
r r
N
M (D
N co
r O
In
o o
In In
o o
In In
N M
In In
M M
In In
- In
In In
In In
In In
(D (D
In In
(D h
In In
h In
In N
h h
In In
h h
In In
h h
In In
W W
In In
N N
N N
N N
N N
N N
N N
N N
N N
N N
N N
N N
N N
N N
N N
N N
N N
N N
N N
N
N N
N N
N N
N N
W6
r N
coIn
(D
h co
O O
r N
M
In (D
h W
O O
N
co
In (D
h W
O O
N
M
In (D
h W
O O
N
M
In (D
r Z
r N
N co
N N
N N
N N
N
M M
M M
M M
M M
M